Search NASA⌕ Search

SEARCH · Search NASA

Results for “structure erection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Overview of future programs - USA

An overview of U.S. manned space flight is presented and recent advanced studies are considered. In connection with long range mission planning, studies are being conducted of future space systems, space vehicles, and space operations. An early Space Construction Base is being studied for launch in 1985 and associated geosynchronous operations are projected for 1987. The Space Construction Base is envisioned as a facility for erecting large structures in space, for basing Manned Orbital Transfer Vehicles that operate between low earth orbit and geosynchronous orbit; and for the conduct of industrial operations and scientific experiments in space. Ways and means for erecting large structures in space are examined. One particular plan involves the development of the technology to demonstrate the capabilities of a solar power station to translate solar energy to electrical energy for use on commercial power stations on earth. Advanced transportation is also being studied, particularly for needs that complement the Shuttle. The use of the Shuttle System as a Heavy Lift Launch Vehicle to place large diameter payloads up to 200,000 pounds in weight is also being explored.

Freitag, R. F.↗

An overview of the EASE/ACCESS space construction demonstration

Consideration is given to the development of the Experimental Assembly of Structures in EVA/Assembly Concept for Construction of Erectable Space Structures (EASE/ACCESS) space construction demonstration, which was performed during Space Shuttle mission 61-B. The mission equipment is described and illustrated and the EASE/ACCESS mission management structure is outlined. Simulations of the assembly and disassembly in the NASA neutral buoyancy simulators were used to test the mission plans. In addition, EVA training and crew performance for the mission are discussed.

Levin, George M.↗

Space Construction

The purpose was to present to the aerospace community an in-depth review of Experimental Assembly of Structures on EVA (EASE)/Assembly Concept for Construction of Erectable Space Structures (ACCESS) space flight experiments and to present the status of activities regarding future space flight experiments and accompanying technology developments that will demonstrate the capability of on-orbit construction required for the Space Station.

Hagaman, Jane A.↗

A synopsis of the EVA training conducted on EASE/ACCESS for STS-61-B

Experimental Assembly of Structure in EVA (EASE)/Assembly Concept for Construction of Erectable Space Structures (ACCESS) training problems; photography/television coverage; training schedules; flight data file (FDF), and flight rules production are summarized.

Havens, Kathryn A.↗

Mission Peculiar Equipment Support Structure: A platform for space construction

The Space Shuttle requires carriers to support payloads in the cargo bay. As a result, the Mission Peculiar Equipment Support Structure (MPESS) was designed to carry partial payloads aboard the shuttle. The efforts to customize the MPESS for the Experimental Assembly of Structure in EVA (EASE) and Assembly Concept for Construction of Erectable Space Structure (ACCESS) experiments are summarized.

Hill, Robert↗

A monograph of the National Space Transportation System Office (NSTSO) integration activities conducted at the NASA Lyndon B. Johnson Space Center for the EASE/ACCESS payload flown on STS 61-B

The integration process of activities conducted at the NASA Lyndon B. Johnson Space Center (JSC) for the Experimental Assembly of Structures in Extravehicular activity (EASE)/Assembly Concept for Construction of Erectable Space Structures (ACCESS) payload is provided as a subset to the standard payload integration process used by the NASA Space Transportation System (STS) to fly payloads on the Space Shuttle. The EASE/ACCESS payload integration activities are chronologically reviewed beginning with the initiation of the flight manifesting and integration process. The development and documentation of the EASE/ACCESS integration requirements are also discussed along with the implementation of the mission integration activities and the engineering assessments supporting the flight integration process. In addition, the STS management support organizations, the payload safety process leading to the STS 61-B flight certification, and the overall EASE/ACCESS integration schedule are presented.

Chassay, Charles↗

EVA space construction - Experience and fundamental issues

Results are presented from EVA space construction studies performed in 1 g, simulated 0 g, and on-orbit. The studies include tests of astronaut participation on the Mobile Work Station concept and the Swing-Arm Beam Erector. Also, results from the Experimental Assembly of Structures in EVA and the Assembly Concept for Construction of Erectable Space Structure programs are summarized. EVA construction applications for the Space Station are discussed and construction scenarios are developed.

Heard, Walter L., Jr.↗

Frameworks for the future

NASA is exploring the techniques and technologies which will permit the construction of large structures in space. EASE (Experimental Assembly of Structures in Extravehicular Activity) and ACCESS (Assembly Concept for Construction of Erectable Space Structures) are structures which are carried in the Atlantis bay and are assembled in space by astronauts. The experimental structures were designed to be durable and strong, easily assembled, have removable parts, and be amenable to alterations using specially-designed tools. All space activities are first rehearsed in detail on earth, mainly in the NASA Neutral Buoyancy Facility. Thorough studies are also being done to examine the human factors of space assembly and to gather biomedical data to characterize the capabilities of humans doing construction work in space.

Mcmahan, T.↗

Advances in adaptive structures at Jet Propulsion Laboratory

Future proposed NASA missions with the need for large deployable or erectable precision structures will require solutions to many technical problems. The Jet Propulsion Laboratory (JPL) is developing new technologies in Adaptive Structures to meet these challenges. The technology requirements, approaches to meet the requirements using Adaptive Structures, and the recent JPL research results in Adaptive Structures are described.

Wada, Ben K.↗

Marshall Space Flight Center's role in EASE/ACCESS mission management

The Marshall Space Flight Center (MSFC) Spacelab Payload Project Office was responsible for the mission management and development of several successful payloads. Two recent space construction experiments, the Experimental Assembly of Structures in Extravehicular Activity (EASE) and the Assembly Concept for Construction of Erectable Space Structures (ACCESS), were combined into a payload managed by the center. The Ease/ACCESS was flown aboard the Space Shuttle Mission 61-B. The EASE/ACCESS experiments were the first structures assembled in space, and the method used to manage this successful effort will be useful for future space construction missions. The MSFC mission management responsibilities for the EASE/ACCESS mission are addressed and how the lessons learned from the mission can be applied to future space construction projects are discussed.

Hawkins, Gerald W.↗

EASE/ACCESS ground processing at Kennedy Space Center

The Kennedy Space Center (KSC) Payload Management and Operations Directorate is responsible for the processing of Space Shuttle payloads. The KSC responsibilities begin prior to hardware arrival at the launch site and extend until the experiments are returned to the investigators after the flight. The KSC involvement with the integration and checkout of payloads begins with participation in experiment, Mission Peculiar Equipment (MPE), and integrated payload design reviews. This involvement also includes participation in assembly and testing of flight hardware at the appropriate design center, university, or private corporation. Once the hardware arrives at the launch site, KSC personnel install the experiments and MPE onto a carrier in the Operations and Checkout (O & C) building. Following integration, the payload is functionally tested and then installed into the orbiter. After the mission, the payload is removed from the orbiter, deintegrated in the O & C building, and the experiments are turned over to the mission manager. One of the many payloads process at KSC consisted of two space construction experiments: the Experimental Assembly of Structures in Extravehicular Activity (EASE) and the Assembly Concept for Construction of Erectable Space Structures (ACCESS). The details of EASE/ACCESS integration, testing, and deintegration are addressed and how this mission can serve as a guide for future space construction payloads is discussed.

Moates, Deborah J.↗

Research and development at the Marshall Space Flight Center Neutral Buoyancy Simulator

The Neutral Buoyancy Simulator (NBS), a facility designed to imitate zero-gravity conditions, was used to test the Experimental Assembly of Structures in Extravehicular Activity (EASE) and the Assembly Concept for Construction of Erectable Space Structures (ACCESS). Neutral Buoyancy Simulator applications and operations; early space structure research; development of the EASE/ACCESS experiments; and improvement of NBS simulation are summarized.

Kulpa, Vygantas P.↗

Thermal analysis of the ACCESS space truss

This paper introduces the Assembly Concept for the Construction of Erectable Space Structure (ACCESS) experiment and describes the thermal requirements in detail. The experiment, an erectable truss beam to be flown and assembled aboard the Space Shuttle, was thermally modeled using the TRASYS and SINDA computer codes. Results from the thermal analysis are presented. Development tests dictate the application of a metallized film insulation on the aluminum beam struts to control transient orbital temperature extremes.

Foss, R. A.↗

Inflatable Tubular Structures Rigidized with Foams

Inflatable tubular structures that have annular cross sections rigidized with foams, and the means of erecting such structures in the field, are undergoing development. Although the development effort has focused on lightweight structural booms to be transported in compact form and deployed in outer space, the principles of design and fabrication are also potentially applicable to terrestrial structures, including components of ultralightweight aircraft, lightweight storage buildings and shelters, lightweight insulation, and sales displays. The use of foams to deploy and harden inflatable structures was first proposed as early as the 1960s, and has been investigated in recent years by NASA, the U.S. Air Force Research Laboratory, industry, and academia. In cases of deployable booms, most of the investigation in recent years has focused on solid cross sections, because they can be constructed relatively easily. However, solid-section foam-filled booms can be much too heavy for some applications. In contrast, booms with annular cross sections according to the present innovation can be tailored to obtain desired combinations of stiffness and weight through choice of diameters, wall thicknesses, and foam densities. By far the most compelling advantage afforded by this innovation is the possibility of drastically reducing weights while retaining or increasing the stiffnesses, relative to comparable booms that have solid foamfilled cross sections. A typical boom according to this innovation includes inner and outer polyimide film sleeves to contain foam that is injected between them during deployment.

Tinker, Michael L.↗

Robotic space construction

Research at Langley AFB concerning automated space assembly is reviewed, including a Space Shuttle experiment to test astronaut ability to assemble a repetitive truss structure, testing the use of teleoperated manipulators to construct the Assembly Concept for Construction of Erectable Space Structures I truss, and assessment of the basic characteristics of manipulator assembly operations. Other research topics include the simultaneous coordinated control of dual-arm manipulators and the automated assembly of candidate Space Station trusses. Consideration is given to the construction of an Automated Space Assembly Laboratory to study and develop the algorithms, procedures, special purpose hardware, and processes needed for automated truss assembly.

Mixon, Randolph W.↗

Foam rigidized inflatable structural assemblies

An inflatable and rigidizable structure for use as a habitat or a load bearing structure is disclosed. The structure consists of an outer wall and an inner wall defining a containment member and a bladder. The bladder is pressurized to erect the structure from an initially collapsed state. The containment member is subsequently injected with rigidizable fluid through an arrangement of injection ports. Exhaust gases from the curing rigidizable fluid are vented through an arrangement of exhaust ports. The rate of erection can be controlled by frictional engagement with a container or by using a tether. A method for fabricating a tubular structure is disclosed.

Tinker, Michael L.↗

Structural Assembly Demonstration Experiment (SADE)

The purpose of the Structural Assembly Demonstration Experiment (SADE) was to create a near-term Shuttle flight experiment focusing on the deployment and erection of structural truss elements. The activities of the MIT Space Systems Laboratory consist of three major areas: preparing and conducting neutral buoyancy simulation test series; producing a formal SADE Experiment plan; and studying the structural dynamics issues of the truss structure. Each of these areas is summarized.

Akin, David L.↗