Search NASA⌕ Search

SEARCH · Search NASA

Results for “Crew Return Vehicle”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Human Mars Landing Site and Impacts on Mars Surface Operations

NASA has begun a process to identify and discuss candidate locations where humans could land, live and work on the Martian surface. These locations are referred to as Exploration Zones (EZs). Given current mission concepts, an EZ is a collection of Regions of Interest (ROIs) that are located within approximately 100 kilometers of a centralized landing site. ROIs are areas that are relevant for scientific investigation and/or development/maturation of capabilities and resources necessary for a sustainable human presence. The EZ also contains a landing site and a habitation site that will be used by multiple human crews during missions to explore and utilize the ROIs within the EZ. These candidate EZs will be used by NASA as part of a multi‐year process of determining where and how humans could explore Mars. In the near term this process includes: (a) identifying locations that would maximize the potential science return from future human exploration missions, (b) identifying locations with the potential for resources required to support humans, (c) developing concepts and engineering systems needed by future human crews to conduct operations within an EZ, and (d) identifying key characteristics of the proposed candidate EZs that cannot be evaluated using existing data sets, thus helping to define precursor measurements needed in advance of human missions. Existing and future robotic spacecraft will be tasked to gather data from specific Mars surface sites within the representative EZs to support these NASA activities. The proposed paper will describe NASA's initial steps for identifying and evaluating candidate EZs and ROIs. This includes plans for the "First Landing Site/Exploration Zone Workshop for Human Missions to the Surface of Mars" to be held in October 2015 at which proposals for EZs and ROIs will be presented and discussed. It will also include a discussion of how these considerations are (or will be) taken into account as future robotic Mars missions are defined and developed. One or more representative EZs, drawn from similar previous studies involving Mars sites, will be used in the proposed paper to illustrate the process NASA envisions for gathering additional data from robotic precursor missions to assist in making a final selection of an EZ for human crews as well as the steps likely to occur during the buildup of a habitation site. Examples of the systems and operations likely to be used by human crews, assisted by robotic vehicles, to explore the scientific ROIs as well as developing the resource ROIs within the example EZs will be discussed.

Bussey, Ben↗

Human Space Exploration: The Moon, Mars, and Beyond

America is returning to the Moon in preparation for the first human footprint on Mars, guided by the U.S. Vision for Space Exploration. This presentation will discuss NASA's mission, the reasons for returning to the Moon and going to Mars, and how NASA will accomplish that mission in ways that promote leadership in space and economic expansion on the new frontier. The primary goals of the Vision for Space Exploration are to finish the International Space Station, retire the Space Shuttle, and build the new spacecraft needed, to return people to the Moon and go to Mars. The Vision commits NASA and the nation to an agenda of exploration that also includes robotic exploration and technology development, while building on lessons learned over 50 years of hard-won experience. Why the Moon? Many questions about the Moon's potential resources and how its history is linked to that of Earth were spurred by the brief Apollo explorations of the 1960s and 1970s. This new venture will carry more explorers to more diverse landing sites with more capable tools and equipment for extended expeditions. The Moon also will serve as a training ground before embarking on the longer, more difficult trip to Mars. NASA plans to build a lunar outpost at one of the lunar poles, learn to live off the land, and reduce dePendence on Earth for longer missions. America needs to extend its ability to survive in hostile environments close to our home planet before astronauts will reach Mars, a planet very much like Earth. NASA has worked with scientists to define lunar exploration goals and is addressing the opportunities for a range of scientific study on Mars. In order to reach the Moon and Mars within a lifetime and within budget, NASA is building on common hardware, shared knowledge, and unique experience derived from the Apollo Saturn, Space Shuttle and contemporary commercial launch vehicle programs. The journeys to the Moon and Mars will require a variety of vehicles, including the Ares I Crew Launch Vehicle, which transports the Orion Crew Exploration Vehicle, and the Ares V Cargo Launch Vehicle, which transports the Lunar Surface Access Module. The architecture for the lunar missions will use one launch to ferry the crew into orbit, where it will rendezvous with the Lunar Module in the Earth Departure Stage, which will then propel the combination into lunar orbit. The imperative to explore space with the combination of astronauts and robots will be the impetus for inventions such as solar power and water and waste recycling. This next chapter in NASA's history promises to write the next chapter in American history, as well. It will require this nation to provide the talent to develop tools, machines, materials, processes, technologies, and capabilities that can benefit nearly all aspects of life on Earth. Roles and responsibilities are shared between a nationwide Government and industry team. The Exploration Launch Projects Office at the Marshall Space Flight Center manages the design, development, testing, and evaluation of both vehicles and serves as lead systems integrator. A little over a year after it was chartered, the Exploration Launch Projects team is testing engine components, refining vehicle designs, performing wind tunnel tests, and building hardware for the first flight test of Ares I-l, scheduled for spring 2009. The U.S. Vision for Space Exploration lays out a roadmap for a long-term venture of discovery. This endeavor will inspire and attract the best and brightest students to power this nation successfully to the Moon, Mars, and beyond. If one equates the value proposition for space with simple dollars and cents, the potential of the new space economy is tremendous, from orbital space delivery services for the International Space Station to mining and solar energy collection on the Moon and asteroids. The Vision for Space Exploration is fundamentally about bringing the resources of the solar system within the economic sphere of humaind. Given the immense size of our solar system, the amount of available material and energy within it present an enormous economic opportunity.

Sexton, Jeffrey D.↗

Assessment of Spatial Navigation and Docking Performance During Simulated Rover Tasks

INTRODUCTION: Following long-duration exploration transits, pressurized rovers will enhance surface mobility to explore multiple sites across Mars and other planetary bodies. Multiple rovers with docking capabilities are envisioned to expand the range of exploration. However, adaptive changes in sensorimotor and cognitive function may impair the crew s ability to safely navigate and perform docking tasks shortly after transition to the new gravitoinertial environment. The primary goal of this investigation is to quantify post-flight decrements in spatial navigation and docking performance during a rover simulation. METHODS: Eight crewmembers returning from the International Space Station will be tested on a motion simulator during four pre-flight and three post-flight sessions over the first 8 days following landing. The rover simulation consists of a serial presentation of discrete tasks to be completed within a scheduled 10 min block. The tasks are based on navigating around a Martian outpost spread over a 970 sq m terrain. Each task is subdivided into three components to be performed as quickly and accurately as possible: (1) Perspective taking: Subjects use a joystick to indicate direction of target after presentation of a map detailing current orientation and location of the rover with the task to be performed. (2) Navigation: Subjects drive the rover to the desired location while avoiding obstacles. (3) Docking: Fine positioning of the rover is required to dock with another object or align a camera view. Overall operator proficiency will be based on how many tasks the crewmember can complete during the 10 min time block. EXPECTED RESULTS: Functionally relevant testing early post-flight will develop evidence regarding the limitations to early surface operations and what countermeasures are needed. This approach can be easily adapted to a wide variety of simulated vehicle designs to provide sensorimotor assessments for other operational and civilian populations.

Wood, S. J.↗

Recent Developments of Thermal Protection Materials to Enable Lower Cost Space Missions

Introduction: Starting with the Commercial Crew Program, a new paradigm has emerged at NASA. Rather than designing rockets and spacecrafts for every mission optimized to achieve science, NASA has begun to use a service-based model and utilizing public-private partnership in developing the vehicles that can bring broader benefits as well as lower the cost for NASA missions. Commercial companies own and operate those vehicles. This allows NASA to not design missions from the bottom up, and has cost, risk, and schedule savings implications. On the other side, the constraints require meeting the requirements in terms of mass, volume, power, etc. By leveraging NASA developed technologies, commercial companies can quickly demonstrate the commercial mission concept, and, through technology transfer, adopt needed technology to address supply chain problems. A downside is that the technology has to be sufficiently mature to be transferred by NASA, which means that it requires significant investment, expertise, and time to develop. Space entities are focused on rapid development with an emphasis on manufacturing and integration innovation with reduced cost and schedule and quick entrance into the market. Thermal Protection Systems (TPS) are mission critical, but their development takes years, and involve access to arc jets or unique test facilities. Therefore, their development is both risky and investment heavy. NASA ARC developed several new TPS materials over the last decade (C-PICA, HEEET, 3MDCP, 3DMAT, ADEPT woven TPS) and brought them to high TPS maturity, making them enablers for commercials space missions from LEO, Lunar Sample Return, Mars, and Venus missions. LEO missions are relevant to future Mars missions due to the comparable entry conditions. External Partners' Missions: C-PICA is a recent improvement on NASA’s heritage PICA lightweight TPS ablator. C-PICA is now considered an enabling technology for New Frontiers and other NASA missions. C-PICA was infused into several missions from external partners. Varda Space Industries’ Winnebago-1 spacecraft successfully returned to Earth from LEO on Feb. 21st, 2024, using a C-PICA heatshield. Inversion Space’s Ray vehicle will test both ARC’s C-PICA and SIRCA TPS materials on a LEO return mission later in 2024. The Kentucky Re-Entry Probe Experiment (KREPE) is another example of a low-cost flight experiment to demonstrate the use of small entry capsules to gather data with three instrumented Kentucky Re-entry and Universal Payload System (KRUPS) capsules. NASA Arc provided C-PICA and Soft-PICA for two of the next KRUPS capsules scheduled to re-enter Earth from the ISS later in 2024. Finally, Rocket Lab’s low-cost mission to Venus, scheduled to launch in December 2024, will search for habitable conditions in Venus’ cloud layer, making use of NASA ARC provided HEEET insulation layer heat shield, and SIRCA backshell TPS materials. Future NASA Missions: NASA’s ability to help commercial missions can lead to future low-cost missions for several reasons: Competition encourages lower cost; technology maturation is now done at an integrated system level; and a common design architecture between commercial and scientific applications requires no specialized engineering design. From an engineering perspective, both of these commercial LEO capsules aforementioned are capable of a Mars entry; the commercial payload mut be replaced with as science payload. Finally, several NASA mission concepts, that could be candidates for future SIMPLEx program calls, such as VATMOS-SR and Nephele, both proposing to target the Venusian atmosphere, would make use of the HEEET insulation layer TPS for part of their heat shield.

TPS materials↗

Recent Developments of Thermal Protection Materials to Enable Lower Cost Space Missions

Introduction: Starting with the Commercial Crew Program, a new paradigm has emerged at NASA. Rather than designing rockets and spacecrafts for every mission optimized to achieve science, NASA has begun to use a service-based model and utilizing public-private partnership in developing the vehicles that can bring broader benefits as well as lower the cost for NASA missions. Commercial companies own and operate those vehicles. This allows NASA to not design missions from the bottom up, and has cost, risk, and schedule savings implications. On the other side, the constraints require meeting the requirements in terms of mass, volume, power, etc. By leveraging NASA developed technologies, commercial companies can quickly demonstrate the commercial mission concept, and, through technology transfer, adopt needed technology to address supply chain problems. A downside is that the technology has to be sufficiently mature to be transferred by NASA, which means that it requires significant investment, expertise, and time to develop. Space entities are focused on rapid development with an emphasis on manufacturing and integration innovation with reduced cost and schedule and quick entrance into the market. Thermal Protection Systems (TPS) are mission critical, but their development takes years, and involve access to arc jets or unique test facilities. Therefore, their development is both risky and investment heavy. NASA ARC developed several new TPS materials over the last decade (C-PICA, HEEET, 3MDCP, 3DMAT, ADEPT woven TPS) and brought them to high TPS maturity, making them enablers for commercials space missions from LEO, Lunar Sample Return, Mars, and Venus missions. LEO missions are relevant to future Mars missions due to the comparable entry conditions. External Partners' Missions: C-PICA is a recent improvement on NASA’s heritage PICA lightweight TPS ablator. C-PICA is now considered an enabling technology for New Frontiers and other NASA missions. C-PICA was infused into several missions from external partners. Varda Space Industries’ Winnebago-1 spacecraft successfully returned to Earth from LEO on Feb. 21st, 2024, using a C-PICA heatshield. Inversion Space’s Ray vehicle will test both ARC’s C-PICA and SIRCA TPS materials on a LEO return mission later in 2024. The Kentucky Re-Entry Probe Experiment (KREPE) is another example of a low-cost flight experiment to demonstrate the use of small entry capsules to gather data with three instrumented Kentucky Re-entry and Universal Payload System (KRUPS) capsules. NASA Arc provided C-PICA and Soft-PICA for two of the next KRUPS capsules scheduled to re-enter Earth from the ISS later in 2024. Finally, Rocket Lab’s low-cost mission to Venus, scheduled to launch in December 2024, will search for habitable conditions in Venus’ cloud layer, making use of NASA ARC provided HEEET insulation layer heat shield, and SIRCA backshell TPS materials. Future NASA Missions: NASA’s ability to help commercial missions can lead to future low-cost missions for several reasons: Competition encourages lower cost; technology maturation is now done at an integrated system level; and a common design architecture between commercial and scientific applications requires no specialized engineering design. From an engineering perspective, both of these commercial LEO capsules aforementioned are capable of a Mars entry; the commercial payload mut be replaced with as science payload. Finally, several NASA mission concepts, that could be candidates for future SIMPLEx program calls, such as VATMOS-SR and Nephele, both proposing to target the Venusian atmosphere, would make use of the HEEET insulation layer TPS for part of their heat shield.

TPS materials↗

NASA’s Moon to Mars (M2M) Transit Habitat (TH) Refinement Point of Departure (PoD) Design

As NASA prepares for the next human footsteps on the lunar surface, the Agency is already looking ahead to systems that will enable a sustained human presence on the lunar surface and mission to Mars, including a lunar Surface Habitat and Mars Transit Habitat (TH). This paper describes the latest NASA government reference design for the TH and how it will support NASA's Moon to Mars human exploration architecture. First, it will serve as a test and demonstration platform in lunar orbit, demonstrating capabilities required for long-duration microgravity human spaceflight as part of the lunar-Mars analog missions. Then, the TH will also serve as a major Mars habitation exploration element to support the crew during their transit from the lunar orbit to Mars and returning them safely to lunar orbit. This paper will cover several considerations contributing to the latest habitat design refinement, including data on the TH's concept of operations, system functional definition, subsystem assumptions, notional interior layouts, a detailed mass and volume breakdown, and trade studies and analyses required to close identified technology/ development/architecture gaps. In addition to a technical description of the TH, this paper describes how the current TH government reference design will achieve many of the current lunar and Mars mission goals. Additionally, there are many assumed technological advances needed to support the prescribed mission phases leading up to the crewed mission to Mars in the late 2030s. The paper will describe many of the TH systems requiring further technology development and identify architectural solutions to achieve these mass, reliability, autonomy, and crew health targets. As a whole, the data in the paper shows that a TH meeting the 43 metric tons launch mass/trans-Mars injection burn limits specified by the Evolvable Mars Campaign is achievable near the desired timeframe with moderate strategic investments including maintainable life support systems, re-purposable structures and packaging, and lightweight exercise modalities. It also identifies operational and technological options to reduce this mass to less than 41 metric tons, including staging of launch structure/packaging and alternate structural materials. The resulting design detail and data contained in this paper are intended to help teams across NASA and potential commercial, academic, or international partners understand the current performance targets of the Transit Habitat and vehicle interface considerations imposed by the latest Moon to Mars mission scope.

Habitation Systems↗

Characterization of Space Shuttle Thermal Protection System (TPS) Materials for Return-to-Flight following the Shuttle Columbia Accident Investigation

During the Space Shuttle Columbia Accident Investigation, it was determined that a large chunk of polyurethane insulating foam (= 1.67 lbs) on the External Tank (ET) came loose during Columbia's ascent on 2-1-03. The foam piece struck some of the protective Reinforced Carbon-Carbon (RCC) panels on the leading edge of Columbia's left wing in the mid-wing area. This impact damaged Columbia to the extent that upon re-entry to Earth, superheGed air approaching 3,000 F caused the vehicle to break up, killing all seven astronauts on board. A paper after the Columbia Accident Investigation highlighted thermal analysis testing performed on External Tank TPS materials (1). These materials included BX-250 (now BX-265) rigid polyurethane foam and SLA-561 Super Lightweight Ablator (highly-filled silicone rubber). The large chunk of foam from Columbia originated fiom the left bipod ramp of the ET. The foam in this ramp area was hand-sprayed over the SLA material and various fittings, allowed to dry, and manually shaved into a ramp shape. In Return-to-Flight (RTF) efforts following Columbia, the decision was made to remove the foam in the bipod ramp areas. During RTF efforts, further thermal analysis testing was performed on BX-265 foam by DSC and DMA. Flat panels of foam about 2-in. thick were sprayed on ET tank material (aluminum alloys). The DSC testing showed that foam material very close to the metal substrate cured more slowly than bulk foam material. All of the foam used on the ET is considered fully cured about 21 days after it is sprayed. The RTF culminated in the successful launch of Space Shuttle Discovery on 7-26-05. Although the flight was a success, there was another serious incident of foam loss fiom the ET during Shuttle ascent. This time, a rather large chunk of BX-265 foam (= 0.9 lbs) came loose from the liquid hydrogen (LH2) PAL ramp, although the foam did not strike the Shuttle Orbiter containing the crew. DMA testing was performed on foam samples taken fiom a simulated PAL ramp panel. It was found that the smooth rind on the foam facing the cable tray did significantly affect the properties of foam at the PAL ramp surface. The smooth rind increased the storage modulus E' of the foam as much as 20- 40% over a temperature range of -145 to 95 C. Because of foam loss fiom the PAL ramp, future Shuttle flights were grounded indefinitely to allow further testing to better understand foam properties. The decision was also made to remove foam from the LH2 PAL, ramp. Other RTF efforts prior to the launch of Discovery included

Wingard, Doug↗

Reducing the Risk of Human Missions to Mars Through Testing

During the summer of 2002 the NASA Deputy Administrator charted an internal NASA planning group to develop the rationale for exploration beyond low-Earth orbit. This team, termed the Exploration Blueprint, performed architecture analyses to develop roadmaps for how to accomplish the first steps beyond Low-Earth Orbit through the human exploration of Mars. The previous NASA Exploration Team (NEXT) activities laid the foundation and framework for development of NASA s Integrated Space Plan. The reference missions resulting from the analysis performed by the Exploration Blueprint team formed the basis for requirement definition, systems development, technology roadmapping, and risk assessments for future human exploration beyond low-Earth orbit. Emphasis was placed on developing recommendations on what could be done now to effect future exploration activities. The Exploration Blueprint team embraced the Stepping Stone approach to exploration where human and robotic activities are conducted through progressive expansion outward beyond low- Earth orbit. Results from this study produced a long-term strategy for exploration with near-term implementation plans, program recommendations, and technology investments. Specific results included the development of a common exploration crew vehicle concept, a unified space nuclear strategy, focused bioastronautics research objectives, and an integrated human and robotic exploration strategy. Recommendations from the Exploration Blueprint included the endorsement of the Nuclear Systems Initiative, augmentation of the bioastronautics research, a focused space transportation program including heavy-lift launch and a common exploration vehicle design for ISS and exploration missions, as well as an integrated human and robotic exploration strategy for Mars. Following the results of the Exploration Blueprint study, the NASA Administrator has asked for a recommendation by June, 2003 on the next steps in human and robotic exploration in order to put into context an updated Integrated Space Transportation Plan (post- Columbia) and guide Agency planning. NASA was on the verge of committing significant funding in programs that would be better served if longer term goals were better known including the Orbital Space Plane, research on the ISS, National Aerospace Initiative, Shuttle Life Extension Program, Project Prometheus, as well as a wide range of technology development throughout the Agency. Much of the focus during this period was on integrating the results from the previous studies into more concrete implementation strategies in order to understand the relationship between NASA programs, timing, and resulting budgetary implications. This resulted in an integrated approach including lunar surface operations to retire risk of human Mars missions, maximum use of common and modular systems including what was termed the exploration transfer vehicle, Earth orbit and lunar surface demonstrations of long-life systems, collaboration of human and robotic missions to vastly increase mission return, and high-efficiency transportation systems (nuclear) for deep-space transportation and power. The data provided in this summary viewgraph presentation was developed to begin to address one of the key elements of the emerging implementation strategy, namely how lunar missions help retire risk of human missions to Mars. During this process the scope of the activity broadened into the issue of how testing in general, in various venues including the Moon, can help reduce the risk for Mars missions.

Drake, Bret G.↗

Concept of Operations for a Prospective "Proving Ground" in the Lunar Vicinity

NASA is studying conceptual architectures for a "Proving Ground" near the Moon or in high lunar orbit to conduct human space exploration missions that bridge the gap between today's operations with the International Space Station (ISS) and future human exploration of Mars beginning in the 2030s. This paper describes the framework of a concept of operations ("Conops") for candidate activities in the Proving Ground. The Conops discusses broad goals that the Proving Ground might address, such as participation from commercial entities, support for human landings on the Moon, use of mature technologies, and growth of capability through a steady cadence of increasingly ambitious piloted missions. Additional Proving Ground objectives are outlined in a companion paper. Key elements in the Conops include the Orion spacecraft (with mission kits for docking and other specialized operations) and the Space Launch System (SLS) heavy-lift rocket. Potential additions include a new space suit, commercial launch vehicles and logistics carriers, Solar Electric Propulsion (SEP) stages to move elements between different orbits and eventually take them on excursions to deep space, a core module with multiple docking ports, a habitation block, and robotic and piloted lunar landers. The landers might include reusable ascent modules which could remain docked to in-space elements between lunar sorties. A module providing advanced regenerative life support functions could launch to the ISS, and later move to the Proving Ground. The architecture will include infrastructure for launch preparation, communication, mission control, and range safety. The Conops describes notional missions chosen to guide the design of the architecture and its elements. One such mission might be the delivery of a approximately 10-t Transit Habitat element, comanifested with Orion on a Block 1B SLS launcher, to the Proving Ground. In another mission, the architecture might participate in direct human exploration of an asteroidal boulder brought to high lunar orbit by the Asteroid Redirect Mission. The Proving Ground stack could serve as a staging point and tele-operation center for robotic and piloted Moon landings. With the addition of a SEP stage, the architecture could support months-long excursions within and beyond the Earth's sphere of influence, possibly culminating in a year-long mission to land humans on a near-Earth asteroid. In the last case, after returning to near-lunar space, two of the asteroid explorers could join two crewmembers freshly arrived from Earth for a Moon landing, helping to quantify the risk of landing deconditioned crews on Mars. In a conceptual mission particularly stressing to system design, Proving Ground elements could transit to Mars orbit. Other possible design-driving operations include relocation of the stack with no crew on board, the unpiloted journey of the advanced life support module from ISS to the lunar vicinity, excursions to other destinations in near-Earth space, and additional support for Mars exploration in conjunction with the Evolvable Mars Campaign. The Proving Ground Conops concludes with a discussion of aborts and contingency operations

Love, Stanley G.↗

Improvement of Odor Control for the UWMS Hard-Sided Fecal Canister and the Alternate Fecal Canister

On longer range exploration missions, the mass and volume of critical hardware and consumables required to support crew will pose a big stowage challenge. This includes the hardware for the collection and storage of human metabolic solid waste. The amount of stowage needed for this hardware both before (empty) and after (full) use will be a significant burden on the overall spacecraft habitable volume, layout, and design. To help with this challenge, the National Aeronautics and Space Administration (NASA) Mars Campaign Office (MCO) Logistics Reduction (LR) Portfolio has developed a collapsible canister for the collection and containment of fecal deposits. The Alternate Fecal Canister (AFC) is a collapsible alternative to the exploration toilet Hard-sided Fecal Canister (HFC). The AFC in its empty state has a volumetric benefit to smaller vehicles on longer missions. The current designs for HFC and AFC were tested with human fecal material for odor containment at White Sands Test Facility (WSTF) where the tests on both were unsuccessful. The source of the lack of containment was isolated to a gasket used on both HFC and AFC. The gasket used was found to be open cell in design. This paper provides a summary of the materials selection and testing process to identify a replacement gasket material with the intention to replace the gaskets on both existing units as well as incorporate it into the designs going forward for future builds for exploration. Details will be provided on the design of the canisters interface with the odor bacteria lid which led to the selection of the thickness of the desired replacement. Finally, the paper will provide an update on the testing in advance of a return to WSTF for final testing and detail plans to complete testing and perform a demonstration on ISS with UWMS.

ECLSS↗

Improvement of Odor Control for the UWMS Hard-Sided Fecal Canister and the Alternate Fecal Canister

On longer range exploration missions, the mass and volume of critical hardware and consumables required to support crew will pose a big stowage challenge. This includes the hardware for the collection and storage of human metabolic solid waste. The amount of stowage needed for this hardware both before (empty) and after (full) use will be a significant burden on the overall spacecraft habitable volume, layout, and design. To help with this challenge, the National Aeronautics and Space Administration (NASA) Mars Campaign Office (MCO) Logistics Reduction (LR) Portfolio has developed a collapsible canister for the collection and containment of fecal deposits. The Alternate Fecal Canister (AFC) is a collapsible alternative to the exploration toilet Hard-sided Fecal Canister (HFC). The AFC in its empty state has a volumetric benefit to smaller vehicles on longer missions. The current designs for HFC and AFC were tested with human fecal material for odor containment at White Sands Test Facility (WSTF) where the tests on both were unsuccessful. The source of the lack of containment was isolated to a gasket used on both HFC and AFC. The gasket used was found to be open cell in design. This paper provides a summary of the materials selection and testing process to identify a replacement gasket material with the intention to replace the gaskets on both existing units as well as incorporate it into the designs going forward for future builds for exploration. Details will be provided on the design of the canisters interface with the odor bacteria lid which led to the selection of the thickness of the desired replacement. Finally, the paper will provide an update on the testing in advance of a return to WSTF for final testing and detail plans to complete testing and perform a demonstration on ISS with UWMS.

Toilet↗

Mars Sample Return Using Commercial Capabilities: Mission Architecture Overview

Mars Sample Return (MSR) is the highest priority science mission for the next decade as recommended by the recent Decadal Survey of Planetary Science. This paper presents an overview of a feasibility study for an MSR mission. The objective of the study was to determine whether emerging commercial capabilities can be used to reduce the number of mission systems and launches required to return the samples, with the goal of reducing mission cost. We report the feasibility of a complete and closed MSR mission design using the following scenario that covers three synodic launch opportunities, beginning with the 2022 opportunity: A Falcon Heavy injects a SpaceX Red Dragon capsule and trunk onto a Trans Mars Injection (TMI) trajectory. The capsule is modified to carry all the hardware needed to return samples collected on Mars including a Mars Ascent Vehicle (MAV), an Earth Return Vehicle (ERV), and hardware to transfer a sample collected in a previously landed rover mission to the ERV. The Red Dragon descends to land on the surface of Mars using Super Sonic Retro Propulsion (SSRP). After previously collected samples are transferred to the ERV, the single-stage MAV launches the ERV from the surface of Mars. The MAV uses a storable liquid bi-propellant propulsion system to deliver the ERV to a Mars phasing orbit. After a brief phasing period, the ERV, which also uses a storable bi-propellant system, performs a Trans Earth Injection (TEI) burn. Upon arrival at Earth, the ERV performs Earth and lunar swing-bys and is placed into a lunar trailing circular orbit - an Earth orbit, at lunar distance. A later mission, using Dragon and launched by a Falcon Heavy, performs a rendezvous with the ERV in the lunar trailing orbit, retrieves the sample container and breaks the chain of contact with Mars by transferring the sample into a sterile and secure container. With the sample contained, the retrieving spacecraft makes a controlled Earth re-entry preventing any unintended release of pristine martian materials into the Earth's biosphere. The analysis methods employed standard and specialized aerospace engineering tools. Mission system elements were analyzed with either direct techniques or by using parametric mass estimating relationships (MERs). The architecture was iterated until overall mission convergence was achieved on at least one path. Subsystems analyzed in this study include support structures, power system, nose fairing, thermal insulation, actuation devices, MAV exhaust venting, and GN&C. Best practice application of loads, mass growth contingencies, and resource margins were used. For Falcon Heavy capabilities and Dragon subsystems we utilized publically available data from SpaceX, published analyses from other sources, as well as our own engineering and aerodynamic estimates. Earth Launch mass is under 11 mt, which is within the estimated capability of a Falcon Heavy, with margin. Total entry masses between 7 and 10 mt were considered with closure occurring between 9 and 10 mt. Propellant mass fractions for each major phase of the EDL - Entry, Terminal Descent, and Hazard Avoidance - have been derived. An assessment of the effect of the entry conditions on the thermal protection system (TPS), currently in use for Dragon missions, shows no significant stressors. A useful payload mass of 2.0 mt is provided and includes mass growth allowances for the MAV, the ERV, and mission unique equipment. We also report options for the MAV and ERV, including propulsion systems, crewed versus robotic retrieval mission, as well as direct Earth entry. International planetary protection policies as well as verifiable means of compliance will have a large impact on any MSR mission design. We identify areas within our architecture where such impacts occur. We also describe preliminary compliance measures that will be the subject of future work. This work shows that emerging commercial capabilities as well as new methodologies can be used to efficiently support an important planetary science objective. The work also has applications for human exploration missions that use propulsive EDL techniques

Red Dragon↗

STS-78 Space Shuttle Mission Report

The STS-78 Space Shuttle Program Mission Report summarizes the Payload activities as well as the Orbiter, External Tank (ET), Solid Rocket Booster (SRB), Reusable Solid Rocket Motor (RSRM), and the Space Shuttle main engine (SSME) systems performance during the seventy-eighth flight of the Space Shuttle Program, the fifty-third flight since the return-to-flight, and the twentieth flight of the Orbiter Columbia (OV-102). In addition to the Orbiter, the flight vehicle consisted of an ET that was designated ET-79; three SSME's that were designated as serial numbers 2041, 2039, and 2036 in positions 1, 2, and 3, respectively; and two SRB's that were designated BI-081. The RSRM's, designated RSRM-55, were installed in each SRB and the individual RSRM's were designated as 360L055A for the left SRB, and 360L055B for the right SRB. The STS-78 Space Shuttle Program Mission Report fulfills the Space Shuttle Program requirement as documented in NSTS 07700, Volume 7, Appendix E. The requirement stated in that document is that each organizational element supporting the Program will report the results of their hardware (and software) evaluation and mission performance plus identify all related in-flight anomalies. The primary objective of this flight was to successfully perform the planned operations of the Life and Microgravity Spacelab experiments. The secondary objectives of this flight were to complete the operations of the Orbital Acceleration Research Experiment (OARE), Biological Research in Canister Unit-Block II (BRIC), and the Shuttle Amateur Radio Experiment II-Configuration C (SAREX-II). The STS-78 mission was planned as a 16-day, plus one day flight plus two contingency days, which were available for weather avoidance or Orbiter contingency operations. The sequence of events for the STS-78 mission is shown in Table 1, and the Space Shuttle Vehicle Management Office Problem Tracking List is shown in Table 2. The Government Furnished Equipment/Flight Crew Equipment (GFE/FCE) Problem Tracking List is shown in Table 3. The Marshall Space Flight Center (MSFC) Problem Tracking List is shown in Table 4. Appendix A lists the sources of data, both formal and informal, that were used to prepare this report. Appendix B provides the definition of acronyms and abbreviations used throughout the report. All times during the flight are given in Greenwich mean time (G.m.t.) and mission elapsed time (MET).

Fricke, Robert W., Jr.↗

A Survey of Autonomous Navigation Techniques Applicable to Lunar Surface Exploration

As humanity returns to the Moon, and more and more attention is being paid to lunar surface operations, there is a greater need than ever for methods of surface navigation. These could be methods of computer-assisted orienteering for astronauts exploring on foot during an Extra-Vehicular Activity (EVA), or methods of solving the Lost-on-the-Moon problem to initialize a crewed or autonomous rover’s state estimate. It may also be necessary to process navigation data associated with surface samples or other surface operations a posteriori to better understand where that analysis occurred. Autonomous rover operation will also require Hazard Detection and Avoidance (HDA) and terrain-aware pathfinding. While navigation on the surface of the Moon will likely rely on Earth-based assets such as the Deep Space Network (DSN) or communication with other spacecraft (e.g., LunaNet, LCRNS, pre-deployed moon beacons, a nearby lander) it may be necessary to navigate in a loss-of-communication scenario. This paper analyzes the methods of surface navigation used on other celestial bodies, such as those used during the Apollo missions and autonomous exploration of Mars, as well as novel methods which have been studied but not yet implemented which may prove useful. It is shown that the navigator has myriad options when processing data from an Inertial Measurement Unit (IMU), a star tracker, (rover) wheel encoders, optical cameras, and LIght Detection and Ranging (LIDAR) sensors. The intention of this paper is to provide a broad overview of what has been done and what could be done, to aid those designing vehicles and/or missions to the lunar surface.

Paul D Mckee↗

A Survey of Autonomous Navigation Techniques Applicable to Lunar Surface Exploration

As humanity returns to the Moon, and more and more attention is being paid to lunar surface operations, there is a greater need than ever for methods of surface navigation. These could be methods of computer-assisted orienteering for astronauts exploring on foot during an Extra-Vehicular Activity (EVA), or methods of solving the Lost-on-the-Moon problem to initialize a crewed or autonomous rover’s state estimate. It may also be necessary to process navigation data associated with surface samples or other surface operations a posteriori to better understand where that analysis occurred. Autonomous rover operation will also require Hazard Detection and Avoidance (HDA) and terrain-aware pathfinding. While navigation on the surface of the Moon will likely rely on Earth-based assets such as the Deep Space Network (DSN) or communication with other spacecraft (e.g., LunaNet, LCRNS, pre-deployed moon beacons, a nearby lander) it may be necessary to navigate in a loss-of-communication scenario. This paper analyzes the methods of surface navigation used on other celestial bodies, such as those used during the Apollo missions and autonomous exploration of Mars, as well as novel methods which have been studied but not yet implemented which may prove useful. It is shown that the navigator has myriad options when processing data from an Inertial Measurement Unit (IMU), a star tracker, (rover) wheel encoders, optical cameras, and LIght Detection and Ranging (LIDAR) sensors. The intention of this paper is to provide a broad overview of what has been done and what could be done, to aid those designing vehicles and/or missions to the lunar surface.

Paul McKee↗

NASA’s Top Human System Research and Technology Needs for Mars

NASA is working with industry and international partners to return humans to the Moon and to eventually enable humans to explore Mars. Within NASA, several organizations work together to identify, prioritize, fund, execute, and operationalize the research and technology development (R&TD) that will be necessary to enable crew health and performance (CHP) during these future missions. These organizations include flight programs, the Health and Medical Technical Authority (HMTA), the Human Research Program, the Space Technology Mission Directorate, System Capability Leadership Teams, and other organizations, many of which existed for several years prior to the creation of the Moon-to-Mars (M2M) Program Office in 2023. A variety of constructs, vocabularies, and processes exist for managing risks and supporting strategic planning across these organizations. For example, M2M objectives, program risks, human system risks, human research gaps, capability gaps, and envisioned futures are all constructs currently used within NASA to identify and prioritize R&TD needs. These strategic planning constructs are evolving to allow M2M objectives and R&TD investments to be aligned and traced at a detailed level. A recognized need exists among stakeholder organizations to identify and communicate the highest CHP R&TD priorities in a unified and digestible way that addresses the perspectives of NASA’s CHP community. To achieve this, the HMTA arranged a series of discussions with representatives of NASA’s CHP community, during which the 8 highest priority CHP capabilities that will enable human missions to Mars, referred to as the “top human system capability needs for Mars”, were identified. The list includes Earth-independent human operations; Mars-duration food system; Mars-duration effects on human physiology; risk mitigations for vehicle atmospheres; computational injury and anthropometric models; exploration exercise countermeasures; individual variability in responses to spaceflight; and sensorimotor countermeasures. Existing tools and processes for strategic planning and risk management were evaluated, as well as the technical practicalities, cost, and schedule feasibility associated with potential R&TD investments in different capability need areas. This capability needs report is not owned by any one NASA organization and does not replace existing strategic or program planning processes; rather it aims to complement and inform them with a unified set of community generated priorities. These top capability needs will be re-evaluated periodically based on R&TD progress and the evolving M2M architecture.

technology gaps↗

NASA’s Top Human System Research and Technology Needs for Mars

NASA is working with industry and international partners to return humans to the Moon and to eventually enable humans to explore Mars. Within NASA, several organizations work together to identify, prioritize, fund, execute, and operationalize the research and technology development (R&TD) that will be necessary to enable crew health and performance (CHP) during these future missions. These organizations include flight programs, the Health and Medical Technical Authority (HMTA), the Human Research Program, the Space Technology Mission Directorate, System Capability Leadership Teams, and other organizations, many of which existed for several years prior to the creation of the Moon-to-Mars (M2M) Program Office in 2023. A variety of constructs, vocabularies, and processes exist for managing risks and supporting strategic planning across these organizations. For example, M2M objectives, program risks, human system risks, human research gaps, capability gaps, and envisioned futures are all constructs currently used within NASA to identify and prioritize R&TD needs. These strategic planning constructs are evolving to allow M2M objectives and R&TD investments to be aligned and traced at a detailed level. A recognized need exists among stakeholder organizations to identify and communicate the highest CHP R&TD priorities in a unified and digestible way that addresses the perspectives of NASA’s CHP community. To achieve this, the HMTA arranged a series of discussions with representatives of NASA’s CHP community, during which the 8 highest priority CHP capabilities that will enable human missions to Mars, referred to as the “top human system capability needs for Mars”, were identified. The list includes Earth-independent human operations; Mars-duration food system; Mars-duration effects on human physiology; risk mitigations for vehicle atmospheres; computational injury and anthropometric models; exploration exercise countermeasures; individual variability in responses to spaceflight; and sensorimotor countermeasures. Existing tools and processes for strategic planning and risk management were evaluated, as well as the technical practicalities, cost, and schedule feasibility associated with potential R&TD investments in different capability need areas. This capability needs report is not owned by any one NASA organization and does not replace existing strategic or program planning processes; rather it aims to complement and inform them with a unified set of community generated priorities. These top capability needs will be re-evaluated periodically based on R&TD progress and the evolving M2M architecture.

technology gaps↗

Mars Commercial-Compatible Initial Human-Precursor Surveying and Instrument-Deployment Concepts

Water is a critical resource need for future human exploration and habitation of Mars and other planetary environments. An integral scientific question in the search for life outside of Earth is: What are the constraints on life in planetary environments? One of the most critical features of habitable environments is the availability of water - both as an environment for prebiotic chemistry, abiogenesis, and life; and as a vehicle for generating geo- and electro- chemical systems that can support metabolism. Seeking evidence of life prior to human arrival is important both to preserve signs of any existing or past evidence of Martian life, reducing the risks of unintentional forward contamination of Martian environments, and to potentially protect the health of any human crews. Looking forward towards Mars, future human exploration will require a rapid, but thorough, initial survey of any local “area of operations” on Mars to determine the spatial distribution, quantity, and quality (e.g., salt/mineral/organic content) of any local water, as well as to evaluate any signs of current or extinct life. We will discuss several candidate field survey methodologies, involving humans, a teamed instrument platform and a surveying/sampling rover. These are proposed to be validated in a given terrestrial Mars analog environment exhibiting varying distributions of water (ice, permafrost, rock-bound) to evaluate the constraints on life. Commercial space exploration brings the future possibility of unprecedented mass, power and in situ instrument capability, potentially enabling thorough exploration of the geology, hydrology and astrobiology of a km-radius study-zone around a future Mars human/commercial space landing site. We propose to study several representative planetary surface precursor-survey architectures and mission concepts (that are commercial-Mars-compatible), and to test and compare them in field application. We will examine some of the performance issues, using given metrics and controls, of spacesuited humans using handheld and standalone instruments, vs. a robotic human-tended rover/drill, robot arm and instruments. The latter rover-based architecture can in turn be viewed in terms of returned-to-base sample in-situ analyses vs sample analysis performed on a standalone instrument platform deployed away from the primary area of operations.

astrobiology↗