Search NASASearch

SEARCH · Search NASA

Results for “webb”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Thermal Considerations for Reducing the Cooldown and Warmup Duration of the James Webb Space Telescope OTIS Cryo-Vacuum Test

The James Webb Space Telescope (JWST), set to launch in 2018, is NASAs next-generation flagship telescope. The Optical Telescope Element (OTE) and Integrated Science Instrument Module (ISIM) contain all of the optical surfaces and instruments to capture and analyze the telescopes infrared targets. The integrated OTE and ISIM are denoted as OTIS, and will be tested as a single unit in a critical thermal-vacuum test in mid-2017 at NASA Johnson Space Centers Chamber A facility. The payload will be evaluated for workmanship and functionality in a 20K simulated flight environment during this thermal-vacuum test. However, the sheer thermal mass of the OTIS payload as well as the restrictive gradient, rate, and contamination-related constraints placed on test components precludes rapid cooldown or warmup to its steady-state cryo-balance condition. Hardware safety considerations precludes injection of helium gas for free molecular heat transfer. Initial thermal analysis predicted that transient radiative cooldown from ambient temperatures, while meeting all limits and constraints, would take 33.3 days; warmup similarly would take 28.4 days. This paper discusses methods used to reduce transition times from the original predictions through modulation of boundary temperatures and environmental conditions. By optimizing helium shroud transition rates and heater usage, as well as rigorously re-examining previously imposed constraints, savings of up to three days on cooldown and up to a week on warmup can be achieved. The efficiencies gained through these methods allow the JWST thermal test team to create faster cooldown and warmup profiles, thus reducing the overall test duration and cost, while keeping all of the required test operations.

JWST

Optical Testing of the James Webb Space Telescope

The James Webb Space Telescope (JWST) will be a large infrared telescope with a 6.5-meter primary mirror, working to an October 2018 launch date. Ground testing for the JWST occurred in two test campaigns, at NASAs Goddard Space Flight Center and Johnson Space Center. The talk describes the JWST and its optical ground testing.

James Webb Space Telescope

The James Webb Space Telescope: Contamination Control and Materials

The James Webb Space Telescope (JWST), expected to launch in 2018 or early 2019, will be the premier observatory for astronomers worldwide. It is optimized for infrared wavelengths and observation from up to 1 million miles from Earth. JWST includes an Integrated Science Instrument Module (ISIM) containing the four main instruments used to observe deep space: Near-Infrared Camera (NIRCam), Near-Infrared Spectrograph (NIRSpec), Mid-Infrared Instrument (MIRI), and Fine Guidance Sensor/Near InfraRed Imager and Slitless Spectrograph (FGS/NIRISS). JWST is extremely sensitive to contamination directly resulting in degradation in performance of the telescope. Contamination control has been an essential focus of this mission since the beginning of this observatory. A particular challenge has been contamination challenges in vacuum chamber operations.

James Webb Space Telescop

The "Very Cool" James Webb Space Telescope!

For over twenty years, scientists, engineers, technicians, and other personnel have been working on the next generation space telescope. As a partnership between NASA (National Aeronautics and Space Administration), CSA (Canadian Space Agency), and ESA (European Space Angency), the James Webb Space Telescope will complement the previous research performed by the Hubble by utilizing a larger primary mirror, which will also be optimized for infrared wavelengths. This combination will allow JWST to collect data and take images of light having traveled over 13.7 billion light years. This presentation will focus on the mission, as well as the contamination control challenges during the integration and testing in the NASA Goddard Spacecraft Systems Development and Integration Facility (SSDIF), one of the largest cleanrooms in the world. Additional information will be presented regarding space simulation testing down to a cool 20 degrees Kelvin [-424 degrees Fahrenheit] that will occur at Johnson Space Center in Houston, TX, and more testing and integration to happen at Northrop Grumman Corp., in Redondo Beach, CA. Launch of the JWST is currently scheduled for the spring of 2019 at Ariane Spaceport in French Guiana, South America.

space sciences

Performance of the Center-Of-Curvature Optical Assembly During Cryogenic Testing of the James Webb Space Telescope

The James Webb Space Telescope (JWST) primary mirror (PM) is 6.6 meters in diameter and consists of 18 hexagonal segments, each 1.5 meters point-to-point. Each segment has a 6 degree-of-freedom hexapod actuation system and a radius-of-curvature (ROC) actuation system. The full telescope was tested at its cryogenic operating temperature at Johnson Space Center (JSC) in 2017. This testing included center-of-curvature measurements of the PM wavefront error using the Center-of-Curvature Optical Assembly (COCOA), along with the Absolute Distance Meter Assembly (ADMA). The COCOA included an interferometer, a reflective null, an interferometer-null calibration system, coarse and fine alignment systems, and two displacement measuring interferometer systems. A multiple-wavelength interferometer was used to enable alignment and phasing of the PM segments. By combining measurements at two laser wavelengths, synthetic wavelengths up to 15 millimeters could be achieved, allowing mirror segments with millimeter-level piston errors to be phased to the nanometer level. The ADMA was used to measure and set the spacing between the PM and the focus of the COCOA null (i.e., the PM center-of-curvature) for determination of the ROC. This paper describes the COCOA, the PM test setup, the testing performed, the test results, and the performance of the COCOA in aligning & phasing the PM segments and measuring the final PM wavefront error.

JWST

EMC Test Challenges for NASA's James Webb Space Telescope

This presentation describes the electromagnetic compatibility (EMC) tests performed on the Integrated Science Instrument Module (ISIM), the science payload of the James Webb Space Telescope (JWST), at NASAs Goddard Space Flight Center (GSFC) in August 2015. By its very nature of being an integrated payload, it could be treated as neither a unit level test nor an integrated spacecraft observatory test. Non-standard test criteria are described along with non-standard test methods that had to be developed in order to evaluate them. Results are presented to demonstrate that all test criteria were met in less than the time allocated.

Electromagnetic Interference (EMI)

James Webb Space Telescope Primary and Secondary Mirror Segment Assemblies Cleaning: a Quantitative Assessment

The James Webb Space Telescope Primary Mirror Segment Assemblies (PMSAs) and Secondary Mirror Assembly (SMA) were cleaned at the Johnson Space Center (JSC) in January 2018. In order to quantify the effectiveness of the cleaning, the same cleaning process was performed on the PMSA and SMA traveling witness wafers. These wafers have accompanied their respective mirror segments from their arrival at the Goddard Space Flight Center, through transport to JSC, and ultimately their exposure in Chamber A for cryogenic testing. The traveling wafers were analyzed using an Image Analysis automated microscope both prior to and after the cleaning. The resulting data showed that the PMSA wafers' Percent Area Coverage (PAC) reduced by 83.5% on average, from 0.1524 PAC to 0.0251 PAC. The SMA wafer's PAC decreased by 97.2%, from 0.1194 PAC to 0.0034 PAC. Further analysis of the particle size bins was completed in order to calculate their particle distribution slopes. The slope of the PMSA wafers increased by 0.025 on average, and the SMA wafer slope increased by 0.066. This indicates that the ratio of large to small particles slightly increased after the cleaning across all mirror segments. Visual inspections of the wafers and the flight PMSAs and SMA showed considerable and comparable particulate coverage improvements, thus leading to the conclusion that the average PAC on the PMSAs and SMA improved by the same factor as their respective wafers.

mirror

Troubleshooting Challenges on the James Webb Space Telescope (JWST)

This presentation provides a summary of troubleshooting efforts on the power interface of the James Webb Space Telescope (JWST) during cryovac testing at Johnson Space Center (JSC). [Of special interest: OTIS (OTE (Optical Telescope Element) and ISIM (Integrated Science Instrument Module))].

Electromagnetics

How NASA decided Webb was ready: Inside the risk assessment

Every do-it-yourselfer knows how hard it can be to declare a project complete. Will another turn of the bolt or brushstroke make things better or worse? That was roughly the choice NASA faced a year before the Dec. 25 launch of the James Webb Space Telescope. Would more testing close more technical risks in the nearly $10 billion project or create new ones? In the end, NASA decided against more testing. NASA’s Jesse Leitner and Tupper Hyde describe the assessment they performed.

JWST

An Overview of Contamination Control for the James Webb Space Telescope Launch Campaign

The James Webb Space Telescope (JWST) is a large, infrared space telescope operating at Lagrange point 2. JWST is a joint effort between NASA, ESA, and CSA and was launched from the Centre Spatial Guyanais (CSG) on an Ariane 5 rocket in December 2021. The three-month launch campaign utilized enhanced contamination controls to meet JWST’s strict cleanliness requirements. Prior to launch, JWST was permitted to only be exposed to ISO Class 7 cleanrooms, whereas the processing facilities at CSG are ISO Class 8. NASA, ESA, Arianespace, and CNES implemented temporary upgrades to the nominal contamination control operations for the launch campaign unique to JWST, including the use of vetted, portable High Efficiency Particulate Air (HEPA) filter walls, pre-entrance cleanliness acceptance surveys of each facility and the intra-plant transporter, tightened cleanroom protocols, upgraded garmenting and laundering techniques, cleaning of Self-Contained Atmospheric Protection Ensemble (SCAPE) suits, increased maintenance, staffed pre-cleaning stations, adaptation of the house purge network, and a contamination control enclosure atop the Ariane 5 launcher prior to fairing encapsulation. The Ariane 5 fairing interior and Vehicle Equipment Bay membrane also received multiple cleanings, detailed inspections, and verification sampling to achieve necessary cleanliness levels. The fairing itself was specially sealed to protect the inner environment with just a small, door porthole accessible via diving board for final closeout of the purge interface. All of these enhancements together allowed JWST to meet its contamination requirements for launch, ensuring successful post-separation deployments and mission science.

Contamination Control

Overview of Contamination Control for the James Webb Space Telescope Launch Campaign

The James Webb Space Telescope (JWST) is a large, infrared space telescope operating at Lagrange point 2. JWST is a joint effort between NASA, ESA, and CSA and was launched from the Centre Spatial Guyanais (CSG) on an Ariane 5 rocket in December 2021. The three-month launch campaign utilized enhanced contamination controls to meet JWST’s strict cleanliness requirements. Prior to launch, JWST was permitted to only be exposed to ISO Class 7 cleanrooms, whereas the processing facilities at CSG are ISO Class 8. NASA, ESA, Arianespace, and CNES implemented temporary upgrades to the nominal contamination control operations for the launch campaign unique to JWST, including the use of vetted, portable High Efficiency Particulate Air (HEPA) filter walls, pre-entrance cleanliness acceptance surveys of each facility and the intra-plant transporter, tightened cleanroom protocols, upgraded garmenting and laundering techniques, cleaning of Self-Contained Atmospheric Protection Ensemble (SCAPE) suits, increased maintenance, staffed pre-cleaning stations, adaptation of the house purge network, and a contamination control enclosure atop the Ariane 5 launcher prior to fairing encapsulation. The Ariane 5 fairing interior and Vehicle Equipment Bay membrane also received multiple cleanings, detailed inspections, and verification sampling to achieve necessary cleanliness levels. The fairing itself was specially sealed to protect the inner environment with just a small, doored porthole accessible via diving board for final closeout of the purge interface. All these enhancements together allowed JWST to meet its contamination requirements for launch, ensuring successful post-separation deployments and mission science.

James Webb Space Telescope

Overview of Contamination Control for the James Webb Space Telescope Launch Campaign

The James Webb Space Telescope (JWST) is a large, infrared space telescope operating at Lagrange point 2. JWST is a joint effort between NASA, ESA, and CSA and was launched from the Centre Spatial Guyanais (CSG) on an Ariane 5 rocket in December 2021. The three-month launch campaign utilized enhanced contamination controls to meet JWST’s strict cleanliness requirements. Prior to launch, JWST was permitted to only be exposed to ISO Class 7 cleanrooms, whereas the processing facilities at CSG are ISO Class 8. NASA, ESA, Arianespace, and CNES implemented temporary upgrades to the nominal contamination control operations for the launch campaign unique to JWST, including the use of vetted, portable High Efficiency Particulate Air (HEPA) filter walls, pre-entrance cleanliness acceptance surveys of each facility and the intra-plant transporter, tightened cleanroom protocols, upgraded garmenting and laundering techniques, cleaning of Self-Contained Atmospheric Protection Ensemble (SCAPE) suits, increased maintenance, staffed pre-cleaning stations, adaptation of the house purge network, and a contamination control enclosure atop the Ariane 5 launcher prior to fairing encapsulation. The Ariane 5 fairing interior and Vehicle Equipment Bay membrane also received multiple cleanings, detailed inspections, and verification sampling to achieve necessary cleanliness levels. The fairing itself was specially sealed to protect the inner environment with just a small, doored porthole accessible via diving board for final closeout of the purge interface. All these enhancements together allowed JWST to meet its contamination requirements for launch, ensuring successful post-separation deployments and mission science.

James Webb Space Telescope, launch, contamination,

25 Years of Contamination Control on the James Webb Space Telescope

The James Webb Space Telescope (JWST) has actively been in process since 1996, and at last, on Christmas Day 2021, it launched. This launch was the fulfillment of an astounding level of work performed by thousands of people across the globe in dozens of disciplines. From the start, effective contamination control was considered essential for the JWST mission due to the large, exposed optics and tight sensitivity required to measure first light and faint signals at the dawn of the universe. This paper will present the JWST mission and requirements overview, including mission requirements that led to optimizing performance for collecting light in the Near Infrared (NIR, 0.6μm) – Mid Infrared (MIR, 29μm) range. Molecular films absorb in the IR bands and can alter thermal emissivity, resulting in increased noise at the longer wavelengths (MIRI). Particles increase light scatter and background noise levels at the shorter wavelengths (NIRSpec, NIRCam and FGS). The passively cooled design of JWST led to an open architecture for the optical telescope element (OTE), presenting the challenge of maintaining cleanliness throughout assembly, integration, and test in a multitude of environments. The paper will describe the mission and will introduce the specific areas of contamination control developed and advanced to keep JWST clean at an unsurpassed level of cleanliness.

Contamination Control

The James Webb Space Telescope: Its Commissioning and Technology

The James Webb Space Telescope (JWST) launched on December 25th, 2021. During the first 120 days of the mission the telescope and mirrors were deployed and the 18 primary segments and secondary mirror were aligned from millimeters to nanometers. This process led to an optical system that is limited only by the laws of physics. JWST is the first segmented, large cryogenic telescope that has been in flown in space and its deployment was an incredible first step in the advancement of large space telescopes. This talk will discuss the origin of several key technologies as well as the commissioning process from the perspective of the telescope including launch, deployments, alignments. It will culminate with a summary of how well the telescope is performing.

James Webb Space Telescope

Phasing the Webb Telescope

The James Webb Space Telescope (JWST) is a segmented deployable telescope, currently operating at L2. The telescope utilizes 6 degrees of freedom for adjustment of the Secondary Mirror (SM) and 7 degrees of freedom for adjustment of each of its 18 segments in the Primary Mirror (PM). After deployment, the PM segments and the SM arrived in their correct optical positions to within a ~1 mm, with accordingly large wavefront errors. A Wavefront Sensing and Controls (WFSC) process was executed to adjust each of these optical elements in order to correct the deployment errors and produce diffraction-limited images across the entire science field. This paper summarizes the application of the WFSC process.

JWST

25 Years of Contamination Control on the James Webb Space Telescope

The James Webb Space Telescope (JWST) has actively been in process since 1996, and at last, on Christmas Day 2021, it launched. This launch was the fulfillment of an astounding level of work performed by thousands of people across the globe in dozens of disciplines. From the start, effective contamination control (CC) was considered essential for the JWST mission due to the large, exposed optics and tight sensitivity required to measure first light and faint signals at the dawn of the universe. This presentation will present the JWST mission and requirements overview, including mission requirements that led to optimizing performance for collecting light in the Near Infrared (NIR, 0.6μm) – Mid Infrared (MIR, 29μm) range. Molecular films absorb in the IR bands and can alter thermal emissivity, resulting in increased noise at the longer wavelengths (MIRI). Particles increase light scatter and background noise levels at the shorter wavelengths (NIRSpec, NIRCam and FGS). The passively cooled design of JWST led to an open architecture for the optical telescope element (OTE), presenting the challenge of maintaining cleanliness throughout assembly, integration, and test in a multitude of environments for over 2 decades. The presentation will describe CC for the mission starting with the first architecture in 1996, then introducing the specific areas of contamination control developed and advanced to keep JWST clean at an unsurpassed level of cleanliness.

Contamination Control

The Webb Space Telescope - An Engineering Marvel Story

This presentation will provide an overview of the James Webb Space Telescope (JWST) and its engineering development process. JWST has succeeded the Hubble Space Telescope in our quest for the first galaxies formed out of the darkness of the early universe. Since its launch in December 2021, JWST has helped us understand how these galaxies evolved over billions of years, how stars and planetary systems form, what exoplanets look like and if they can harbor life. JWST uses a ~6.5-m-diameter primary mirror to collect infrared light, which is sent to four scientific instruments. It operates at the second Sun-Earth Lagrange point and has a five-layer sunshield to be able to operate at cryogenic temperatures. JWST is an international effort of NASA and the European and Canadian Space Agencies.

James Webb Space Telescope

Hunting Dark Matter Lines in the Infrared Background with the James Webb Space Telescope

Dark matter particles with a mass around 1 eV can decay into near-infrared photons. Utilising available public blank sky observations from the NIRSpec IFU on the James Webb Space Telescope (JWST), we search for a narrow emission line due to decaying dark matter and derive leading constraints in the mass range 0.8-3 eV on the decay rate to photons, and more specifcally, on the axion-photon coupling for the case of axion-like particles. We exclude τ < 3.5 x 10 26 s at m DM ≃ 0.8 eV and, in the case of axions, g aγγ > 1.3 x 10 -11 GeV -1 for m a ≃ 2.2 eV. Our results do not rely on dedicated observations, rather we use blank sky observations intended for sky subtraction, and thus our reach may be automatically strengthened as JWST continues to observe.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS