Search NASA⌕ Search

SEARCH · Search NASA

Results for “Linear accelerators”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Beam breakup in a solid state powered linear induction accelerator

It has been proposed to use solid-state pulsed-power modules to power the new Scorpius accelerator. Since this highcurrent accelerator would have 360 gaps (more than five times the number of cells as present radiography LIAs), it is natural to be concerned about the beam-breakup (BBU) instability. Earlier calculations of this effect used a half-scale model of the accelerator to avoid the limitation to 200 gaps in the code. We have now updated the code to accommodate the extraordinary number of gaps in this proposed LIA. The results of these early simulations are presented here. They indicate that BBU can only be suppressed to the same level as in designs powered by conventional pulsed power, if the calculated cell impedance can truly be achieved in practice. The magnetic focusing field required for this is of the same order as the field required for a conventionally powered LIA only if the transverse impedance can indeed be constrained to the values obtained in some simulations of the cell.

42 ENGINEERING↗

Consideration of REBCO Rapid-Cycling Diple Magnet for Staged Muon Acceleration

A possible application of the HTS (ReBCO) rapid-cycling dipole magnet [1] in the first stages of muon acceleration consisting of Recirculating Linear Accelerator (RLA) and followed-up first Rapid Cycling Synchrotron (RCS-1) is presented. The projected ReBCO magnet hysteresis loss is discussed in terms of the liquid helium coolant choice and the option with the striated ReBCO conductor for the further significant reduction of the hysteresis power loss.

Piekarz, Henryk [Fermilab] (ORCID:0000000194225662↗

OPERATION AND COMMISSIONING OF THE JEFFERSON LAB UV FEL USING AN SRF DRIVER ERL

We describe the operation and commissioning of the Jefferson Lab UV FEL using a CW SRF ERL driver. Based on the same 135 MeV linear accelerator as the Jefferson Lab 10 kW IR Upgrade FEL, the UV driver ERL uses a bypass geometry to provide transverse phase space control, bunch length compression, and nonlinear aberration compensation necessitating a unique set of commissioning and operational procedures. Additionally, a novel technique to initiate lasing is described. To meet these constraints and accommodate a challenging installation schedule, we adopted a staged commissioning plan with alternating installation and operation periods. This report addresses these issues and presents operational results from on-going beam operations.

43 PARTICLE ACCELERATORS↗

Production and Testing Experience with the SRF Cavities for the CEBAF 12 GeV Upgrade

The CEBAF recirculating CW electron linear accelerator at Jefferson Lab is presently undergoing a major upgrade to 12 GeV. This project includes the fabrication, preparation, and testing of 80 new 7-cell SRF cavities, followed by their incorporation into ten new cryomodules for subsequent testing and installation. In order to maximize the cavity Q over the full operable dynamic range in CEBAF (as high as 25 MV/m), the decision was taken to apply a streamlined preparation process that includes a final light temperature-controlled electropolish of the rf surface over the vendor-provided bulk BCP etch. Cavity processing work began at JLab in September 2010 and will continue through December 2011. The excellent performance results are exceeding project requirements and indicate a fabrication and preparation process that is stable and well controlled. The cavity production and performance experience to date will be summarized and lessons learned reported to the community.

43 PARTICLE ACCELERATORS↗