Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operational forecasting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Integration of DER Adoption Forecasting into Distribution Planning: Cooperative Research and Development Final Report, CRADA Number CRD-11-00430 (Project H)

The objective of this project is to improve distributed energy resources (DER) technology, time, and locational impact analysis by incorporating customer adoption intentions and preferences into distribution planning and operations. The National Renewable Energy Laboratory (NREL) shall collaborate with EPRI staff to contribute to the development of methodology, literature review, analysis, and write-up for two sections of a report "Identification and Overview of Methods for Mapping DER Adoption Forecasts” and “Comparative Analysis of Methods for Mapping DER Adoption Forecasts."

14 SOLAR ENERGY↗

Nuclear Materials Process Modeling at the Y-12 National Security Complex

The Y-12 National Security Complex (Y-12) has implemented process modeling for various accountable nuclear materials operations that are performed throughout the plant. Using a discrete, event-based dynamic simulation program, key nuclear material streams are modeled, allowing Y-12 to effectively manage numerous points of interest within the plant’s production operations. Integration of the various material processes into a single, interdependent supply and demand model is one of the ongoing focuses within Y-12’s process modeling effort. The primary purpose of using dynamic simulation modeling is to allow for analysis of the nuclear materials inventories and forecasted supplies based on future demands. Analysis of these inventories includes capacity evaluation, bottleneck mitigation, and assessments of individual pieces of equipment to inform future facility investment decisions and associated project schedules. Modeling of the nuclear materials processes throughout the complex also allows for incorporation of changes relevant to production capabilities such as the upcoming transition of specific operations to the new Uranium Processing Facility. Prior to implementation of process modeling, Y-12 forecasted supply and demand of accountable nuclear materials streams using Microsoft Excel. With deterministic models such as Microsoft Excel, the annual forecasts, generated within data input condition parameters, can only provide a fixed point of data. Fixed data cannot simulate integrated material streams and account for the possibility of occurrences and other changes that dynamic simulations take into consideration. Y-12’s dynamic process modeling allows integrated simulations of multiple accountable nuclear materials processes, including supply and demand forecasting and analysis, and is a coordinated effort involving many steps of verification and validation (V&V), site briefings, testing, reporting, data mining, planning, and documentation that spans various programs throughout the Y-12 complex.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Corrective Control to Handle Forecast Uncertainty: A Chance Constrained Optimal Power Flow

Higher shares of electricity generation from renewable energy sources and market liberalization is increasing uncertainty in power systems operation. At the same time, operation is becoming more flexible with improved control systems and new technology such as phase shifting transformers (PSTs) and high voltage direct current connections (HVDC). Previous studies have shown that the use of corrective control in response to outages contributes to a reduction in operating cost, while maintaining N-1 security. In this work, we propose a method to extend the use of corrective control of PSTs and HVDCs to react to uncertainty. We characterize the uncertainty as continuous random variables, and define the corrective control actions through affine control policies. This allows us to efficiently model control reactions to a large number of uncertainty sources. The control policies are then included in a chance constrained optimal power flow formulation, which guarantees that the system constraints are enforced with a desired probability. Lastly, by applying an analytical reformulation of the chance constraints, we obtain a second-order cone problem for which we develop an efficient solution algorithm. In a case study for the IEEE 118 bus system, we show that corrective control for uncertainty leads to a decrease in operational cost, while maintaining system security. Further, we demonstrate the scalability of the method by solving the problem for the IEEE 300 bus and the Polish system test cases.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Alaskan North Slope Oil & Gas Transportation Support

North Slope oil and gas resources are a critical part of US energy supplies and their development is facing a period of new growth to meet increasing national energy needs. While this growth is taking place in areas active in development for more than 20 years, there are many increasing environmental challenges facing industry and management agencies. A majority of all exploration and development activities, pipeline maintenance and other field support activities take place in the middle of winter, when the fragile tundra surface is more stable. The window for the critical oil and gas winter operational season has been steadily decreasing over the last 25 years. The number of companies working on the North Slope is increasing. Many of these companies are smaller and working with fewer resources than the current major companies. The winter operations season starts with the tundra-travel opening, which requires 15 cm of snow on the land surface in the coastal management areas and 23 cm in the foothills management areas. All state managed areas require -5°C soil temperatures at a soil depth of 30 cm. Currently there are no methods to forecast this opening date, so field mobilization efforts are dependent on agency personnel visiting field sites to measure snow and soil temperature conditions. Weeks can be easily lost in the winter operating season due to delays in field verification of tundra conditions and the resulting mobilization. After the season is open, a significant percentage of exploration, construction, and maintenance do not proceed until ice roads and pads can be built. This effort is dependent on access to lake ice and under-ice water. Ice chipping is a common ice-road construction technique used to build faster and stronger ice roads. Seasonal variability in water availability and permitting approaches are a constant constraint to industry. At the end of the winter season, projects reliant on ice-road networks are often faced with ending operations early or risk being caught on ice roads with flooded stream crossings, or unusable sections of ice road due to local melt. These challenges result in higher oil and gas field exploration and operational costs. Much of the scientific understanding to address transportation issues for oil and gas development on the North Slope exists, but has not been placed into a set of tools and data sets useful for industry and management agencies. Optimizing North Slope transportation networks during winter operation seasons is critical in managing increasing resource development and will provide a framework for environmentally-responsive development. Understanding the physical environment (such as snow, water, ice, soils) is necessary to ensure protection of fisheries and other natural resources on the sensitive tundra landscape. Solutions also have to do more than just describe current conditions, they need the ability to forecast short-term conditions. This will allow management agencies to respond to future variability in snow cover, soil temperature, and water availability more effectively. In turn, industry will then have more time to plan the significant mobilization taking place every winter season.

02 PETROLEUM↗

Chapter 15: Reliability of Wind Turbines

The global wind industry has witnessed exciting developments in recent years. The future will be even brighter with further reductions in capital and operation and maintenance costs, which can be accomplished with improved turbine reliability, especially when turbines are installed offshore. One opportunity for the industry to improve wind turbine reliability is through the exploration of reliability engineering life data analysis based on readily available data or maintenance records collected at typical wind plants. If adopted and conducted appropriately, these analyses can quickly save operation and maintenance costs in a potentially impactful manner. This chapter discusses wind turbine reliability by highlighting the methodology of reliability engineering life data analysis. It first briefly discusses fundamentals for wind turbine reliability and the current industry status. Then, the reliability engineering method for life analysis, including data collection, model development, and forecasting, is presented in detail and illustrated through two case studies. The chapter concludes with some remarks on potential opportunities to improve wind turbine reliability. An owner and operator's perspective is taken and mechanical components are used to exemplify the potential benefits of reliability engineering analysis to improve wind turbine reliability and availability.

17 WIND ENERGY↗

Parameterization of cloud transmittance for expeditious assessment and forecasting of all-sky DNI

Radiative transfer models require vast computing resources to solve cloud transmittance and reflectance from the radiative transfer equation. As a result, models offering precise simulation in operations often acquire individual cloud transmittance or reflectance from a lookup table precomputed for practicable scenarios. To further expedite the computation of global horizontal irradiance and to reduce the storage requirements, the Fast All-sky Radiation Model for Solar applications (FARMS) parameterized the lookup table using elementary functions with specified coefficients. This study extends FARMS direct normal irradiance (DNI) computation by utilizing hyperbolic tangent functions and various polynomial functions to parameterize the cloud transmittance for scattered solar radiation in the circumsolar region. The parameterization is implemented in FARMS with DNI (FARMS-DNI) and accounts for the circumsolar radiation when assessing or forecasting DNI. The evaluation, with long-term observations at the National Renewable Energy Laboratory's, Solar Radiation Research Laboratory, and the Atmospheric Radiation Measurement, Southern Great Plains, Central Facility, shows that the parameterized DNIs are virtually identical with those computed by coupling FARMS-DNI to a lookup table of cloud transmittance. This parameterization has diverse applications in radiative transfer models and numerical weather prediction models used to assess or forecast direct solar radiation.

14 SOLAR ENERGY↗

Decentralized wind uncertainty management: Alternating direction method of multipliers based distributionally-robust chance constrained optimal power flow

How to manage wind power uncertainty in system operation is an urgent and important issue, especially under substantially increasing penetration levels of wind generation in electric power systems. With increasing numbers of wind power plants (WPPs) integrated into power systems, their variability and uncertain power outputs become a challenge to maintaining system reliability. Traditional stochastic optimization-based models face the curse of dimensionality when the number of WPPs increases. This paper proposes a novel decentralized wind power uncertainty management model. In this model, conventional generators optimize their power capacity output and their participation to mitigate wind power uncertainty locally with only limited information exchange with the system operators. First, a distributionally-robust chance-constrained optimal power flow (DRCC-OPF) model is deployed to schedule the generation and reserve considering the wind power forecast uncertainty. Then, the alternating direction method of multipliers (ADMM) is used to reformulate the DRCC-OPF model into the distributed optimization model for each conventional generator and WPP. The tests on a small PJM 5-bus system and the IEEE 118-bus system demonstrate that the proposed decentralized model can increase the operation reliability without sacrificing system operating cost, especially when the wind power penetration levels are high. Using the proposed model, the optimal solutions can be obtained within one minute, for all studied cases, which verifies the computation efficiency of the proposed decentralized model. Furthermore, considering a large number of WPPs integrated into the system, the proposed decentralized method obtains a lower operating cost within one minute which demonstrates its efficiency to deal with high dimension of uncertainties.

17 WIND ENERGY↗

FINAL REPORT - Development of High Pressure Hydrogen Storage Tank for Storage and Gaseous Truck Delivery

The “Development of High Pressure Hydrogen Storage Tanks for Storage and Gaseous Truck Delivery” project [DE-FG36-08GO18062] was initiated on 01 July 2008. Hexagon Lincoln (then Lincoln Composites) received grant funding from the U.S. Department of Energy to support the design and development of an improved bulk hauling and storage solution for hydrogen in terms of cost, safety, weight and volumetric efficiency. The development of this capability required parallel development and qualification of large all-composites pressure vessels, a custom ISO container to transport and store said tanks, and performance of trade studies to identify optimal operating pressure for the system. Qualification of the 250 bar TITAN® module was completed in 2009 with supervision from the American Bureau of Shipping [ABS], and the equipment has been used internationally for bulk transportation of fuel gases since 2010. Phase 1 of the project was successfully completed in 2012 with the issuance of USDOT SP 14951, the special permit authorizing the manufacture, marking, sale and use of TITAN® Mobile Pipeline® equipment in the United States. The introduction of tube trailers with light weight composite tankage has meant that 2 to 3 times as much gaseous fuel can be transported with each trip. This increased hauling efficiency offers dramatically reduced operating costs and has enabled a profitable business model for over-the-road compressed natural gas delivery. The economic drivers of this business opportunity vary from country to country and region to region, but in many places gas distribution companies have realized profitable operations. Additional testing was performed in 2015 to characterize hydrogen-specific operating protocols for use of TITAN® systems in CHG service at 250 bar. This program demonstrated that existing compression and decompression methodologies can efficiently and safely fill and unload lightweight bulk hauling systems. Hexagon Lincoln and U.S. DOE agreed to continue into Phase 2 of the project without pursuing the development of higher pressure capabilities as originally planned. At 250 bar, development of equipment for hydrogen transport is supported by strong activity in the adjacent natural gas transportation sector. Trade studies performed since 2011 indicate optimization of hauling efficiency and system cost for hydrogen transport at about 350 bar (5076 psi). However, due to reduced efficiency of compression of natural gas above 250 bar, 350 bar operation is not an attractive option for natural gas transportation. The CHG market is not developed at this time, and it is difficult to forecast the arrival of significant revenues. On the investment side, the cost to fully qualify a large tank module at 350 bar is estimated at $3MM to $5MM. There is insufficient CHG market definition to support a stand-alone business case for this investment without near term revenue in the adjacent CNG transportation market. Therefore development of a 350 bar TITAN® system was deferred and not pursued under this project. Hexagon Lincoln continues to support the development of tankage and equipment for operation at 350 bar and above; with 700 bar vehicle tanks and 950 bar tanks for ground storage applications. Phase 2 activities were focused on reducing system cost, increasing system capacity, increasing system safety and characterization of polymer material performance specific to hydrogen pressure vessel usage. With the successful launch of TITAN® modules and trailers in natural gas transportation, over 600 units have been produced through the end of 2016, resulting in improved purchasing power for raw materials and manufactured components. This has allowed Hexagon Lincoln to approach the current project goals for system cost. At $590/kg of compressed hydrogen delivered, the system cost of the baseline TITAN® module is below the project’s 2015 target of $730/kg H2 delivered, and very close to the project’s 2020 target of $575/kg H2 delivered. [Based on product pricing in 1Q2017.] Emphasis was placed on configuration of larger capacity systems within the vehicle weights and dimensions allowed on federal and state highways in the United States and other countries. These activities resulted in the design and development of integrated tube trailer systems that have increased delivery capacities by 45%. The hydrogen delivery capacity of our largest system is 845 kg, exceeding the project’s 2015 target of 700 kg H2 delivered. Emerging technologies offering improvement of the safety systems used on the equipment were investigated, with particular focus on improving the reliability and cost of the emergency venting system for fire protection. Finally, investment in our materials laboratory improved detection and characterization of hydrogen-induced damage in polymer materials, supporting the development of operational protocols to avoid damage to pressure vessel liners and valve components.

08 HYDROGEN↗

What Polarimetric Weather Radars Offer to Cloud Modelers: Forward Radar Operators and Microphysical/Thermodynamic Retrievals

The utilization of polarimetric weather radars for optimizing cloud models is a next frontier of research. It is widely understood that inadequacies in microphysical parameterization schemes in numerical weather prediction (NWP) models is a primary cause of forecast uncertainties. Due to its ability to distinguish between hydrometeors with different microphysical habits and to identify “polarimetric fingerprints” of various microphysical processes, polarimetric radar emerges as a primary source of needed information. There are two approaches to leverage this information for NWP models: (1) radar microphysical and thermodynamic retrievals and (2) forward radar operators for converting the model outputs into the fields of polarimetric radar variables. In this paper, we will provide an overview of both. Polarimetric measurements can be combined with cloud models of varying complexity, including ones with bulk and spectral bin microphysics, as well as simplified Lagrangian models focused on a particular microphysical process. Combining polarimetric measurements with cloud modeling can reveal the impact of important microphysical agents such as aerosols or supercooled cloud water invisible to the radar on cloud and precipitation formation. Some pertinent results obtained from models with spectral bin microphysics, including the Hebrew University cloud model (HUCM) and 1D models of melting hail and snow coupled with the NSSL forward radar operator, are illustrated in the paper.

54 ENVIRONMENTAL SCIENCES↗

What Is the Value of Alternative Methods for Estimating Ramping Needs?

Power system operators procure and deploy flexibility reserves or ramping products to address balancing needs caused by uncertainty and variability of load and generation. Existing methods estimate ramping needs using calendar information and historical forecast errors. Novel methods investigate if real-time weather information could inform ramping and other balancing requirements. This paper compares estimation methods for ramping requirements in theory and practice. The theoretical framework indicates when an alternative method could yield improved economic or reliability performance than existing methods by requiring lower or higher levels of ramping products. Preliminary simulations on a 118-bus test system for 4 days in May 2019 illustrate how system performance improves or deteriorates when ramping requirements are weather-informed (alternative) instead of calendar-based (baseline). Preliminary results suggest high variability in change of performance and underline the impact of additional factors, such as system conditions, on the realized performance change.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Discrete-event Simulation Process Model for the Pyrochemical Processing of Plutonium at Los Alamos National Laboratory

The pyrochemical metal production operations that occur in the Plutonium Facility at Los Alamos National Laboratory perform plutonium purification with the aim to provide plutonium metal for a variety of defense- and non-defense missions within the National Nuclear Security Administration. The demands and constraints associated with the pyrochemical processing of plutonium are complex, making decision analyses challenging for program managers who require plutonium production for their mission applications. The construction of a discrete-event simulation process model is proposed to measure and report the process capacity, material throughput, equipment requirements, and dose accumulation for operators of the pyrochemical metal production operations. The process model, constructed in the ExtendSim™ software, will represent the cause-and-effect relationships between the pyrochemical processing environment and the process constraints, including criticality limitations, material control and accountability measures, chemical analysis requirements, and equipment availability. An accurate representation of the pyrochemical metal production process capacity through simulation modeling will be helpful to program managers in their efforts to forecast plutonium availability for mission applications. Furthermore, the proposed process model will be vital for future analyses that will measure the interactions between the pyrochemical metal production operations and the aqueous reprocessing operations and their ability to minimize transuranic waste disposal.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Advancing spatiotemporal forecasts of CO 2 plume migration using deep learning networks with transfer learning and interpretation analysis

Accurate and timely forecasts of CO 2 plume distribution throughout the injection and post-injection phases are crucial for detecting plume migration, assessing leakage risks, and supporting operational decisions in geologic carbon storage (GCS). Current convolutional neural network-based approaches primarily focus on spatial information and overlook temporal dependencies in plume distributions, thus limiting their ability to capture dynamic movement effects and provide accurate predictions of plume migration. In this work, we propose two deep learning models, Auto-Encoder (AE)-LSTM and Encoder-Decoder (ED)-ConvLSTM, each uniquely designed to capture both spatial and temporal features. We apply the proposed methods to forecast the dynamic distribution of CO 2 plumes based on 108 reservoir simulations over a 30-year injection and a 30-year post-injection period. The results indicate that the ED-ConvLSTM model outperforms the AE-LSTM model in accurately predicting the spatiotemporal dynamics of CO 2 plume migration, achieving R 2 values above 0.99. To provide a deeper understanding of these model predictions, we employ a gradient-based explanation method on the trained models. This approach provides insights into the influence of input variables on plume migration forecasts and uncovers the underlying prediction mechanisms of the proposed models. Furthermore, we introduce a transfer learning technique, enabling fast and accurate plume migration forecasting in the post-injection phase by leveraging the trained model during the injection phase. This reduces the necessity for extensive data collection or re-training. In conclusion, the methods proposed in our work enhances the performance and interpretability of CO 2 plume migration forecasts, thereby facilitating informed decision-making throughout the entire lifecycle of GCS applications.

58 GEOSCIENCES↗

Reimagining How Flood Warnings Can Inform Decision‐Making and Community Actions

Society faces increasingly severe flood hazards, intensifying demand for flood early warning systems (FEWS) that deliver accurate and actionable information. However, most existing FEWS remain prediction‐centric, treating decision‐making as a downstream consumer of hazard forecasts while offering limited support for uncertainty interpretation, risk communication, and real‐world response. This Perspective presents a vision and blueprint for a novel inland FEWS‐decision‐making (FEWS‐DM) framework that repositions decision‐making as an equal partner in the forecasting process—not a passive recipient of its outputs. The framework is built on three tightly coupled, co‐evolving thrusts: Physical Science (T1), which advances flood prediction with quantified uncertainty informed by decision relevance; Human Science (T2), which incorporates psychology, behavior, and cultural and institutional context; and Decision Science (T3), which unifies physical predictions and human factors through principled, utility‐based decision support with end‐to‐end uncertainty management. Rather than treating T1 as a solved problem, FEWS‐DM recognizes that forecast development itself must be shaped by decision needs through continuous bidirectional feedback. We identify key scientific, behavioral, and operational challenges limiting such integration and discuss the enabling role of AI, while emphasizing human‐centered design and community feedback as essential for building trust and improving flood risk management.

54 ENVIRONMENTAL SCIENCES↗

GRAF-Plan for Vietnam

Evaluates the reserve requirements for power system balancing areas based on variability and uncertainty of load as well as wind and solar generation scenarios. The tool uses minute‐by‐minute site‐specific generation and load information, as well as information from generation and load forecasting algorithms used in the balancing areas. The Balancing‐Plan Tool can be used directly by utility planners and operators to aid in the integration of intermittent renewable resources. The tool provides reserve requirements of various kinds, such as day‐ahead, load following and regulation, as well as estimates the capacity of the generation fleet to provide the require reserves.

Campbell, Allison↗

Forestry Biofuel Statewide Collaboration Center (Michigan) (Final Technical Report)

A team composed of scientists from Michigan State University (MSU) and Michigan Technological University (MTU) assembled to better understand, document, and improve systems for using forest-based biomass feedstocks in the production of energy products within Michigan. Work was funded by a grant (DE-EE-0000280) from the U.S. Department of Energy (DOE) and was administered by the Michigan Economic Development Corporation (MEDC). The goal of the project was to improve the forest feedstock supply infrastructure to sustainably provide woody biomass for biofuel production in Michigan over the long-term. Work was divided into four broad areas with associated objectives: • TASK A: Develop a Forest-Based Biomass Assessment for Michigan – Define forest-based feedstock inventory, availability, and the potential of forest-based feedstock to support state and federal renewable energy goals while maintaining current uses. • TASK B: Improve Harvesting, Processing and Transportation Systems – Identify and develop cost, energy, and carbon efficient harvesting, processing and transportation systems. • TASK C: Improve Forest Feedstock Productivity and Sustainability – Identify and develop sustainable feedstock production systems through the establishment and monitoring of a statewide network of field trials in forests and energy plantations. • TASK D: Engage Stakeholders – Increase understanding of forest biomass production systems for biofuels by a broad range of stakeholders. The goal and objectives of this research and development project were fulfilled with key model deliverables including: 1) The Forest Biomass Inventory System (Sub-task A1) of feedstock inventory and availability and, 2) The Supply Chain Model (Sub-task B2). Both models are vital to Michigan’s forest biomass industry and support forecasting delivered cost, as well as carbon and energy balance. All of these elements are important to facilitate investor, operational and policy decisions. All other sub-tasks supported the development of these two tools either directly or by building out supporting information in the forest biomass supply chain. Outreach efforts have, and are continuing to get these user friendly models and information to decision makers to support biomass feedstock supply chain decisions across the areas of biomass inventory and availability, procurement, harvest, forwarding, transportation and processing. Outreach will continue on the project website at http://www.michiganforestbiofuels.org/ and http://www.michiganwoodbiofuels.org/

09 BIOMASS FUELS↗

Case Studies of the ROZ CO 2 Flood and the Combined ROZ/MPZ CO 2 Flood at the Goldsmith Landreth Unit, Ector County, Texas. Using ''Next Generation'' CO 2 EOR Technologies to Optimize the Residual Oil Zone CO 2 Flood

The technology for CO 2 Enhanced Oil Recovery (CO 2 EOR) has significantly advanced since the earliest floods were implemented in the 1970s. At least for the Permian Basin region of the U.S., the oil recovery has been now been extended into residual oil zones (ROZs) where the mobile fluid phase is water and immobile phase is oil. But the nature of the formation and fluids within the ROZs has brought some challenges that were not present when flooding the MPZs. The Goldsmith-Landreth project in the Permian Basin was intended to first identify the most pressing issues of the ROZs floods and, secondly, begin to address them with new techniques designed to optimize a flood that commingled the MPZ and the ROZ. The early phase of the research conducted considerable reservoir and fluid characterization work and identified both technical and commercial challenges of producing the enormous quantities of water when flooding the ROZs. It also noted the differing water compositions in the ROZ as compared to the overlying MPZs. A new CO 2 gas lift system using a capillary string was successfully applied during the project which conveyed the CO 2 to the deeper and differing ROZ reservoir conditions at Goldsmith and added a second capillary string that facilitated applying scale inhibitors to mitigate the scaling tendencies of the mixing ROZ and MPZ formation waters. The project also undertook a reservoir modeling effort, using the acquired reservoir characterization data, to history match both the primary and water flood phases of the MPZ and to establish the initial conditions for a modeling effort to forecast response of the ROZ to CO 2 EOR. With the advantage of many profile logs acquired from the operator, some concentration on the original pattern area for the ROZ pilot was accomplished to attempt to perfect the history match for that area. Several optional scenarios for producing the ROZ were simulated seeking to find the preferred mode of producing the two intervals. Finally, the project attempted to document for the first time the production performance of commingled MPZ and ROZ CO 2 EOR project at the nearby Seminole San Andres Unit. The analysis shows that over 10,000 bopd can be shown to be coming from the ROZ interval, a zone that would have produced no oil under primary or water flood phases. A similar analysis was done for the GLSAU project illustrating that 2000 bopd of incremental EOR oil is currently being produced. The results of the modeling work would suggest that 800 bopd can be attributed to the ROZ alone at GLSAU.

02 PETROLEUM↗

Los Alamos Climatology 2016 Update

The Los Alamos National Laboratory (LANL or the Laboratory) operates a meteorology monitoring network to support LANL emergency response, engineering designs, environmental compliance, environmental assessments, safety evaluations, weather forecasting, environmental monitoring, research programs, and environmental restoration. Weather data has been collected in Los Alamos since 1910. Bowen (1990) provided climate statistics (temperature and precipitation) for the 1961– 1990 averaging period, and included other analyses (e.g., wind and relative humidity) based on the available station locations and time periods. This report provides an update to the 1990 publication Los Alamos Climatology (Bowen 1990).

54 ENVIRONMENTAL SCIENCES↗

Integrated Multi-Scale Data Analytics and Machine Learning for the Distribution Grid and Building-to-Grid Interface

This white paper introduces the application of advanced data analytics to the modernized grid. In particular, we consider the field of machine learning and where it is both useful, and not useful, for the particular field of the distribution grid and buildings interface. While analytics, in general, is a growing field of interest, and often seen as the golden goose in the burgeoning distribution grid industry, its application is often limited by communications infrastructure, or lack of a focused technical application. Overall, the linkage of analytics to purposeful application in the grid space has been limited. In this paper we consider the field of machine learning as a subset of analytical techniques, and discuss its ability and limitations to enable the future distribution grid and the building-to-grid interface. To that end, we also consider the potential for mixing distributed and centralized analytics and the pros and cons of these approaches. Machine learning is a subfield of computer science that studies and constructs algorithms that can learn from data and make predictions and improve forecasts. Incorporation of machine learning in grid monitoring and analysis tools may have the potential to solve data and operational challenges that result from increasing penetration of distributed and behind-the-meter energy resources. There is an exponentially expanding volume of measured data being generated on the distribution grid, which, with appropriate application of analytics, may be transformed into intelligible, actionable information that can be provided to the right actors – such as grid and building operators, at the appropriate time to enhance grid or building resilience, efficiency, and operations against various metrics or goals – such as total carbon reduction or other economic benefit to customers. While some basic analysis into these data streams can provide a wealth of information, computational and human boundaries on performing the analysis are becoming significant, with more data and multi-objective concerns. Efficient applications of analysis and the machine learning field are being considered in the loop.

24 POWER TRANSMISSION AND DISTRIBUTION↗