Search NASA⌕ Search

SEARCH · Search NASA

Results for “FINALS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

GA-ASI Final Report and Program Wrap-up for NASA System Integration and Operationalization (SIO)

The NASA SIO demonstration flight of April 3, 2020 represents a successful culmination of 18 months of coordinated effort between GA-ASI, NASA, the FAA, Collins Aerospace, and Honeywell Aerospace to operate a Medium Altitude, Long Endurance (MALE) Unmanned Aircraft System (UAS) safely in the National Airspace System (NAS) using industry leading prototype technologies. The GA-ASI team consisted of technical experts, program managers, engineers, mechanics, flight technicians, flight crews, and numerous other subject matter experts. This final report describes the most significant and potentially impactful aspects of the planning, integration, test, and flight aspects of this effort. GA-ASI successfully integrated the key technologies needed for UAS to fly in the NAS onto our prototype SkyGuardian UAS, which was designed to meet the most stringent airworthiness standards applicable to an aircraft of its size category. A proven Detect and Avoid (DAA) system, developed by GA-ASI and utilizing Honeywell Aerospace technology was integrated onto SkyGuardian for the first time, along with datalink radios from Collins Aerospace that meet the new civil standard for Control and Non-Payload Communication (CNPC) links. GA-ASI also obtained approvals from the FAA and FCC to operate the reconfigured UAS. The SIO demonstration flight represented a commercial aerial surveying operation conducted at medium altitude (>10,000ft above mean sea level). The aircraft’s onboard sensors were used to capture photographic, infrared and radar imagery of public and commercial infrastructure and land, and to subsequently produce the types of data products that would provide business value to potential customers. These survey services would supplement or replace services currently provided by manned airplanes and helicopters, small drones or satellites. A “virtual” mission was also planned, to show what additional survey data could have been captured during the flight if additional sensors had been installed on the aircraft’s external hardpoints. This revision of the final report focuses on information of value to the wider UAS community, and avoids propriety data to facilitate broad dissemination. It also includes a description of GA-ASI’s engagement with the FAA following the SIO flight, which led to the award of an updated Special Airworthiness Certificate in the Experimental Category (SAC-EC) and a Certificate of Waiver or Authorization (COA) allowing operation of the SkyGuardian UAS using its DAA system to satisfy right-of-way rules, instead of a chase plane. The associated operational limitations are described to illustrate the further steps that would be needed to remove those limitations for unhindered commercial operations.

Flight demonstration↗

Derivation of the final OSIRIS-REx OVIRS in-flight radiometric calibration

The OSIRIS-REx Visible and InfraRed Spectrometer (OVIRS) operates over the ∼0.4- to 4.3-μm wavelength range. Radiometric calibration over this broad range requires the use of multiple calibration sources. Initial OVIRS in-flight calibration coefficients were previously computed using ground calibration from visible integrating sphere and IR blackbody sources, cross-calibrated with Earth-observing satellites for visible wavelengths, and adjusted using the spectrum of the OSIRIS-REx mission’s target body, asteroid (101955) Bennu. As part of the final in-flight calibration, we determined that the best calibration method removes out-of-band IR signal leakage prior to radiometric calibration and updated the calibration coefficients accordingly. These final calibration coefficients work well for data where the field of view is filled, and we document the possible artifacts in underfilled spots.

Amy A. Simon↗

Blue Origin De-orbit Descent and Landing Tipping Point: Program Final Report

The purpose of this document is to provide a final report on the Deorbit, Descent, and Landing (DDL) Tipping Point program, a public-private partnership between Blue Origin and NASA that is partially funded by NASA contract 80LARC19C0005. In this report we summarize the results of the entire contract, including recommendations and conclusions based on the experience and results obtained. Only the portions funded by the government with associated unlimited rights are documented in detail in this report. For the work funded by Blue Origin, summaries with unlimited rights are provided for context and completeness. The Blue Origin funded work exceeded 25% of the originally proposed total program cost and included a mixture of hardware procurement and critical technology maturation. The scope of this document is a discussion of all the major tasks performed under the contract including the sensor flight demonstrations on New Shepard, the hardware in the loop lunar landing navigator demonstration, and the ground testing of the Flash LiDAR hazard sensor. The contributions from the multiple NASA teams – Johnson Space Center, Langley Research Center, Goddard Space Flight Center, and Jet Propulsion Laboratory – are described along with the contributions from Blue Origin. This document is the Final Report for statement of work item 4.1.2.10 as Deliverable 5.8.

Stefan Bieniawski↗

Atacama Rover Astrobiology Drilling Studies Project: Final Year

The Atacama Rover Astrobiology Drilling Studies (ARADS) project, a simulated Mars rover biomarker detection mission, was iteratively developed over four years from 2015 -2019, including three NASA centers, the Centro de Astrobiologia, Johns Hopkins University, Honeybee Robotics, Maxar and the University of Antofagasta. The final (4th) ARADS field season, in 2019, tested an integrated mobile life-prospecting platform loosely inspired by the 2000’s Astrobiology Field Laboratory concept, with a 1m rotary-percussive drill and sample transfer robot arm that fed three astrobiology instruments operating in-situ on the KREX2 medium rover prototype. A fourth instrument was field tested earlier in 2019 due to flight mission requirements. In the final ARADS field deployment in September 2019, the project conducted a remote mission operation simulation (Stoker 2022)demonstrating sample drilling, acquisition and transfer into the rover instruments (while minimizing cross-contamination), performing in-situ analysis of the samples, and returning the results to a remote science operations team(which commanded the daily science goals and uploaded operations sequences).

astrobiology↗

H2O Electrolysis with Impure Water Source - Final Report

This Phase III final report summarizes the Phase I research and development work performed during the IRAD FY 2018-Cycle 1, Stage C-Phase I project March 15, 2018 through August 17, 2018 and during the Phase II continuation request which funded the research and development November 26, 2018 through September 30, 2019. A Phase III proposal was accepted to continue the technology development, but due to the unavailability of the Principal Investigators to complete the proposed PhasE III work, the Phase III project was re-scoped to complete a final report on the research and development work that was previously completed as a wrap-up of this IRAD project

Electrolysis↗

RST CGI: Final Verification and Calibration of Prism and Polarizer Flight Units

As part of its technology demonstration, the Nancy Grace Roman Space Telescope Coronagraph Instrument (CGI) will demonstrate point source spectroscopy and polarization measurements of disks. The spectroscopy mode is a zero-deviation Amici prism and slit which is deployed to the planet position after an imaging detection. The Wollaston prism polarization optics allow for imaging two orthogonal polarization states simultaneously. The CGI spectral characterization modes, designed and built at Goddard Space Flight Center (GSFC), have a spectral resolution of R50 in two 15% bandpass centered at 660nm and 730nm. There are duplicate Wollaston prism channels, clocked 45 degrees with respect to one another to completely characterize the instrument polarization effects and recover the Stokes parameters of the targeted disk. The Wollaston design and optical elements are a contribution by the Japanese Aerospace Exploration Agency, with final alignment and testing being done at GSFC. The spectroscopy mode is optimized to target Methane absorption features around 730nm, keeping the spectral resolution as low as possible to improve the signal-to-noise ratio and hence reduce detection time. We highlight the requirements for these modes, the ground-to-orbit calibration process, and the operations required to use a deployable slit on a CGI point source in the presence of pointing error. We also provide further detail on the optomechanical design, testing results from the final as-built flight units, verification process, and performance of the as-built flight assemblies.

high contrast imaging↗

CALIPSO Final Data Product Status

The CALIPSO project is preparing for the end of the mission in October 2025. In this poster we provide detailed summaries of each final data products that will be released, a concise description of the changes between each of these final products and their previous versions, and a target release schedule. A summary of all of the steps that will be carried outby the CALIPSO project during the remainder of the mission for long term data discoverability and accessibility will also be provided.

Brian Getzewich↗

ESTABLISHING FINAL END STATE FOR A RETIRED NUCLEAR WEAPONS PRODUCTION REACTOR; COLLABORATION BETWEEN STAKEHOLDERS, REGULATORS, AND THE FEDERAL GOVERNMENT - 11052

The Savannah River Site (SRS) is a 310-square-mile United States Department of Energy nuclear facility located along the Savannah River (SRS) near Aiken, South Carolina. Nuclear weapons material production began in the early 1950s, utilizing five production reactors. In the early 1990s all SRS production reactor operations were terminated. The first reactor closure end state declaration was recently institutionalized in a Comprehensive Environmental Response and Compensation and Liability Act (CERCLA) Early Action Record of Decision. The decision for the final closure of the 318,000 square foot 105-P Reactor was determined to be in situ decommissioning (ISD). ISD is an acceptable and cost effective alternative to off-site disposal for the reactor building, which will allow for consolidation of remedial action wastes generated from other cleanup activities within the P Area. ISD is considered protective by the regulators, U. S. Environmental Protection Agency (US EPA) and the South Carolina Department of Health and Environmental Control (SCDHEC), public and stakeholders as waste materials are stabilized/immobilized, and radioactivity is allowed to naturally decay, thus preventing future exposure to the environment. Stakeholder buy-in was critical in the upfront planning in order to achieve this monumental final decision. Numerous public meetings and workshops were held in two different states (covering a 200 mile radius) with stakeholder and SRS Citizens Advisory Board participation. These meetings were conducted over an eight month period as the end state decision making progressed. Information provided to the public evolved from workshop to workshop as data became available and public input from the public meetings were gathered. ISD is being considered for the balance of the four SRS reactors and other hardened facilities such as the chemical Separation Facilities (canyons).

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

FINAL DESIGN OF ILC RTML EXTRACTION LINE FOR SINGLE STAGE BUNCH COMPRESSOR

The use of single stage bunch compressor (BC) in the International Linear Collider (ILC) Damping Ring to the Main Linac beamline (RTML) requires new design for the extraction line (EL). The EL located downstream of the BC will be used for both an emergency abort dumping of the beam and the tune-up continuous train-by-train extraction. It must accept both compressed and uncompressed beam with energy spread of 3.54% and 0.15% respectively. In this paper we report the final design that allowed minimizing the length of such extraction line while offsetting the beam dumps from the main line by 5m distance required for acceptable radiation level in the service tunnel. Proposed extraction line can accommodate beams with different energy spreads at the same time providing the beam size suitable for the aluminum ball dump window. We described the final design of the ILC RTML extraction line located downstream of the new single-stage bunch compressor. The extraction line is only 24m long and is capable of accepting and transmitting 220kW of beam power. The EL can be used for both fast intra-train and continual extraction, and is capable of accepting both 0.15% and 3.54% energy spread beams at 5MeV and 4.37MeV respectively.

220k W aluminum ball dump↗

Searches for diboson production at the Tevatron in final states containing heavy-flavor jets

Recent searches performed by the CDF and D0 collaborations at the Tevatron for diboson production in final states containing heavy-flavor jets are reported. The searches for WZ and ZZ can be regarded as the ultimate benchmark for the corresponding searches for a low-mass Higgs boson in the WH and ZH final states. Using the exact same techniques as for those Higgs boson searches, the D0 collaboration measured a cross section for WZ/ZZ production of 1.13 {+-} 0.36 times its expectation in the standard model, with a diboson signal significance of 3.3 standard deviations (2.9 expected).

43 PARTICLE ACCELERATORS↗

PREPARATION OF U-PLANT FOR FINAL DEMOLITION AND DISPOSAL - 12109E

The U-Plant is one of the five major nuclear materials processing facilities at Hanford and was chosen as a pilot project to develop the modalities for closure of the other four facilities at Hanford and the rest of the Department of Energy (DOE) complex. The remedy for this facility was determined by a Record of Decision (ROD) pursuant to the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). That remedy was to 'Close in Place - Partially Demolished Structure'. The U-Plant facility is identified as the 221-U Building and is a large, concrete structure nominally 247m (810 ft) long, 20 M (66 ft) wide and 24 m (77 ft) high with approximately 9 m (30 ft) being below grade level. It is a robust facility with walls ranging from 0.9 m to 2.7 m (3 ft to 9 ft) thick. One large room extends the entire length of the building that provides access to 40 sub-grade processing cells containing tanks, piping and other components. The work breakdown was divided into three major deliverables: (1) Tank D-10 Removal: removal of Tank D-10, which contained TRU waste; (2) Equipment Disposition: placement of contaminated equipment in the sub-grade cells; and (3) Canyon Grouting: grouting canyon void spaces to the maximum extent practical. A large number of pieces of contaminated equipment (pumps, piping, centrifuges, tanks, etc) from other facilities that had been stored on the canyon operating floor were placed inside of the sub-grade cells as final disposition, grouted and the cell shield plug reinstalled. This action precluded a large volume of waste being transported to another burial site. Finally, {approx}19,000 m3 ({approx}25,000 yd3) of grout was placed inside of the cells (in and around the contaminated equipment), in the major galleries. the ventilation tunnel, the external ventilation duct, and the hot pipe trench to minimize the potential for void spaces and to reduce the mobility, solubility, and/or toxicity of the grouted waste. The interim condition of the facility is 'cold and dark'. Upon availability of funding the structure will have contamination fixative applied to all contaminated surfaces and may be explosively demolished, with the remaining structure buried under an engineered barrier.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advances in the Design of the SuperB Final Doublet

SuperB is an asymmetric energy e{sup +}e{sup -} collider operating at the {Upsilon}(4S) peak with a design peak luminosity of 10{sup 36} Hz/cm{sup 2} to be built in Italy in the very near future. The design luminosity is almost a factor hundred higher than that of the present generation comparable facilities. To get the design luminosity a novel collision scheme, the so called 'large Piwinski angle with crab waist', has been designed. The scheme requires a short focus final doublet to reduce the vertical beta function down to {beta}*{sub y} = 0.2mm at the interaction point (IP). The final doublet will be composed by a set of permanent and superconducting (SC) quadrupoles. The SC quadrupole doublets QD0/QF1 will be placed as close to the IP as possible. This layout is critical because the space available for the doublets is very small. An advanced design of the quadrupole has been developed, based on the so-called helical coil concept. The paper discusses the design concept, the construction and the results of test of a model of the superconducting quadrupole based on NbTi technology. Future developments are also presented.

43 PARTICLE ACCELERATORS↗

UPGRADING THE CEBAF INJECTOR WITH A NEW BOOSTER, HIGHER VOLTAGE GUN, AND HIGHER FINAL ENERGY

The Continuous Electron Beam Accelerator Facility (CEBAF) accelerator at Jefferson Lab will be upgraded from 6 GeV to 12 GeV in the next few years. To meet the requirement of the new machine and to take the opportunity to improve the beam quality, the CEBAF injector will be upgraded with a higher voltage gun, a new booster, and a new accelerating RF module. The CEBAF injector creates and accelerates three beams at different currents simultaneously. The beams are interleaved, each at one third of the RF frequency, traveling through the same beam line. The higher voltage gun will lower the space charge effects. The new booster with optimized beam dynamics will complete the bunching process and provide initial acceleration matched to the new gun voltage. Using our latest SRF design, the new booster has significantly lower x/y coupling effects that should improve our beam setup and operation for the highly sensitive parity experiments scheduled for the CEBAF's future. Finally, the new accelerating RF module will roughly double the injector final energy to match the rest of the 12 GeV accelerator. In this paper we will provide more detail about this upgrade.

43 PARTICLE ACCELERATORS↗

Search for CP Violation in $\tau$ And D Decays With a $K^0_S$ in the Final State

I report the recent searches for CP violation in {tau} and D decays including a K{sub s}{sup 0} in the final state. The analyses herein shown are based on data samples recorded by BABAR and Belle experiments. A brief introduction on CP violation is followed by the summary of the experimental techniques and the results obtained for {tau} and D decays, respectively. Finally, an outlook on future development is provided.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Bioelectronics Research Lab (Final Report)

The Doheny Eye Institute at the University of Southern California (DEI) served as the lead institution in the DOE Artificial Retina Project. In this role, DEI coordinated the efforts of six national labs, four universities, and one company. The coordination role included arranging regular telecons, scheduling investigator meeting, collating and finalizing quarterly and annual reports, and maintaining progress towards project milestones. Despite being on time and accomplishing the milestones and receiving the highest marks by outside reviewers, the Artificial Retina Program was cut short by 2 years and the amount of funding was drastically reduced for the last 2 years that were funded. These budget cuts led to the inability of the team to complete any of the two products. The 200+ electrode device with the goal of providing vision compatible with mobility and orientation was built but not completed as there were no funds or time to complete the final packaging step for the implantable electronics. The 1,000 electrode device with the goal of providing reading vision was never started beyond conceptual designs.

42 ENGINEERING↗

Climate Change Impacts to Hydropower Generation in Pacific Northwest River Basins (Final Report)

This is the final technical report describing the research findings for the project, “Climate change impacts to hydropower generation in Pacific Northwest river basins”. The overall objective of the research was to develop a new approach to assess which types of climate changes would adversely affect hydropower production. This research had three major components. First, we conducted a geospatial analysis of the region to identify potential focus basins. We compiled geospatial data on hydropower dam locations, contributing areas to hydropower dams, and climate characteristics in contributing areas. For the potential focus basins identified, we classified these basins by hydrologic regime as snow-dominated, rain-dominated, or mixed. Rain-dominated basins were primarily found in Oregon, with some in western Washington. Most of the basins draining west out of the Cascades in Washington were mixed, whereas most of the potential focus basins in Idaho were snowmelt-dominated. Next, we developed a stochastic conceptual modeling approach in which we stochastically generate a wide range of climate scenarios and use these scenarios to generate time series of reservoir inflows. We developed and applied this modeling approach to the North Fork of the Clearwater River in Idaho. Results showed that increases in temperature in the basin led to decreases in streamflow, even in cases where precipitation increased. Finally, we used the reservoir inflow scenarios from the stochastic conceptual model to force a reservoir operations model for Dworshak reservoir. The wide range of climate scenarios generated by the hydrologic model allowed us to test the sensitivity of reservoir operations objectives to shifts in both temperature and precipitation. Results showed that scenarios with lower inflow had less hydropower generation, but changes in hydropower generation were not always proportional to changes in inflow. Current reservoir operations were better suited to maximize hydropower generation under climate change scenarios with no shift in inflow timing but did not optimize power generation under warming scenarios with earlier snowmelt runoff.

13 HYDRO ENERGY↗

Materials and Modules for Low Cost, High Performance Fuel Cell Humidifiers (Final Report)

Over the past 20 years, great technical progress has been made in improving power density and durability of fuel cell stacks. Yet, operating durably at high performance levels under very dry conditions, e.g., < 20% RH at 80 °C or above, remains beyond even the best fuel cell membrane electrode assemblies. Thus, today it is essential to humidify the gases supplied to the fuel cell inlets. In this work, we have produced a new, inexpensive, composite membrane capable of very high water vapor transport and low air cross-over. The composite structure consists of a very thin ionomer layer (e.g., < 5 μm) sandwiched between two microporous polymer layers. The thin ionomer layer facilitates the rapid water transport and provides an impermeable layer to prevent gas cross-over. Such an approach reduces cost, but maintains performance. The microporous layer protects the thin ionomer layer from mechanical damage during handling; confers strength to the thin layer allowing it to be more durable during use; and allows it to withstand higher automotive pressures and temperatures. The composite structure will therefore allow lower total cost while still meeting automotive humidifier water transport and durability targets. Because the transport rates of these new materials are so high, existing planar membrane humidifier module designs available at the start of the program were incapable of efficiently utilizing the high rates. Therefore, the assembled team designed, tested and demonstrated an innovative, low-cost humidifier module with customized channel geometries that can take advantage of the high the water transport rates. Program Results: The objectives of the program have been fully met. The optimized membrane produced in the program has very high transport rates, nearly twice that of the closest competitive option, a homogeneous perfluorosulfonic acid (PFSA) membrane. Furthermore, the composite structure imparts significant durability advantages, allowing the membrane to remain gas impermeable during 20,000 relative humidity (RH) cycles, unlike the closest competitive options that fail very rapidly. It does suffer from a loss of performance with time at temperature because of inherent properties of the PFSA polymer, but this degradation is manageable through relatively simple system design changes. The final membrane of this program has been produced on manufacturing level equipment in a roll to roll form in the scale of hundreds of square meters. The process is readily scalable to automotive level volumes to allow production of a low-cost membrane required for this application. A full scale automotive air-to-air humidifier module has been designed, tested and built. The final module meets the design specifications required for automotive fuel cell use, and exceeds all the DOE 2017 targets for a cathode humidification module as determined in independent testing at Ford Motor Company. It has a small volume, less than 5 liters; a high water transfer rate, significantly greater than 5 g/s at the DOE specified conditions; acceptably low pressure drop; and is projected to maintain these properties over 5000 hours. Additionally, high volume cost projections suggest that the module can be produced for less than $100 per unit in a scale of 500,000 units per year.

08 HYDROGEN↗

Evaluation of Final Radiological Conditions at Areas of the Niagara Falls Storage Site Remediated under the Formerly Utilized Sites Remedial Action Program -12184

The U. S. Department of Energy (DOE) methods and protocols allow evaluation of remediation and final site conditions to determine if remediated sites remain protective. Two case studies are presented that involve the Niagara Falls Storage Site (NFSS) and associated vicinity properties (VPs), which are being remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). These properties are a part of the former Lake Ontario Ordnance Works (LOOW). In response to stakeholders concerns about whether certain remediated NFSS VPs were putting them at risk, DOE met with stakeholders and agreed to evaluate protectiveness. Documentation in the DOE records collection adequately described assessed and final radiological conditions at the completed VPs. All FUSRAP wastes at the completed sites were cleaned up to meet DOE guidelines for unrestricted use. DOE compiled the results of the investigation in a report that was released for public comment. In conducting the review of site conditions, DOE found that stakeholders were also concerned about waste from the Separations Process Research Unit (SPRU) at the Knolls Atomic Power Laboratory (KAPL) that was handled at LOOW. DOE agreed to determine if SPRU waste remained at that needed to be remediated. DOE reviewed records of waste characterization, historical handling locations and methods, and assessment and remediation data. DOE concluded that the SPRU waste was remediated on the LOOW to levels that pose no unacceptable risk and allow unrestricted use and unlimited exposure. This work confirms the following points as tenets of an effective long-term surveillance and maintenance (LTS&M) program: Stakeholder interaction must be open and transparent, and DOE must respond promptly to stakeholder concerns. DOE, as the long-term custodian, must collect and preserve site records in order to demonstrate that remediated sites pose no unacceptable risk. DOE must continue to maintain constructive relationships with the U.S. Army Corps of Engineers and state and federal regulators.

Remediation, Niagara Falls Storage Site, Lake Onta↗