Search NASA⌕ Search

SEARCH · Search NASA

Results for “Planning software”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Evaluating Heuristics for Planning Effective and Efficient Inspections

A significant body of knowledge concerning software inspection practice indicates that the value of inspections varies widely both within and across organizations. Inspection effectiveness and efficiency can be measured in numerous ways, and may be affected by a variety of factors such as Inspection planning, the type of software, the developing organization, and many others. In the early 1990's, NASA formulated heuristics for inspection planning based on best practices and early NASA inspection data. Over the intervening years, the body of data from NASA inspections has grown. This paper describes a multi-faceted exploratory analysis performed on this · data to elicit lessons learned in general about conducting inspections and to recommend improvements to the existing heuristics. The contributions of our results include support for modifying some of the original inspection heuristics (e.g. Increasing the recommended page rate), evidence that Inspection planners must choose between efficiency and effectiveness, as a good tradeoff between them may not exist, and Identification of small subsets of inspections for which new inspection heuristics are needed. Most Importantly, this work illustrates the value of collecting rich data on software Inspections, and using it to gain insight into, and Improve, inspection practice.

Shull, Forrest J.↗

SU-E-T-167: Evaluation of Mobius Dose Calculation Engine Using Out of the Box Preconfigured Beam Data

Purpose: Determine the dose calculation accuracy of a preconfigured Mobius server for use in secondary checks of a treatment planning system. Methods: 10 plans were created for irradiation on two of the IROC (formerly RPC) accreditation phantoms: 4 for the head and neck phantom and 6 for the lung phantom. The plans each were created using one of four different photon energies (6FFF, 10 FFF, 6X, and 15X) and were varied in treatment type including VMAT, step and shoot IMRT, dynamic MLC IMRT (DMLC), and conformal RT (CRT). The TLDs in the phantoms were contoured, and each plan was sent for calculation to Mobius software (Mobius Medical Systems, Houston, TX) with a default configuration. Each plan was then irradiated on the planned phantom 3 times to create an average reading across 56 TLDs. These readings were then compared against the corresponding Mobius calculation at each TLD location. Results: The mean difference (MD) normalized to the plan prescription dose between each TLD and Mobius calculation for all measurements was 0.5 ± 3.3%, with a maximum difference of 8.4%. The MD was 0.6 ± 3.8%, − 2.0 ± 1.9%, 1.7 ± 3.7%, and 1.9 ± 1.2% across the 6FFF, 10FFF, 6X and 15X energies respectively. The MD was −1.2 ± 2.3% for lung plans and 1.8 ± 3.5% for head/neck plans. Across treatment types, the MD ranged from − 1.8 ± 1.7% for CRT to 4.3 ± 2.4 % for DMLC. Conclusion: Out of the box and preconfigured, Mobius provides accurate dose calculations with respect to beam energy, treatment type, and treatment site.

60 APPLIED LIFE SCIENCES↗

Structural considerations for a software life cycle dynamic simulation model

This paper presents the results of a preliminary study into the prospects for simulating the software implementation and maintenance life cycle process, with the aim of producing a computerized tool for use by management and software engineering personnel in project planning, tradeoff studies involving product, environmental, situational, and technological factors, and training. The approach taken is the modular application of a 'flow of resource' concept to the systems dynamics simulation modeling technique. The software life cycle process is represented as a number of stochastic, time-varying, interacting work tasks that each achieves one of the project milestones. Each task is characterized by the item produced, the personnel applied, and the budgetary profile.

Tausworthe, R. C.↗

Automation of the Environmental Control and Life Support System

The objective of the Environmental Control and Life Support System (ECLSS) Advanced Automation Project is to recommend and develop advanced software for the initial and evolutionary Space Station Freedom (SSF) ECLS system which will minimize the crew and ground manpower needed for operations. Another objective includes capturing ECLSS design and development knowledge for future missions. This report summarizes our results from Phase I, the ECLSS domain analysis phase, which we broke down into three steps: 1) Analyze and document the baselined ECLS system, 2) envision as our goal an evolution to a fully automated regenerative life support system, built upon an augmented baseline, and 3) document the augmentations (hooks and scars) and advanced software systems which we see as necessary in achieving minimal manpower support for ECLSS operations. In addition, Phase I included development of an advanced software life cycle testing tools will be used in the development of the software. In this way, we plan in preparation for phase II and III, the development and integration phases, respectively. Automated knowledge acquisition, engineering, verification, and can capture ECLSS development knowledge for future use, develop more robust and complex software, provide feedback to the KBS tool community, and insure proper visibility of our efforts.

Dewberry, Brandon S.↗

General Purpose Data-Driven Monitoring for Space Operations

As modern space propulsion and exploration systems improve in capability and efficiency, their designs are becoming increasingly sophisticated and complex. Determining the health state of these systems, using traditional parameter limit checking, model-based, or rule-based methods, is becoming more difficult as the number of sensors and component interactions grow. Data-driven monitoring techniques have been developed to address these issues by analyzing system operations data to automatically characterize normal system behavior. System health can be monitored by comparing real-time operating data with these nominal characterizations, providing detection of anomalous data signatures indicative of system faults or failures. The Inductive Monitoring System (IMS) is a data-driven system health monitoring software tool that has been successfully applied to several aerospace applications. IMS uses a data mining technique called clustering to analyze archived system data and characterize normal interactions between parameters. The scope of IMS based data-driven monitoring applications continues to expand with current development activities. Successful IMS deployment in the International Space Station (ISS) flight control room to monitor ISS attitude control systems has led to applications in other ISS flight control disciplines, such as thermal control. It has also generated interest in data-driven monitoring capability for Constellation, NASA's program to replace the Space Shuttle with new launch vehicles and spacecraft capable of returning astronauts to the moon, and then on to Mars. Several projects are currently underway to evaluate and mature the IMS technology and complementary tools for use in the Constellation program. These include an experiment on board the Air Force TacSat-3 satellite, and ground systems monitoring for NASA's Ares I-X and Ares I launch vehicles. The TacSat-3 Vehicle System Management (TVSM) project is a software experiment to integrate fault and anomaly detection algorithms and diagnosis tools with executive and adaptive planning functions contained in the flight software on-board the Air Force Research Laboratory TacSat-3 satellite. The TVSM software package will be uploaded after launch to monitor spacecraft subsystems such as power and guidance, navigation, and control (GN&C). It will analyze data in real-time to demonstrate detection of faults and unusual conditions, diagnose problems, and react to threats to spacecraft health and mission goals. The experiment will demonstrate the feasibility and effectiveness of integrated system health management (ISHM) technologies with both ground and on-board experiments.

Iverson, David L.↗

Software engineering environment tool set integration

Space Transportation System Division (STSD) Engineering has a program to promote excellence within the engineering function. This program resulted in a capital funded facility based on a VAX cluster called the Rockwell Operational Engineering System (ROSES). The second phase of a three phase plan to establish an integrated software engineering environment for ROSES is examined. It discusses briefly phase one which establishes the basic capability for a modern software development environment to include a tool set, training and standards. Phase two is a tool set integration. The tool set is primarily off-the-shelf tools acquired through vendors or government agencies (public domain). These tools were placed into categories of software development. These categories are: requirements, design, and construction support; verification and validation support; and software management support. The integration of the tool set is being performed through concept prototyping and development of tools specifically designed to support the life cycle and provide transition from one phase to the next.

Selfridge, William P.↗

The evaluation of a 2D diode array in “magic phantom” for use in high dose rate brachytherapy pretreatment quality assurance

Purpose: High dose rate (HDR) brachytherapy is a treatment method that is used increasingly worldwide. The development of a sound quality assurance program for the verification of treatment deliveries can be challenging due to the high source activity utilized and the need for precise measurements of dwell positions and times. This paper describes the application of a novel phantom, based on a 2D 11 × 11 diode array detection system, named “magic phantom” (MPh), to accurately measure plan dwell positions and times, compare them directly to the treatment plan, determine errors in treatment delivery, and calculate absorbed dose. Methods: The magic phantom system was CT scanned and a 20 catheter plan was generated to simulate a nonspecific treatment scenario. This plan was delivered to the MPh and, using a custom developed software suite, the dwell positions and times were measured and compared to the plan. The original plan was also modified, with changes not disclosed to the primary authors, and measured again using the device and software to determine the modifications. A new metric, the “position–time gamma index,” was developed to quantify the quality of a treatment delivery when compared to the treatment plan. The MPh was evaluated to determine the minimum measurable dwell time and step size. The incorporation of the TG-43U1 formalism directly into the software allows for dose calculations to be made based on the measured plan. The estimated dose distributions calculated by the software were compared to the treatment plan and to calibrated EBT3 film, using the 2D gamma analysis method. Results: For the original plan, the magic phantom system was capable of measuring all dwell points and dwell times and the majority were found to be within 0.93 mm and 0.25 s, respectively, from the plan. By measuring the altered plan and comparing it to the unmodified treatment plan, the use of the position–time gamma index showed that all modifications made could be readily detected. The MPh was able to measure dwell times down to 0.067 ± 0.001 s and planned dwell positions separated by 1 mm. The dose calculation carried out by the MPh software was found to be in agreement with values calculated by the treatment planning system within 0.75%. Using the 2D gamma index, the dose map of the MPh plane and measured EBT3 were found to have a pass rate of over 95% when compared to the original plan. Conclusions: The application of this magic phantom quality assurance system to HDR brachytherapy has demonstrated promising ability to perform the verification of treatment plans, based upon the measured dwell positions and times. The introduction of the quantitative position–time gamma index allows for direct comparison of measured parameters against the plan and could be used prior to patient treatment to ensure accurate delivery.

60 APPLIED LIFE SCIENCES↗

SU-E-T-500: Initial Implementation of GPU-Based Particle Swarm Optimization for 4D IMRT Planning in Lung SBRT

Purpose 4D-IMRT planning, combined with dynamic MLC tracking delivery, utilizes the temporal dimension as an additional degree of freedom to achieve improved OAR-sparing. The computational complexity for such optimization increases exponentially with increase in dimensionality. In order to accomplish this task in a clinically-feasible time frame, we present an initial implementation of GPU-based 4D-IMRT planning based on particle swarm optimization (PSO). Methods The target and normal structures were manually contoured on ten phases of a 4DCT scan of a NSCLC patient with a 54cm3 right-lower-lobe tumor (1.5cm motion). Corresponding ten 3D-IMRT plans were created in the Eclipse treatment planning system (Ver-13.6). A vendor-provided scripting interface was used to export 3D-dose matrices corresponding to each control point (10 phases × 9 beams × 166 control points = 14,940), which served as input to PSO. The optimization task was to iteratively adjust the weights of each control point and scale the corresponding dose matrices. In order to handle the large amount of data in GPU memory, dose matrices were sparsified and placed in contiguous memory blocks with the 14,940 weight-variables. PSO was implemented on CPU (dual-Xeon, 3.1GHz) and GPU (dual-K20 Tesla, 2496 cores, 3.52Tflops, each) platforms. NiftyReg, an open-source deformable image registration package, was used to calculate the summed dose. Results The 4D-PSO plan yielded PTV coverage comparable to the clinical ITV-based plan and significantly higher OAR-sparing, as follows: lung Dmean=33%; lung V20=27%; spinal cord Dmax=26%; esophagus Dmax=42%; heart Dmax=0%; heart Dmean=47%. The GPU-PSO processing time for 14940 variables and 7 PSO-particles was 41% that of CPU-PSO (199 vs. 488 minutes). Conclusion Truly 4D-IMRT planning can yield significant OAR dose-sparing while preserving PTV coverage. The corresponding optimization problem is large-scale, non-convex and computationally rigorous. Our initial results indicate that GPU-based PSO with further software optimization can make such planning clinically feasible. This work was supported through funding from the National Institutes of Health and Varian Medical Systems.

60 APPLIED LIFE SCIENCES↗

A six-legged rover for planetary exploration

To survive the rigors and isolation of planetary exploration, an autonomous rover must be competent, reliable, and efficient. This paper presents the Ambler, a six-legged robot featuring orthogonal legs and a novel circulating gait, which has been designed for traversal of rugged, unknown environments. An autonomous software system that integrates perception, planning, and real-time control has been developed to walk the Ambler through obstacle strewn terrain. The paper describes the information and control flow of the walking system, and how the design of the mechanism and software combine to achieve competent walking, reliable behavior in the face of unexpected failures, and efficient utilization of time and power.

Simmons, Reid↗

Risk Analysis of Various Design Architectures for High Safety-significant Safety-related Digital Instrumentation and Control Systems of Nuclear Power Plants during Accident Scenarios

This report documents the plus-up activities performed by Idaho National Laboratory (INL) during Fiscal Year (FY) 2022 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) risk assessment project. In FY 2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a strong technical basis to support effective, licensable, and secure DI&C technologies for digital upgrades/designs. An integrated risk assessment technology for the DI&C systems was proposed for this strategy, which aims to (1) provide a best-estimate, risk-informed capability to quantitatively and accurately estimate the safety margin obtained from plant modernization, especially for the high safety-significant safety-related (HSSSR) DI&C systems, (2) support and supplement existing advanced risk-informed DI&C design guides by providing quantitative risk information and evidence, (3) offer a capability of design architecture evaluation of various DI&C systems to support system design decisions and diversity and redundancy applications, (4) assure the long-term safety and reliability of HSSSR DI&C systems, and (5) reduce uncertainty in costs and support integration of DI&C systems in the plant. To achieve these technical goals and deal with the expensive licensing justifications from regulatory insights, the LWRS-developed framework instructs nuclear vendors and utilities on how to effectively lower the costs associated with digital compliance and speed industry advances by: (1) defining an integrated risk-informed analysis process for DI&C upgrade, including hazard analysis, reliability analysis, and consequence analysis, (2) applying systematic and risk-informed tools to address common cause failures (CCFs) and quantify corresponding failure probabilities for DI&C technologies, particularly software CCFs, (3) evaluating the impact of digital failures at the component level, system level, and plant level, and (4) providing insights and suggestions on designs to manage the risks, thus to support the development, licensing, and deployment of advanced DI&C technologies on nuclear power plant (NPPs). Adding diversity within system or components is the main means to eliminate and mitigate CCFs, but diversity also increases plant complexity and errors and may not address all sources of systematic failures. How to optimize the diversity and redundancy applications for the safety-critical DI&C systems remains a challenge. To deal with the technical issues in addressing potential software CCFs in HSSSR DI&C systems of NPPs and supporting relevant design optimization, the framework provides: ? An integrated best-estimate, risk-informed capability to address new technical digital issues quantitatively, accurately, and efficiently in plan modernization progress, such as software CCFs in HSSSR DI&C systems of NPPs ? A common and a modularized platform for DI&C designers, software developers, cybersecurity analysts, and plant engineers to efficiently predict and prevent risk in the early design stage of DI&C systems ? Technical bases and risk-informed insights to assist U.S. Nuclear Regulatory Commission (NRC) and industry to address and fulfill the risk-informed alternatives for evaluation of CCFs in HSSSR DI&C systems of NPPs ? An integrated risk-informed tool that offers a capability of design architecture evaluation of various DI&C systems to support system design decisions in diversity and redundancy applications. The plus-up research and development efforts of this project in FY 2022 are focused on methodology improvement of software CCF modeling and estimation, prevention analysis, importance analysis and risk analysis of various design architectures of HSSSR DI&C systems. This work greatly enhances the capability of the LWRS-developed framework for the risk assessment and design optimization of safety-critical DI&C systems. It should be noted that all the analyses are performed for the demonstration of the LWRS-developed framework, not for the evaluation of relevant systems. Results are obtained based on very limited design information and testing data.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

MDSplus quality improvement project

MDSplus is a data acquisition and analysis system used worldwide predominantly in the fusion research community. Development began 29 years ago on the OpenVMS operating system. Since that time there have been many new features added and the code has been ported to many different operating systems. There have been contributions to the MDSplus development from the fusion community in the way of feature suggestions, feature implementations, documentation and porting to different operating systems. The bulk of the development and support of MDSplus, however, has been provided by a relatively small core developer group of three or four members. Given the size of the development team and the large number of users much more effort was focused on providing new features for the community than on keeping the underlying code and documentation up to date with the evolving software development standards. To ensure that MDSplus will continue to provide the needs of the community in the future, the MDSplus development team along with other members of the MDSplus user community has commenced on a major quality improvement project. The planned improvements include changes to software build scripts to better use GNU Autoconf and Automake tools, refactoring many of the source code modules using new language features available in modern compilers, using GNU MinGW-w64 to create MS Windows distributions, migrating to a more modern source code management system, improvement of source documentation as well as improvements to the www.mdsplus.org web site documentation and layout, and the addition of more comprehensive test suites to apply to MDSplus code builds prior to releasing installation kits to the community. This paper should lead to a much more robust product and establish a framework to maintain stability as more enhancements and features are added. Finally, this paper will describe these efforts that are either in progress or planned for the near future.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Guide to data collection

Guidelines and recommendations are presented for the collection of software development data. Motivation and planning for, and implementation and management of, a data collection effort are discussed. Topics covered include types, sources, and availability of data; methods and costs of data collection; types of analyses supported; and warnings and suggestions based on software engineering laboratory (SEL) experiences. This document is intended as a practical guide for software managers and engineers, abstracted and generalized from 5 years of SEL data collection.

Source record↗

Integrated platform for optimized solar PV system design and engineering plan set generation

The Aurora team has developed software that allows users to quickly generate a three-dimensional model for a building, with a corresponding irradiance map, from any two-dimensional image with associated geo-coordinates. The purpose of this project is to build upon that technology by developing and distributing to solar installers a software platform that automatically retrieves engineering, financial and geographic data for a specific site, and quickly generates an optimal customer proposal and corresponding engineering plans for that site. At the end of the project, Aurora’s optimization platform would have been used to make at least one thousand proposals from at least ten unique solar installation companies, two of whom would sign economically viable contracts to use the software. Furthermore, Aurora’s algorithms would be tested to show that in at least seventy percent of cases, Aurora automatically generated a design equivalent to or better than what a human could have done manually. A ‘better’ design is one that generates more energy for the same cost, or that generates a higher return on investment, while complying with all site-specific aesthetic, electrical and spatial requirements.

14 SOLAR ENERGY↗

SU-F-T-80: A Mobile Application for Intra-Operative Electron Radiotherapy Treatment Planning

Purpose: Intraoperative electron radiotherapy (IORT) poses a unique set of challenges for treatment planning. Planning must be performed in a busy operating room environment over a short timeframe often with little advance knowledge of the treatment depth or applicator size. Furthermore, IORT accelerators can have a large number of possible applicators, requiring extensive databooks that must be searched for the appropriate dosimetric parameters. The goal of this work is to develop a software tool to assist in the planning process that is suited to the challenges faced in the IORT environment. Methods: We developed a mobile application using HTML5 and Javascript that can be deployed to tablet devices suitable for use in the operating room. The user selects the desired treatment parameters cone diameter, bevel angle, and energy (a total of 141 datasets) and desired bolus. The application generates an interactive display that allows the user to dynamically select points on the depth-dose curve and to visualize the shape of the corresponding isodose contours. The user can indicate a prescription isodose line or depth. The software performs a monitor unit calculation and generates a PDF report. Results: We present our application, which is now used routinely in our IORT practice. It has been employed successfully in over 23 cases. The interactivity of the isodose distributions was found to be of particular use to physicians who are less-frequent IORT users, as well as for the education of residents and trainees. Conclusion: This software has served as a useful tool in IORT planning, and demonstrates the need for treatment planning tools that are designed for the specialized challenges encountered in IORT. This software is the subject of a license agreement with the IntraOp Medical Corporation. This software is the subject of a license agreement between Massachusetts General Hospital / Partners Healthcare and the IntraOp Medical Corporation. CLW is consulting on software development with the IntraOp Medical Corporation.

60 APPLIED LIFE SCIENCES↗

PVMapper: Report on the Second Public Opinion Survey

This report has been developed as an integral part of the PVMapper project, funded by the U.S. Department of Energy’s Office of Energy Efficiency and Renewable Energy’s SunShot program. The objective of the SunShot program is to reduce the total costs of solar energy systems. The scope of PVMapper is to develop a geographic information system (GIS) based project planning tool to identify optimal utility-scale solar facility sites. The specific objectives of the project are to 1) develop the software on an open-source platform; 2) integrate the appropriate data sets and GIS layers; 3) include a measure of social risk and public acceptance; 4) enable customization of variable weights; 5) provide a free and accessible platform for software download; and 6) provide a sustainability plan to ensure future relevance of the software. When completed, PVMapper is intended to be used by solar developers, Authorities Having Jurisdiction (AHJs), and other interested parties. This project supports SunShot’s objective by reducing the non-hardware balance of system costs (“soft costs”) for utility-scale solar project development. In order to accomplish the third project objective – including a measure of social risk and public acceptance within PVMapper – the project team has developed a time-series public opinion survey, administered yearly over the course of the three-year project. This report highlights the results and preliminary analyses from the second survey in this series. While the results of this survey are valuable to both PVMapper and future utility-scale solar development, the time-series design is extremely important. The completion of the series enables the extension of the dataset to much richer information. For example, the research team altered this iteration to sharpen the focus on specific topics (those posing potentially higher risks) and target specific locations in the oversample (such as communities near existing facilities). Using similar approaches for each iteration leads to an increasingly greater amount of detail regarding siting risks. The need for this extended dataset to aid in siting utility-scale solar projects is evident, as developers continue to scale back initial plans due to unidentified or incorrectly quantified social risks. It should be noted that this report provides the complete dataset from the survey, encompassing the wide-ranging responses from all of the survey questions. Although the methods used to integrate these data into PVMapper’s siting algorithms is not the purpose of this report, allusions to integration can be found in the discussions surrounding the design of questions and types of data to be used.

14 SOLAR ENERGY↗

SU-E-T-608: Performance Comparison of Four Commercial Treatment Planning Systems Applied to Intensity-Modulated Radiotherapy

Purpose: To compare the performances of four commercial treatment planning systems (TPS) used for the intensity-modulated radiotherapy (IMRT). Methods: Ten patients of nasopharyngeal (4 cases), esophageal (3 cases) and cervical (3 cases) cancer were randomly selected from a 3-month IMRT plan pool at one radiotherapy center. For each patient, four IMRT plans were newly generated by using four commercial TPS (Corvus, Monaco, Pinnacle and Xio), and then verified with Matrixx (two-dimensional array/IBA Company) on Varian23EX accelerator. A pass rate (PR) calculated from the Gamma index by OminiPro IMRT 1.5 software was evaluated at four plan verification standards (1%/1mm, 2%/2mm, 3%/3mm, 4%/4mm and 5%/5mm) for each treatment plan. Overall and multiple pairwise comparisons of PRs were statistically conducted by analysis of covariance (ANOVA) F and LSD tests among four TPSs. Results: Overall significant (p>0.05) differences of PRs were found among four TPSs with F test values of 3.8 (p=0.02), 21.1(>0.01), 14.0 (>0.01), 8.3(>0.01) at standards of 1%/1mm to 4%/4mm respectively, except at 5%/5mm standard with 2.6 (p=0.06). All means (standard deviation) of PRs at 3%/3mm of 94.3 ± 3.3 (Corvus), 98.8 ± 0.8 (Monaco), 97.5± 1.7 (Pinnacle), 98.4 ± 1.0 (Xio) were above 90% and met clinical requirement. Multiple pairwise comparisons had not demonstrated a consistent low or high pattern on either TPS. Conclusion: Matrixx dose verification results show that the validation pass rates of Monaco and Xio plans are relatively higher than those of the other two; Pinnacle plan shows slight higher pass rate than Corvus plan; lowest pass rate was achieved by the Corvus plan among these four kinds of TPS.

60 APPLIED LIFE SCIENCES↗