Pacific Northwest National Laboratory Grounds Maintenance
FEMP Water Efficiency Best Management Practice #4 and #5: Case study overview of the grounds maintenance program for Pacific Northwest National Laboratory.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
FEMP Water Efficiency Best Management Practice #4 and #5: Case study overview of the grounds maintenance program for Pacific Northwest National Laboratory.
Fact sheet summarizing technical report TP-7A40-67553. As solar photovoltaic (PV) systems have continued their transition from niche applications into large, mature markets in the United States, their potential as financial investments has risen accordingly. Mainstream investors, however, need to feel confident about the risk and return of solar photovoltaic (PV) systems before committing funds. A major influence on risk and return for PV is operations and maintenance (O&M) - but O&M practices and costs vary widely across the United States, making these variables difficult for investors to predict. To address this barrier to continued PV investment, the PV O&M Working Group has developed a new best-practices guide for PV O&M.
This poster shows the design, and the indoor validation of 'DUSST' (Detector Unit for Soiling Spectral Transmittance), a new low-maintenance soiling station. DUSST projects a collimated monochromatic light through a glass surface and on to a light detector to measure the intensity of the transmitted light. As the glass surface naturally soils, the losses are quantified by comparing this soiled reading with a calibrated reading in the baseline clean condition.
An air maintenance tire assembly is provided in which an elongate groove is located within a first sidewall of a tire. The groove forms an elongate channel within the first sidewall and an elongate groove access passage extends from the elongate channel to an access opening located at an outward surface of the first sidewall. An air pumping tube inserts through the groove access passage and is positioned within the groove channel. A cover strip attaches to the first sidewall to enclose the access opening of the groove access passage. The cover strip is positioned along the first sidewall at a higher distance from the bead region of the first sidewall than the groove channel to avoid contact with a wheel rim flange when the tire is mounted to a wheel rim.
The National Renewable Energy Laboratory has developed a technology maintenance readiness level (TMRL) guide for advanced technology vehicle fleets to help fleet operators (such as transit agencies) assess their readiness level to maintain new zero-emission buses. This guide mirrors a technology readiness level guide, but it focuses on the ability of the fleet operator to maintain and repair the advanced vehicle technology rather than defining the commercial readiness of the technology itself.
Apparatus and method for manufacturing an air maintenance tire includes an air pumping tube assembly station constructing an air pumping tube sub-assembly, a tire preparation station for forming passageways in the tire to accept an outlet device of the air pumping tube sub-assembly, an air pumping tube sub-assembly installation station and a pressure regulator installation station. The air pumping tube sub-assembly inserts into an elongate tire groove opening, facilitated by groove-spreading apparatus.
This fact sheet describes resources for organizations in the retail, food service, and grocery sector related to the procurement of contractual services from qualified technicians to perform preventative maintenance, tuning, and repairs of HVACR equipment.
The primary objective of this research is to address challenges in the implementation of risk-informed, condition-based predictive maintenance (PdM), which reduces operating costs while still maintaining the safety and reliability of commercial nuclear power plants (NPPs). To achieve the objective, risk models are being developed by taking advantage of advancements in data analytics, deep learning, machine learning (ML), and artificial intelligence (AI). The notable outcomes presented in the report include ? Development of a ML models using heterogeneous plant process and vibration data collected at different spatial and temporal resolutions from the Salem?s CWS to diagnose a circulating water pump (CWP) failure based on salient fault signatures. The developed diagnostic models are extendable to other faults associated with CWPs and CWP motors given associated fault signatures. ? Development of a natural language processing (NLP) technique to automatically classify the WO data into different categories. The developed NLP technique was validated on independent WO data. This automates the tedious and time-consuming activity of mining and classifying WOs by subject matter experts. ? Estimation of mean time between downtime (i.e., time duration between time instances when 1 or more CWPs are not available) and developed an approach to establish reliability of CWS components using unstructured WO data along with CWS plant process data. ? Formulation of economic model based on Markov chain models. The parameters of associated with the transition rate between different states of Markov chain models were estimated using WO data. The economic model formulation and discussion captures both time-independent and time-dependent parameter variation, leading to risk-informed decision-making.
Global wind industry has experienced tremendous growth during the past two decades and the trend does not appear changing in near future. However, the industry is still challenged by premature component failures and high operations & maintenance (O&M) costs, which can account for up to 35% of levelized cost of energy. It is imperative for the industry to improve performance, reliability and reduce O&M costs through advanced technologies, enabled by research in related disciplines, to be competitive. This talk will first briefly discuss the challenges with wind plant O&M, then give an overview of related NREL research in the areas of performance, reliability, and O&M cost modeling, finally touch on future R&D opportunities in related areas. The authors hope some of these challenges are of interested to and can be addressed by the INFORMS community in future.
The Lepse was built in Russia in 1934 and commissioned as a dry cargo ship. In 1961 she was re-equipped for use as a nuclear service ship (NSS), specifically a floating maintenance base (FMB), to support the operation of the civilian nuclear fleet (ice-breakers) of the USSR. In 1988 Lepse was taken out of service and in 1990 she was re-classified as a 'berth connected ship', located at a berth near the port of Murmansk under the ownership of Federal State Unitary Enterprise (FSUE) Atomflot. Lepse has special storage facilities for spent nuclear fuel assemblies (SFA) that have been used to store several hundred SFAs for nearly 40 years. High and intermediate-level liquid radioactive waste (LRW) is also present in the spent nuclear fuel assembly storage channels, in special tanks and also in the SFA cooling circuit. Many of the SFAs stored in Lepse are classified as damaged and cannot be removed using standard procedures. The removal of the SFA and LRW from the Lepse storage facilities is a hazardous task and requires specially designed tools, equipment and an infrastructure in which these can be deployed safely. Lepse is a significant environmental hazard in the North West of Russia. Storing spent nuclear fuel and high-level liquid radioactive waste on board Lepse in the current conditions is not acceptable with respect to Russian Federation health, safety and environmental standards and with international best practice. The approved concept design for the removal of the SFA and LRW and dismantling of Lepse requires that the ship be transported to Nerpa shipyard where specialist infrastructure will be constructed and equipment installed. One of the main complexities of the Project lies within the number of interested stakeholders involved in the Project. The Lepse project has been high focus on the international stage for many years with previous international efforts failing to make significant progress towards the objective of decommissioning Lepse. The Northern Dimension Environmental Partnership (NDEP) approved an internationally funded project to identify and prioritise nuclear and environmental hazards in NW Russia. Within this project the Lepse was recognised as being one of the highest nuclear hazards in NW Russia. Removal of SNF, SRW and LRW from Lepse requires innovative design and development of bespoke equipment. The main drivers of the NDEP Donors are first to safely transport Lepse in 2012 from her current berth close to the local population in Murmansk to the nominated dismantling shipyard, and secondly to raise Lepse from the water in 2013 onto the slip-way at the dismantling shipyard. A description is provided of the approach and progress towards preparing the Lepse for the removal of SFAs and other radioactive waste, to decontaminate and then dismantle the vessel under international donor funding. (authors)
This report documents the Hazardous Waste Management Act (HWMA)/ Resource Conservation and Recovery Act (RCRA) Partial Closure Certification of the Sodium Components Maintenance Shop (SCMS) Carbonation Vessel. The HWMA/RCRA Closure followed the multi step review and evaluation closure process identified in the Idaho National Laboratory (INL) Materials and Fuels Complex (MFC) HWMA/RCRA Partial Permit Closure Plan, October 1, 2015. This closure certification report documents that the SCMS Carbonation Vessel was removed from the SCMS, packaged as hazardous waste and stored for future treatment and disposal, and therefore has met the closure performance standards in accordance with the Department of Energy Idaho National Laboratory Materials and Fuels Complex HWMA/RCRA Partial Permit Closure Plan (EPA No. ID4890008952, October 1, 2015).
All eleven of the British first-generation Magnox nuclear power plants have now ceased operating and are in various stages of decommissioning. The Magnox reactors were graphite moderated, using carbon dioxide as the primary coolant. The reactor cores are contained in steel reactor pressure vessels, except for the last two stations which have pre-stressed concrete pressure vessels. All but two of the Magnox reactor stations have been completely de-fueled. The spent fuel removed has been despatched for reprocessing at Sellafield in the north-west of England. On behalf of the UK government the Nuclear Decommissioning Authority (NDA) is responsible for cleaning up the majority of the civil nuclear legacy. The current NDA decommissioning strategy is to prepare the Magnox reactor sites for an extended period of Care and Maintenance (C and M), during which quiescent safe storage will take place (also known as safe enclosure), whereby the cores and associated structures will accrue the benefits of radioactive decay over a period of decades. This will reduce the radiation doses to workers during final dismantling and site clearance. The two Magnox rector units at the Bradwell licensed nuclear site in the south-east of England are the first scheduled to enter this quiescent safe-storage period. This is planned to commence in the second-half of 2018, and is scheduled to last for around 70 years. The Office for Nuclear Regulation (ONR) is the independent regulatory body, responsible for enforcing safety and security requirements at nuclear installations in Great Britain (GB). This paper outlines the national strategic context and how ONR's regulatory regime is applied to nuclear power plant decommissioning. It addresses some of the specific challenges posed at Bradwell during the preparatory works for entry to C and M and how ONR has addressed these. It describes how this will culminate in a regulatory decision on the acceptability of the safety and security of the Bradwell site to enter this new stage of its life cycle. Over the last few years ONR has assessed and inspected various safety aspects of decommissioning, radioactive waste management and other preparations for Bradwell's entry into C and M. Some of the operator's proposals have provided challenges to ONR, particularly where there have been changes to established approaches taken at other sites, as the licensee seeks to minimise its costs. These have included how far to remove redundant structures, systems and components prior to C and M; how to define interim and end-states for fuel cooling ponds and other contaminated areas; and how to treat and store Intermediate Level Waste (ILW), for which there is no geological disposal facility yet available. ONR has begun its final assessment of safety and security justifications supplied by the site licensee, Magnox Ltd (ML). ONR is using its legal powers conferred to it under the site licence conditions to authorise this first-of-a-kind transition into a 70 year period of safe storage. (authors)
The P- and R-Area Reactor buildings, located at SRS near Aiken, SC, were in-situ decommissioned by grouting below-grade portions of the buildings and demolishing some above-grade structures to grade level. Other reactor building structures were left above-grade and sealed to prevent human or animal access. Because the above grade-structures are expected to continue in their present state for hundreds of years, the condition of the building roofs is critical to mitigate rainwater intrusion. For this reason, building roof areas were strengthened with high strength concrete to ensure the long-term integrity of the roof structure. Periodic inspections of the roof structures are required to ensure that the roofs are functioning properly and to identify damage areas. The traditional method of inspecting closed reactor buildings requires the use of a helicopter and photographer to generate photographs and videos for review. This method proved sufficient but lacked the resolution and clarity that is required for a thorough inspection of the building structure. Fortunately, the Savannah River National Laboratory (SRNL) has established a Small Unmanned Aircraft System (sUAS) program using commercially available and custom-built remote-controlled aircraft. EC and ACP contacted the SRNL program to evaluate whether the sUAS technology could be employed for periodic reactor building inspections. The sUAS can fly within a few meters of the reactor buildings and hover, allowing for a more thorough aerial inspection. The initial sUAS inspection of the P-Area Reactor building was completed in February 2018 and at the R-Area Reactor building in August 2018 and were successful in providing higher resolution photos and videos. The sUAS inspections also revealed that vegetation had begun to grow on the roofs that could potentially damage the structure integrity. SRNL partnered with Virginia Polytechnic Institute and State University to build a custom heavy lift sUAS that could be equipped with herbicides to remotely treat the vegetative growth. Herbicides were successfully applied to the R-Area Reactor building roof using the custom sUAS in September 2018. The use of unmanned aircraft systems at SRS to perform aerial inspections and herbicide treatment in otherwise inaccessible areas has proven to be an efficient and cost-effective technology that provides high value, increases knowledge of facility conditions, and provides for early detection of damage. Periodic inspections of the reactor building roofs using sUAS technology are performed safely, efficiently, and at a significant cost and schedule savings while reducing emissions, noise, and fossil fuel use. The use of sUAS equipment for building inspections and herbicide application at SRS is unique within the DOE complex. The goal of SRS is to apply this remote technology to other waste unit operations and maintenance activities in the future. (authors)
Operations and maintenance (O&M) savings frequently occur in energy savings performance contracts (ESPCs). During FY 2022, 37% of reported annual cost savings for projects awarded under the U.S. Department of Energy (DOE) ESPC indefinite delivery indefinite quantity (IDIQ) contracts and in the performance period were due to O&M or other energy- and/or water-related cost savings, with the balance (63%) from utility cost savings (i.e., energy or water cost savings). Sometimes the energy- and water-related cost savings are acknowledged and included in payments within ESPCs; other times, for various reasons, they are not. As presented in this guide, FEMP recommends including energy- and water-related cost savings that are O&M (including related repair and replacement) savings in the financial aspects of an ESPC, to the extent such savings can be documented. Inclusion of these savings will help augment project scopes and/or lower interest costs (by shortening financing terms). However, there is a burden of proof as to what constitutes acceptability in O&M savings that needs to be carefully considered and documented in individual projects. Beyond promoting a key tenet used in U.S. federal performance contracting—that savings must be from actual budgets and therefore based on the level of O&M that is actually occurring, not what should have been performed—FEMP also recommends good practice in establishing and documenting O&M baselines, formulating the rationale for baseline adjustments during the performance period, and conducting ongoing verification activities. This document concludes with five examples of how O&M savings may be handled, in situations ranging from the partial displacement of O&M contracts to consolidation and “virtualization” of servers in data centers. A key theme that permeates this guide is the importance of thoroughly documenting all conditions and assumptions used in the development of and accounting for O&M costs and savings throughout the ESPC life cycle, from baseline-setting to measurement and verification (M&V) of the savings during each year of the performance period. Doing so not only prevents internal claims of non-performance (especially in the case of staff turnover during the contract term), but also simplifies ordering agency and energy service company (ESCO) response in the event of scrutiny from oversight organizations, such as government audits. While this guide focuses on federal ESPCs, it may also be applicable when O&M savings are included in utility energy service contracts (UESCs) and non-federal ESPCs.
Not Available
Not Available
Explore the source record for details and available documents.
Explore the source record for details and available documents.