Search NASA⌕ Search

SEARCH · Search NASA

Results for “sequence design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

DeMAID/GA an Enhanced Design Manager's Aid for Intelligent Decomposition

Many companies are looking for new tools and techniques to aid a design manager in making decisions that can reduce the time and cost of a design cycle. One tool is the Design Manager's Aid for Intelligent Decomposition (DeMAID). Since the initial public release of DeMAID in 1989, much research has been done in the areas of decomposition, concurrent engineering, parallel processing, and process management; many new tools and techniques have emerged. Based on these recent research and development efforts, numerous enhancements have been added to DeMAID to further aid the design manager in saving both cost and time in a design cycle. The key enhancement, a genetic algorithm (GA), will be available in the next public release called DeMAID/GA. The GA sequences the design processes to minimize the cost and time in converging a solution. The major enhancements in the upgrade of DeMAID to DeMAID/GA are discussed in this paper. A sample conceptual design project is used to show how these enhancements can be applied to improve the design cycle.

Rogers, J. L.↗

Preliminary design of an Orbiter/IUS separation sequence

An orbiter/IUS separation sequence to satisfy the assumed requirements of Shuttle Flight 8 was defined for the purpose of gaining an insight into the flight design software requirements. The key to economical and effective flight design for orbiter/IUS proximity operations is considered to be the capability for rapid and accurate generation of graphical displays that will facilitate not only decision making on the part of the designer, but also lucid documentation of rationale and the resulting design features. The data indicate that (1) an OMS burn is required to attain the necessary velocity without subjecting the IUS and its payload to undue plume impingement, and (2) a departure trajectory that places the orbiter above and behind the IUS at SRM ignition time is preferred over the alternative which would place it below and ahead.

Wilson, S. W.↗

Multi-Maneuver Clohessy-Wiltshire Targeting

Orbital rendezvous involves execution of a sequence of maneuvers by a chaser vehicle to bring the chaser to a desired state relative to a target vehicle while meeting intermediate and final relative constraints. Intermediate and final relative constraints are necessary to meet a multitude of requirements such as to control approach direction, ensure relative position is adequate for operation of space-to-space communication systems and relative sensors, provide fail-safe trajectory features, and provide contingency hold points. The effect of maneuvers on constraints is often coupled, so the maneuvers must be solved for as a set. For example, maneuvers that affect orbital energy change both the chaser's height and downrange position relative to the target vehicle. Rendezvous designers use experience and rules-of-thumb to design a sequence of maneuvers and constraints. A non-iterative method is presented for targeting a rendezvous scenario that includes a sequence of maneuvers and relative constraints. This method is referred to as Multi-Maneuver Clohessy-Wiltshire Targeting (MM_CW_TGT). When a single maneuver is targeted to a single relative position, the classic CW targeting solution is obtained. The MM_CW_TGT method involves manipulation of the CW state transition matrix to form a linear system. As a starting point for forming the algorithm, the effects of a series of impulsive maneuvers on the state are derived. Simple and moderately complex examples are used to demonstrate the pattern of the resulting linear system. The general form of the pattern results in an algorithm for formation of the linear system. The resulting linear system relates the effect of maneuver components and initial conditions on relative constraints specified by the rendezvous designer. Solution of the linear system includes the straight-forward inverse of a square matrix. Inversion of the square matrix is assured if the designer poses a controllable scenario - a scenario where the the constraints can be met by the sequence of maneuvers. Matrices in the linear system are dependent on selection of maneuvers and constraints by the designer, but the matrices are independent of the chaser's initial conditions. For scenarios where the sequence of maneuvers and constraints are fixed, the linear system can be formed and the square matrix inverted prior to real-time operations. Example solutions are presented for several rendezvous scenarios to illustrate the utility of the method. The MM_CW_TGT method has been used during the preliminary design of rendezvous scenarios and is expected to be useful for iterative methods in the generation of an initial guess and corrections.

Dannemiller, David P.↗

Program Helps To Optimize Assembly Sequences

FAST project-management software tool designed to optimize sequence of assembly of Space Station Freedom. Assesses effects of detailed changes upon system and produces output metrics identifying preferred assembly sequences. Incorporates Space-Shuttle integration, Space-Station hardware, on-orbit operations, and governing programmatic considerations as either precedence relations or numerical data. Written in C language.

Borden, Chester S.↗

Interuser Interference Analysis for Direct-Sequence Spread-Spectrum Systems Part I: Partial-Period Cross-Correlation

This presentation discusses an analysis approach to evaluate the interuser interference for Direct-Sequence Spread-Spectrum (DSSS) Systems for Space Network (SN) Users. Part I of this analysis shows that the correlation property of pseudo noise (PN) sequences is the critical factor which determines the interuser interference performance of the DSSS system. For non-standard DSSS systems in which PN sequence s period is much larger than one data symbol duration, it is the partial-period cross-correlation that determines the system performance. This study reveals through an example that a well-designed PN sequence set (e.g. Gold Sequence, in which the cross-correlation for a whole-period is well controlled) may have non-controlled partial-period cross-correlation which could cause severe interuser interference for a DSSS system. Since the analytical derivation of performance metric (bit error rate or signal-to-noise ratio) based on partial-period cross-correlation is prohibitive, the performance degradation due to partial-period cross-correlation will be evaluated using simulation in Part II of this analysis in the future.

Ni, Jianjun (David)↗

Robotics

Lunar robotic functions include: 1. Transport of crew and payloads on the surface of the moon; 2. Offloading payloads from a lunar lander; 3. Handling the deployment of surface systems; with 4. Human commanding of these functions from inside a lunar vehicle, habitat, or extravehicular (space walk), with Earth-based supervision. The systems that will perform these functions may not look like robots from science fiction. In fact, robotic functions may be automated trucks, cranes and winches. Use of this equipment prior to the crew s arrival or in the potentially long periods without crews on the surface, will require that these systems be computer controlled machines. The public release of NASA's Exploration plans at the 2nd Space Exploration Conference (Houston, December 2006) included a lunar outpost with as many as four unique mobility chassis designs. The sequence of lander offloading tasks involved as many as ten payloads, each with a unique set of geometry, mass and interface requirements. This plan was refined during a second phase study concluded in August 2007. Among the many improvements to the exploration plan were a reduction in the number of unique mobility chassis designs and a reduction in unique payload specifications. As the lunar surface system payloads have matured, so have the mobility and offloading functional requirements. While the architecture work continues, the community can expect to see functional requirements in the areas of surface mobility, surface handling, and human-systems interaction as follows: Surface Mobility 1. Transport crew on the lunar surface, accelerating construction tasks, expanding the crew s sphere of influence for scientific exploration, and providing a rapid return to an ascent module in an emergency. The crew transport can be with an un-pressurized rover, a small pressurized rover, or a larger mobile habitat. 2. Transport Extra-Vehicular Activity (EVA) equipment and construction payloads. 3. Transport habitats and power modules over long distances, pre-positioning them for the arrival of crew on a subsequent lander. Surface Handling 1. Offload surface system payloads from the lander, breaking launch restraints and power/data connections. Payloads may be offloaded to a wheeled vehicle for transport. 2. Deploy payloads from a wheeled vehicle at a field site, placing the payloads in their final use site on the ground or mating them with existing surface systems. 3. Support regolith collection, site preparation, berm construction, or other civil engineering tasks using tools and implements attached to rovers. Human-Systems Interaction 1. Provide a safe command and control interface for suited EVA to ride on and drive the vehicles, making sure that the systems are also safe for working near dismounted crew. 2. Provide an effective control system for IV crew to tele-operate vehicles, cranes and other equipment from inside the surface habitats with evolving independence from Earth. .. Provide a supervisory system that allows machines to be commanded from the ground, working across the Earth-Lunar time delays on the order of 5-10 seconds (round trip) to support operations when crew are not resident on the surface. Technology Development Needs 1. Surface vehicles that can dock, align and mate with outpost equipment such as landers, habitats and fluid/power interfaces. 2. Long life motors, drive trains, seals, motor electronics, sensors, processors, cable harnesses, and dash board displays. 3. Active suspension control, localization, high speed obstacle avoidance, and safety systems for operating near dismounted crew. 4. High specific energy and specific power batteries that are safe, rechargeable, and long lived.

Ambrose, Robert O.↗

Low Density Supersonic Decelerator Flight Dynamics Test-1 Flight Design and Targeting

NASA's Low Density Supersonic Decelerator (LDSD) program was established to identify, develop, and eventually qualify to Test [i.e. Technology] Readiness Level (TRL) - 6 aerodynamic decelerators for eventual use on Mars. Through comprehensive Mars application studies, two distinct Supersonic Inflatable Aerodynamic Decelerator (SIAD) designs were chosen that afforded the optimum balance of benefit, cost, and development risk. In addition, a Supersonic Disk Sail (SSDS) parachute design was chosen that satisfied the same criteria. The final phase of the multi-tiered qualification process involves Earth Supersonic Flight Dynamics Tests (SFDTs) within environmental conditions similar to those that would be experienced during a Mars Entry, Descent, and Landing (EDL) mission. The first of these flight tests (i.e. SFDT-1) was completed on June 28, 2014 with two more tests scheduled for the summer of 2015 and 2016, respectively. The basic flight design for all the SFDT flights is for the SFDT test vehicle to be ferried to a float altitude of 120 kilo-feet by a 34 thousand cubic feet (Mcf) heavy lift helium balloon. Once float altitude is reached, the test vehicle is released from the balloon, spun-up for stability, and accelerated to supersonic speeds using a Star48 solid rocket motor. After burnout of the Star48 motor the vehicle decelerates to pre-flight selected test conditions for the deployment of the SIAD system. After further deceleration with the SIAD deployed, the SSDS parachute is then deployed stressing the performance of the parachute in the wake of the SIAD augmented blunt body. The test vehicle/SIAD/parachute system then descends to splashdown in the Pacific Ocean for eventual recovery. This paper will discuss the development of both the test vehicle and the trajectory sequence including design trade-offs resulting from the interaction of both engineering efforts. In addition, the SFDT-1 nominal trajectory design and associated sensitivities will be discussed as well as an overview of the on-board flight software used to trigger and sequence the main flight events necessary to deploy the deceleration technologies. Finally, as-flown performance of the SFDT-1 system will be discussed.

Ivanov, Mark↗

NASA Tech Briefs, December 2007

Topics include: Ka-Band TWT High-Efficiency Power Combiner for High-Rate Data Transmission; Reusable, Extensible High-Level Data-Distribution Concept; Processing Satellite Imagery To Detect Waste Tire Piles; Monitoring by Use of Clusters of Sensor-Data Vectors; Circuit and Method for Communication Over DC Power Line; Switched Band-Pass Filters for Adaptive Transceivers; Noncoherent DTTLs for Symbol Synchronization; High-Voltage Power Supply With Fast Rise and Fall Times; Waveguide Calibrator for Multi-Element Probe Calibration; Four-Way Ka-Band Power Combiner; Loss-of-Control-Inhibitor Systems for Aircraft; Improved Underwater Excitation-Emission Matrix Fluorometer; Metrology Camera System Using Two-Color Interferometry; Design and Fabrication of High-Efficiency CMOS/CCD Imagers; Foam Core Shielding for Spacecraft CHEM-Based Self-Deploying Planetary Storage Tanks Sequestration of Single-Walled Carbon Nanotubes in a Polymer PPC750 Performance Monitor Application-Program-Installer Builder Using Visual Odometry to Estimate Position and Attitude Design and Data Management System Simple, Script-Based Science Processing Archive Automated Rocket Propulsion Test Management Online Remote Sensing Interface Fusing Image Data for Calculating Position of an Object Implementation of a Point Algorithm for Real-Time Convex Optimization Handling Input and Output for COAMPS Modeling and Grid Generation of Iced Airfoils Automated Identification of Nucleotide Sequences Balloon Design Software Rocket Science 101 Interactive Educational Program Creep Forming of Carbon-Reinforced Ceramic-Matrix Composites Dog-Bone Horns for Piezoelectric Ultrasonic/Sonic Actuators Benchtop Detection of Proteins Recombinant Collagenlike Proteins Remote Sensing of Parasitic Nematodes in Plants Direct Coupling From WGM Resonator Disks to Photodetectors Using Digital Radiography To Image Liquid Nitrogen in Voids Multiple-Parameter, Low-False-Alarm Fire-Detection Systems Mosaic-Detector-Based Fluorescence Spectral Imager Plasmoid Thruster for High Specific-Impulse Propulsion Analysis Method for Quantifying Vehicle Design Goals Improved Tracking of Targets by Cameras on a Mars Rover Sample Caching Subsystem Multistage Passive Cooler for Spaceborne Instruments GVIPS Models and Software Stowable Energy-Absorbing Rocker-Bogie Suspensions

Source record↗

Deep Impact comet encounter: design, development, and operations of the Big Event at Tempel 1

Deep Impact is NASA's eighth Discovery mission. This low-cost, focused planetary science investigation gathered the data necessary to help scientists unlock early secrets of our solar system. The comet encounter with Tempel 1 was a complex event - requiring extremely accurate timing, robutstness to an unknown environment, and flight team adaptability. The mission operations and flight systems performance were spectacular for approach, impact, and lookback imaging on July 4, 2005.

encounter↗

Deep Impact comet encounter: design, development, and operations of the big event at Tempel 1

Deep Impact is NASA's eighth Discovery mission. This low-cost, focused planetary science investigation gathered the data necessary to help scientists unlock early secrets of our solar system. The comet encounter with Tempel 1 was a complex event - requiring extremely accurate timing, robustness to an unknown environment, and flight team adaptibility. The mission operations and flight systems performance were spectacular for approach, impact, and lookback imaging on July 4, 2005.

sequence design↗

The Solar-B Mission: First Light, Future Plans and Community Participation

The Solar-B spacecraft was launched from the Uchinoura Space Center into a circular, sun-synchronous, polar orbit by the Japanese Aerospace Exploration Agency in late September 2006. The spacecraft carries thee scientific instruments designed to follow the flow of magnetic energy from the photosphere to the corona to improve our understanding of both steady state and transient energy release. This goal will be achieved through coordinated observations of three highly advanced solar telescopes developed cooperatively by teams from Japan, the United States and the United Kingdom. The three telescopes are a 0.5m aperture, diffraction limited, solar optical telescope (SOT), an X-ray telescope (XRT) designed for full sun imaging with 1.0 arcsec pixels and an EUV imaging spectrometer (EIS) with an order of magnitude improvement in sensitivity over past instruments. The SOT focal plane contains three instruments, a spectropolarimeter for measuring vector magnetic fields, a broadband filter imager for recording images of the photosphere and chromosphere at the highest resolution the telescope is capable of, and a narrow band filter imager that will record Doppler grams and vector magnetograms. The XRT has broad temperature coverage and a spatial a resolution three times as high as Yohkoh. EIS covers a broad range of transition region and coronal temperatures in two spectral bands. Both XRT and EIS have 2 arcsec spatial resolution (1 arcsec pixels). Instrument first light occurred after five weeks on orbit to allow for out gassing and the opening of the telescopes doors. The initial observation sequences are designed to test the functionality of the different operating modes and for calibration. After this commissioning phase is complete a series of observations are planned to demonstrate the ability of the instruments to meet NASA's mission minimum success criteria. Data is downloaded every orbit to the Norwegian high latitude ground station at Svalbard. The data are transmitted to ISAS where they are reformatted into FITS files and archived as Level 0 data on the ISAS DARTS system. Once the initial observation period is complete, approximately six months after launch, the mission data will be open and freely available to researchers shortly after receipt at the DARTS data archive hosted in Japan and at NASA s Solar Data Analysis Center at the Goddard Space Flight Center. Scientific operations will be conducted from the ISAS facility in Sagamihara, Japan and the observatory will become available for performing joint operations with both ground and space based instruments and for conducting observing programs proposed by non-team members. This process will be described together with a status report from the initial operation of the observatory, showing examples of the first observations.

Davis, John M.↗

Spacecraft development

Flight sequence, capsule design, pyrotechnic applications, escape modes, and safety features for Gemini spacecraft

SAFETY DEVICE↗

Development of Integrated Programs for Aerospace-vehicle design (IPAD): Reference design process

The airplane design process and its interfaces with manufacturing and customer operations are documented to be used as criteria for the development of integrated programs for the analysis, design, and testing of aerospace vehicles. Topics cover: design process management, general purpose support requirements, design networks, and technical program elements. Design activity sequences are given for both supersonic and subsonic commercial transports, naval hydrofoils, and military aircraft.

Meyer, D. D.↗

Shuttle program standard maneuver sequences for orbiter/upper-stage separation SSUS-A, SSUS-D, and IUS

Descriptions of standard post-ejection maneuver sequences for the deployment of IUS, SSUS-A, and SSUS-D upper stages from the space shuttle orbiter are presented. The sequences were designed to satisfy requirements for limiting the damage inflicted on the orbiter by upper-stage exhaust particles, subject to a further requirement for minimizing the impingement of orbiter thruster plumes on the deployed payload. In all cases it was assumed that the orbital maneuvering system engines would be used to apply the orbiter's major separation velocity increment.

Wilson, S. W.↗

Cable-catenary large antenna concept

Deployable to very large diameters (over 1000 ft), while still remaining compatible with a complete satellite system launch by STS, the cable-catenary antenna comprises: 8 radial deployable boom masts; a deployable hub and feed support center mast; balanced front and back, radial and circumferential catenary cabling for highly accurate (mm) surface control; no interfering cabling in the antenna field; and an RF reflecting mesh supported on the front catenaries. Illustrations show the antenna-satellite system deployed and stowed configurations; the antenna deployment sequence; the design analysis logic; the sizing analysis output, and typical parametric design data.

Akle, W.↗