Search NASA⌕ Search

SEARCH · Search NASA

Results for “Nuclear waste management program*”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

FY22 Laboratory Directed Research and Development Annual Report

The Laboratory Directed Research and Development (LDRD) program yields foundational scientific research and development (R&D) essential to growing SRNL’s core competencies, in alignment with SRNL’s Strategic Plan to provide long-term benefits to the Department of Energy (DOE), the National Nuclear Security Administration (NNSA), and other customers and stakeholders. Five strategic goals are outlined in SRNL’s strategic plan: 1) Provide applied science and engineering for EM’s active clean-up sites and LM’s post closure management sites; 2) Provide science-based solutions for gaps identified in nonproliferation strategic vision and support the government in actives impacting national security; 3) Lead ST&E as the central technical authority for processing tritium loaded reservoirs and support production of plutonium pits; 4) Align science and energy security programs by focusing modern modeling, simulation, and data analytics tools on materials engineering and performance applications; 5) Build a workforce for the future.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Canadian Nuclear Laboratories Waste Management: Challenges and the Integrated Waste Strategy - 19160

Canadian Nuclear Laboratories (CNL) currently faces various waste management challenges and CNL's Integrated Waste Strategy is adapting to manage them. As Canada's premier nuclear science and technology organization, CNL is a global leader in developing peaceful and innovative applications from nuclear technology through its expertise in the scientific field, including physics, metallurgy, chemistry, biology and engineering. As demands change, CNL is shifting its focus to alpha therapies for cancer treatments and sustainable energy solutions. The next decade will see CNL decommission the sites it manages across Canada, whilst transforming Chalk River Laboratories (CRL) into a new, world-class facility which will have the capability to demonstrate the commercial viability of advanced reactor designs including Small Modular Reactors (SMRs). This is being enabled through an accelerated decommissioning program for all CNL operated sites, while renovating CRL, which includes revitalizing essential site infrastructure, and investment in new, world-class science facilities in a modern campus environment. With decommissioning and revitalization occurring simultaneously, the long-term strategy and vision for CNL presents some unique challenges to waste management. Therefore, integrated, collaborative and coordinated waste management is a vital component to ensuring a successful future. The Integrated Waste Strategy coordinates, and provides alignment of, waste management across CNL and: - Includes all CNL operated (Atomic Energy of Canada Limited (AECL) owned) sites; - Considers all CNL managed waste (including radioactive and non-radioactive operational, decommissioning, legacy and historic waste) for the planned lifetime of the sites; - Defines waste routes using a life cycle approach (from the generation of waste to final disposal) A baseline Integrated Waste Strategy and associated action plan to mitigate identified gaps and issues have been produced. A program of work is underway to close those gaps identified in a consistent, transparent, prioritized and justified manner. One of the key challenges is to ensure that waste management planning is completed effectively and in a timely manner. This will enable the provision of suitable and sufficient waste capability to meet CNL's long-term strategy. The Integrated Waste Strategy has been developed and maintained through engagement at all levels across CNL, ensuring buy-in of proposed solutions. Key process stakeholders include generators of CNL managed waste to ensure integrated consideration of legacy, current and future waste generation; waste management personnel to identify requirements, including processing, storage, transport and disposal; AECL as the client and waste liability owner; and the public to ensure they understand the 'big picture' regarding waste strategy. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Stellarators as a fast path to fusion

Herein this paper is focused on three points: (1) overcoming obstacles to tokamak power plants may require a configuration modification as large as that of a stellarator. (2) The demonstrated reliability of the computational design of stellarators should change fusion strategy. (3) Deployment of carbon-free energy sources is mandated by the thirty-year doubling of carbon dioxide emissions. Carbon-free energy options must be developed and fully deployed within a few doubling times. Unit size and cost of electricity are only relevant in comparison to alternative worldwide energy solutions. Intermittency, site specificity, waste management, and nuclear proliferation make fusion attractive as the basis for a carbon-free energy system compared to the alternatives. Nonetheless, fusion is not an option for deployment until a power plant has successfully operated. A critical element in a minimal time and risk program is the use of computational design as opposed to just extrapolation. Only the stellarator has an empirical demonstration of the reliable computational design through large changes in configuration properties and scale. The computational design of stellarators should proceed while the inventions necessary for a more tokamak-like power plant are sought. The cost of computational design is extremely small, but adequate time is required for the development of ideas that maximize attractiveness and minimize risk. Rapid power-plant construction without many intermediate steps may seem risky, but the price is small compared to the cost of trillions of dollars for each year's delay in addressing carbon-dioxide emissions.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Independent Review of Non-Destructive Assay for the K-25/K-27 D&D Project: November 30-December 3, 2004, Oak Ridge, TN

The DOE with concurrence from the D&D contractor has chartered an assessment of the methods and procedures used to obtain the original NDA results of holdup deposits at the K-25 and K-27 uranium gaseous diffusion facilities in Oak Ridge. The assessment has been performed by an external review team with the participation of the D&D contractor, DOE, and DOE/OR. This document is the final report for the assessment. The DOE provided the charter for this review. The review team spent a week in Oak Ridge attending meetings and participating in discussions with expert contractor staff. Substantial additional input for the review came from numerous written materials, unpublished and published. This final report of observations, findings, and recommendations in areas defined by the charter is based on information from the meetings, discussions, and documents. The assessment of the Review Team is that the DOE/OR and BJC approach in using historical NDA data for the D&D of K-25 and K-27 is appropriate and generally acceptable. Resolving issues, addressing findings, and implementing the recommendations documented in this report will reconcile specific technical concerns.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Brine Availability Test in Salt (BATS) FY23 Update

This report summarizes the fiscal year 2023 (FY23) status of the second phase of a series of borehole heater tests in salt at the Waste Isolation Pilot Plant (WIPP) funded by the Disposal Research and Development (R&D) program of the Spent Fuel & Waste Science and Technology (SFWST) office at the US Department of Energy’s Office of Nuclear Energy’s (DOE-NE) Office in the Spent Fuel and Waste Disposition (SFWD) program.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LLNL SFA OBER–SBR FY19 Program Management and Performance Report: Biogeochemistry of Actinides

Over 2,600 metric tons of plutonium (Pu) are estimated to have been produced worldwide, with approximately 70-90 metric tons added to this inventory each year from spent nuclear fuel. A subset of this Pu inventory has been released into the environment as a result of nuclear weapons production, weapons testing, poor waste management practices, and nuclear accidents. The migration of low levels of Pu released in the environment has been documented on the scale of kilometers. Due to its long half-life, toxicity, and its ability to migrate, Pu represents a potentially significant risk to humankind and the environment. Their fate depends on the nature of the release, the biogeochemical processes controlling mobilization, and the eventual exposure pathways. Understanding their behavior in the environment is critical for managing environmental contamination and planning for the safe, long-term isolation of nuclear waste from the biosphere.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The Time Needed to Implement the Blue Ribbon Commission Recommendation on Interim Storage - 13124

The report of the Blue Ribbon Commission on America's Nuclear Future [1] makes a number of important recommendations to be considered if Congress elects to redirect U.S. high-level radioactive waste disposal policy. Setting aside for the purposes of this discussion any issues related to political forces leading to stopping progress on the Yucca Mountain project and driving the creation of the Commission, an important recommendation of the Commission was to institute prompt efforts to develop one or more consolidated storage facilities. The Blue Ribbon Commission noted that this recommended strategy for future storage and disposal facilities and operations should be implemented regardless of what happens with Yucca Mountain. It is too easy, however, to focus on interim storage as an alternative to geologic disposal. The Blue Ribbon Commission report does not go far enough in addressing the magnitude of the contentious problems associated with reopening the issues of relative authorities of the states and federal government with which Congress wrestled in crafting the Nuclear Waste Policy Act [2]. The Blue Ribbon Commission recommendation for prompt adoption of an interim storage program does not appear to be fully informed about the actions that must be taken, the relative cost of the effort, or the realistic time line that would be involved. In essence, the recommendation leaves to others the details of the systems engineering analyses needed to understand the nature and details of all the operations required to reach an operational interim storage facility without derailing forever the true end goal of geologic disposal. The material presented identifies a number of impediments that must be overcome before the country could develop a centralized federal interim storage facility. In summary, and in the order presented, they are: 1. Change the law, HJR 87, PL 107-200, designating Yucca Mountain for the development of a repository. 2. Bring new nuclear waste legislation to the floor of the Senate, overcoming existing House support for Yucca Mountain; 3. Change the longstanding focus of Congress from disposal to storage; 4. Change the funding concepts embodied in the Nuclear Waste Policy Act to allow the Nuclear Waste fund to be used to pay for interim storage; 5. Reverse the Congressional policy not to give states or tribes veto or consent authority, and to reserve to Congress the authority to override a state or tribal disapproval; 6. Promulgate interim storage facility siting regulations to reflect the new policies after such changes to policy and law; 7. Complete already underway changes to storage and transportation regulations, possibly incorporating changes to reflect changes to waste disposal law; 8. Promulgate new repository siting regulations if the interim storage facility is to support repository development; 9. Identify volunteer sites, negotiate agreements, and get Congressional approval for negotiated benefits packages; 10. Design, License and develop the interim storage facility. The time required to accomplish these ten items depends on many factors. The estimate developed assumes that certain of the items must be completed before other items are started; given past criticisms of the current program, such an assumption appears appropriate. Estimated times for completion of individual items are based on historical precedent. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluating the Performance Envelope of Axial Flow HEPA Filter Designs - 17466

Nuclear grade high efficiency particulate air (HEPA) filters are routinely employed as the final control element in confinement ventilation systems. Approximately 6000 nuclear grade HEPA filters are purchased each year for use in the Department of Energy National Nuclear Security Administration (DOE/NNSA) complex. The traditional HEPA filter utilizes a pleated filter medium of fibrous glass that has been produced in a manner analogous to manufacturing paper. Containment ventilation systems are designed to condition the air-stream (temperature, relative humidity, moisture, particle size distribution of aerosols, and aerosol concentration) to levels and conditions that fibrous glass HEPA filters can handle. Axial Flow filters can be purchased with physical separators or embossed medium to maintain proper pleat geometry. Separator-less designs use media embossed with a corrugation pattern to retain pleat geometry. At least some versions of the separator-less filter packs have demonstrated unexpected and rapid failure under slightly elevated temperature and humidity conditions. The effects of age on HEPA filter performance have been a concern for at least two decades. A combination of physical evaluation of aged filter media and a review of filter failure records resulted in Appendix C of the Nuclear Air Cleaning Handbook (NACH), Determination of HEPA Filter Life. Mississippi State University is conducting studies to more clearly identify the operating envelope of separator and separator-less designs of ASME AG-1 Section FC axial flow HEPA filters under a set of generic design basis conditions. A parallel study is also being conducted to evaluate the effects of age on fibrous glass HEPA filters. Activities described in this paper have been conducted under Institute for Clean Energy Technology (ICET's) NQA-1 nuclear quality assurance program approved by DOE-EM. Testing meets the requirements of EM Quality Assurance Program (QAP) EM-QA-001, Rev. 1, June 11, 2012 that includes the applicable requirements of NQA-1-2008/2009a and DOE Order 414.1D. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Discrete-event Simulation Process Model for the Pyrochemical Processing of Plutonium at Los Alamos National Laboratory

The pyrochemical metal production operations that occur in the Plutonium Facility at Los Alamos National Laboratory perform plutonium purification with the aim to provide plutonium metal for a variety of defense- and non-defense missions within the National Nuclear Security Administration. The demands and constraints associated with the pyrochemical processing of plutonium are complex, making decision analyses challenging for program managers who require plutonium production for their mission applications. The construction of a discrete-event simulation process model is proposed to measure and report the process capacity, material throughput, equipment requirements, and dose accumulation for operators of the pyrochemical metal production operations. The process model, constructed in the ExtendSim™ software, will represent the cause-and-effect relationships between the pyrochemical processing environment and the process constraints, including criticality limitations, material control and accountability measures, chemical analysis requirements, and equipment availability. An accurate representation of the pyrochemical metal production process capacity through simulation modeling will be helpful to program managers in their efforts to forecast plutonium availability for mission applications. Furthermore, the proposed process model will be vital for future analyses that will measure the interactions between the pyrochemical metal production operations and the aqueous reprocessing operations and their ability to minimize transuranic waste disposal.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Commissioning and Operation of a Robotic Arm for Waste Retrieval at Trawsfynydd NPP, North Wales - 12091

Trawsfynydd is one of the UK's first generation Magnox nuclear power plants. It started operation in 1965 and ceased generation in 1991. Before the site can enter the 'care and maintenance' phase a number of wet and dry waste stores around the site must be emptied and their contents made safe. Wet wastes include sludges and resins produced during the operating life of the NPP. The sludges and resins are stored in a number of different tanks that vary significantly in terms of size, shape, internal features and access. A dexterous long reach manipulator arm has been designed and built to facilitate tank clearance. Commissioning of the arm was carried out in parallel with Factory Acceptance Testing (FAT) at the manufacturer's site in Colorado, USA. In addition to basic functional testing this work included a full range of task based testing to ensure that the arm, tools, control system and support equipment were thoroughly exercised in representative conditions. Trawsfynydd is one of the lead sites in the UK's program for nuclear plant decommissioning. As such the lessons learned, both in terms of technology and process, will be applicable across the remainder of the fleet. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

US NRC-Sponsored Research on Stress Corrosion Cracking Susceptibility of Dry Storage Canister Materials in Marine Environments - 13344

At a number of locations in the U.S., spent nuclear fuel (SNF) is maintained at independent spent fuel storage installations (ISFSIs). These ISFSIs, which include operating and decommissioned reactor sites, Department of Energy facilities in Idaho, and others, are licensed by the U.S. Nuclear Regulatory Commission (NRC) under Title 10 of the Code of Federal Regulations, Part 72. The SNF is stored in dry cask storage systems, which most commonly consist of a welded austenitic stainless steel canister within a larger concrete vault or overpack vented to the external atmosphere to allow airflow for cooling. Some ISFSIs are located in marine environments where there may be high concentrations of airborne chloride salts. If salts were to deposit on the canisters via the external vents, a chloride-rich brine could form by deliquescence. Austenitic stainless steels are susceptible to chloride-induced stress corrosion cracking (SCC), particularly in the presence of residual tensile stresses from welding or other fabrication processes. SCC could allow helium to leak out of a canister if the wall is breached or otherwise compromise its structural integrity. There is currently limited understanding of the conditions that will affect the SCC susceptibility of austenitic stainless steel exposed to marine salts. NRC previously conducted a scoping study of this phenomenon, reported in NUREG/CR-7030 in 2010. Given apparent conservatisms and limitations in this study, NRC has sponsored a follow-on research program to more systematically investigate various factors that may affect SCC including temperature, humidity, salt concentration, and stress level. The activities within this research program include: (1) measurement of relative humidity (RH) for deliquescence of sea salt, (2) SCC testing within the range of natural absolute humidity, (3) SCC testing at elevated temperatures, (4) SCC testing at high humidity conditions, and (5) SCC testing with various applied stresses. Results to date indicate that the deliquescence RH for sea salt is close to that of MgCl{sub 2} pure salt. SCC is observed between 35 and 80 deg. C when the ambient (RH) is close to or higher than this level, even for a low surface salt concentration. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In Situ Decommissioning Sensor Network, Meso-Scale Test Bed - Phase 3 Fluid Injection Test Summary Report

The DOE Office of Environmental management (DOE EM) faces the challenge of decommissioning thousands of excess nuclear facilities, many of which are highly contaminated. A number of these excess facilities are massive and robust concrete structures that are suitable for isolating the contained contamination for hundreds of years, and a permanent decommissioning end state option for these facilities is in situ decommissioning (ISD). The ISD option is feasible for a limited, but meaningful number of DOE contaminated facilities for which there is substantial incremental environmental, safety, and cost benefits versus alternate actions to demolish and excavate the entire facility and transport the rubble to a radioactive waste landfill. A general description of an ISD project encompasses an entombed facility; in some cases limited to the blow-grade portion of a facility. However, monitoring of the ISD structures is needed to demonstrate that the building retains its structural integrity and the contaminants remain entombed within the grout stabilization matrix. The DOE EM Office of Deactivation and Decommissioning and Facility Engineering (EM-13) Program Goal is to develop a monitoring system to demonstrate long-term performance of closed nuclear facilities using the ISD approach. The Savannah River National Laboratory (SRNL) has designed and implemented the In Situ Decommissioning Sensor Network, Meso-Scale Test Bed (ISDSN-MSTB) to address the feasibility of deploying a long-term monitoring system into an ISD closed nuclear facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nevada National Security Site V3XA Spherical Explosive Confinement Vessel Awareness Package

This report summarizes the plans and activities that will facilitate shipment of the V3XA experimental spheres (a.k.a., Nevada Spheres) from the Nevada National Security Site (NNSS) to the Idaho National Laboratory’s (INL) Advanced Mixed Waste Treatment Project (AMWTP). The spheres require shipment to INL to be segmented, characterized, and repackaged for ultimate disposal at the Waste Isolation Pilot Plant (WIPP). The NNSS does not currently have the facilities or safety basis to perform these activities. The INL has the facilities, the INL M&O contractor owns an 8-120B cask, and AMWTP has a WIPP Waste Acceptance Criteria approved characterization program. The NNSS has shipped other legacy transuranic waste to INL for WIPP certified characterization in the past.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advances in Resin Management Using 3R-Scan - 20154

The most important factor underlying optimal waste management is developing a clear picture of the radioactivity content of the waste and its impact on waste disposal cost. For over 35 years since the publishing of 10CFR61, waste characterization has relied on sampling the final waste product after formation. In the days following 10CFR61, the cost of final disposal was marginal with only a small impact on the overall costs. Constraints were added by provisions of the Low Level Waste Policy Act of 1985 leading to increasingly limited access to those disposal sites that remained available. In addition, Nuclear Regulatory Commission (NRC) pressure promoting waste volume reduction led to disposal costs inevitably rising. Despite this, characterization practices in monitoring of waste generation for activity content still center on the same dated processes. This results in a disposal classification on the basis of endpoint sampling without consideration of the homogeneity of the waste mixture. It can also disregard consideration of the representativeness of the single or small sample base. As a minimum effort, a formalized sampling program of a fixed grouping of waste streams can be implemented that could account for more than 95% of all of the activity carried in solid waste products. The sample results for each radionuclide could then be trended as time passes to develop reasonable scaling factors for difficult to measure radionuclides. This process, identified in NRC guidance, has been rigorously followed by a relatively small number of facilities. The trended scaling factors serve to improve accuracy by identifying anomalous results that could otherwise go undetected. Direct monitoring of the accumulation of activity in process streams generating solid radwaste, including demineralizers and filter streams, is a more precise approach. Nearly all of these streams are monitored by plant chemistry on a regular schedule to maintain water quality. This paper discusses viable options for developing the basis for characterization through process monitoring of the accumulation of activity at the point of generation. Special focus is on resin bed tracking and how process knowledge of these streams can be brought together to form a consistent and precise solid waste radioactivity inventory. Some of the specific points covered in this paper include the merger of the fission product release computer program, 3R-STAT, with the radwaste sample analysis computer program, SCAN4 to create 3R-SCAN, the importance of individual waste stream influences on the overall source term, and the use of historic sample data to develop scaling factors using an automated process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Burnup Credit Approach Used in the Yucca Mountain License Application

The United States Department of Energy has submitted a license application (LA) for construction authorization of a deep geologic repository at Yucca Mountain, Nevada. The license application is currently under review by the United States Nuclear Regulatory Commission (NRC). This paper will describe the methodology and approach used in the LA to address the issue of criticality and the role of burnup credit during the postclosure period. The most significant and effective measures for prevention of criticality in the repository include multiple redundant barriers that act to isolate fissionable material from water (which can act as a moderator, corrosive agent, and transporter of fissile material); inherent geometry of waste package internals and waste forms; presence of fixed neutron absorbers in waste package internals; and fuel burnup for commercial spent nuclear fuel. A probabilistic approach has been used to screen criticality from the total system performance assessment. Within the probabilistic approach, criticality is considered an event, and the total probability of a criticality event occurring within 10,000 years of disposal is calculated and compared against the regulatory criterion. The total probability of criticality includes contributions associated with both internal (within waste packages) and external (external to waste packages) criticality for each of the initiating events that could lead to waste package breach. The occurrence of and conditions necessary for criticality in the repository have been thoroughly evaluated using a comprehensive range of parameter distributions. A simplified design-basis modeling approach has been used to evaluate the probability of criticality by using numerous significant and conservative assumptions. Burnup credit is used only for evaluations of in-package configurations and uses a combination of conservative and bounding modeling approximations to ensure conservatism. This paper will review the NRC regulatory criteria relevant to postclosure criticality, explain the role of criticality within the overall repository performance assessment, describe the strategy for preventing criticality via design features and waste form properties, and discuss the numerous considerations relevant to criticality and burnup credit for spent nuclear fuel disposed of in a geologic repository, with emphasis on the burnup credit approach and analyses.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

LIBS Measurement in Vitrification of HLW Process: Towards a Development of Online Chemical Analyses - 18290

Research programs are currently underway in the Joint CEA-AREVA Vitrification Laboratory (LCV) to develop and optimize Laser Induced Breakdown Spectroscopy (LIBS) for nuclear waste streams analyses. The laboratory has full scale prototypes with the advantage of working on simulated inactive solutions of fission products. LIBS is an elemental chemical analysis technology that uses a short laser pulse to create a micro-plasma on the sample surface. This analytical technique offers many advantages compared to other techniques. It includes a sample preparation-free measurement and an extremely fast measurement time, from a few seconds to a few minutes. This paper presents the LIBS technique available in the laboratory. The first LIBS analyzes results of liquid samples from the off-gas treatment unit integrated on the full scale vitrification process are also presented and discussed. These complex solutions contain suspended particles and up to 30 chemical elements. A vision of an online LIBS analysis cell is also proposed with the development and associated research steps. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In Backyards and Bedrooms: Challenges and Successes in Gaining Access to Homes for Radiological Testing - 18204

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada The safety of workers, the public and the environment while delivering the PHAI on time and within budget is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.2 million cubic metres of historic waste from various locations within the community. The Port Hope Project includes a unique and important component - the Property Radiological Survey. This survey involves the interior and exterior investigation of approximately 4,800 small-scale properties - primarily residential - in the Municipality of Port Hope for the presence or absence of historic low-level radioactive waste. The Property Radiological Survey began in 2012 and is being conducted in five campaigns with between 450 and 1,250 properties in each campaign. The survey begins with radon monitoring, followed by interior and exterior gamma radiation tests, and concludes with exterior borehole drilling/soil sampling. The full suite of tests take approximately 18 - 24 months to complete at each property. This paper will describe the communications strategy implemented to obtain consent from thousands of property owners for CNL's contractor to conduct radiological testing in private living spaces such as bathrooms, bedrooms and closets, as well as front yards, backyards and outbuildings. This strategy incorporates tactics used to secure consent from residents who are reluctant to participate in the survey for reasons including privacy issues, family situations, life events and misapprehensions about the survey and/or the PHAI in general. The paper will include information about how residents' concerns are addressed, the stepped approach to securing access from owners who do not respond to repeated attempts at contact, and the importance of close coordination with the contractor to ensure that all components of the investigations are aligned so that work is conducted in a safe, timely and systematic manner. The authors will also describe the process for keeping the regulator and the municipality informed of survey outreach efforts, challenges and successes, and will outline the process for notifying the approximately 800 owners of properties on which historic low-level radioactive waste is expected to be identified and transitioning those owners from the survey to the remediation phase. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Port Hope Area Initiative Project Update - 19146

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. With funding of $1.28 billion CAD it is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI on time and within budget is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.2 million cubic metres of historic waste from various locations within the community. The Port Granby Project will relocate approximately 450,000 cubic metres of historic low-level radioactive waste and marginally contaminated soils, located at an existing waste management facility on the shoreline of Lake Ontario, to a new engineered aboveground mound being built about a kilometre north of the current site. This paper will provide an update on both projects with an emphasis on successes to date and challenges yet be faced. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗