Search NASA⌕ Search

SEARCH · Search NASA

Results for “spin navigator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

62 records · Page 4

Spacecraft/Rover Hybrids for the Exploration of Small Solar System Bodies: Final Report: NASA NIAC - Phase II Study

This study investigated a mission architecture that allows the systematic and affordable in-situ exploration of small solar system bodies, such as asteroids, comets, and Martian moons (Figure 1). The architecture relies on the novel concept of spacecraft/rover hybrids,which are surface mobility platforms capable of achieving large surface coverage (by attitude controlled hops, akin to spacecraft flight), fine mobility (by tumbling), and coarse instrument pointing (by changing orientation relative to the ground) in the low-gravity environments(micro-g to milli-g) of small bodies. The actuation of the hybrids relies on spinning three internal flywheels. Using a combination of torques, the three flywheel motors can produce a reaction torque in any orientation without additional moving parts. This mobility concept allows all subsystems to be packaged in one sealed enclosure and enables the platforms to be minimalistic. The hybrids would be deployed from a mother spacecraft, which would act as a communication relay to Earth and would aid the in-situ assets with tasks such as localization and navigation (Figure 1). The hybrids are expected to be more capable and affordable than wheeled or legged rovers, due to their multiple modes of mobility (both hopping and tumbling), and have simpler environmental sealing and thermal management (since all components are sealed in one enclosure, assuming non-deployable science instruments). In summary, this NIAC Phase II study has significantly increased the TRL (Technology Readiness Level) of the mobility and autonomy subsystems of spacecraft/rover hybrids, and characterized system engineering aspects in the context of a reference mission to Phobos. Future studies should focus on improving the robustness of the autonomy module and further refine system engineering aspects, in view of opportunities for technology infusion.

mobility platforms↗

Bootstrapping Multi-Agent Unmanned Aerial Vehicle (UAV) System Integration Using Ground-Based Assets: Lessons Learned

The highly dynamic nature of UAVs imposes significant challenges when conducting initial testing ranging from safety risks posed by high-capacity lithium batteries and spinning propellers to rigorous timing demands on controllers and the consequences of failures mid-air. Flight testing of a single vehicle is time and labor intensive due to these challenges and more, and the complexity increases exponentially with the number of vehicles. While simulations and hardware-in-the-loop bench testing can provide adequate environments for preliminary validation, differences in system deployment architecture, software interfaces, and hardware infrastructure between simulation and a fleet of real UAVs create a sizable gap that must be navigated carefully during system integration. In support of the Autonomy Teaming and TRAjectories for Complex Trusted Operational Reliability (ATTRACTOR) project, which had the goal of establishing a basis of certification of trust and trustworthiness in multi-agent autonomous systems, this gap was tackled from two directions. First, a novel mixed-reality simulation environment was engineered to blur the transition from simulation to flight hardware. Second, a fleet of Unmanned Surface Vehicles (USVs) was developed as a test and evaluation platform that more closely represented the final aerial fleet while eliminating many of the risks associated with air vehicles. This paper delves into the second element, analyzing the efficacy of the USV platform in performing system integration testing for the UAV system. In this paper we present the USV fleet and its role in reducing the aforementioned gaps in deployment architecture, software interfaces, and hardware infrastructure when moving from simulation to flight. An overview of the hardware and software onboard the vehicles will be provided along with supporting infrastructure. The system integration process will be documented including results in supporting both the overarching design reference mission (DRM) of ATTRACTOR and individual research efforts conducted during the project. Finally, we will discuss some of the practical lessons learned regarding the testing, deployment, and operation of multi-agent autonomous systems.

Matthew P Vaughan↗

Recent Results from Dragonfly Testing/Analysis as we head to PDR

Dragonfly is a relocatable lander mission to Saturn's moon Titan4, which as well as being a target of out-standing astrobiological interest as an organic-rich Ocean World, has the combination of low gravity (1/7 that of Earth) and a thick atmosphere (4x the density of Earth), making it an environment uniquely suitable for flight. Thus, the Dragonfly lander (similar in size to the Curiosity Mars rover) can take off using lift from a set of eight rotors and fly to a new landing site several kilometers away. The ability to perform such flights, lasting approximately 30 minutes, every month or so on Titan brings unprecedented mobility to planetary exploration, on a world known to have a diverse land-scape of dunes, craters and other features. Dragonfly is planned to launch in 2027, and following a nearly seven year interplanetary cruise would arrive at Titan by 2034. Due to the large scale height of the Titan atmosphere, Entry, Descent, and Landing (EDL) will be prolonged affair, taking nearly two hours to reach the surface. The ballistic entry environments that Dragonfly will be subjected to are fairly similar to that experienced by recent Mars missions; peak heating on the aeroshell will be about 300 W/sq.cm and peak deceleration is about 10g’s. Following the five minute entry segment, much of the remaining time is spent descending on the drogue and main para-chutes, which carry the dual role of decelerating the spacecraft and stabilizing the system during the long descent. While on one hand, this leisurely EDL sequence affords a relaxed timeline and plenty of time for event staging, it also provides ample opportunity for small disturbances to grow into potential flight safety risks, adding emphasis to the need for careful modeling, simulation and testing of key dynamic events. About two hours after entering the atmosphere, the nearly one metric ton rotocraft will be lowered approximately one meter out of the backshell (the ‘pose’ maneuver) to expose all eight rotors. The rotors will then be used to arrest any residual spin rate and prepare the system for transition to powered flight. Once despin is complete and the lander reaches a target altitude of 1.2 km above the surface (as verified by on-board lidar), the lander will be released and free fall for approximately one second before beginning controlled free flight. This entire “preparation for powered flight” process takes place over several minutes while the system is subject to the dynamic environment produced by so-called “wrist-mode” oscillations as the lander and backshell swing on the main parachute. Once in free flight, the lander will engage on-board terrain relative navigation to locate and navigate to a safe landing zone in the Shangri-La dune field south of Selk crater. Communication during this sequence will be limited to a series of direct-to-Earth X-band tones signalling key events and providing forensic information. Once on the ground, the lander will begin to send additional information, including data collected during this EDL sequence by the on-board Dragonfly Entry Aerosciences Measurements (DrEAM) instrumentation suite. This presentation will walk through the entry to first landing timeline in more detail, with a focus on recent analysis and testing results that inform system performance, margins and residual risk estimation.

Dragonfly↗

Preliminary results of the satellite orbit determination of Mariner Mars 1971.

The preflight planning and real-time experience relating to the navigation of the first artificial satellite placed about a distant planet is presented. Results of determining the orbit of Mariner 9 are presented and contrasted against the preflight simulation test results. It is concluded that the position of Mariner 9 was located to 40 km before coefficients of the gravity field of Mars were estimated. The planet Mars has been found to be 3 to 4 times gravitationally rougher than expected, with the dominant features, the 2nd order tesserals C22 and S22, causing the orbital period of Mariner 9 to oscillate with an amplitude of 40 seconds and a wavelength of 19.5 days. The direction of the Mars spin axis has been relocated from the Camichel-Burton value by 1/2 degree.

Jordan, j. F.↗

Nozomi Cis-Lunar Phase Orbit Determination

Japan's Institute of Space and Astronautical Science (ISAS) launched Nozomi, its first mission to the planet Mars using the newly developed M-V launch vehicle on July 3, 1998. Scientific objectives of the mission are to study the structure and dynamics of the Martian upper atmosphere and its interaction with the solar wind. Nozomi is a cooperative mission between ISAS and the National Aeronautics and Space Administration (NASA). The NASA contribution includes navigation and tracking services provided by the Jet Propulsion Laboratory (JPL). The spacecraft also serves as an engineering demonstration of basic technology for planetary exploration. One of the new technologies was a unique trajectory, developed by ISAS, which used solar gravitational perturbations at the weak stability boundary as an aid to achieve an Earth-Mars transfer orbit. This trajectory saves approximately 120 m/s of Delta V compared to direct hyperbolic insertion and is considered an enabling technology for the mission. Nozomi was the first spacecraft to employ this trajectory and provided on-orbit validation of the technique. The trajectory was achieved by initially placing the spacecraft in a highly elliptical cis-lunar phasing orbit. Six maneuvers were performed during this period to correct injection errors and target an outbound lunar swingby in September 1998. The gravity assist from the lunar swingby raised apogee to the vicinity of the weak stability boundary. After three more targeting maneuvers, Nozomi performed an inbound lunar swingby followed immediately by a powered Earth swingby in late December 1998. A 420 m/s Trans Mars Insertion (TMI) burn at the final Earth periapsis was intended to place the spacecraft on a heliocentric trajectory leading to Mars orbit insertion in October 1999. Orbit determination for Nozomi is performed in parallel by both ISAS and the Multi-Mission Navigation (MMNAV) group at JPL. This was an advantage for the mission because each group would generate solutions based on data collected from their respective tracking networks. Spacecraft events, such as sequence uplinks and maneuvers, were generally scheduled during passes at the Usuda tracking station in Japan. As a result, maneuver design and reconstruction was derived from MMNAV solutions based on JPL tracking data obtained immediately prior to or following maneuvers. Data was also exchanged between ISAS and MMNAV so orbit determination could be performed on joint data sets in support of critical targeting late in the cis-lunar phase. In this paper, information regarding the MMNAV orbit determination effort for the first six months of the mission is presented. The spacecraft trajectory is characterized first, followed by a discussion of the orbit determination estimation procedure and models. Results from selected orbit solutions are presented and compared against reconstructed trajectories. One area of emphasis in this paper is orbit determination in the vicinity of the weak stability boundary. Precise navigation was necessary to target the second lunar swingby and the powered Earth swingby. Delivery accuracy of 150 m was required for these critical encounters, but a number of factors contributed to the general degradation of orbit determination accuracy. This included the fact that the spacecraft was at apogee, at a range of 1.7 million km and moving at less than I km/sec perpendicular to the line of sight. Nozomi was also close to zero degrees declination where there are known limitations on orbit determination performance. Finally, S-band tracking data was acquired through the Nozomi backup low gain antenna. This antenna is offset from the axis of this spin stabilized spacecraft and superimposed large signatures in the Doppler and range data. These difficulties were overcome by combining long data arcs, spanning several maneuvers, with a high fidelity solar pressure model. The model included a physically accurate representation of the spacecraft structure and a high time resolution orientation model. Observation modeling included the removal of the spin induced Doppler bias, spin signature and per pass correction of range calibration errors applied for data leading up to critical events. As a result, all orbit determination goals were met. A second area of emphasis in this paper is the JPL tracking and orbit determination effort in support of the TMI maneuver. TMI occurred out of contact with ground stations and the JPL Goldstone tracking complex had the first pass following the bum. As a result, MMNAV had the responsibility to make a rapid assessment of the maneuver performance. MMNAV made the determination that a 100 m/s under bum had occurred and promptly informed ISAS via voice lines. ISAS immediately began preparations for a correction maneuver (TMIc), which had to be performed during the next Usuda pass. The near real time assessment by MMNAV provided accurate antenna frequency and pointing updates for the spacecraft acquisition at Usuda and the close coordination between the two agencies enabled the design and successful execution of the TMc maneuver. Propellant consumption during the correction burn dictated that the mission be redesigned. ISAS developed a new plan which adds 3 full solar orbits, two Earth swingbys and one lunar swingby with arrival at Mars in January 2004. The final Mars orbit will still enable the mission to achieve all of its science objectives.

Ryne, Mark↗

Flight Computer Design for the Space Technology 5 (ST-5) Mission

As part of NASA's New Millennium Program, the Space Technology 5 mission will validate a variety of technologies for nano-satellite and constellation mission applications. Included are: a miniaturized and low power X-band transponder, a constellation communication and navigation transceiver, a cold gas micro-thruster, two different variable emittance (thermal) controllers, flex cables for solar array power collection, autonomous groundbased constellation management tools, and a new CMOS ultra low-power, radiation-tolerant, +0.5 volt logic technology. The ST-5 focus is on small and low-power. A single-processor, multi-function flight computer will implement direct digital and analog interfaces to all of the other spacecraft subsystems and components. There will not be a distributed data system that uses a standardized serial bus such as MIL-STD-1553 or MIL-STD-1773. The flight software running on the single processor will be responsible for all real-time processing associated with: guidance, navigation and control, command and data handling (C&DH) including uplink/downlink, power switching and battery charge management, science data analysis and storage, intra-constellation communications, and housekeeping data collection and logging. As a nanosatellite trail-blazer for future constellations of up to 100 separate space vehicles, ST-5 will demonstrate a compact (single board), low power (5.5 watts) solution to the data acquisition, control, communications, processing and storage requirements that have traditionally required an entire network of separate circuit boards and/or avionics boxes. In addition to the New Millennium technologies, other major spacecraft subsystems include the power system electronics, a lithium-ion battery, triple-junction solar cell arrays, a science-grade magnetometer, a miniature spinning sun sensor, and a propulsion system.

Speer, David↗

NASA Tech Briefs, October 2005

Topics covered include: Insect-Inspired Optical-Flow Navigation Sensors; Chemical Sensors Based on Optical Ring Resonators; A Broad-Band Phase-Contrast Wave-Front Sensor; Progress in Insect-Inspired Optical Navigation Sensors; Portable Airborne Laser System Measures Forest-Canopy Height; Deployable Wide-Aperture Array Antennas; Faster Evolution of More Multifunctional Logic Circuits; Video-Camera-Based Position-Measuring System; N-Type delta Doping of High-Purity Silicon Imaging Arrays; Avionics System Architecture Tool; Updated Chemical Kinetics and Sensitivity Analysis Code; Predicting Flutter and Forced Response in Turbomachinery; Upgrades of Two Computer Codes for Analysis of Turbomachinery; Program Facilitates CMMI Appraisals; Grid Visualization Tool; Program Computes Sound Pressures at Rocket Launches; Solar-System Ephemeris Toolbox; Data-Acquisition Software for PSP/TSP Wind-Tunnel Cameras; Corrosion-Prevention Capabilities of a Water-Borne, Silicone-Based, Primerless Coating; Sol-Gel Process for Making Pt-Ru Fuel-Cell Catalysts; Making Activated Carbon for Storing Gas; System Regulates the Water Contents of Fuel-Cell Streams; Five-Axis, Three-Magnetic-Bearing Dynamic Spin Rig; Modifications of Fabrication of Vibratory Microgyroscopes; Chamber for Growing and Observing Fungi; Electroporation System for Sterilizing Water; Thermoelectric Air/Soil Energy-Harvesting Device; Flexible Metal-Fabric Radiators; Actuated Hybrid Mirror Telescope; Optical Design of an Optical Communications Terminal; Algorithm for Identifying Erroneous Rain-Gauge Readings; Condition Assessment and End-of-Life Prediction System for Electric Machines and Their Loads; Lightweight Thermal Insulation for a Liquid-Oxygen Tank; Stellar Gyroscope for Determining Attitude of a Spacecraft; and Lifting Mechanism for the Mars Explorer Rover.

Source record↗

Mars Science Laboratory Orbit Determination

Mars Science Laboratory (MSL) Orbit Determination (OD) met all requirements with considerable margin, MSL OD team developed spin signature removal tool and successfully used the tool during cruise, A novel approach was used for the MSL solar radiation pressure model and resulted in a very accurate model during the approach phase, The change in velocity for Attitude Control System (ACS) turns was successfully calibrated and with appropriate scale factor resulted in improved change in velocity prediction for future turns, All Trajectory Correction Maneuvers were successfully reconstructed and execution errors were well below the assumed pre-fight execution errors, The official OD solutions were statistically consistent throughout cruise and for OD solutions with different arc lengths as well, Only EPU-1 was sent to MSL. All other Entry Parameter Updates were waived, EPU-1 solution was only 200 m separated from final trajectory reconstruction in the B-plane

Mars Science Laboratory (MSL)↗