Search NASA⌕ Search

SEARCH · Search NASA

Results for “subassembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Fabrication technology: A compilation

A compilation is presented which supplies technical information on the assembly of diverse components into functional assemblies and subassemblies, as well as information on several fasteners and fastening techniques that join components, subassemblies, and complete assemblies to achieve a functional unit. Quick-disconnect fasteners are described, along with several devices and methods for attaching thermal insulators, and for joining and separating objects in the absence of gravity.

Source record↗

Shuttle payload vibroacoustic test plan evaluation

Statistical decision theory is used to evaluate seven alternate vibro-acoustic test plans for Space Shuttle payloads; test plans include component, subassembly and payload testing and combinations of component and assembly testing. The optimum test levels and the expected cost are determined for each test plan. By including all of the direct cost associated with each test plan and the probabilistic costs due to ground test and flight failures, the test plans which minimize project cost are determined. The lowest cost approach eliminates component testing and maintains flight vibration reliability by performing subassembly tests at a relatively high acoustic level.

Stahle, C. V.↗

The influence of various test plans on mission reliability

Methods have been developed for the evaluation of cost effective vibroacoustic test plans for Shuttle Spacelab payloads. The shock and vibration environments of components have been statistically represented, and statistical decision theory has been used to evaluate the cost effectiveness of five basic test plans with structural test options for two of the plans. Component, subassembly, and payload testing have been performed for each plan along with calculations of optimum test levels and expected costs. The tests have been ranked according to both minimizing expected project costs and vibroacoustic reliability. It was found that optimum costs may vary up to $6 million with the lowest plan eliminating component testing and maintaining flight vibration reliability via subassembly tests at high acoustic levels.

Stahle, C. V.↗

30-cm mercury ion thruster technology

The LeRC/Hughes 30-cm mercury ion thruster has been developed to a state of maturity such that is has become meaningful to formulate models for describing the performance characteristics of the major subassemblies. The thruster hollow cathode and the ion optics subassemblies have been investigated with this objective and conceptual, semiquantitative models have been formulated for relating lifetime and performance capabilities to design and operating parameters. This paper summarizes the investigations, discusses the factors considered for inclusion in the models, and describes the status of the models.

Poeschel, R. L.↗

Test program to develop vibroacoustics test criteria for the Galileo bus

In order to define random vibration test requirements for Galileo bus-mounted hardware, an extensive vibroacoustics test program was conducted on hardware available from the previous Voyager spacecraft development program. The Galileo test program consisted of acoustic tests on three configurations of the Voyager Dynamic Test Model bus and shaker random vibration tests on two flight-like bus equipment bay assemblies and one dummy equipment bay assembly. The primary goal of the acoustic tests was to define vibration levels at locations on the bus structure representative of inputs to bus equipment bay assemblies and to obtain response data on bus bay subassemblies for correlation with the vibration tests response data. The primary purpose of the vibration tests was to determine if the vibration tests excited subassembly responses at least as severely as the bus acoustic tests.

Kern, D. L.↗

Multistage spent particle collector and a method for making same

A description is given of a spent particle collector which maintains structural integrity when raised to a high temperature although constructed of materials having widely different coefficients of expansion. The collector is comprised of one or more axisymmetric stages, each stage comprising a subassembly. A subassembly includes an inner pyrolytic graphite ring, a transition ring, a ceramic insulator ring and an outer metal ring which forms part of the wall of the collector. Each transition is of a ductile metal having high thermal conductivity and is provided with an annular sputter shield wall extending toward the source of spent particles and, where necessary, a trough in the other surface to enclose the sputter shield of the next adjacent transition ring. A plurality of radial extending slots are provided in a transition ring to form segments which are retained in their position by the sputter shield.

Ebihara, B. T.↗

Space station resistojet system requirements and interface definition study

Preliminary resistojet design requirements were established based on initial technical requirements imposed by the results of NASA and Rocketdyne studies. The requirements are directed toward long life, simplicity, flexibility, and commonality with other space station components. The resistojet assembly is comprised of eight resistojets, fluid components downstream of the waste fluid storage system, a power controller, structure, and shielding. It consists of two identical subassemblies, one of which is redundant. Each subassembly consists of four 500-W resistojets, series redundant latch values, a power controller, a water vaporizer, two pressure regulators, filters, check valves, disconnects, fluid tubing, and electrical cables. All components are packaged at the end of the stinger aft of the JEM and Columbus modules. Different flow and power control methods were studied. A constant inlet pressure and a two-power setting controller were tentatively selected based on simplicity and reasonably high specific impulse for the range of waste gas compositions that are anticipated. The constant pressure is supplied by pressure regulators. The two set point power control includes individual power supplies to each resistojet heater and water vaporizer. An embedded data processor, a multiplexer-demultiplexer, and a network interface unit that are standard space station components are included in the power controller. The total dry weight of the resistojet assembly is approximately 172 lb. The total cost for design, development, test, evaluation, qualification, and flight hardware is estimated to be $16 million.

Heckert, Bruce J.↗

Phase calibration generator

A phase calibration system was developed for the Deep Space Stations to generate reference microwave comb tones which are mixed in with signals received by the antenna. These reference tones are used to remove drifts of the station's receiving system from the detected data. This phase calibration system includes a cable stabilizer which transfers a 20 MHz reference signal from the control room to the antenna cone. The cable stabilizer compensates for delay changes in the long cable which connects its control room subassembly to its antenna cone subassembly in such a way that the 20 MHz is transferred to the cone with no significant degradation of the hydrogen maser atomic clock stability. The 20 MHz reference is used by the comb generator and is also available for use as a reference for receiver LO's in the cone.

Sigman, E. H.↗

Single launch lunar habitat derived from an NSTS external tank

A concept for using the spent external tank from a National Space Transportation System (NSTS) to derive a lunar habitat is described. The external tank is carried into low Earth orbit where the oxygen tank-intertank subassembly is separated from the hydrogen tank, berthed to Space Station Freedom and the subassembly outfitted as a 12-person lunar habitat using extravehicular activity (EVA) and intravehicular activity (IVA). A single launch of the NSTS orbiter can place the external tank in LEO, provide orbiter astronauts for disassembly of the external tank, and transport the required subsystem hardware for outfitting the lunar habitat. An estimate of the astronauts' EVA and IVA is provided. The liquid oxygen intertank modifications utilize existing structures and openings for man access without compromising the structural integrity of the tank. The modifications include installation of living quarters, instrumentation, and an airlock. Feasibility studies of the following additional systems include micrometeoroid and radiation protection, thermal control, environmental control and life support, and propulsion. The converted lunar habitat is designed for unmanned transport and autonomous soft landing on the lunar surface without need for site preparation. Lunar regolith is used to fill the micrometeoroid shield volume for radiation protection using a conveyer. The lunar habitat concept is considered to be feasible by the year 2000 with the concurrent development of a space transfer vehicle and a lunar lander for crew changeover and resupply.

King, Charles B.↗

Galileo spacecraft power management and distribution system

The Galileo PMAD (power management and distribution system) is described, and the design drivers that established the final as-built hardware are discussed. The spacecraft is powered by two general-purpose heat-source-radioisotope thermoelectric generators. Power bus regulation is provided by a shunt regulator. Galileo PMAD distributes a 570-W beginning of mission (BOM) power source to a user complement of some 137 load elements. Extensive use of pyrotechnics requires two pyro switching subassemblies. They initiate 148 squibs which operate the 47 pyro devices on the spacecraft. Detection and correction of faults in the Galileo PMAD is an autonomous feature dictated by requirements for long life and reliability in the absence of ground-based support. Volatile computer memories in the spacecraft command and data system and attitude control system require a continuous source of backup power during all anticipated power bus fault scenarios. Power for the Jupiter Probe is conditioned, isolated, and controlled by a Probe interface subassembly. Flight performance of the spacecraft and the PMAD has been successful to date, with no major anomalies.

Detwiler, R. C.↗

Dual-Roll Robotic Wrist-Joint Assembly

Compact robotic wrist-joint assembly includes two motor subassemblies providing two concentric output rotations about axis of wrist: outer output flange on front face of assembly rotated to, and held at, any predetermined roll angle within range of plus or minus 180 degrees, and inner output flange concentric with outer output flange capable of unlimited rotation relative to outer flange. Each motor subassembly includes concentric rotor and stator and harmonic drive.

Vranish, John M.↗

Design and construction of a prototype ACTS propagation terminal

The launch schedule for the Advanced Communication Technology Satellite (ACTS) spacecraft did not leave sufficient time for completion of the prototype ACTS Propagation Terminals (APT) prior to initiation of the APT production phase. In fact, the approach used was to construct and test all subassemblies of the terminal with special emphasis on the technically challenging portions. These include the RF front end that uses a state-of-the-art down converter which integrates a low noise amplifier, mixer, post amplifier, filter, and local oscillator port frequency doubler into a single small package. In addition, a new digital receiver that uses the latest DSP technology was developed. Both of these subassemblies were thoroughly tested. The highest risk technology in the APT program was the digital receiver. Several candidate algorithms and DSP chips were investigated early on, primarily under JPL sponsorship. A receiver was constructed based on Texas Instruments chip. The final prototype digital receiver was one based on an Analog Devices chip. The design and test results are documented in a report prepared for this grant. A Primary Design Review (PDR) was conducted 30 May 1991, and a Critical Design Review was held 7 Jul. 1992. Final complete documentation of the APT's will appear in the form of three reports: a hardware description report, a report on the data collection code (ACTS VIEW), and a report on the preprocessing code.

Stutzman, Warren↗

International Space Station Program Phase 3 Integrated Atmosphere Revitalization Subsystem Test

Testing of the International Space Station (ISS) U.S. Segment baseline configuration of the Atmosphere Revitalization Subsystem (ARS) by NASA's Marshall Space Flight Center (MSFC) was conducted as part of the Environmental Control and Life Support System (ECLSS) design and development program. This testing was designed to answer specific questions regarding the control and performance of the baseline ARS subassemblies in the ISS U.S. Segment configuration. These questions resulted from the continued maturation of the ISS ECLSS configuration and design requirement changes since 1992. The test used pressurized oxygen injection, a mass spectrometric major constituent analyzer, a Four-Bed Molecular Sieve Carbon Dioxide Removal Assembly, and a Trace Contaminant Control Subassembly to maintain the atmospheric composition in a sealed chamber at ISS specifications for 30 days. Human metabolic processes for a crew of four were simulated according to projected ISS mission time lines. The performance of a static feed water electrolysis Oxygen Generator Assembly was investigated during the test preparation phases; however, technical difficulties prevented its use during the integrated test. The Integrated ARS Test (IART) program built upon previous closed-door and open-door integrated testing conducted at MSFC between 1987 and 1992. It is the most advanced test of an integrated ARS conducted by NASA to demonstrate its end-to-end control and overall performance. IART test objectives, facility design, pretest analyses, test and control requirements, and test results are presented.

Perry, J. L.↗

Overview of the International Space Station System Level Trace Contaminant Injection Test

Trace contaminant control onboard the International Space Station will be accomplished not only by the Trace Contaminant Control Subassembly but also by other Environmental Control and Life Support System subassemblies. These additional removal routes include absorption by humidity condensate in the Temperature and Humidity Control Condensing Heat Exchanger and adsorption by the Carbon Dioxide Removal Assembly. The Trace Contaminant Injection Test, which was performed at NASA's Marshall Space Flight Center, investigated the system-level removal of trace contaminants by the International Space Station Atmosphere Revitalization, and Temperature/Humidity Control Subsystems, (November-December 1997). It is a follow-on to the Integrated Atmosphere Revitalization Test conducted in 1996. An estimate for the magnitude of the assisting role provided by the Carbon Dioxide Removal Assembly and the Temperature and Humidity Control unit was obtained. In addition, data on the purity of Carbon Dioxide Removal Assembly carbon dioxide product were obtained to support Environmental Control and Life Support System Air Revitalization Subsystem loop closure.

Tatara, James D.↗

Development Unit Configuration and Current Status of the MIP/MTERC Experiment

The Mars In-Situ Propellant Production (ISPP) Precursor (MIP) experiment package is planned for inclusion on the Mars 2001 Lander. This experiment package consists of five experiments whose purpose is to demonstrate the performance of various ISPP processes in-situ on Mars. The demonstrated ability to produce propellant for Mars Return Vehicles (MRV) is considered to be a necessary precursor to any future manned mission to Mars. The Mars Thermal Environment/Radiator Characterization (MTERC) experiment is part of the MIP package and is intended to determine the Mars night sky temperature as well as to characterize the performance degradation of radiators caused by environmental exposure on Mars over time. Radiators are needed as part of the ISPP process to remove heat from the Mars Atmosphere Acquisition and Compression (MAAC) CO2 sorption compressor. MTERC will provide the data needed to optimize the design of radiators for ISPP and other processes. A MTERC Development Unit (DU) has been fabricated and tested at JPL. The MTERC DU consists of 1) a radiator subassembly, 2) a motor/cover subassembly, 3) a differential temperature control circuit and motor control electronics circuit board, and 4) a command and data handling electronics circuit board. This paper will describe the operational theory and the configuration of the MTERC DU and will discuss the current status of the MTERC experiment development including some selected results of performance testing that has been completed prior to the ISRU III meeting.

Juanero, K. J.↗

Development Unit Configuration and Current Status of the MIP/MTERC Experiment

The Mars In-Situ Propellant Production (ISPP) Precursor (MIP) experiment package is planned for inclusion on the Mars 2001 Lander. This experiment package consists of five experiments whose purpose is to demonstrate the performance of various ISPP processes in-situ on Mars. The demonstrated ability to produce propellant for Mars Return Vehicles (MRV) is considered to be a necessary precursor to any future manned mission to Mars. The Mars Thermal Environment/Radiator Characterization (MTERC) experiment is part of the MIP package and is intended to determine the Mars night sky temperature as well as to characterize the performance degradation of radiators caused by environmental exposure on Mars over time. Radiators are needed as part of the ISPP process to remove heat from the Mars Atmosphere Acquisition and Compression (MAAC) C02 sorption compressor. MTERC will provide the data needed to optimize the design of radiators for ISPP and other processes. A MTERC Development Unit (DU) has been fabricated and tested at JPL. The MTERC DU consists of: (1) a radiator subassembly, (2) a motor/cover subassembly, (3) a differential temperature control circuit and motor control electronics circuit board, and (4) a command and data handling electronics circuit board. This paper will describe the operational theory and the configuration of the MTERC DU and will discuss the current status of the MTERC experiment development including some selected results of performance testing that has been completed prior to the ISRU III meeting.

Juanero, K. J.↗

Temperature Compensated Sapphire Resonator for Ultrastable Oscillator Operating at Temperatures Near 77 Deg Kelvin

A sapphire resonator for an ultrastable oscillator capable of substantial performance improvements over the best available crystal quartz oscillators in a compact cryogenic package is based on a compensation mechanism enabled by the difference between copper and sapphire thermal expansion coefficients for so tuning the resonator as to cancel the temperature variation of the sapphire's dielectric constant. The sapphire resonator consists of a sapphire ring separated into two parts with webs on the outer end of each to form two re-entrant parts which are separated by a copper post. The re-entrant parts are bonded to the post by indium solder for good thermal conductivity between parts of that subassembly which is supported on the base plate of a closed copper cylinder (rf shielding casing) by a thin stainless steel cylinder. A unit for temperature control is placed in the stainless steel cylinder and is connected to the subassembly of re-entrant parts and copper post by a layer of indium for good thermal conduction. In normal use, the rf shielding casing is placed in a vacuum tank which is in turn placed in a thermos flask of liquid nitrogen. The temperature regulator is controlled from outside the thermos flask to a temperature in a range of about 40K to 150K, such as 87K for the WGH-811, mode of resonance in response to microwave energy inserted into the rf shielding casing through a port from an outside source.

Dick, G. John↗

Clean then Assemble Versus Assemble then Clean: Several Comparisons

Cleanliness of manufactured parts and assemblies is a significant issue in many industries including disk drives, semiconductors, aerospace, and medical devices. Clean manufacturing requires cleanroom floor space and cleaning technology that are both expensive to own and expensive to operate. Strategies to reduce these costs are an important consideration. One strategy shown to be effective at reducing costs is to assemble parts into subassemblies and then clean the subassembly, rather than clean the individual parts first and then assemble them. One advantage is that assembly outside of the cleanroom reduces the amount of cleanroom floor space and its associated operating cost premium. A second advantage is that this strategy reduces the number of individual parts that must be cleaned prior to assembly, reducing the number of cleaning baskets, handling and, possibly, reducing the number of cleaners. The assemble then clean strategy also results in a part that is significantly cleaner because contamination generated during the assembly steps are more effectively removed that normally can be achieved by hand wiping after assembly in the cleanroom.

contamination↗