Space shuttle Production Verification Motor 1 (PV-1) static fire

All inspection and instrumentation data indicate that the PV-1 static test firing conducted 18 Aug. 1988 was successful. With the exception of the intentionally flawed joints and static test modifications, PV-1 was flight configuration. Fail-safe flaws guaranteeing pressure to test the sealing capability of primary O-rings were included in the aft field joint, case-to-nozzle joint, and nozzle internal Joint 5. The test was conducted at ambient conditions, with the exception of the field joints and case/nozzle joints which were maintained at a minimum of 75 F. Ballistics performance values were within specification requirements. The PV-1 motor exhibited chamber pressure oscillations similar to previously tested Space Shuttle redesigned solid rocket motors, particularly QM-7. The first longitudinal mode oscillations experienced by PV-1 were the strongest ever measured in a Space Shuttle motor. Investigation into this observation is being conducted. Joint insulation performed as designed with no evidence of gas flow within unflawed forward field joints. The intentionally flawed center and aft case field joint insulation performance was excellent. There was no evidence of hot gas past the center field joint capture feature O-ring, the case-to-nozzle joint primary O-ring, or the aft field joint primary O-ring. O-ring seals and barriers with assured pressure at the flaws showed erosion and heat effect, but all sealed against passage of hot gases with the exception of the aft field joint capture feature O-ring. There was no evidence of erosion, heat effect, or blowby on any O-ring seals or barriers at the unflawed joints. Nozzle performance was nominal with typical erosion. Post-test examination revealed that the forward nose ring was of the old high performance motor design configuration with the 150-deg ply angle. All nozzle components remained intact for post-test evaluation. The thrust vector control system operated correctly. The water deluge system, CO2 quench, and other test equipment performed as planned during all required test operations.

Source record↗

The development and application of aerodynamic uncertainties: And flight test verification for the space shuttle orbiter

The approach used in establishing the predicted aerodynamic uncertainties and the process used in applying these uncertainties during the design of the Orbiter flight control system and the entry trajectories are presented. The flight test program that was designed to verify the stability and control derivatives with a minimum of test flights is presented and a comparison of preflight predictions with preliminary flight test results is made. It is concluded that the approach used for the Orbiter is applicable to future programs where testing is limited due to time constraints or funding.

Gamble, J. D.↗

Definition of ground test for verification of large space structure control

Directions regarding the analytical models were received. A counter balance arm with weights was added at the top of the ASTROMAST to offset the arm with the gimbals. In addition to this model, three more models were requested from MSFC: structure as in the revised model with the addition of lumped masses at bays 46 and 91 of the ASTROMAST; cantilevered cruciform structure with lumped masses at bays 46 and 91, and an all up cruciform structure with lumped masses at bays 46 and 91. Figures for each model and their corresponding natural frequencies and general mode shapes associated with these frequencies are included. The drawbar in use in the cruciform models must be incorporated into the antenna and ASTROMAST models. The total tensile load carrying capability of the ASTROMAST is approximately 840 pounds.

Seltzer, S. M.↗

Multiple Boundary Condition Tests (MBCT) for verification of large space structures

The Multiple Boundary Condition Tests (MBCT) approach is evaluated and recent modifications are described. For the application of MBCT, 12 different boundary conditions are selected and the results of applying MBCT in conjunction with a nonlinear formulation are indicated schematically. It is concluded that the nonlinear formulation enhances the ability to implement the MBCT test approach on large space structures which cannot be ground tested without the artificial boundary conditions incorporated in MBCT. In addition, it leads to significant improvements in the convergence to the correct solution.

Wada, B. K.↗

Verification of large space structures using scale modelling laws

The feasibility of testing large space structures in 1-g environment for the purpose of verifying its performance requirement is considered. Because of the difference in test objectives as compared to the conventional structural systems, the scale modelling laws are examined. The investigation is performed on a generic structural element, a space beam. A preliminary conclusion is obtained based on the results.

Chen, J.-C.↗

O-ring sealing verification for the space shuttle redesign solid rocket motor

As a part of the redesign of the Space Shuttle Solid Rocket Motor, the field and nozzle-to-case joints were redesigned to minimize the dynamic flexure caused by internal motor pressurization during ignition. The O-ring seals and glands for the joints were designed to accommodate both structural deflections and to promote pressure assistance. A test program was conducted to determine if a fluorocarbon elastomeric O-ring could meet this criteria in the redesigned gland. Resiliency tests were used to investigate the O-ring response to gap motion while static seal tests were used to verify design criteria of pressure assistance for sealing. All tests were conducted in face seal fixtures mounted in servo-hydraulic test machines. The resiliency of the O-ring was found to be extremely sensitive to the effects of temperature. The External Tank/Solid Rocket Booster attach strut loads had a negligible affect on the ability of the O-ring to track the simulated SRB field joint deflection. In the static pressure-assisted seal tests, as long as physical contact was maintained between the O-ring and the gland sealing surface, pressure assistance induced instantaneous sealing.

Lach, Cynthia L.↗

Design of ground test suspension systems for verification of flexible space structures

A simple model demonstrates the frequency-increasing effects of a simple cable suspension on flexible test article/suspension systems. Two passive suspension designs, namely a negative spring mechanism and a rolling cart mechanism, are presented to alleviate the undesirable frequency-increasing effects. Analysis methods are provided for systems in which the augmentations are applied to both discrete and continuous representations of test articles. The damping analyses are based on friction equivalent viscous damping. Numerical examples are given for comparing the two augmentations with respect to minimizing frequency and damping increases.

Cooley, V. M.↗

Structural Verification of the Space Shuttle's External Tank Super LightWeight Design: A Lesson in Innovation

The Super LightWeight Tank (SLWT) team was tasked with a daunting challenge from the outset: boost the payload capability of the Shuttle System by safely removing 7500 lbs. from the existing 65,400 lb. External Tank (ET). Tools they had to work with included a promising new Aluminum Lithium alloy, the concept of a more efficient structural configuration for the Liquid Hydrogen (LH2) tank, and a highly successful, mature Light Weight Tank (LWT) program. The 44 month schedule which the SLWT team was given for the task was ambitious by any measure. During this time the team had to not only design, build, and verify the new tank, but they also had to move a material from the early stages of development to maturity. The aluminum lithium alloy showed great promise, with an approximately 29% increase in yield strength, 15% increase in ultimate strength, 5 deg/O increase in modulus and 5 deg/O decrease in density when compared to the current 2219 alloy. But processes had to be developed and brought under control, manufacturing techniques perfected, properties characterized, and design allowable generated. Because of the schedule constraint, this material development activity had to occur in parallel with design and manufacturing. Initial design was performed using design allowable believed to be achievable with the Aluminum Lithium alloy system, but based on limited test data. Preliminary structural development tests were performed with material still in the process of iteration. This parallel path approach posed obvious challenges and risks, but also allowed a unique opportunity for interaction between the structures and materials disciplines in the formulation of the material.

Otte, Neil↗

Verification of International Space Station Component Leak Rates by Helium Accumulation Method

Discovery of leakage on several International Space Station U.S. Laboratory Module ammonia system quick disconnects (QDs) led to the need for a process to quantify total leakage without removing the QDs from the system. An innovative solution was proposed allowing quantitative leak rate measurement at ambient external pressure without QD removal. The method utilizes a helium mass spectrometer configured in the detector probe mode to determine helium leak rates inside a containment hood installed on the test component. The method was validated through extensive developmental testing. Test results showed the method was viable, accurate and repeatable for a wide range of leak rates. The accumulation method has been accepted by NASA and is currently being used by Boeing Huntsville, Boeing Kennedy Space Center and Boeing Johnson Space Center to test welds and valves and will be used by Alenia to test the Cupola. The method has been used in place of more expensive vacuum chamber testing which requires removing the test component from the system.

Underwood, Steve D.↗

Using Life-Cycle Human Factors Engineering to Avoid $2.4 Million in Costs: Lessons Learned from NASA's Requirements Verification Process for Space Payloads

The Human Factors Implementation Team (HFIT) process has been used to verify human factors requirements for NASA International Space Station (ISS) payloads since 2003, resulting in $2.4 million in avoided costs. This cost benefit has been realized by greatly reducing the need to process time-consuming formal waivers (exceptions) for individual requirements violations. The HFIT team, which includes astronauts and their technical staff, acts as the single source for human factors requirements integration of payloads. HFIT has the authority to provide inputs during early design phases, thus eliminating many potential requirements violations in a cost-effective manner. In those instances where it is not economically or technically feasible to meet the precise metric of a given requirement, HFIT can work with the payload engineers to develop common sense solutions and formally document that the resulting payload design does not materially affect the astronaut s ability to operate and interact with the payload. The HFIT process is fully ISO 9000 compliant and works concurrently with NASA s formal systems engineering work flow. Due to its success with payloads, the HFIT process is being adapted and extended to ISS systems hardware. Key aspects of this process are also being considered for NASA's Space Shuttle replacement, the Crew Exploration Vehicle.

Carr, Daniel↗

International Space Station Requirement Verification for Commercial Visiting Vehicles

The COTS program demonstrated NASA could rely on commercial providers for safe, reliable, and cost-effective cargo delivery to ISS. The ISS Program has developed a streamlined process to safely integrate commercial visiting vehicles and ensure requirements are met Levy a minimum requirement set (down from 1000s to 100s) focusing on the ISS interface and safety, reducing the level of NASA oversight/insight and burden on the commercial Partner. Partners provide a detailed verification and validation plan documenting how they will show they've met NASA requirements. NASA conducts process sampling to ensure that the established verification processes is being followed. NASA participates in joint verification events and analysis for requirements that require both parties verify. Verification compliance is approved by NASA and launch readiness certified at mission readiness reviews.

Garguilo, Dan↗

Space Station integration and verification concepts

The TAVERNS concept for the integration, verification, and maintenance of the Space Station avionics and payload systems is described. The functional requirements which TAVERNS integrates are discussed, showing the mode of integration and the flight systems integration. The top and bottom TAVERNS sections are described, and the use of TAVERNS to develop software required for flight applications and testing is discussed.

Chevers, Edward S.↗

Methodologies for Verification and Validation of Space Launch System (SLS) Structural Dynamic Models: Appendices

Verification and validation (V&V) is a highly challenging undertaking for SLS structural dynamics models due to the magnitude and complexity of SLS subassemblies and subassemblies. Responses to challenges associated with V&V of Space Launch System (SLS) structural dynamics models are presented in Volume I of this paper. Four methodologies addressing specific requirements for V&V are discussed. (1) Residual Mode Augmentation (RMA). (2) Modified Guyan Reduction (MGR) and Harmonic Reduction (HR, introduced in 1976). (3) Mode Consolidation (MC). Finally, (4) Experimental Mode Verification (EMV). This document contains the appendices to Volume I.

Coppolino, Robert N.↗

Dynamic verification of very large space structures

A research program in spacecraft structures, structural dynamics, and controls verification using a relatively large, flexible beam as a focus is introduced. This research effort addresses fundamental problems applicable to the verification of large, flexible space structures and combines ground tests, flight behavior prediction, and instrumented orbital tests. The program is expected to produce quantitative results for use in improving the validity of ground tests for verifying flight performance analyses.

Hanks, B. R.↗