Search NASA⌕ Search

SEARCH · Search NASA

Results for “Padding”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

TPSAS-NF1676L-11021-DND

The Orion Pad Abort 1 Flight Test occurred on May 6th, 2010 at White Sands Missile Range in New Mexico. The test was the first for the Orion vehicle and was primarily a test of the Orion Launch Abort System’s ability to execute an abort from the launch pad. The test was successful and in most cases results were well within predicted outcomes. For this test, the thermal control subsystem was an inherent part of the flight operations team. The thermal team provided pre-launch predictions of component temperatures, set component temperature limits, and monitored those limits during the flight operations process as part of the primary flight operations team. The thermal team was also responsible for day-of-flight predictions of the main abort motor’s propellant mean bulk temperature, a key launch constraint for the test. After the test, thermal data was collected, reviewed, and compared against pre-launch predictions showing very good agreement in most areas. Based on the pre-test and flight operations experience, a detailed list of lessons learned has been developed and will be reviewed prior to potential future Orion or other such flight tests.

Joseph F Gasbarre↗

CFD 2030 Grand Challenge: CFD-in-the-Loop Monte Carlo Flight Simulation for Space Vehicle Design

Flight qualification of space vehicles is markedly different from those typically employed for aircraft. The concept of an extensive flight test campaign for a space vehicle does not exist, and vehicle designers must look to alternative techniques for demonstrating robust and reliable performance of their vehicles prior to operational flight. A space vehicle may undergo only a handful of flight tests in its development cycle, with each flight representing a drastically different flight phase or flight configuration. For instance, NASA’s Space Launch System (SLS) launch vehicle and Orion spacecraft will only see a total of four flight demonstrations before flying a crew on its first operational mission, and each flight demonstrates a unique vehicle configuration and/or set of flight conditions. The SLS will be flown only one time before it becomes operational (Artemis 1). The Orion spacecraft Crew Module (CM) will have been tested twice, once on a Delta IV launch vehicle (Exploration Flight Test 1) and once as a fully integrated system with the SLS launch vehicle (Artemis 1). The Orion Launch abort system will have been tested twice, once in a pad abort scenario (Pad Abort 1) and once in an inflight abort scenario (Ascent Abort 2) on a modified Peacekeeper booster. Both of these latter tests involve only a boiler plate CM, not a functional Orion spacecraft. Thus, unlike aircraft, there is very little opportunity for engineers to assess and evaluate their preflight predictions. Instead, space vehicle designers rely on Monte Carlo flight simulations with detailed dispersions of predicted nominal flight behavior to determine how robust their design is to errors and uncertainties in the flight conditions their vehicle may encounter. These Monte Carlo analyses entail thousands of trajectory simulations to demonstrate that the vehicle can meet design requirements at a specified level of reliability. From an aerodynamics and aerothermodynamics perspective, these trajectory simulations are fueled by an extensive aerodynamic database that covers the complete range of expected flight conditions, vehicle configurations, and flight attitudes expected in a given mission. Today, these databases amount to a table of engineering parameters that can be quickly interrogated by the trajectory simulator. The aerodynamic and aerothermodynamic databases are assembled via a series of ground tests, empirical and analytical analysis, physics-based computational analysis, applicable past flight performance data, and in some cases, engineering judgment. These databases generally take years to assemble for a new space vehicle system and in the case of SLS/Orion, over a decade of test and analysis have been expended to develop the extensive databases required to cover the myriad of configurations and potential flight conditions required for the system. Recently, it has been proposed that Computational Fluid Dynamic (CFD) and computing capability may be reaching a point where it is foreseeable that CFD could be integrated directly into the production trajectory simulation tools used to design NASA’s space vehicles. To demonstrate this, NASA has embarked on two demonstrations of this type of capability, one where six degree of freedom flight trajectory simulation equations are embedded in an existing CFD solver and another where a production CFD solver is loosely coupled with a production trajectory simulation tool. These efforts represent an initial demonstration of a future approach to flight trajectory simulation, but they are a far cry from the capability required to perform a full-up CFD-in-the-loop Monte Carlo trajectory simulation. Therefore, this represents a viable grand challenge for computational methods addressing space vehicle design and development. The final paper/presentation will discuss the many hurdles, beyond simply raw computational power, to realizing this grand challenge and how they map directly to the CFD Vision 2030 ojectives. Among these are the wide range of flight conditions, including accelerating/decelerating flight, encountered by a space vehicle during launch and/or entry. The vehicle can also encounter numerous configuration changes, some of which can be quite drastic, during the course of its flight, so robust, automated geometry modeling, grid generation, and adaptation will play a huge role in reaching this goal. Multiply this by 1000’s of trajectory simulations occurring simultaneously in a given Monte Carlo analysis, and the problem readily scales to absorb virtually any size of supercomputer envisioned today. The concept of CFD-in-the-loop Monte Carlo trajectory simulation poses a formidable challenge for emerging and future computing systems, and it has the potential to shave years off the development cycle for aerodynamic and aerothermodynamic performance predictions as compared to today’s space vehicle design approach.

CFD 2030↗

In-Situ Surface Construction of Infrastructure

In situ resources offer an opportunity to reduce the amount of items brought from Earth when exploring moons and planets. Utilizing those resources requires energy that comes with a cost. In the case of human missions to Mars, trading surface power for launch mass is beneficial for propellant and consumables required to sustain human pioneering and settlement on the planet’s surface. However, In Situ Resource Utilization (ISRU) can mean far more than propellant production and consumables replacement for missions beyond Low Earth Orbit. NASA’s Systems Capability Leader-ship Team (SCLT) for ISRU created a work break-down structure based on functions identified in roadmaps pertaining to human exploration. That WBS includes Prospecting, Extraction, Processing, Construction, Manufacturing, and Energy. Over the years, NASA has developed some capabilities and technologies for prospecting, extraction, and processing carbon dioxide and water on Mars into propellants and life support consumables. However, that is a small subset of the ISRU needs that are coming to light with NASA’s push to return to the Moon for extended periods of time. For instance, astronauts require shielding from Ga-lactic Cosmic Rays and nuclear radiation and protection from the low temperatures and pressures in Space. Surface assets including crew, landers, and ascent modules can be damaged by surface ejecta during landing and launch operations on the Moon and Mars. Creating shielding, berms, and pads requires movement of large volumes and stabilization of regolith in the context of a civil engineering construction project. Because of the multi-disciplinary nature of the aerospace systems needed for human exploration, SCLT on ISRU created an ISRU Construction Integrated Steering Group that combines expertise among several NASA Principal Technologists and Capabilities Leaders for exploring options, assessing opportunities, and developing requirements for construction and manufacturing on the Moon and Mars NASA’s new program to develop Lunar landers for small, mid, and large payload deliveries to the Lunar surface leading to human missions by 2025 spawned an investigation into plume surface interactions caused by the lander during descent and ascent. The trade space to resolve this issue includes regolith stabilization via landing pad construction techniques and lander nozzles characteristics due to vehicle systems design. Some data exists from the Apollo missions but more is required for the missions ahead. The purpose of this paper [1] is to outline an approach for developing requirements that can guide systems designs while taking advantage of flight opportunities in NASA’s plans to return to the Moon.

In-Situ↗

Moon to Mars Planetary Autonomous Construction Technology (MMPACT) Lunar Surface Construction Activity at NASA Marshall Space Flight Center

Introduction: The goal of the Moon to Mars Planetary Autonomous Construction Technology (MMPACT) Project at NASA Marshall Space Flight Center (MSFC) is to develop, deliver, and demonstrate on-demand capabilities to protect astronauts and create infrastructure elements on the lunar surface via construction of landing pads, habitats, shelters, roadways, berms, and blast shields using lunar regolith-based materials. MSFC has strong collaborations with industry, academia, and other NASA Centers to accomplish this goal. The MMPACT project consists of three elements. The first focuses on the development of an autonomous construction system. The second focuses on construction feedstock materials development. The third element focuses on the development of a microwave sintering construction capability. The team plans to demonstrate construction on a small Commercial Lunar Payload Services (CLPS) lander in the 2025 timeframe, with a future goal of constructing a subscale landing pad in 2028-2029.The MMPACT project is funded through the Lunar Surface Innovation Initiative, which is part of the Space Technology Mission Directorate. Technology Development: The MMPACT team will evaluate multiple autonomous construction and microwave construction technologies, materials, and construction element forms. Selected technologies will be matured; processes and operations will be defined for the two flight missions. Evaluations of materials, as well as the technology itself, will be demonstrated in simulated lunar environments as part of the technology maturation process. The team is keenly aware of the properties of the lunar environment. Its temperature swings, negligible exosphere, and unprepared site foundations factor into the materials for both construction and hardware, the concept of operations, and the technology’s interdependencies. Materials: The team is looking at materials that can be produced from in-situ resources in an effort to make lunar construction cost-effective. The particular focus of the materials team is cementitious materials, metals, and sintered and melted regolith. These materials will be studied for tensile, compressive, and flexural strength. They will also be tested for their ability to handle thermal swings and vacuum. They will be fully characterized using various microscopy techniques to examine micro-structures, chemistry, and crystal formation. Interdependencies: There are many interdependencies that MMPACT has already identified. These include: •Excavation interface •Regolith feedstock beneficiation •Regolith feedstock storage and provision •Requirements for structures •Site-to-site mobility systems •Availability of lunar simulant •Lander off-loading capabilities •Navigation systems •Power •Regolith composition and mineralogy •Lander specifications •Communication protocols Technology developments in these additional areas would be beneficial to MMPACT.

Moon to Mars Planetary Autonomous Construction Tec↗

Pedestal Hazard Abatement and Soil Removal Construction Completion Report for Launch Complex 34, Solid Waste Management Unit CC054, Cape Canaveral Space Force Station, Florida

This Construction Completion Report summarizes the activities associated with implementation of an interim measure (IM) for hazard abatement of the Launch Pedestal and soil removal at Launch Complex 34 (LC34), Cape Canaveral Space Force Station, Florida. The purpose of the hazard abatement IM was to mitigate any continuing source of contamination associated with residual paint on the Launch Pedestal that contained polychlorinated biphenyls (PCBs). Sampling determined that residual PCB concerns were limited to the steel elements on the top-side of the Pedestal, which included the torus ring, feed pipe, down pipes, pipe straps and shields, remaining steel cover plates and bolts, and railing support steel. The IM also mitigated the potential spread of contamination to surrounding areas by removing fallen metal fragments from the concrete launch pad, as well as soil from trenches on the launch pad where PCB-containing paint chips may have accumulated prior to or during Pedestal hazard abatement activities.

Complex 34↗

A Microphone Phased Array for Launch Acoustics Application

A new, portable, phased array of microphones is built at NASA Ames Research Center specifically for the harsh environment encountered in launch acoustics applications. It uses 70 rugged, piezo-electric, dynamic pressure sensors optimally distributed on a 10.5ft diameter open frame dome structure. The open frame is light yet robust to sustain the high wind load of typical seaside launch pads, and the blast and acoustic loads from the launch. A 200-ft long cable bundle carries the microphone signals to a weather-protected electronic cabinet containing the data acquisition system, computers, and other equipment. The array is equipped with an infra-red camera and a visible wavelength camera for imaging the launch site. The beamformed noise maps will be superimposed on the video footages collected by the cameras for correct identification of the noise sources. The array is tested with very loud noise sources to determine the beamforming ability. Multiple mathematical models, such as the conventional beamforming, functional beamforming, spectral element method etc. are used to determine the minimum spatial resolution of the sound sources that can be measured at different frequencies. Additionally, the array hardware is being tested for different environmental conditions and electro-magnetic compliance. The immediate goal is to use the array for NASA’s Artemis/SLS vehicle that will be launched from a newly built Mobile Launch platform and a modified launch pad.

microphone phased-array↗

Meteorite Sample Section Repair at NASA Johnson Space Center

Introduction: Meteorite thin and thick sections are routinely shipped from NASA Johnson Space Center to fulfill sample allocation requests from principle investigators around the world. Sections are also re-turned to JSC when researchers are finished studying them since, in most cases, they can be reused for other studies. The sections are very fragile unfortunately, and sometimes return to us needing repairs. The fol-lowing should give you an idea of how we repair sections here in the very lab where they were created. NOTE: Please do not attempt to repair ANSMET meteorite sections that are in your possession. We will perform the repairs for you at NASA JSC if you send the section back to us. Section Delamination: The majority of the meteorite sections that we produce here are secured to the glass slide using a high quality, two-part epoxy. Occasionally, we are asked to use superglue if the researcher wishes to dismount the section from the slide. Both epoxy and superglue are excellent adhesives, but they both tend to embrittle with time which results in delamination from the slide. Exposure to vacuum can also degrade the adhesion between the sample section and the glass slide. Repeated handling of the slide edges can accelerate delamination and, as a preventive measure, the outer 1-2 mm of epoxy is trimmed from newly created sections at JSC. If conductive tapes (copper, carbon, etc.) are used on the section during analysis, great care must be taken in removing the tape so that the epoxy is not pulled up with it. If in doubt, the tape can be left on the section when it is returned to JSC. Before we perform any repairs to sample sections, carbon, gold, or other coatings are removed. We accomplish this using a slurry of 0.05 micron alumina and 190 proof ethyl alcohol applied to a felt polishing pad fitted to a rotating lap wheel. Coatings are re-moved in this manner from all sections that are re-turned to JSC. The extent of the delamination determines how we proceed with the section repair. If the meteorite sample area of the section is not disturbed, then we carefully remove the delaminated epoxy. This is done using a binocular microscope with a 6X zoom, cut-proof gloves, and a very sharp, single edged razor blade. We cut the delaminated epoxy with the blade angled away from the sample area and using very light pressure. The trimmed section is then cleaned in an ultrasonic bath of 200 proof ethyl alcohol for no more than 10 seconds and carefully dried using a lint-free clean room wipe. The section is then placed into a lab oven at 110o F in preparation for epoxy. We mix the resin and hardener components of the low viscosity epoxy and very small amounts are applied to the cut edges of the section using a needle probe and the binocular microscope. Warming the epoxy helps secure the existing section by filling any voids between the glass slide and the section. After the new epoxy cures, we give the section a light polish on a lap wheel fitted with cotton polishing paper that is charged with 1 micron diamond paste. If the section has delaminated to the point of sample area being lifted from the glass, then it may be irreparable. We employ the above technique along with clamping the section in a Teflon pad arrangement in order to flatten the sample while the epoxy cures. Otherwise, the sample will tend to curl. This works to some degree, but once the sample area curls, it seldom re-turns to the original flatness without cracking or bending. Canada Balsam and Crystalbond: We repair damaged sections that had originally been prepared using Canada Balsam or Crystalbond adhesives through the gradual application of heat. We take great care with these samples since these bonding materials tend to get brittle with age. The section is heated in gradual steps (40-50o F per hour) to the melting point of the adhesive. We repair the sample while the adhesive is fluid and then the section is cooled in the same gradual manner in which it was heated. Slide Cracks and Breaks: Accidents happen. Especially with something as small and fragile as a thin/thick section. We all know someone who has driven a microscope objective into a section. As bad as the damage may look, the section can be repaired in most instances. NOTE: Please do not try to tape or glue section pieces back together prior to returning the dam-aged section. This practice usually renders the section irreparable. If the glass slide is cracked but the section is still in one piece, we repair it by infilling the crack with the low viscosity epoxy mentioned earlier. If the slide is in pieces, we can reassemble it with epoxy on a new backer slide. This is a tricky task as the pieces need to be in the correct plane with respect to each other, especially if the sample area is split among several pieces.

Meteorite↗

Predicting Orion Launch Abort Acoustics

Computational fluid dynamics (CFD) scale-resolving simulations were performed to help assess the Orion launch abort system’s vibro-acoustic environment in collaboration with the Orion Loads and Dynamics team at the Johnson Space Center (JSC). The primary objectives are to establish best practices and to validate CFD predictions for surface fluctuating pressure spectra with ground, wind tunnel, and flight test data. Excellent agreement is obtained between CFD predictions by the Cartesian adaptive mesh refinement (AMR) module of the Launch, Ascent, and Vehicle Aerodynamics (LAVA) solver and measurements from a ground test representative of the start of a pad abort scenario, and with measurements from a wind tunnel test case corresponding to a transonic, high total angle of attack ascent abort scenario. A simplified (static and at rest) simulation of a pad abort flight test shows good agreement with the flight data, whereas a more costly simulation where the vehicle is accelerating relative to the ground from rest to Mach 0.4 shows consistent over-prediction of the spectra. Simulation results for a supersonic ascent abort flight test are in reasonable agreement with the measurements, but show larger excursions in regions where non-linear interactions between the plume turbulence, shocks, and turbulent boundary layer are strongest – likely due to CFD modeling assumptions, the effect of which are discussed. Overall, the CFD results demonstrate that scale-resolving simulation methodologies like the one presented can help characterize full-scale launch abort vehicle near-field noise and can complement wind tunnel, ground and flight tests by providing trends and reducing uncertainty for scenarios that cannot or are not planned to be tested.

Orion↗

NASA’s Moon-to-Mars Planetary Autonomous Construction Technology Project: Overview and Status

NASA plans to land the first woman and next man on the Moon by 2025 through the initial Artemis missions. NASA and its international partners plan to establish a sustainable long-term presence on the lunar surface and build up infrastructure in the subsequent Artemis missions. The Lunar Surface Innovation Initiative (LSII), within NASA’s Space Technology Mission Directorate, aims to spur the creation of novel technologies needed for lunar surface exploration and accelerate the technology readiness of key systems and components. The primary thrust areas of LSII include sustainable power; dust mitigation; in-situ resource utilization; surface excavation, construction, and outfitting; and extreme access/extreme environments. The Moon-to-Mars Planetary Autonomous Construction Technology (MMPACT) projectwas initiated to address the lunar surface construction thrust area of LSII. The goal of the MMPACT project is to develop, deliver, and demonstrate on-demand capabilities to protect astronauts and create infrastructure on the lunar surface via construction of landing pads, habitats, shelters, roadways, berms and blast shields using lunar regolith-based materials. The MMPACT project is leveraging technology derived from NASA’s 3D Printed Mars Habitat Challenge along with contributions from other Government agencies, and multiple partners within industry and academia. The MMPACT project is comprised of three interrelated elements, construction hardware and process development; feedstock materials development; and microwave structure construction capabilities. These elements are working together to address the multiple challenges of infrastructure construction on the surface of the Moon including increased autonomy of operations, hardware operation and manufacturing under lunar environmental conditions, long-duration operation of mechanisms and parts, scale of construction activities, and material and construction requirements and standards. This presentation will summarize the status of development activities in each of the three elements, including testing of the various candidate materials, preliminary design concepts for future lunar infrastructure elements, and the vision for future technology demonstrations on the lunar surface. These demonstrations, targeting the mid-to-late 2020’s, are expected to enable landing pad construction and habitat construction resulting in commercial capabilities early in the next decade.

lunar infrastructure↗

NASA’s Moon-to-Mars Planetary Autonomous Construction Technology Project: Overview and Status

NASA plans to land the first woman and next man on the Moon by 2025 through the initial Artemis missions. NASA and its international partners plan to establish a sustainable long-term presence on the lunar surface and build up infrastructure in the subsequent Artemis missions. The Lunar Surface Innovation Initiative (LSII), within NASA’s Space Technology Mission Directorate, aims to spur the creation of novel technologies needed for lunar surface exploration and accelerate the technology readiness of key systems and components. The primary thrust areas of LSII include sustainable power; dust mitigation; in-situ resource utilization; surface excavation, construction, and outfitting; and extreme access/extreme environments. The Moon-to-Mars Planetary Autonomous Construction Technology (MMPACT) project was initiated to address the lunar surface construction thrust area of LSII. The goal of the MMPACT project is to develop, deliver, and demonstrate on-demand capabilities to protect astronauts and create infrastructure on the lunar surface via construction of landing pads, habitats, shelters, roadways, berms and blast shields using lunar regolith-based materials. The MMPACT project is leveraging technology derived from NASA’s 3D Printed Mars Habitat Challenge along with contributions from other Government agencies, and multiple partners within industry and academia. The MMPACT project is comprised of three interrelated elements, construction hardware and process development; feedstock materials development; and microwave structure construction capabilities. These elements are working together to address the multiple challenges of infrastructure construction on the surface of the Moon including increased autonomy of operations, hardware operation and manufacturing under lunar environmental conditions, long-duration operation of mechanisms and parts, scale of construction activities, and material and construction requirements and standards. This presentation will summarize the status of development activities in each of the three elements, including testing of the various candidate materials, preliminary design concepts for future lunar infrastructure elements, and the vision for future technology demonstrations on the lunar surface. These demonstrations, targeting the mid-to-late 2020’s, are expected to enable landing pad construction and habitat construction resulting in commercial capabilities early in the next decade.

Additive construction, regolith processing, lunar ↗

Fabrication of Gecko Mobility Aids for Deep Space Exploration

Spacecraft large enough for crew to move around inside them have traditionally used handrails and foot restraints to enable crew mobility. The mass of this hardware can become significant in large spacecraft such as ISS or a Mars Transit Habitat. The Common Habitat study also determined that handrails and foot restraints in a multi-gravity habitat are trip hazards when the habitat is in a gravity environment. ISS crew have noted risks of breaking ankles and wrists when using handrails for translation and have noted places where not enough handrails are present. Robotic gecko-derived grippers developed by JPL to retrieve satellites can be adapted to crew-worn pads that can adhere to surfaces to enable crew translation in microgravity. This project will fabricate prototypes of crew clothing augmented with gecko pads.

Restraints and Mobility Aids↗

Gecko Mobility Aids for a Common Habitat Architecture

Spacecraft large enough for crew to move around inside them have traditionally used handrails and foot restraints to enable crew mobility. The mass of this hardware can become significant in large spacecraft such as the Common Habitat. Additionally, handrails and foot restraints in a multi-gravity habitat are trip hazards when the habitat is in a gravity environment. Further, ISS crew have noted risks of breaking ankles and wrists when using handrails for translation and have noted places where not enough handrails are present. Robotic gecko-derived grippers developed by JPL to retrieve satellites can be adapted to crew-worn pads that can adhere to surfaces to enable crew translation in microgravity. This technology will help to eliminate the need for handrails and foot restraints for mobility in crewed microgravity spacecraft cabins. It has the potential to achieve significant mass reductions in future space habitats, with application to suborbital flight, LEO, cislunar space, interplanetary space, the Moon, and Mars. Additionally, it can prevent crew injury and discomfort. Project goals and objectives are to prepare gecko uniform prototypes for use in multi-gravity testing and conduct initial investigations into human factors of postures and motions needed for intravehicular activity (IVA) translation and restraint in multiple gravity environments, without the use of handrails or foot restraints. Gecko grippers have been tested for use as robotic end effectors terrestrially, on microgravity aircraft, and aboard the ISS. Using the grippers as a body-mounted system to achieve IVA crew mobility is a new application that has not been pursued outside of this effort. This work will continue paper studies performed by NASA student interns by developing physical prototypes of spacecraft crew uniforms with gecko-derived body-mounted grippers. Clothing prototypes may include long sleeves, short sleeves, long pants, shorts, gloves, and/or booties equipped with gecko gripper pads. Forward work is to test these uniforms in a 1g environment to verify that the design does not introduce obstructions, trip hazards, or other consequences when used in terrestrial gravity. Based on the 1g test results, the uniform prototypes will be refined, and a test plan developed for testing at 0g, (1/6)g, and (3/8)g.

Restraints and Mobility Aids↗

Electrical and Dielectric Characterizations of HTCC Electronic Packages for High Temperature Harsh Environment Applications

A prototype high temperature co-fired ceramic (HTCC) alumina packaging system composed of a 32-I/Os package and a compatible circuit board was previously developed and demonstrated for long term operation in 500 °C environments. The electrical / dielectric parasitic parameters of that chip level package were characterized and reported. This co-fired packaging system with platinum (Pt) conductor has successfully facilitated tests of silicon carbide (SiC) analog and digital integrated circuits (ICs) developed at NASA GRC at 500°C for up to 10,000 hours in ambient oven environment and 60 earth days in Venus surface environment with simulated temperature, pressure, and chemical constituents. Based on these previous results, this paper introduces new designs of Pt-HTCC packages with 16, 24, and 44 I/Os for packaging a new generation SiC ICs with 8, 24, 56, 62, and 72 I/Os to be tested in high temperature harsh environments. The package with 44 I/Os is specifically designed for the new SiC ICs with 56, 62, and 72-I/Os and electrical connection needs, the power pads of this package are consolidated, and an array of I/O pads distributed on separated vertical levels (inside the package) is used to control the overall package dimensions and mitigate the parasitic effects at high temperatures. This paper will present the detailed design of these chip-level packages and results of electrical and dielectric characterization of these newly fabricated chip-level Pt-HTCC packages.

High temperature↗

Electrical and Dielectric Characterizations of HTCC Electronic Packages for High Temperature Harsh Environment Applications

A prototype high temperature co-fired ceramic (HTCC) alumina packaging system composed of a 32-I/Os package and a compatible circuit board was previously developed and demonstrated for long term operation in 500 °C environments. The electrical / dielectric parasitic parameters of that chip level package were characterized and reported. This co-fired packaging system with platinum (Pt) conductor has successfully facilitated tests of silicon carbide (SiC) analog and digital integrated circuits (ICs) developed at NASA GRC at 500°C for up to 10,000 hours in ambient oven environment and 60 earth days in Venus surface environment with simulated temperature, pressure, and chemical constituents. Based on these previous results, this paper introduces new designs of Pt-HTCC packages with 16, 24, and 44 I/Os for packaging a new generation SiC ICs with 8, 24, 56, 62, and 72 I/Os to be tested in high temperature harsh environments. The package with 44 I/Os is specifically designed for the new SiC ICs with 56, 62, and 72-I/Os and electrical connection needs, the power pads of this package are consolidated, and an array of I/O pads distributed on separated vertical levels (inside the package) is used to control the overall package dimensions and mitigate the parasitic effects at high temperatures. This paper will present the detailed design of these chip-level packages and results of electrical and dielectric characterization of these newly fabricated chip-level Pt-HTCC packages.

High temperature↗

Curation planning and facilities for asteroid Bennu samples returned by the OSIRIS-REx mission

NASA's OSIRIS-REx spacecraft collected samples from carbonaceous near-Earth asteroid (101955) Bennu on October 20, 2020, and will deliver them to the Earth on September 24, 2023. The samples will be processed at the NASA Johnson Space Center (JSC), where most of the sample collection will be subsequently curated in a new cleanroom suite. The spacecraft collected loose regolith two ways: in a bulk sample chamber capable of holding up to 2 kg, and on industrial Velcro “contact pads” intended to collect small particles at the surface. Included in the JSC collection will be the bulk sample, the contact pads, contamination-monitoring witness plates, and supporting hardware. Planning for the curation of the samples and hardware started at the earliest phase of proposal development and continued in parallel with project development and execution. Because a major mission goal is characterization of organic compounds in the Bennu samples, extra effort was spent in the design stage to ensure a clean curation environment. Here, we describe the preparations to receive the sample, including the design, construction, outfitting, and monitoring of the cleanrooms at JSC; the planned recovery of the sample-containing capsule when it lands on Earth; and the approach to characterizing and cataloging the samples. These curation efforts will result in the distribution of pristine Bennu samples from JSC to the OSIRIS-REx science team, international partners, and the global scientific community for years to come.

curation↗

NASA’s Space Launch System Stands Ready on Doorstep of Maiden Voyage Launch and Progress Made to Future Missions

NASA and its partners made significant progress towards the Artemis I launch in 2022. The integrated Space Launch System (SLS)vehicleand Orion spacecraft were first rolled out of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center (KSC) in March. SLS is a super heavy-lift vehicle to send large, strategic payloads to the Moon, Mars, and beyond. It isthebackbone of the Artemis human lunar exploration program. Rollout transported the vehicle to Launch Pad 39B for a series of tests, including the wet dress rehearsal (WDR). Multiple attempts were required to complete WDR, each building on the one before. Following the WDR campaign, NASA teams refined hardware and launch procedures, and the vehicle was prepared for its first launch attempt scheduled for August 29. Challenges with the weather and hardware resulted in a scrub on the 29th, and the second attempt was set for Sept. 3. A hydrogen leak on the tail service mast umbilical forced a scrub. NASA teams completed repairs and testing on the vehicle on Launch Pad 39B to preserve a launch attempt at the end of September. Managers chose to return the vehicle to the VAB to protect it fromthe threat of Hurricane Ian. Within the VAB, NASA further inspected and prepared SLS for selected November windows. In addition to progress to the Artemis I mission, significant progress was made on the Artemis II and Artemis III rockets. Progress was also made towards on the Block 1B and Block 2 variants, beginning on the fourth and ninth flight, respectively. Both variants will provide significant improvements in both launch mass and mission flexibility to multiple destinations. This paper will discuss Artemis I vehicle integration, testing, and available results from the launch campaign to date.

Bruce Askins↗

Evaluating Liftoff Debris for NASA’s Space Launch System (SLS) Prior to the Artemis I Launch

The SLS Artemis I launch vehicle is the first of several planned Artemis launch vehicles, with a number of design differences from earlier NASA missions that incur liftoff debris risk to the mission. As a test vehicle, the Artemis I hardware also endured environments and tests not planned for future missions, which led to several additional factors contributing to an evolving liftoff debris risk to the SLS vehicle. This paper will summarize these risk factors and address the processes used to evaluate and communicate the risks to support a successful Artemis I launch. It will discuss how the evolving risks that were quantified and evaluated by a Cross-Program team of debris Subject Matter Experts to mitigate liftoff debris hazards and communicate updated risk to the SLS vehicle. This process was performed through the inaugural use of an SLS debris day-of-launch (DOL) standard operating procedure that will be used for subsequent Artemis missions. This paper addresses the risk of liftoff debris, debris released by the vehicle or from the launch pad during liftoff through vehicle tower clear. Expected liftoff debris is well understood from previous NASA programs’ experience and from tests of materials, processes and functions that are known to release liftoff debris. These expected sources were assessed and cleared well ahead of launch day. However, given the ever-changing schedules and environments, processes were in place to evaluate any additional potential liftoff debris risks identified during launch countdown. Although many of the Artemis vehicle hardware components are similar to those on the NASA Shuttle Program, there are important differences in the architecture of the Artemis I vehicle which require new assessments of liftoff debris risk for the Artemis missions. The more favorable Artemis crew module location and surfaces are far less vulnerable to debris impacts; however, the longer vehicle can result in higher liftoff debris impact energies to those components on the aft end of the vehicle. Additionally, the positional change of the RS-25 liquid engines to nearer the Booster nozzle exit plane along with the change in Booster throat plug design is a disadvantage to the overall liftoff debris risk which resulted in additional test and analysis efforts for evaluating the integrated vehicle debris risk. In spite of the comprehensive tests and analyses of Artemis I expected liftoff debris, a number of additional tests/processes were completed prior to the Artemis I mission that were required to support a complete understanding of a new launch vehicle, but increased the risk of releasing liftoff debris. The hardware endured several additional cryogenic loading cycles, including the Green Run tests at Stennis Space Center, Wet Dress Rehearsals at Kennedy Space Center, and multiple launch attempts. Each of these cycles induced stresses in the thermal protection system (TPS) materials, increasing the risk of damage to and release of the TPS. Additionally, induced and weather environmental factors that could increase the likelihood of debris release were significant. Vibrations and stresses in the TPS were induced by a required roll-back to the Vehicle Assembly Building before Hurricane Ian to protect the vehicle from damage by high winds. Wind damage and potential internal stresses to several outer mold line materials on the integrated SLS vehicle and mobile launcher were caused by weathering Hurricane Nicole at Pad 39B the week before launch. A thorough imagery scan of the vehicle was performed after each event and the damage observed was repaired, removed, or assessed and the risk to the mission evaluated. Mitigation of debris risk can occur by tests and analyses to show debris impacted components as damage tolerant, by new/improved processes for prevention of debris availability, or redesign. Risk mitigation processes for Artemis I-specific liftoff debris events and the development and use of the SLS debris day of launch (DOL) procedures that will be used for subsequent Artemis missions will be described.

Space Launch System↗

Evaluating Liftoff Debris for NASA’s Space Launch System (SLS) Prior to the Artemis I Launch

The SLS Artemis I launch vehicle is the first of several planned Artemis launch vehicles, with a number of design differences from earlier NASA missions that incur liftoff debris risk to the mission. As a test vehicle, the Artemis I hardware also endured environments and tests not planned for future missions, which led to several additional factors contributing to an evolving liftoff debris risk to the SLS vehicle. This paper will summarize these risk factors and address the processes used to evaluate and communicate the risks to support a successful Artemis I launch. It will discuss how the evolving risks that were quantified and evaluated by a Cross-Program team of debris Subject Matter Experts to mitigate liftoff debris hazards and communicate updated risk to the SLS vehicle. This process was performed through the inaugural use of an SLS debris day-of-launch (DOL) standard operating procedure that will be used for subsequent Artemis missions. This paper addresses the risk of liftoff debris, debris released by the vehicle or from the launch pad during liftoff through vehicle tower clear. Expected liftoff debris is well understood from previous NASA programs’ experience and from tests of materials, processes and functions that are known to release liftoff debris. These expected sources were assessed and cleared well ahead of launch day. However, given the ever-changing schedules and environments, processes were in place to evaluate any additional potential liftoff debris risks identified during launch countdown. Although many of the Artemis vehicle hardware components are similar to those on the NASA Shuttle Program, there are important differences in the architecture of the Artemis I vehicle which require new assessments of liftoff debris risk for the Artemis missions. The more favorable Artemis crew module location and surfaces are far less vulnerable to debris impacts; however, the longer vehicle can result in higher liftoff debris impact energies to those components on the aft end of the vehicle. Additionally, the positional change of the RS-25 liquid engines to nearer the Booster nozzle exit plane along with the change in Booster throat plug design is a disadvantage to the overall liftoff debris risk which resulted in additional test and analysis efforts for evaluating the integrated vehicle debris risk. In spite of the comprehensive tests and analyses of Artemis I expected liftoff debris, a number of additional tests/processes were completed prior to the Artemis I mission that were required to support a complete understanding of a new launch vehicle, but increased the risk of releasing liftoff debris. The hardware endured several additional cryogenic loading cycles, including the Green Run tests at Stennis Space Center, Wet Dress Rehearsals at Kennedy Space Center, and multiple launch attempts. Each of these cycles induced stresses in the thermal protection system (TPS) materials, increasing the risk of damage to and release of the TPS. Additionally, induced and weather environmental factors that could increase the likelihood of debris release were significant. Vibrations and stresses in the TPS were induced by a required roll-back to the Vehicle Assembly Building before Hurricane Ian to protect the vehicle from damage by high winds. Wind damage and potential internal stresses to several outer mold line materials on the integrated SLS vehicle and mobile launcher were caused by weathering Hurricane Nicole at Pad 39B the week before launch. A thorough imagery scan of the vehicle was performed after each event and the damage observed was repaired, removed, or assessed and the risk to the mission evaluated. Mitigation of debris risk can occur by tests and analyses to show debris impacted components as damage tolerant, by new/improved processes for prevention of debris availability, or redesign. Risk mitigation processes for Artemis I-specific liftoff debris events and the development and use of the SLS debris day of launch (DOL) procedures that will be used for subsequent Artemis missions will be described.

Space Launch System↗