Search NASA⌕ Search

SEARCH · Search NASA

Results for “CAPACITY PLANNING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Tribal Wind Assessment by the Eastern Shoshone Tribe of the Wind River Reservation

The Tribes, through its consultant and advisor, Distributed Generation Systems (Disgen) -Native American Program and Resources Division, of Lakewood CO, assessed and qualified, from a resource and economic perspective, a wind energy generation facility on tribal lands. The goal of this feasibility project is to provide wind monitoring and to engage in preproject planning activities designed to provide a preliminary evaluation of the technical, economic, social and environmental feasibility of developing a sustainable, integrated wind energy plan for the Eastern Shoshone and the Northern Arapahoe Tribes, who resides on the Wind River Indian Reservation. The specific deliverables of the feasibility study are: 1) Assessments of the wind resources on the Wind River Indian Reservation 2) Assessments of the potential environmental impacts of renewable development 3) Assessments of the transmission capacity and capability of a renewable energy project 4) Established an economic models for tribal considerations 5) Define economic, cultural and societal impacts on the Tribe

17 WIND ENERGY↗

Human Capacity Building Grant for Renewable energy development (Final Report)

Warm Springs Power and Water Enterprise (WSPWE), a Corporate Entity of the Confederated Tribes of Warm Springs Oregon, developed and distributed written materials, held workshops and field trips to educate tribal members on renewable energy projects that are a possibility utilizing resources on reservation. In order to build stronger public and Tribal Council support for the development of renewable energy projects on the reservation, WSPWE conducted a 12 month public education and technical expertise development program. The objectives of this program were to: To build a knowledge base within the tribal community regarding renewable energy development potential and opportunities on reservation lands. To educate the tribal community regarding development process, impacts and benefits. To increase the technical expertise of tribal government and Tribal Council.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Human Capacity Building Grant for Renewable energy development (Final Report)

Warm Springs Power and Water Enterprise (WSPWE), a Corporate Entity of the Confederated Tribes of Warm Springs Oregon, developed and distributed written materials, held workshops and field trips to educate tribal members on renewable energy projects that are a possibility utilizing resources on reservation. In order to build stronger public and Tribal Council support for the development of renewable energy projects on the reservation, WSPWE conducted a 12 month public education and technical expertise development program. The objectives of this program were to: To build a knowledge base within the tribal community regarding renewable energy development potential and opportunities on reservation lands. To educate the tribal community regarding development process, impacts and benefits. To increase the technical expertise of tribal government and Tribal Council.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Grid Integration and the Carrying Capacity of the U.S. Grid to Incorporate Variable Renewable Energy

In the United States and elsewhere, renewable energy (RE) generation supplies an increasingly large percentage of annual demand, including nine U.S. states where wind comprised over 10% of in-state generation in 2013. This white paper summarizes the challenges to integrating increasing amounts of variable RE, identifies emerging practices in power system planning and operation that can facilitate grid integration, and proposes a unifying concept—economic carrying capacity—that can provide a framework for evaluating actions to accommodate higher penetrations of RE. There is growing recognition that while technical challenges to variable RE integration are real, they can generally be addressed via a variety of solutions that vary in implementation cost. As a result, limits to RE penetration are primarily economic, driven by factors that include transmission and the flexibility of the power grid to balance supply and demand. This limit can be expressed as economic carrying capacity, or the point at which variable RE is no longer economically competitive or desirable to the system or society.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Collaborative Arrival Planning: Data Sharing and User Preference Tools

Air traffic growth and air carrier economic pressures have motivated efforts to increase the flexibility of the air traffic management process and change the relationship between the air traffic control service provider and the system user. One of the most visible of these efforts is the U.S. government/industry "free flight" initiative, in which the service provider concentrates on safety and cross-airline fairness, and the user on their business objectives and operating preferences, including selecting their own path and speed in real-time. In the terminal arrival phase of flight, severe restrictions and rigid control are currently placed on system users, typically without regard for individual user operational preferences. Airborne delays applied to arriving aircraft into capacity constrained airports are imposed on a first-come, first-serve basis, and thus do not allow the system user to plan for or prioritize late arrivals, or to economically optimize their arrival sequence. A central tenant of the free-flight operating paradigm is collaboration between service providers and users in reaching air traffic management decisions. Such collaboration would be particularly beneficial to an airline's "hub" operation, where off-schedule arrival aircraft are a consistent problem, as they cause serious air-port ramp difficulties, rippling airline scheduling effects, and result in large economic inefficiencies. Greater collaboration can also lead to increased airport capacity and decrease the severity of over-capacity rush periods. In the NASA Collaborative Arrival Planning (CAP) project, both independent exchange of real-time data between the service provider and system user and collaborative decision support tools are addressed. Data exchange of real-time arrival scheduling, airspace management, and air carrier fleet data between the FAA service provider and an air carrier is being conducted and evaluated. Collaborative arrival decision support tools to allow intra-airline arrival preferences are being developed and simulated. The CAP project is part of and leveraged from the NASA/FAA Center TRACON Automation System (CTAS), a fielded set of decision support tools that provide computer generated advisories for both enroute and terminal area controllers to manage and control arrival traffic more efficiently. In this paper, the NASA Collaborative Arrival Planning project is outlined and recent results detailed, including the real-time use of CTAS arrival scheduling data by a major air carrier and simulations of tactical and strategic user preference decision support tools.

Zelenka, Richard E.↗

Restoring Resiliency: Case Studies from Pacific Northwest Estuarine Eelgrass (Zostera marina L.) Ecosystems

The purpose of many ecological restoration projects is to establish an ecosystem with fully developed structure and function that exhibits resistance to and resilience from disturbances. Coastal restoration projects in the Pacific Northwest provide opportunities to understand what is required to restore the resilience of eelgrass (Zostera marina L.) populations. Factors influencing resilience observed in three case studies of eelgrass restoration include minimum viable population, adaptations of transplant populations, and natural and anthropogenic disturbances at restoration sites. The evaluation of resiliency depends on selecting appropriate monitoring metrics and the frequency and duration of monitoring. Eelgrass area, cover and shoot density provide useful and reliable metrics for quantifying resilience of restored meadows. Further, five years of monitoring of these metrics provides data that can reasonably predict the long-term viability of a planted plot. Eelgrass appears to be a resilient ecosystem in general, though one that data suggest may exhibit tipping points brought about by compounded environmental conditions outside of its tolerance ranges. Explicit inclusion of resilience in the planning and practice of habitat restoration may reduce uncertainties and improve the performance of restored systems by increasing buffering capacity, nurturing sources of renewal (e.g., seeds and rhizomes), and managing for habitat forming and maintaining processes (e.g., sediment dynamics) at multiple scales.

54 ENVIRONMENTAL SCIENCES↗

Planning to Explore: Using a Coordinated Multisource Infrastructure to Overcome Present and Future Space Flight Planning Challenges

Few human endeavors present as much of a planning and scheduling challenge as space flight, particularly manned space flight. Just on the operational side of it, efforts of thousands of people across hundreds of organizations need to be coordinated. Numerous tasks of varying complexity and nature, from scientific to construction, need to be accomplished within limited mission time frames. Resources need to be carefully managed and contingencies worked out, often on a very short notice. From the beginning of the NASA space program, planning has been done by large teams of domain experts working months, sometimes years, to put together a single mission. This approach, while proven very reliable up to now, is becoming increasingly harder to sustain. Elevated levels of NASA space activities, from deployment of the new Crew Exploration Vehicle (CEV) and completion of the International Space Station (ISS), to the planned lunar missions and permanent lunar bases, will put an even greater strain on this largely manual process. While several attempts to automate it have been made in the past, none have fully succeeded. In this paper we describe the current NASA planning methods, outline their advantages and disadvantages, discuss the planning challenges of upcoming missions and propose a distributed planning/scheduling framework (CMMD) aimed at unifying and optimizing the planning effort. CMMD will not attempt to make the process completely automated, but rather serve in a decision support capacity for human managers and planners. It will help manage information gathering, creation of partial and consolidated schedules, inter-team negotiations, contingencies investigation, and rapid re-planning when the situation demands it. The fist area of CMMD application will be planning for Extravehicular Activities (EVA) and associated logistics. Other potential applications, not only in the space flight domain, and future research efforts will be discussed as well.

Balaban, Edward↗

Inverse planning for IMRT with nonuniform beam profiles using total-variation regularization (TVR)

Purpose: Radiation therapy with high dose rate and flattening filter-free (FFF) beams has the potential advantage of greatly reduced treatment time and out-of-field dose. Current inverse planning algorithms are, however, not customized for beams with nonuniform incident profiles and the resultant IMRT plans are often inefficient in delivery. The authors propose a total-variation regularization (TVR)-based formalism by taking the inherent shapes of incident beam profiles into account. Methods: A novel TVR-based inverse planning formalism is established for IMRT with nonuniform beam profiles. The authors introduce a TVR term into the objective function, which encourages piecewise constant fluence in the nonuniform FFF fluence domain. The proposed algorithm is applied to lung and prostate and head and neck cases and its performance is evaluated by comparing the resulting plans to those obtained using a conventional beamlet-based optimization (BBO). Results: For the prostate case, the authors' algorithm produces acceptable dose distributions with only 21 segments, while the conventional BBO requires 114 segments. For the lung case and the head and neck case, the proposed method generates similar coverage of target volume and sparing of the organs-at-risk as compared to BBO, but with a markedly reduced segment number. Conclusions: TVR-based optimization in nonflat beam domain provides an effective way to maximally leverage the technical capacity of radiation therapy with FFF fields. The technique can generate effective IMRT plans with improved dose delivery efficiency without significant deterioration of the dose distribution.

60 APPLIED LIFE SCIENCES↗

Impacts of Regional Coordination on Transmission Needs for Power System Resource Adequacy [Slides]

Resource adequacy (RA) is an important component of bulk power system reliability that addresses whether there are sufficient resources available to meet electricity demand at all times. RA analysis is used to assess whether the planned power system will provide reliable electricity to consumers while accounting for equipment outages, weather variability, and load uncertainty. Coordination between regions can enable resource sharing to meet RA needs if sufficient transmission capacity exists. Transmission's role in RA coordination can be particularly pronounced for large power systems like the U.S. electricity grid which contains geographically diverse demand and weather-dependent resources. Depending on the level of coordination desired, existing inter-regional transmission capacity may not be sufficient. This study is designed to assess optimal pathways for the development of inter-regional transmission in the U.S. under varying levels of RA coordination. Results can inform long-term grid infrastructure planning and provide insights into potential benefits of greater coordination for generation and transmission planning between regional U.S. power systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

NNSA ASC Exascale Environment Planning, Applications Working Group, Report February 2011

The scope of the Apps WG covers three areas of interest: Physics and Engineering Models (PEM), multi-physics Integrated Codes (IC), and Verification and Validation (V&V). Each places different demands on the exascale environment. The exascale challenge will be to provide environments that optimize all three. PEM serve as a test bed for both model development and 'best practices' for IC code development, as well as their use as standalone codes to improve scientific understanding. Rapidly achieving reasonable performance for a small team is the key to maintaining PEM innovation. Thus, the environment must provide the ability to develop portable code at a higher level of abstraction, which can then be tuned, as needed. PEM concentrate their computational footprint in one or a few kernels that must perform efficiently. Their comparative simplicity permits extreme optimization, so the environment must provide the ability to exercise significant control over the lower software and hardware levels. IC serve as the underlying software tools employed for most ASC problems of interest. Often coupling dozens of physics models into very large, very complex applications, ICs are usually the product of hundreds of staff-years of development, with lifetimes measured in decades. Thus, emphasis is placed on portability, maintainability and overall performance, with optimization done on the whole rather than on individual parts. The exascale environment must provide a high-level standardized programming model with effective tools and mechanisms for fault detection and remediation. Finally, V&V addresses the infrastructure and methods to facilitate the assessment of code and model suitability for applications, and uncertainty quantification (UQ) methods for assessment and quantification of margins of uncertainty (QMU). V&V employs both PEM and IC, with somewhat differing goals, i.e., parameter studies and error assessments to determine both the quality of the calculation and to estimate expected deviations of simulations from experiments. The exascale environment must provide a performance envelope suitable both for capacity calculations (high through-put) and full system capability runs (high performance). Analysis of the results place shared demand on both the I/O as well as the visualization subsystems.

97 MATHEMATICS AND COMPUTING↗

The United States' (DOE) Action Plan for Power Sector Decarbonization

A collaborative report from the Clean Energy Ministerial (CEM) on Lessons Learned for Rapid Decarbonization of Power Sectors was delivered to energy ministers and presented at the 13th CEM (CEM13) in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several jurisdictions signaled intent to develop Action Plans for power sector decarbonization. The first cohort of Action Plans was released at CEM14 in India in July 2023. The U.S. Department of Energy (DOE) is pleased to release this Action Plan as a contribution to the second cohort of Action Plans released at CEM15 in Brazil in October 2024. The Action Plans, supported by the 21st Century Power Partnership, and other CEM workstreams via direct technical assistance and capacity building, are intended to focus on select implementation actions, given each country's existing power sector goals and activities, and are an opportunity for countries to display leadership in power sector decarbonization. The Action Plans are organized in a framework for Planning, Building and Operating, as well as Stakeholder Engagement where appropriate based on country priorities. These Action Plans are voluntary, developed by each country individually, not comprehensive of all activities within the jurisdiction, and are living documents that are subject to change. This Action Plan, developed by DOE, is focused on federal actions for power sector decarbonization primarily led by DOE. There are many other actions being led by other U.S. government agencies, or at the state and local level, that are not featured in this Action Plan.

21st Century Power Partnership↗

Brazil's Action Plan for Rapid Decarbonization of Power Sectors

A collaborative report from the Clean Energy Ministerial (CEM) on Lessons Learned for Rapid Decarbonization of Power Sectors was delivered to energy ministers and presented at the CEM13 in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several jurisdictions signaled intent to develop Action Plans for power sector decarbonization. The first cohort of Action Plans was released at CEM14 in India in July 2023. The second cohort of action plans will be presented at CEM15 in Brazil. The Action Plans, supported by the 21st Century Power Partnership, and other CEM workstreams via direct technical assistance and capacity building, are intended to focus on select implementation actions, given each country's existing power sector goals and activities, and are an opportunity for countries to display leadership in power sector decarbonization. The Action Plans are organized in a framework for Planning, Building and Operating, as well as Stakeholder Engagement where appropriate based on country priorities. They complement, but are differentiated from, other international power sector initiatives such as the Breakthrough Agenda (whose broad purpose is to raise collective ambition) and the Global Power System Transformation Consortium (whose goals are to convene power system operators to accelerate research innovations and foster peer learning). These Action Plans are voluntary, developed by each country individually, not comprehensive of all activities within the jurisdiction, and are living documents that are subject to change.

21st Century Power Partnership↗

Uruguay's Action Plan and Experience for Power Sector Decarbonization

A collaborative report from the Clean Energy Ministerial (CEM), Lessons Learned for Rapid Decarbonization of Power Sectors, was delivered to energy ministers and presented at the 13th CEM (CEM13) in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several jurisdictions signaled intent to develop Action Plans for power sector decarbonization. The first cohort of Action Plans was released at CEM14 in India in July 2023. The Uruguay Ministry of Industry, Energy and Mining is pleased to release this Action Plan as a contribution to the second cohort of Action Plans released at CEM15 in Brazil in October 2024. The Action Plans, supported by the 21st Century Power Partnership, and other CEM workstreams via direct technical assistance and capacity building, are intended to focus on select implementation actions given each country's existing power sector goals and activities, and are an opportunity for countries to display leadership in power sector decarbonization. The Action Plans are organized in a framework for planning, building, and operating, as well as stakeholder engagement where appropriate based on country priorities. They complement, but are differentiated from, other international power sector initiatives such as the Breakthrough Agenda (whose broad purpose is to raise collective ambition) and the Global Power System Transformation Consortium (whose goals are to convene power system operators to accelerate research innovations and foster peer learning). These Action Plans are voluntary, developed by each country individually, not comprehensive of all activities within the jurisdiction, and are living documents that are subject to change.

21st Century Power Partnership↗

Canada's Actions for Rapid Decarbonization of Power Sector

A collaborative report from the Clean Energy Ministerial (CEM) on Lessons Learned for Rapid Decarbonization of Power Sectors was delivered to energy ministers and presented at the 13th CEM (CEM13) in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several jurisdictions signaled intent to develop Action Plans for power sector decarbonization. The first cohort of Action Plans was released at CEM14 in India in July 2023. Canada is pleased to release this Action Plan as a contribution to the second cohort of Action Plans released at CEM15 in Brazil in October 2024. The Action Plans, supported by the 21st Century Power Partnership, and other CEM workstreams via direct technical assistance and capacity building, are intended to focus on select implementation actions, given each country's existing power sector goals and activities, and are an opportunity for countries to display leadership in power sector decarbonization. The Action Plans are organized in a framework for Planning, Building and Operating, as well as Stakeholder Engagement where appropriate based on country priorities. These Action Plans are voluntary, developed by each country individually, not comprehensive of all activities within the jurisdiction, and are living documents that are subject to change.

21st Century Power Partnership↗

Southwest Region Experiment Station - Final Technical Report

Southwest Technology Development Institute (SWTDI), an independent, university-based research institute, has been the operator of the Southwest Region Photovoltaic Experiment Station (SWRES) for almost 30 years. The overarching mission of SWTDI is to position PV systems and solar technologies to become cost-effective, major sources of energy for the United States. Embedded in SWTDI's general mission has been the more-focused mission of the SWRES: to provide value added technical support to the DOE Solar Energy Technologies Program (SETP) to effectively and efficiently meet the R&D needs and targets specified in the SETP Multi-Year Technical Plan. : The DOE/SETP goals of growing U.S. PV manufacturing into giga-watt capacities and seeing tera-watt-hours of solar energy production in the U.S. require an infrastructure that is under development. The staff of the SWRES has supported DOE/SETP through a coherent, integrated program to address infrastructural needs inhibiting wide-scale PV deployment in three major technical categories: specialized engineering services, workforce development, and deployment facilitation. The SWRES contract underwent three major revisions during its five year period-of- performance, but all tasks and deliverables fell within the following task areas: Task 1: PV Systems Assistance Center 1. Develop a Comprehensive multi-year plan 2. Provide technical workforce development materials and workshops for PV stakeholder groups including university, professional installers, inspectors, state energy offices, Federal agencies 3. Serve on the NABCEP exam committee 4. Provide on-demand technical PV system design reviews for U.S. PV stakeholders 5. Provide PV system field testing and instrumentation, technical outreach (including extensive support for the DOE Market Transformation program) Task 2: Design-for-Manufacture PV Systems 1. Develop and install 18 kW parking carport (cost share) and PV-thermal carport (Albuquerque) deriving and publishing lessons learned Task 3: PV Codes and Standards 1. Serve as the national lead for development and preparation of all proposals (related to PV) to the National Electrical Code 2. Participate in the Standards Technical Panels for modules (UL1703) and inverters (UL1741) Task 4: Assess Inverter Long Term Reliability 1. Install and monitor identical inverters at SWRES and SERES 2. Operate and monitor all inverters for 5 years, characterizing all failures and performance trends Task 5: Test and Evaluation Support for Solar America Initiative 1. Provide test and evaluation services to the National Laboratories for stage gate and progress measurements of SAI TPP winners

14 SOLAR ENERGY↗

A sampling-based optimization approach to handling environmental uncertainty for a planetary lander

Planning for unknown environments presents a number of technical challenges. The planner must ensure robustness to unknown phenomena and manage unpredictable variation in execution, all while operating in a capacity that maximizes its objective. Productivity in the face of these challenges re-quires an integrated approach to planning and execution that is capable of accomplishing goals, reacting to variation, and maximizing overall utility. We examine this problem in the context of a Europa Lander concept mission. We model the problem as a hierarchical task network, framing it as a utility maximization problem constrained on a depletable energy resource. We propose an uncertainty–sensitive deterministic planning framework that utilizes periodic replanning to better handle model uncertainty and variable execution. We demonstrate the efficacy of our framework through simulations of a Europa Lander concept mission in which our algorithm out-performs several baseline approaches in both utility maximization and robustness

Zilberstein, Shlomo↗

A Sampling-Based Optimization Approach to Handling Environmental Uncertainty for a Planetary Lander

Planning for unknown environments presents a number of technical challenges. The planner must ensure robustness to unknown phenomena and manage unpredictable variation in execution, all while operating in a capacity that maximizes its objective. Productivity in the face of these challenges re-quires an integrated approach to planning and execution that is capable of accomplishing goals, reacting to variation, and maximizing overall utility. We examine this problem in the context of a Europa Lander concept mission. We model the problem as a hierarchical task network, framing it as a utility maximization problem constrained on a depletable energy resource. We propose an uncertainty–sensitive deterministic planning framework that utilizes periodic replanning to better handle model uncertainty and variable execution. We demonstrate the efficacy of our framework through simulations of a Europa Lander concept mission in which our algorithm out-performs several baseline approaches in both utility maximization and robustness

Chien, Steve↗