Search NASA⌕ Search

SEARCH · Search NASA

Results for “test system test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Remote Advanced Payload Test Rig (RAPTR) Portable Payload Test System for the International Space Station (ISS)

The RAPTR was developed to test ISS payloads for NASA. RAPTR is a simulation of the Command and Data Handling (C&DH) interfaces of the ISS (MIL-STD 1553B, Ethernet and TAXI) and is designed to facilitate rapid testing and deployment of payload experiments to the ISS. The ISS Program's goal is to reduce the amount of time it takes a payload developer to build, test and fly a payload, including payload software. The RAPTR meets this need with its user oriented, visually rich interface. Additionally, the Analog and Discrete (A&D) signals of the following payload types may be tested with RAPTR: (1) EXPRESS Sub Rack Payloads; (2) ELC payloads; (3) External Columbus payloads; (4) External Japanese Experiment Module (JEM) payloads. The automated payload configuration setup and payload data inspection infrastructure is found nowhere else in ISS payload test systems. Testing can be done with minimal human intervention and setup, as the RAPTR automatically monitors parameters in the data headers that are sent to, and come from the experiment under test.

Calvert, John↗

Endosafe(R)-Portable Test System (PTS)

The Portable Test System (PTS) is a hand-held device for monitoring the presence of potentially hazardous bacteria in the environment. It uses an immunological method derived from the horseshoe crab (Limulus polyphemus) to detect bacterial cell membranes and other molecular components of a cell. Further modifications of the PTS will allow detection of individual hazardous species of bacteria. This study was a follow-up of previous PTS and other immunological tests performed on the KC-135 during 2002-2003 (Maule et al., 2003, J. Gravit. Physiol.) and in the underwater habitat Aquarius during NEEMO 5 (Maule et al., 2005, Appl. Environ. Microbiol in prep.). The experiments described here were part of a final testing phase prior to use of the PTS on the International Space Station (ISS), scheduled for launch on 12A.1 on February 9th 2006. The specific aspects of PTS operation studied were those involving a fluid component: pumping, mixing, incubations and pipetting into the instrument. The PTS uses a stepper motor to move fluid along small channels, which may be affected by reduced gravity.

Maule, Jake↗

Introducing the 9500 Node Distribution Test System to Support Advanced Power Applications: An Operations-Focused Approach

The 9500 Node Test System is a representative section of distribution power system model developed as a part of the GridAPPS-D™ project, an effort funded by DOE as a part of the Grid Modernization Lab Consortium (GMLC) program. The test system was developed to fulfill a growing need to represent the rapidly evolving state of electric distribution systems by combining elements of legacy infrastructure systems, modern feeder topologies, and an anticipated future with smart grid technologies. It also provides a network model capable of supporting the simulation of operational scenarios such as the ones in a utility distribution control center. This test system allows the evaluation of the performance of advanced power applications in real-time, such as one that simulates the operations of an Advanced Distribution Management Systems (ADMS), Distributed Energy Resource Management Systems (DERMS), etc. in a Distribution control center. This model is an extension of the widely used IEEE 8500 Node Test Feeder and is currently being validated to become an IEEE test case to help increase adoption and widespread usage among both academia and industry. It is a full-size model representative of a section of a utility’s distribution system with multiple feeders fed from different substations. The model includes multiple distribution circuits, a sub-transmission system, multiple substations, behind the meter customer rooftop photovoltaics (PV), and multiple utility-scale distributed energy resources. To enable accurate simulations of operational scenarios, the 9500 Node Test System is designed to support procedure-based operations, with the ability to realistically demonstrate switching operations, feeder reconfiguration, adjustment of volt-var control equipment, dispatch of distributed generation, and response to planned and unplanned outages. The 9500 Node Test System includes three radial distribution feeders with 12.3 MVA of average load, consisting of both medium voltage and low voltage equipment each supplied by a different distribution substation. The three distribution feeders are connected to each other through Normally-Open switches which can be closed when needed to simulate restoration scenarios due to a fault. One feeder represents today’s grid with low penetration of customer-side renewables. The second represents a potential future grid with microgrids and 100% renewable penetration. The third has no customer generation resources, a district steam plant, and a utility-scale solar farm. The three diverse circuits were created to allow the simulation of both today’s situation as well as potential future scenarios. All three feeders have customers connected by low-voltage secondary triplex lines. This test system meets all requirements outlined in the report for creating a simulation environment that would enable discussion between key technical stakeholders as well as having the potential to accelerate operational application development and their subsequent testing and integration. The new model is a possible representation of what we believe the distribution grid may look like in the future: a high penetration of renewables, reconfigurable radial and mesh topology, numerous DERs, islanded microgrids, and significantly increased data and measurement density. The system supports both the solution of existing and newer algorithms but also enables the evaluation of applications in a realistic operational environment defined by task oriented procedural steps that represent the interaction between the control center operator and field personnel.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Requirements document for mini system test unit

The mini system test unit (STU) for the Trace Gas Analyzer (TGA) is defined. The interface signals of the components used to implement the STU are also defined. The mini STU is used to support pre-flight ground test operations. The STU indications of TGA operation (organic and carbon monoxide analyses) and its ability to monitor gas chromatograph and mass spectrometer test signals are included.

Garofolo, D.↗

Capacitor-Test System

Polycarbonate film capacitors tested for leakage paths with microprocessor controlled multiplexer test sequence. Microprocessor based capacitor test system simultaneously monitors 80 capacitors.

Ott, F. M.↗

Knowledge acquisition and representation for the Systems Test and Operations Language (STOL) Intelligent Tutoring System (ITS)

This presentation concentrates on knowledge acquisition and its application to the development of an expert module and a user interface for an Intelligent Tutoring System (ITS). The Systems Test and Operations Language (STOL) ITS is being developed to assist NASA control center personnel in learning a command and control language as it is used in mission operations rooms. The objective of the tutor is to impart knowledge and skills that will permit the trainee to solve command and control problems in the same way that the STOL expert solves those problems. The STOL ITS will achieve this object by representing the solution space in such a way that the trainee can visualize the intermediate steps, and by having the expert module production rules parallel the STOL expert's knowledge structures.

Seamster, Thomas L.↗

A self-certifying FPGA based pixel readout chip test system for CMS ETL upgrade

A flexible self-certifying pixel readout test system for testing the Endcap Timing Read-Out Chip (ETROC) has been developed for the CMS MIP Timing Detector (MTD), part of the upgrade for the HL-LHC. The system includes an FPGA-based (Xilinx KC705) test system that can take data from an emulator or up to four ETROC boards in telescope mode. A python based DAQ system simplifies configuration, calibration, and testing of the chips. The system provides an efficient & reliable solution for testing ETROC (ETROC2 since April 2023 with 16x16 pixels, full-size, full functionality prototype) and can be extended to other readout chips with similar architecture (AIDA integration is currently being explored).

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

An approach to operating system testing

To ensure the reliability and performance of a new system, it must be verified or validated in some manner. Currently, testing is the only resonable technique available for doing this. Part of this testing process is the high level system test. System testing is considered with respect to operating systems and in particular UNIX. This consideration results in the development and presentation of a good method for performing the system test. The method includes derivations from the system specifications and ideas for management of the system testing project. Results of applying the method to the IBM System/9000 XENIX operating system test and the development of a UNIX test suite are presented.

Sum, R. N., Jr.↗

Cataloging Legacy Data from the Tritium Systems Test Assembly Program

The Tritium Systems Test Assembly (TSTA) at Los Alamos National Laboratory, operational from 1984 to 2001, was critical in advancing fusion fuel cycle technologies, including tritium storage, gas separation, and pumping. TSTA’s contributions, particularly in safe tritium operations, have influenced subsequent fusion projects. This paper discusses the ongoing effort to digitize and catalog TSTA’s historical data to create a searchable resource for the fusion research community. While the long-term objective is to develop a relational database for structured data management, the project remains in the early phase, with current efforts focused on scanning and indexing physical documents. Initial plans for database implementations are also presented, outlining key considerations for structure, query indexing, and standardization. As digitization progresses, future discussions will refine these implantation details to ensure an efficient and comprehensive system. This initiative aims to preserve critical legacy data, enhance the design of tritium system facilities, and support the next generation of fusion energy research.

42 ENGINEERING↗

Automated screening of propulsion system test data by neural networks, phase 1

The evaluation of propulsion system test and flight performance data involves reviewing an extremely large volume of sensor data generated by each test. An automated system that screens large volumes of data and identifies propulsion system parameters which appear unusual or anomalous will increase the productivity of data analysis. Data analysts may then focus on a smaller subset of anomalous data for further evaluation of propulsion system tests. Such an automated data screening system would give NASA the benefit of a reduction in the manpower and time required to complete a propulsion system data evaluation. A phase 1 effort to develop a prototype data screening system is reported. Neural networks will detect anomalies based on nominal propulsion system data only. It appears that a reasonable goal for an operational system would be to screen out 95 pct. of the nominal data, leaving less than 5 pct. needing further analysis by human experts.

Hoyt, W. Andes↗

A Time-Series Distribution Test System Based on Real Utility Data

In this paper, we provide a time-series distribution test system. This test system is a fully observable distribution grid in Midwest U.S. with smart meters (SM) installed at all end users. Our goal is to share a real U.S. distribution grid model without modification. This grid model is comprehensive and representative since it consists of both overhead lines and underground cables, and it has standard distribution grid components such as capacitor banks, line switches, substation transformers with load tap changer and secondary distribution transformers. An important uniqueness of this grid model is it has one-year smart meter measurements at all nodes, thus bridging the gap between existing test feeders and quasi-static time-series based distribution system analysis.

Bu, Fankun↗

Directed Design of Experiments for Validating Probability of Detection Capability of a Testing System

A method of validating a probability of detection (POD) testing system using directed design of experiments (DOE) includes recording an input data set of observed hit and miss or analog data for sample components as a function of size of a flaw in the components. The method also includes processing the input data set to generate an output data set having an optimal class width, assigning a case number to the output data set, and generating validation instructions based on the assigned case number. An apparatus includes a host machine for receiving the input data set from the testing system and an algorithm for executing DOE to validate the test system. The algorithm applies DOE to the input data set to determine a data set having an optimal class width, assigns a case number to that data set, and generates validation instructions based on the case number.

Generazio, Edward R.↗

Flash evaporator systems test

A flash evaporator heat rejection system representative of that proposed for the space shuttle orbiter underwent extensive system testing at the NASA Johnson Space Center (JSC) to determine its operational suitability and to establish system performance/operational characteristics for use in the shuttle system. During the tests the evaporator system demonstrated its suitability to meet the shuttle requirements by: (1) efficient operation with 90 to 95% water evaporation efficiency, (2) control of outlet temperature to 40 + or - 2 F for partial heat load operation, (3) stability of control system for rapid changes in Freon inlet temperature, and (4) repeated dormant-to-active device operation without any startup procedures.

Dietz, J. B.↗

CMS Forward Pixel Upgrade Electronics and System Testing

This note discusses results of electronics and system testing of the CMS forward pixel (FPIX) detector upgrade for Phase 1. The FPIX detector is comprised of four stand-alone half cylinders, each of which contains frontend readout electronic boards, power regulators, cables and fibers in addition to the pixel modules. All of the components undergo rigorous testing and quality assurance before assembly into the half cylinders. Afterwards, we perform full system tests on the completely assembled half cylinders, including calibrations at final operating temperatures, characterization of the realistic readout chain, and system grounding and noise studies. The results from all these tests are discussed.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Test effectiveness study report: An analytical study of system test effectiveness and reliability growth of three commercial spacecraft programs

Failure data from 16 commercial spacecraft were analyzed to evaluate failure trends, reliability growth, and effectiveness of tests. It was shown that the test programs were highly effective in ensuring a high level of in-orbit reliability. There was only a single catastrophic problem in 44 years of in-orbit operation on 12 spacecraft. The results also indicate that in-orbit failure rates are highly correlated with unit and systems test failure rates. The data suggest that test effectiveness estimates can be used to guide the content of a test program to ensure that in-orbit reliability goals are achieved.

Feldstein, J. F.↗

A closed-loop automatic control system for high-intensity acoustic test systems.

Description of an automatic control system for high-intensity acoustic tests in reverberation chambers. Working in 14 one-third-octave bands from 50 to 1000 Hz, the desired sound pressure levels are set into the memory in the control system before the test. The control system then increases the sound pressure level in the reverberation chamber gradually in each of the one-third-octave bands until the level set in the memory is reached. This level is then maintained for the duration of the test. Additional features of the system are overtest protection, the capability of 'holding' the spectrum at any time, and the presence of a total test timer.

Slusser, R. A.↗

Programmable, automated transistor test system

A programmable, automated transistor test system was built to supply experimental data on new and advanced power semiconductors. The data will be used for analytical models and by engineers in designing space and aircraft electric power systems. A pulsed power technique was used at low duty cycles in a nondestructive test to examine the dynamic switching characteristic curves of power transistors in the 500 to 1000 V, 10 to 100 A range. Data collection, manipulation, storage, and output are operator interactive but are guided and controlled by the system software.

Truong, L. V.↗

Automatic Radiated Susceptibility Test System for Payload Equipment

An automatic radiated susceptibility test system (ARSTS) was developed for NASA Lewis Research Center's Electro-magnetic Interference laboratory. According to MSFC-SPEC 521B, any electrical or electronic equipment that will be transported by the spacelab and space shuttle must be tested for susceptibility to electromagnetic interference. This state-of-the-art automatic test system performs necessary calculations; analyzes, processes, and records a great quantity of measured data; and monitors the equipment being tested in real-time and with minimal user intervention. ARSTS reduces costly test time, increases test accuracy, and provides reliable test results.

Ngo, Hoai T.↗