Experience in Thermal-vacuum Testing Earth Satellites at Goddard Space Flight Center
Thermal-vacuum environmental testing of satellites
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Thermal-vacuum environmental testing of satellites
A research and development program of the Infra-Red Test has been conducted by the French Space Agency (CNES). A choice, after characterization, among several possibilities has been made on the type of methods and facilities for the I.R. test. An application to the Thermal Vacuum Test of the SIGMA Telescope is described.
Apollo program all-up spacecraft thermal vacuum tests, considering component and subsystem reliability analysis, thermal model verification and certification requirements
To support NASA’s goal to return to the Moon through the Artemis mission, the development of an exploration portable life support system (xPLSS) has been conducted at Johnson Space Center (JSC). As part of this development process, a large system level thermal/fluid model of the xPLSS was developed using Thermal Desktop and an in-house human model (METMAN). The xPLSS model was used throughout the design process to predict the performance and temperature of nearly all components within the xPLSS. In the fall of 2023, the design, verification, and testing (DVT) unit of the xPLSS was tested in a thermal vacuum (TVAC) chamber at JSC. This testing consisted of combining the xPLSS with an upper torso of the exploration pressure garment system (xPGS) and simulating five extravehicular activities (EVAs) in extreme thermal conditions (two cold EVAs and three hot EVAs). The data generated in this test series provided system level data of the xPLSS operating in vacuum and at flight-like environmental temperatures for the first time. This data was compared to results output by the xPLSS system model to assess the accuracy of previous analyses and improve the fidelity and accuracy of the xPLSS system model. The comparison between model and test hardware provides valuable insight that will help improve the design and fidelity of next generation space suits. In general, comparison between test data and model data generally showed slightly un-conservative values (model predicting colder temperatures than test in hot environments, and hotter temperatures than test in cold environments). Model assumptions and test assumptions were assessed to understand potential causes of some of these sources in error. Recommendations to improve the fidelity of the xPLSS model were also made based on the results presented in this paper.
To support NASA’s goal to return to the Moon through the Artemis Mission, the development of an Exploration Portable Life Support Subsystem (xPLSS) has been conducted at Johnson Space Center (JSC). As part of this development process, a large system level thermal/fluid model of the xPLSS was developed using Thermal Desktop and an in-house human model (METMAN). The xPLSS model was used throughout the design process to predict the performance and temperature of nearly all components within the xPLSS. In the fall of 2023, the Design, Verification, and Testing (DVT) unit of the xPLSS was tested in a thermal vacuum (TVAC) chamber at JSC. This testing consisted of combining the xPLSS with an upper torso of the Exploration Pressure Garment System (xPGS) and simulating five Extravehicular Activities (EVAs) in extreme thermal conditions (two cold EVAs and three hot EVAs). The data generated in this test series provided system level data of the xPLSS operating in vacuum and at flight-like environmental temperatures for the first time. These data were compared to results output by the xPLSS system model to assess the accuracy of previous analyses and improve the fidelity and accuracy of the xPLSS system model. The comparison between model and test hardware provides valuable insight that will help improve the design and fidelity of next generation space suits. In general, comparison between test data and model data generally showed slightly un-conservative values (model predicting colder temperatures than test in hot environments, and hotter temperatures than test in cold environments). Model assumptions and test assumptions were assessed to understand potential causes of some of these sources in error. Recommendations to improve the fidelity of the xPLSS model were also made based on the results presented in this paper.
This presentation describes the test objectives, test summary, test configuration and test performance of the James Webb Space Telescope Integrated Science Instrument Module CryoVac 3 Thermal Vacuum Test. Verify the ISIM System in its final configuration after environmental exposure and provide a post-environmental performance baseline, including critical ground calibrations needed for science data processing in flight.
This paper presents viewgraphs on Thermal Vacuum Tests of the GLAS (Geoscience Laser Altimeter System) Propylene Loop Heat Pipe Development Model. The topics include: 1) Flight LHP System (Laser); 2) Test Design and Objectives; 3) DM (Development Model) LHP (Loop Heat Pipe) Test Design; 4) Starter Heater and Coupling Blocks; 5) CC Control Heaters and PRT; 6) Heater Plates (Shown in Reflux Mode); 7) Startup Tests; 8) CC Control Heater Power Tests for CC Temperature Control; and 9) Control Temperature Stability.
Slat heater boxes have been invented for controlling the sink temperatures of objects under test in a thermal vacuum chamber, the walls of which are cooled to the temperature of liquid nitrogen. A slat heater box (see Figure 1) includes a framework of struts that support electrically heated slats that are coated with a high-emissivity optically gray paint. The slats can be grouped together into heater zones for the purpose of maintaining an even temperature within each side. The sink temperature of an object under test is defined as the steady-state temperature of the object in the vacuum/ radiative environment during the absence of any internal heat source or sink. The slat heater box makes it possible to closely control the radiation environment to obtain a desired sink temperature. The slat heater box is placed inside the cold thermal vacuum chamber, and the object under test is placed inside (but not in contact with) the slat heater box. The slat heaters occupy about a third of the field of view from any point on the surface of the object under test, the remainder of the field of view being occupied by the cold chamber wall. Thus, the radiation environment is established by the combined effects of the slat heater box and the cold chamber wall. Given (1) the temperature of the chamber wall, (2) the fractions of the field of view occupied by the chamber wall and the slat heater box, and (3) the emissivities of the slats, chamber wall, and the surface of object under test, the slat temperature required to maintain a desired sink temperature can be calculated by solving the equations of gray-body radiation for the steady-state adiabatic case (equal absorption and emission by the object under test). Slat heater boxes offer an important advantage over the infrared lamps that have been previously used to obtain desired sink temperatures: In comparison with an infrared lamp, a slat heater box provides a greater degree of sink temperature uniformity for a test-object surface that includes multiple areas with differing optical properties.
Pressure measurements and gas flow analysis during thermal vacuum tests of manned spacecraft indicating adequate space vacuum simulation
Pressure measurements and gas flow analysis during thermal vacuum tests of manned spacecraft indicating adequate space vacuum simulation
An infrared simulator was developed and installed in SIM Chamber A in support of the Apollo lunar-exploration mission thermal vacuum testing. The simulator was designed to provide thermal simulation of the radiation emitted and reflected by the lunar surface incident on the Apollo service module in a 60-mile-altitude lunar orbit. The infrared simulator comprises 18 individually controlled zones that provide the irradiance profiles over a 180 deg arc around the spacecraft, simulating the flux levels of equatorial, polar, and 45 deg lunar orbits.
In June 2011, the multi-university sponsored Cosmic Ray Electron Synchrotron Telescope (CREST) has undergone thermal-vacuum qualification testing at the NASA Glenn Research Center (GRC), Plum Brook Station, Sandusky, Ohio. The testing was performed in the B-2 Space Propulsion Facility vacuum chamber. The CREST was later flown over the Antarctic region as the payload of a stratospheric balloon. Solar simulation was provided by a system of planar infrared lamp arrays specifically designed for CREST. The lamp arrays, in conjunction with a liquid-nitrogen-cooled cold wall, achieved the required thermal conditions for the qualification tests. The following slides accompanied the presentation of the report entitled Solar Simulation for the CREST Preflight Thermal-Vacuum Test at B-2, at the 27th Aerospace Testing Seminar, October 2012. The presentation described the test article, the test facility capability, the solar simulation requirements, the highlights of the engineering approach, and the results achieved. The presentation was intended to generate interest in the report and in the B-2 test facility.
Early design studies showed that the UV spectrometer thermal design margins were very small so that an experimental confirmation of the analytical model would be desirable. At that time the prototype unit was scheduled too far downstream to be of value, so a separate thermal model was built for use in verifying the analytical model.
Unusual requirements for the Pressure Distribution/Air Data System (PD/ADS) transducer thermal vacuum testing led to the development of a conductively heated and cooled, fully automated, bell-jar test system. The system has proven to be easily adaptable for other tests and offers the advantages of quick turn-around and low operational cost.
The Mars Observer spacecraft underwent a successful system thermal vacuum (STV) test in March 1992, meeting all five primary objectives. This paper presents a description of the spacecraft and the test configuration, as well as a discussion of the test results and how the test objectives were successfully met. It then describes some of the cost-saving methods used in this test. These include the early commitment to restricting the total test time to 300 hours, the timely completion of test control documentation, use of IR heating instead of solar simulation, use of non-flight structural heaters, and the in-test modification of test phases to account for unexpected deviations from pre-test predictions.
In order to maintain cleanliness during preparations for JWST’s OTIS (Optical Telescope Element-Integrated Science Instrument Module) Cryogenic Thermal Vacuum Test, a cleanroom was built that attached directly to the 60-year-old Chamber A. The cleanroom and chamber were outfitted with independent environmental control systems each providing ISO Class 71 air cleanliness. To maintain balanced, positive pressure in both the cleanroom and chamber volumes, a special control protocol was developed and successfully implemented. Dual back-up environmental control units (one each for the chamber and cleanroom) were installed just outside the building to provide environmental control redundancy due to a single source chilled water supply and weather threats. In addition, lack of a dedicated cleanroom airlock facilitating clean ingress and egress made it necessary to perform additional cleaning and packaging, as well as augment the uncontrolled truck lock space with small clean tents for pre-cleaning. Special procedures were developed to allow ingress of extra-large support equipment required for load testing of the cleanroom crane, installation of optical equipment in Chamber A and accommodation of the OTIS shipping container. A thorough bake-out and cleaning of Chamber A was also necessary to reduce volatiles from the shroud’s black thermal paint and to reduce particle fallout. Acrylic adhesive fracture discovered during early cryo-testing represented a significant challenge that was successfully mitigated prior to OTIS testing. A dedicated team of Contamination Control (CC) Technicians was specifically trained to clean support equipment and screen materials entering the cleanroom and chamber to ensure cleanliness and vacuum compatibility.
In order to maintain cleanliness during preparations for JWST’s OTIS (Optical Telescope Element-Integrated Science Instrument Module) Cryogenic Thermal Vacuum Test, a cleanroom was built that attached directly to the 60-year-old Chamber A. The cleanroom and chamber were outfitted with independent environmental control systems each providing ISO Class 71 air cleanliness. To maintain balanced, positive pressure in both the cleanroom and chamber volumes, a special control protocol was developed and successfully implemented. Dual back-up environmental control units (one each for the chamber and cleanroom) were installed just outside the building to provide environmental control redundancy due to a single source chilled water supply and weather threats. In addition, lack of a dedicated cleanroom airlock facilitating clean ingress and egress made it necessary to perform additional cleaning and packaging, as well as augment the uncontrolled truck lock space with small clean tents for pre-cleaning. Special procedures were developed to allow ingress of extra-large support equipment required for load testing of the cleanroom crane, installation of optical equipment in Chamber A and accommodation of the OTIS shipping container. A thorough bake-out and cleaning of Chamber A was also necessary to reduce volatiles from the shroud’s black thermal paint and to reduce particle fallout. Acrylic adhesive fracture discovered during early cryo-testing represented a significant challenge that was successfully mitigated prior to OTIS testing. A dedicated team of Contamination Control (CC) Technicians was specifically trained to clean support equipment and screen materials entering the cleanroom and chamber to ensure cleanliness and vacuum compatibility.
Manned operations were a significant part of Gemini and Apollo thermal-vacuum test programs. The development of test techniques and equipment at the Space Environment Simulation Laboratory is discussed relative to these programs.