Search NASA⌕ Search

SEARCH · Search NASA

Results for “Action Potentials”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

100-KE REACTOR CORE REMOVAL PROJECT ALTERNATIVE ANALYSIS WORKSHOP REPORT

On December 15-16, 2009, a 100-KE Reactor Core Removal Project Alternative Analysis Workshop was conducted at the Washington State University Consolidated Information Center, Room 214. Colburn Kennedy, Project Director, CH2M HILL Plateau Remediation Company (CHPRC) requested the workshop and Richard Harrington provided facilitation. The purpose of the session was to select the preferred Bio Shield Alternative, for integration with the Thermal Shield and Core Removal and develop the path forward to proceed with project delivery. Prior to this workshop, the S.A. Robotics (SAR) Obstruction Removal Alternatives Analysis (565-DLV-062) report was issued, for use prior to and throughout the session, to all the team members. The multidisciplinary team consisted ofrepresentatives from 100-KE Project Management, Engineering, Radcon, Nuclear Safety, Fire Protection, Crane/Rigging, SAR Project Engineering, the Department of Energy Richland Field Office, Environmental Protection Agency, Washington State Department of Ecology, Defense Nuclear Facility Safety Board, and Deactivation and Decommission subject matter experts from corporate CH2M HILL and Lucas. Appendix D contains the workshop agenda, guidelines and expectations, opening remarks, and attendance roster going into followed throughout the workshop. The team was successful in selecting the preferred alternative and developing an eight-point path forward action plan to proceed with conceptual design. Conventional Demolition was selected as the preferred alternative over two other alternatives: Diamond Wire with Options, and Harmonic Delamination with Conventional Demolition. The teams preferred alternative aligned with the SAR Obstruction Removal Alternative Analysis report conclusion. However, the team identified several Path Forward actions, in Appendix A, which upon completion will solidify and potentially enhance the Conventional Demolition alternative with multiple options and approaches to achieve project delivery. In brief, the Path Forward was developed to reconsider potential open air demolition areas; characterize to determine if any zircaloy exists, evaluate existing concrete data to determine additional characterization needs, size the new building to accommodate human machine interface and tooling, consider bucket thumb and use ofshape-charges in design, and finally to utilize complex-wide and industry explosive demolition lessons learned in the design approach. Appendix B documents these results from the team's use ofValue Engineering process tools entitled Weighted Analysis Alternative Matrix, Matrix Conclusions, Evaluation Criteria, and Alternative Advantages and Disadvantages. These results were further supported with the team's validation of parking-lot information sheets: memories (potential ideas to consider), issues/concerns, and assumptions, contained in Appendix C. Appendix C also includes the recorded workshop flipchart notes taken from the SAR Alternatives and Project Overview presentations. The SAR workshop presentations, including a 3-D graphic illustration demonstration video have been retained in the CHPRC project file, and were not included in this report due to size limitations. The workshop concluded with a round robin close-out where each member was engaged for any last minute items and meeting utility. In summary, the team felt the session was value added and looked forward to proceeding with the recommended actions and conceptual design.

36 MATERIALS SCIENCE↗

Radiative corrections to the non commutative photon propagator at one-loop order

We study the non-commutative gauge theory on the Moyal space. We add the harmonic potential introduced by Grosse and Wulkenhaar to the Maxwell Lagrange as well as the Gauge fixation. We determine the non-commutative U{sub *}(1) Gauge action which is invariant under the BRST transformations in the matrix basis. We determine in this basis the quadratic parts and the vertex of the Gauge field A{sub {mu}} and of the Faddeev-Popov ghost fields c(bar sign)andc. Finally, we study the perturbative correction to one loop order of the one point function in the matrix basis.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Anticipating Hazard Impacts through Capacity Building and Co-development

Improving forecast accuracy, extending lead time, understanding hazard susceptibility, and integrating exposure and vulnerability data to generate impact-based forecasts are critical in mitigating disaster impacts. These efforts enable anticipatory action through enhancing the efficacy of early warning systems to assess potential multi-dimensional hazard impacts. In response to this need, SERVIR has co-developed a series of hazard services providing vital information from national to regional scales. This poster showcases examples of geospatial services co-developed with partners through a capacity building approach, supporting the establishment of hazard early warning / early action systems. These services integrate multidimensional vulnerability and exposure data to comprehensively assess impacts. Furthermore, these services demonstrate how co-development and capacity building can advance the development of impact-based forecasts and multi-hazards services. By prioritizing collaboration, human insights, local knowledge, capacity building, and employing applied science approaches in geospatial service development, this work has helped create inclusive and customized solutions. These solutions are tailored to meet the needs of local communities and are readily adaptable into decision-making processes.

weather↗

Benefits of a Proposed Process to Preserve Lunar Sites

Assets in lunar orbit and on the surface, whether operational or defunct, have the ability to cause inadvertent interference with proximity operations. As missions to the Moon continue to proliferate, and as more actors become involved, a mechanism is needed to bring communities together to ensure ones' actions do not inhibit the mission objectives of another. A mechanism may also be needed to determine whether any locations on the Moon or in its orbit are of high value to various users, and, pending potential decreases in this value due to interference and other concerns, warrant mitigative actions to preserve these locations. Such a mechanism could provide benefits to all those involved, including governments, industry, academia, and other interested groups. We present a notional process to aggregate community interests for lunar sites and orbits. We then consider two user needs and explore how this process could be used to identify potential alignments and misalignments across communities.

preservation↗

Geothermal(Ground-Source)Heat Pumps: Market Status, Barriers to Adoption, and Actions to Overcome Barriers

More effective stewardship of our resources contributes to the security, environmental sustainability, and economic well-being of the nation. Buildings present one of the best opportunities to economically reduce energy consumption and limit greenhouse gas emissions. Geothermal heat pumps (GHPs), sometimes called ground-source heat pumps, have been proven capable of producing large reductions in energy use and peak demand in buildings. However, GHPs have received little attention at the policy level as an important component of a national strategy. Have policymakers mistakenly overlooked GHPs, or are GHPs simply unable to make a major contribution to the national goals for various reasons? This brief study was undertaken at DOE's request to address this conundrum. The scope of the study includes determining the status of global GHP markets and the status of the GHP industry and technology in the United States, assembling previous estimates of GHP energy savings potential, identifying key barriers to application of GHPs, and identifying actions that could accelerate market adoption of GHPs. The findings are documented in this report along with conclusions and recommendations.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Charting the Path to Electrification: Analyzing the Economic and Technological Potential of Advanced Vehicle Powertrains

The U.S. Department of Energy’s Vehicle Technologies Office (DOE-VTO) is driving advancements in highway transportation by targeting energy efficiency, environmental sustainability, and cost reductions. This study investigates the fuel economy potential and cost implications of advanced powertrain technologies using comprehensive system simulations. Leveraging tools such as Autonomie and TechScape, developed by Argonne National Laboratory, this study evaluates multiple timeframes (2023–2050) and powertrain types, including conventional internal combustion engines, hybrid electric vehicles (HEVs), plug-in hybrid electric vehicles (PHEVs), and battery electric vehicles (BEVs). Simulations conducted across standard regulatory driving cycles provide detailed insights into fuel economy improvements, cost trajectories, and total cost of ownership. The findings highlight key innovations in battery energy density, lightweighting, and powertrain optimization, demonstrating the growing viability of BEVs and their projected economic competitiveness with conventional vehicles by 2050. This work delivers actionable insights for policymakers and industry stakeholders, underscoring the transformative potential of vehicle electrification in achieving sustainable transportation goals.

Islam, Ehsan Sabri (ORCID:0000000200220180)↗

Closure Report for Corrective Action Unit 117: Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada, Revision 0

This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 117: Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 117 comprises Corrective Action Site (CAS) 26-41-01, Pluto Disassembly Facility, located in Area 26 of the Nevada Test Site. The purpose of this CR is to provide documentation supporting the completed corrective actions and provide data confirming that the closure objectives for CAU 117 were met. To achieve this, the following actions were performed: • Review the current site conditions, including the concentration and extent of contamination. • Implement any corrective actions necessary to protect human health and the environment. • Properly dispose of corrective action and investigation wastes. • Document Notice of Completion and closure of CAU 117 issued by the Nevada Division of Environmental Protection. From May 2008 through February 2009, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 117, Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada. The purpose of the activities as defined during the data quality objectives process were: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels to determine COCs for CAU 117. Assessment of the data generated from closure activities indicated that the final action levels were exceeded for polychlorinated biphenyls (PCBs) reported as total Aroclor and radium-226. A corrective action was implemented to remove approximately 50 cubic yards of PCB-contaminated soil, approximately 1 cubic foot of radium-226 contaminated soil (and scabbled asphalt), and a high-efficiency particulate air filter that was determined to meet the criteria of a potential source material (PSM). Electrical and lighting components (i.e., PCB-containing ballasts and capacitors) and other materials (e.g., mercury-containing thermostats and switches, lead plugs and bricks) assumed to be PSM were also removed from Building 2201, as practical, without the need for sampling. Because the COC contamination and PSMs have been removed, clean closure of CAS 26-41-01 is recommended, and no use restrictions are required to be placed on this CAU. No further action is necessary because no other contaminants of potential concern were found above preliminary action levels. The physical end state for Building 2201 is expected to be eventual demolition to slab. The DOE, National Nuclear Security Administration Nevada Site Office provides the following recommendations: • Clean closure is the recommended corrective action for CAS 26-41-01 in CAU 117. • A Notice of Completion to the DOE, National Nuclear Security Administration Nevada Site Office is requested from the Nevada Division of Environmental Protection for closure of CAU 117. • Corrective Action Unit 117 should be moved from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order.

54 ENVIRONMENTAL SCIENCES↗

Tool-Based Case Studies on Strategic Deployment of Untapped Micro-Pumped Hydro Storage in Michigan

With most classical hydropower sites already utilized and the global push for rapid integration of renewable energy sources accelerating, there is a critical need to identify alternative energy storage solutions. Pumped hydro energy storage, which accounts for the vast majority of global grid-scale storage, remains one of the most cost-effective and long-duration storage technologies available. Hence, this study presents a novel tool designed to assess the untapped potential of inland lakes and reservoirs for micro-PSH, using Michigan’s relatively flat landscape as a case study due to its extensive but underutilized water infrastructure. To ensure accuracy and reliability, the tool incorporates extensive data gathered from authorized sources, covering more than 420 water facilities and potential reservoirs in the state. The tool evaluates key parameters such as horizontal and vertical distances, volume, and the total storage capacity of each reservoir. Its robust assessment framework integrates these metrics to evaluate each site’s potential. The tool’s intuitive interface and geospatial visualizations support actionable insights for planners and scalable deployment of distributed storage infrastructure.

13 HYDRO ENERGY↗

Lattice QCD and High Baryon Density State

We report our recent studies on the finite density QCD obtained from lattice QCD simulation with clover-improved Wilson fermions of two flavor and RG-improved gauge action. We approach the subject from two paths, i.e., the imaginary and chemical potentials.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Advanced Reactor Supply Chain Assessment (GAIN Report)

Several net-zero scenario evaluations predict a rapid ramp up of nuclear energy in the coming decades. If this materializes, it will most likely strain the supply chains associated with the potential advanced reactor concepts awaiting deployment. To help assess the current and potential capacities of the various advanced reactor supply chains, the Gateway for Accelerated Innovation in Nuclear (GAIN) conducted a survey of companies able to produce components for advanced reactors in the near future (namely for sodium, gas-cooled, and molten salt reactors). Using an aggressive nuclear deployment scenario, the objective was to assess the ability of the various supply chains to meet the considerable demand projections for certain key components (vessels, heat exchangers, pumps, graphite, and sensors) and identify potential challenges. While individual companies were unable to meet the most optimistic nuclear deployment rate projections, it was found that on aggregate, a United States-based supply chain projected that expansion could be ramped up to meet a larger future demand of these components. However, meeting projected demand for several more complex items (namely gas or salt heat exchangers) was found to be more challenging. Deploying new reactors at scale necessitates the production of more and more supply chain components, requiring a ramp up in production. Supply chain companies were surveyed, and respondents appeared less able to meet short term demand (next year) versus longer-term demand projections (5 and 10 years). This reflects the need to obtain orders with adequate lead times (can range from 3 to 30 months). Future demand will need to be met by expanding existing capacity. These expansions will require suppliers to raise capital or secure other types of support (federal loans or grants) to invest in facilities, equipment, and workforce. Individual suppliers indicated financial investments could be in the range of $\$ $100 million to $\$ $1 billion for their own facilities (depending on the type of facility). The biggest risk, according to respondents, related to general uncertainties surrounding the future nuclear industry and whether the potential demand projections will materialize into real demand that is actionable from a business perspective. Businesses do not seem willing to take investments risks without clear orders. If businesses are not able to invest to expand the supply, it will either delay the deployment of advanced nuclear technology, or the supply chain will be met by suppliers outside of the United States. This report only focuses on the domestic supply chain’s ability to meet the various projections stipulated here for the specific assessed components (vessels, heat exchangers, pumps, graphite, and sensors). The report does not cover all reactor designs or all components that may ultimately be needed for any one reactor design. It also does not address whether any specific aspect of the supply chain will be cost competitive in the global market, nor how potential state-backed entities could affect the expansion of a United States-based supply chain. The largest challenges in ramping up capacity among respondents appear to be workforce related. This includes workforce availability, experience, training, and turnover. In addition to facility investment, suppliers will also need to invest heavily in long-term workforce training to meet production goals. This issue is not nuclear-specific, and the expansion of any supply chain will likely face similar challenges. While suppliers evaluated expected normal business demand from other markets outside of nuclear, it is possible that other market segments could expand more than predicted and compete for the same suppliers. One potential market that may compete for the same supplier resources is the United States military, as many of these suppliers support both the commercial nuclear sector as well as the Navy with reactors and components. In summary, suppliers in the United States believe that there is a way to increase production in order to begin meeting the demand which will exist for advanced reactors—as long as appropriate investments can be made in the supply chain in an appropriate timeframe. Based on the capacity projections and lead times, investment will be needed to meet the 5-year and 10-year production targets. Therefore, if significant nuclear deployment is to occur in the 2030s, investment and ramp up of the advanced nuclear supply chain will need to begin in the near future for the United States to successfully deploy these advanced reactors with domestic supply chains.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Quantification of Uncertainty and Risk Sensitivity for Safety of Emerging Operations

The growing need to develop and deploy small unmanned aerial vehicles (sUAVs) for various applications in the airspace necessitates reliable tools to accurately predict the flight trajectories of the sUAVs. The knowledge of the predicted trajectories help decision makers anticipate potential conflict, assess the risk, and take appropriate risk mitigation actions. In addition, uncertainties in vehicle models, weather, and controller action further highlights the need for reliable prediction tools. In this project, the application of mixed sparse grid-based quadrature and generalized polynomial chaos(gPC) expansion method for uncertainty quantification and collision assessment in air traffic consisting of fixed-wing small unmanned aerial vehicles (sUAV) was studied. From the results obtained, it can be concluded that this provides a reliable framework to carry out quantitative conflict assessment in an unmanned air traffic, which when employed, can improve the functionalities of the unmanned traffic management system. It was observed that the results from the gPC expansion framework developed in the project can be utilized to conduct rapid probabilistic collision assessment for near real-time unmanned traffic management in the airspace. From the vehicle models, position updates, and wind-field data, a priori gPC based 3-σcon-fidence ellipses can provide estimates of potential conflict at some future instants. The computational costs scaled linearly when the uncertain inputs were fewer. Further, the largest allowable distribution of para-metric uncertainties that leads to the smallest risk of collision in traffic of small unmanned aerial vehicles could be calculated. The time of closest approach between two sUAVs can be established paving way for development of proactive mitigation strategies. The separation between the sUAVs was found to be most significantly affected by uncertainties in the maximum available thrusts, zero-lift drag coefficients, and wing planform areas of the sUAVs. The study of uncertain wind-fields indicated that a heterogeneous traffic mix resulted in an increased probability of conflict. Increased measurement update rate reduced the uncertain-ties in the trajectories of the vehicles, further reducing the probability of conflict but rapid updates of all vehicles in the airspace poses a stringent communication limitation. The gPC framework also provided the means to analyze vehicle impact (crash region) due to loss of control resulting from actuator failure in sUAS traffic, essentially to predict impact and crash zones for representative vehicles. The predicted regions when compared with non-participant density, provides a means to develop an early mitigation strategy, should the sUAV detect an imminent actuator failure.

Rajnish Bhusal↗

A U.S.-China coal power transition and the global 1.5 °C pathway

As the world seeks to increase ambition rapidly to limit global warming to 1.5 °C, joint leadership from the world's largest greenhouse gas (GHG) emitters—the United States (U.S.) and China—will be critical to deliver significant emissions reductions from their own countries as well as to catalyze increased international action. After a period of uncertainty in international climate policy, these countries now both have current leadership that supports ambitious climate action. In this context, a feasible, high-impact, and potentially globally catalytic agreement by the U.S. and China to transition away from coal to clean energy would be a major contribution toward this global effort. We undertake a plant-by-plant assessment in the power sector to identify practical coal retirement pathways for each country that are in line with national priorities and the global 1.5 °C target. Our plant-by-plant analysis shows that the 1.5 °C-compatible pathways may result in an average retirement age of 47 years for the U.S. coal plants and 22 years for Chinese coal plants, raising important questions of how to compare broader economic, employment, and social impacts. We also demonstrate that such pathways would also lead to significant emissions reductions, lowering overall global energy-related CO 2 emissions by about 9% in 2030 relative to 2020. A catalytic effect from the possibility of other countries taking compatible actions is estimated to reduce global emissions by 5.1 Gt CO 2 in 2030 and by 10.1 Gt CO 2 in 2045.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Sclerostin neutralization unleashes the osteoanabolic effects of Dkk1 inhibition [Genetic disruption of compensatory WNT inhibitor expression reveals a context-dependent, highly osteoanabolic role for DKK1 inhibition in the skeleton]

The WNT pathway has become an attractive target for skeletal therapies. High-bone-mass phenotypes in patients with loss-of-function mutations in the LRP5/6 inhibitor Sost (sclerosteosis), or in its downstream enhancer region (van Buchem disease), highlight the utility of targeting Sost/sclerostin to improve bone properties. Sclerostin-neutralizing antibody is highly osteoanabolic in animal models and in human clinical trials, but antibody-based inhibition of another potent LRP5/6 antagonist, Dkk1, is largely inefficacious for building bone in the unperturbed adult skeleton. In this work, we show that conditional deletion of Dkk1 from bone also has negligible effects on bone mass. Dkk1 inhibition increases Sost expression, suggesting a potential compensatory mechanism that might explain why Dkk1 suppression lacks anabolic action. To test this concept, we deleted Sost from osteocytes in, or administered sclerostin neutralizing antibody to, mice with a Dkk1-deficient skeleton. A robust anabolic response to Dkk1 deletion was manifest only when Sost/sclerostin was impaired. Whole-body DXA scans, μCT measurements of the femur and spine, histomorphometric measures of femoral bone formation rates, and biomechanical properties of whole bones confirmed the anabolic potential of Dkk1 inhibition in the absence of sclerostin. Moreover, combined administration of sclerostin and Dkk1 antibody in WT mice produced a synergistic effect on bone gain that greatly exceeded individual or additive effects of the therapies, confirming the therapeutic potential of inhibiting multiple WNT antagonists for skeletal health. In conclusion, the osteoanabolic effects of Dkk1 inhibition can be realized if sclerostin upregulation is prevented. Anabolic therapies for patients with low bone mass might benefit from a strategy that accounts for the compensatory milieu of WNT inhibitors in bone tissue.

59 BASIC BIOLOGICAL SCIENCES↗

Mercury Remediation in Oak Ridge, Tennessee; Successes and Remaining Challenges

Mercury remediation is a high priority for the US Department of Energy’s (DOE’s) Environmental Management program in Oak Ridge, Tennessee because of large historical losses of mercury to the environment, and the potential health risks to humans and wildlife primarily through fish consumption. Remedial solutions for mercury contaminated aquatic systems are limited – many aquatic systems have diffuse sources of mercury (Hg) and depending on the environmental conditions, these low concentrations of inorganic Hg can result in fish consumption advisories due to the production of the more toxic methylmercury (MeHg) and its bioaccumulation and biomagnification. From the 1980s to the present, long-term monitoring of mercury concentrations in water and fish downstream of DOE facilities in Oak Ridge have provided an opportunity to assess the performance and effectiveness of various remedial and abatement actions to address mercury. Early actions in the mid-1980s focused on pollution control that positively affected mercury discharges to one local stream, including consolidation and elimination of untreated discharges, sanitary sewer relining, the construction of a pollution control facility, and the replacement of a contaminated settling basin. The 1990s were an intensive period of facility remedial actions designed to improve stream water quality and reduce mercury discharges. Actions included dechlorinating cooling water discharges, an additional phase of storm sewer relining, the addition of flow from a nearby reservoir, the addition of two small-scale mercury treatment systems, the bypass of stream flow around the settling basin, and the removal of high mercury-contaminated floodplain soils. Because of these multiple remedial actions total mercury concentrations in receiving streams decreased significantly; however, mercury concentrations in fish did not respond commensurately and remain a challenge to the present day. Although the mercury remedial strategy in Oak Ridge will continue to focus in the near-term on upstream facility source reduction, recent research suggests that understanding mercury transport, methylation, and bioaccumulation processes in the downstream environment is essential to reducing mercury fish concentrations. Since 2014, mercury remediation research and technology development activities have been underway to develop potential remedial solutions for the downstream environment, including use of sorbents to control soil leaching and the potential use of chemical or biological manipulations. The Oak Ridge mercury remediation story is a valuable case study for flowing systems that can inform our national-level understanding of potential mercury cleanup actions and their likely environmental response.

Peterson, Mark J.↗

Mercury Remediation in Oak Ridge, Tennessee; Successes and Remaining Challenges - 19390

Mercury remediation is a high priority for the US Department of Energy's (DoE's) Environmental Management program in Oak Ridge, Tennessee because of large historical losses of mercury to the environment, and the potential health risks to humans and wildlife primarily through fish consumption. Remedial solutions for mercury contaminated aquatic systems are limited - many aquatic systems have diffuse sources of mercury (Hg) and depending on the environmental conditions, these low concentrations of inorganic Hg can result in fish consumption advisories due to the production of the more toxic methylmercury (MeHg) and its bioaccumulation and biomagnification. From the 1980's to the present, long-term monitoring of mercury concentrations in water and fish downstream of DOE facilities in Oak Ridge have provided an opportunity to assess the performance and effectiveness of various remedial and abatement actions to address mercury. Early actions in the mid-1980's focused on pollution control that positively affected mercury discharges to one local stream, including consolidation and elimination of untreated discharges, sanitary sewer relining, the construction of a pollution control facility, and the replacement of a contaminated settling basin. The 1990's were an intensive period of facility remedial actions designed to improve stream water quality and reduce mercury discharges. Actions included dechlorinating cooling water discharges, an additional phase of storm sewer relining, the addition of flow from a nearby reservoir, the addition of two small-scale mercury treatment systems, the bypass of stream flow around the settling basin, and the removal of high mercury-contaminated floodplain soils. Because of these multiple remedial actions total mercury concentrations in receiving streams decreased significantly; however, mercury concentrations in fish did not respond commensurately and remain a challenge to the present day. Although the mercury remedial strategy in Oak Ridge will continue to focus in the near-term on upstream facility source reduction, recent research suggests that understanding mercury transport, methylation, and bioaccumulation processes in the downstream environment is essential to reducing mercury fish concentrations. Since 2014, mercury remediation research and technology development activities have been underway to develop potential remedial solutions for the downstream environment, including use of sorbents to control soil leaching and the potential use of chemical or biological manipulations. The Oak Ridge mercury remediation story is a valuable case study for flowing systems that can inform our national-level understanding of potential mercury cleanup actions and their likely environmental response. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Inertial Symmetry Breaking

We review and expand upon recent work demonstrating that Weyl invariant theories can be broken "inertially," which does not depend upon a potential. This can be understood in a general way by the "current algebra" of these theories, independently of specific Lagrangians. Maintaining the exact Weyl invariance in a renormalized quantum theory can be accomplished by renormalization conditions that refer back to the VEV's of fields in the action. We illustrate the computation of a Weyl invariant Coleman-Weinberg potential that breaks a U(1) symmetry together,with scale invariance.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Space Station Freedom viewed as a 'tight building'

The Space Station Freedom (SSF), with a 30-year projected lifetime and a completely closed-loop Environmental Control and Life Support System (ECLSS), is perhaps the ultimate 'tight building'. Recognizing the potential for the development of 'tight building syndrome' (TBS), and initiating actions to minimize possible TBS occurrences on SSF, requires a multidisciplinary approach that begins with appropriate design concerns and ends with detection and control measures on board SSF. This paper presents a brief summary of current experience with TBS on earth. Air contamination, including volatile organic compounds and microorganisms, is the focus of the discussion. Preventive steps to avoid TBS, control of environmental factors that may lead to TBS, and use of real-time instrumentation for the detection of potential causes of TBS are also outlined.

Limero, Thomas F.↗

Inhibition of chlorine-induced pulmonary inflammation and edema by mometasone and budesonide

Chlorine gas is a widely used industrial compound that is highly toxic by inhalation and is considered a chemical threat agent. Inhalation of high levels of chlorine results in acute lung injury characterized by pneumonitis, pulmonary edema, and decrements in lung function. Because inflammatory processes can promote damage in the injured lung, anti-inflammatory therapy may be of potential benefit for treating chemical-induced acute lung injury. We previously developed a chlorine inhalation model in which mice develop epithelial injury, neutrophilic inflammation, pulmonary edema, and impaired pulmonary function. This model was used to evaluate nine corticosteroids for the ability to inhibit chlorine-induced neutrophilic inflammation. Two of the most potent corticosteroids in this assay, mometasone and budesonide, were investigated further. Mometasone or budesonide administered intraperitoneally 1 h after chlorine inhalation caused a dose-dependent inhibition of neutrophil influx in lung tissue sections and in the number of neutrophils in lung lavage fluid. Budesonide, but not mometasone, reduced the levels of the neutrophil attractant CXCL1 in lavage fluid 6 h after exposure. Mometasone or budesonide also significantly inhibited pulmonary edema assessed 1 day after chlorine exposure. Chlorine inhalation resulted in airway hyperreactivity to inhaled methacholine, but neither mometasone nor budesonide significantly affected this parameter. The results suggest that mometasone and budesonide may represent potential treatments for chemical-induced lung injury. - Highlights: • Chlorine causes lung injury when inhaled and is considered a chemical threat agent. • Corticosteroids may inhibit lung injury through their anti-inflammatory actions. • Corticosteroids inhibited chlorine-induced pneumonitis and pulmonary edema. • Mometasone and budesonide are potential rescue treatments for chlorine lung injury.

60 APPLIED LIFE SCIENCES↗