Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

SU-E-J-99: Reconstruction of Cone Beam CT Image Using Volumetric Modulated Arc Therapy Exit Beams

Purpose: To test the possibility of obtaining an image of the treated volume during volumetric modulated arc therapy (VMAT) with exit beams. Method: Using a Varian Clinac 21EX and MVCT detector the following three sets of detector projection data were obtained for cone beam CT reconstruction with and without a Catphan 504 phantom. 1) 72 projection images from 20 × 16 cm{sup 2} open beam with 3 MUs, 2) 72 projection images from 20 × 16 cm{sup 2} MLC closed beam with 14 MUs. 3) 137 projection images from a test RapicArc QA plan. All projection images were obtained in ‘integrated image’ mode. We used OSCaR code to reconstruct the cone beam CT images. No attempts were made to reduce scatter or artifacts. Results: With projection set 1) we obtained a good quality MV CBCT image by optimizing the reconstruction parameters. Using projection set 2) we were not able to obtain a CBCT image of the phantom, which was determined to be due to the variation of interleaf leakage with gantry angle. From projection set 3), we were able to obtain a weak but meaningful signal in the image, especially in the target area where open beam signals were dominant. This finding suggests that one might be able to acquire CBCT images with rough body shape and some details inside the irradiated target area. Conclusion: Obtaining patient images using the VMAT exit beam is challenging but possible. We were able to determine sources of image degradation such as gantry angle dependent interleaf leakage and beams with a large scatter component. We are actively working on improving image quality.

60 APPLIED LIFE SCIENCES↗

Iraq liquid radioactive waste tanks maintenance and monitoring program plan.

The purpose of this report is to develop a project management plan for maintaining and monitoring liquid radioactive waste tanks at Iraq's Al-Tuwaitha Nuclear Research Center. Based on information from several sources, the Al-Tuwaitha site has approximately 30 waste tanks that contain varying amounts of liquid or sludge radioactive waste. All of the tanks have been non-operational for over 20 years and most have limited characterization. The program plan embodied in this document provides guidance on conducting radiological surveys, posting radiation control areas and controlling access, performing tank hazard assessments to remove debris and gain access, and conducting routine tank inspections. This program plan provides general advice on how to sample and characterize tank contents, and how to prioritize tanks for soil sampling and borehole monitoring.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Review of NASA's Hypersonic Research Engine Project

The goals of the NASA Hypersonic Research Engine (HRE) Project, which began in 1964, were to design, develop, and construct a hypersonic research ramjet/scramjet engine for high performance and to flight-test the developed concept over the speed range from Mach 3 to 8. The project was planned to be accomplished in three phases: project definition, research engine development, and flight test using the X-15A-2 research aircraft, which was modified to carry hydrogen fuel for the research engine. The project goal of an engine flight test was eliminated when the X-15 program was canceled in 1968. Ground tests of engine models then became the focus of the project. Two axisymmetric full-scale engine models having 18-inch-diameter cowls were fabricated and tested: a structural model and a combustion/propulsion model. A brief historical review of the project with salient features, typical data results, and lessons learned is presented.

Andrews, Earl H.↗

NASA's Hypersonic Research Engine Project: A review

The goals of the NASA Hypersonic Research Engine (HRE) Project, which began in 1964, were to design, develop, and construct a high-performance hypersonic research ramjet/scramjet engine for flight tests of the developed concept over the speed range of Mach 4 to 8. The project was planned to be accomplished in three phases: project definition, research engine development, and flight test using the X-15A-2 research airplane, which was modified to carry hydrogen fuel for the research engine. The project goal of an engine flight test was eliminated when the X-15 program was canceled in 1968. Ground tests of full-scale engine models then became the focus of the project. Two axisymmetric full-scale engine models, having 18-inch-diameter cowls, were fabricated and tested: a structural model and combustion/propulsion model. A brief historical review of the project, with salient features, typical data results, and lessons learned, is presented. An extensive number of documents were generated during the HRE Project and are listed.

Andrews, Earl H.↗

Composite Crew Module: Primary Structure

In January 2007, the NASA Administrator and Associate Administrator for the Exploration Systems Mission Directorate chartered the NASA Engineering and Safety Center to design, build, and test a full-scale crew module primary structure, using carbon fiber reinforced epoxy based composite materials. The overall goal of the Composite Crew Module project was to develop a team from the NASA family with hands-on experience in composite design, manufacturing, and testing in anticipation of future space exploration systems being made of composite materials. The CCM project was planned to run concurrently with the Orion project's baseline metallic design within the Constellation Program so that features could be compared and discussed without inducing risk to the overall Program. This report discusses the project management aspects of the project including team organization, decision making, independent technical reviews, and cost and schedule management approach.

Kirsch, Michael T.↗

Materials and Process Activities for NASA's Composite Crew Module

In January 2007, the NASA Administrator and Associate Administrator for the Exploration Systems Mission Directorate chartered the NASA Engineering and Safety Center (NESC) to design, build, and test a full-scale Composite Crew Module (CCM). The overall goal of the CCM project was to develop a team from the NASA family with hands-on experience in composite design, manufacturing, and testing in anticipation of future space exploration systems being made of composite materials. The CCM project was planned to run concurrently with the Orion project s baseline metallic design within the Constellation Program so that features could be compared and discussed without inducing risk to the overall Program. The materials and process activities were prioritized based on a rapid prototype approach. This approach focused developmental activities on design details with greater risk and uncertainty, such as out-of-autoclave joining, over some of the more traditional lamina and laminate building block levels. While process development and associated building block testing were performed, several anomalies were still observed at the full-scale level due to interactions between process robustness and manufacturing scale-up. This paper describes the process anomalies that were encountered during the CCM development and the subsequent root cause investigations that led to the final design solutions. These investigations highlight the importance of full-scale developmental work early in the schedule of a complex composite design/build project.

Polis, Daniel L.↗

Explanation of Change (EoC) Study: Approach and Findings

This study investigated thirty historical NASA science missions to explain the cost change experienced. The study included investigation of historical milestone and monthly status report documentation followed by interviews with key project personnel. Based on the information collected, the reasons for cost change were binned, at the highest level, into four separate categories: NASA External, Project External, Internal Planning, and Internal Execution. The results identified that roughly a third of the change is outside of the project's control, a third is due to assumptions made in project planning, and a third is due to the inherent difficulty of building highly complex, one-of-a-kind, cutting edge, Earth and space science missions.

Bitten, Robert E.↗

The Department of Energy and IDEA team up to document industry best practices

This article describes a collaboration between the U.S. Department of Energy and the International District Energy Association (IDEA) to document best practices in district energy systems. The initiative focuses on analyzing real-world performance data and highlighting effective strategies for improving efficiency, integrating renewable energy, and supporting decarbonization efforts. It highlights case studies from the University of California, Davis, and Princeton University to show how long-term master planning, phased project implementation, and strong financial analysis can drive successful transitions to more sustainable energy systems. U.C. Davis emphasizes incremental, results-driven planning and pilot projects, while Princeton focuses on aligning climate goals with financially viable infrastructure investments and life-cycle cost analysis. Overall, the article demonstrates that combining strategic planning, data-driven decision-making, and financial accountability is essential for advancing sustainable district energy systems.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Balancing renewable energy and river resources by moving from individual assessments of hydropower projects to energy system planning

As governments and non-state actors strive to minimize global warming, a primary strategy is the decarbonization of power systems which will require a massive increase in renewable electricity generation. Leading energy agencies forecast a doubling of global hydropower capacity as part of that necessary expansion of renewables. While hydropower provides generally low-carbon generation and can integrate variable renewables, such as wind and solar, into electrical grids, hydropower dams are one of the primary reasons that only one-third of the world’s major rivers remain free-flowing. This loss of free-flowing rivers has contributed to dramatic declines of migratory fish and sediment delivery to agriculturally productive deltas. Further, the reservoirs behind dams have displaced tens of millions of people. Thus, hydropower challenges the world’s efforts to meet climate targets while simultaneously achieving other Sustainable Development Goals. In this paper, we explore strategies to achieve the needed renewable energy expansion while sustaining the diverse social and environmental benefits of rivers. These strategies can be implemented at scales ranging from the individual project (environmental flows, fish passage and other site-level mitigation) to hydropower cascades to river basins and regional electrical power systems. While we review evidence that project-level management and mitigation can reduce environmental and social costs, we posit that the most effective scale for finding balanced solutions occurs at the scale of power systems. We further hypothesize that the pursuit of solutions at the system scale can also provide benefits for investors, developers and governments; evidence of benefits to these actors will be necessary for achieving broad uptake of the approaches described in this paper. We test this hypothesis through cases from Chile and Uganda that demonstrate the potential for system-scale power planning to allow countries to meet low-carbon energy targets with power systems that avoid damming high priority rivers (e.g., those that would cause conflicts with other social and environmental benefits) for a similar system cost as status quo approaches. We also show that, through reduction of risk and potential conflict, strategic planning of hydropower site selection can improve financial performance for investors and developers, with a case study from Colombia.

Opperman, Jeffrey J.↗

Follow-on Report of Analysis of Approaches to Supplemental Treatment of Low-Activity Waste at the Hanford Nuclear Reservation (Vol. I)

The Hanford Site, in southeast Washington State, is preparing to disposition approximately 56,000,000 gallons (56 Mgal) of radioactive and chemically hazardous wastes currently stored in underground tanks at the site. Tank wastes will be divided into a high-activity fraction and a low-activity fraction for subsequent treatment and disposition. A waste processing and treatment facility, the Waste Treatment and Immobilization Plant (WTP), will include the high-level waste (HLW) vitrification facility (WTP HLW Vitrification Facility) for immobilizing the high-activity fraction and a low-activity waste (LAW) vitrification facility (WTP LAW Vitrification Facility) for immobilizing the low-activity fraction. Both facilities will use vitrification technology to immobilize the Hanford tank wastes in a glass waste form. The volume of LAW to be treated and disposed of following waste retrieval and WTP operations will exceed the planned processing capacity of the WTP LAW Vitrification Facility. ORP-11242,-River Protection Project System Plan, estimates a shortfall in LAW treatment capacity of approximately 56 Mgal, approximately 50% of the projected LAW volume. To maintain the planned tank waste processing mission schedule, the U.S. Department of Energy (DOE) will require additional LAW treatment capacity (termed “supplemental LAW”) external to the WTP process. LAW must be solidified by a treatment technology before the waste can be permanently disposed of in an approved DOE on-site disposal facility or a commercial (state or U.S. Nuclear Regulatory Commission [NRC-licensed]) off-site mixed low-level waste disposal facility. A decision on the approach to supplemental LAW treatment, processing, and disposal has not yet been made

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SU-D-BRF-04: Digital Tomosynthesis for Improved Daily Setup in Treatment of Liver Lesions

Purpose: Daily localization of liver lesions with cone-beam CT (CBCT) is difficult due to poor image quality caused by scatter, respiratory motion, and the lack of radiographic contrast between the liver parenchyma and the lesion(s). Digital tomosynthesis (DTS) is investigated as a modality to improve liver visualization and lesion/parenchyma contrast for daily setup. Methods: An in-house tool was developed to generate DTS images using a point-by-point filtered back-projection method from on-board CBCT projection data. DTS image planes are generated in a user defined orientation to visualize the anatomy at various depths. Reference DTS images are obtained from forward projection of the planning CT dataset at each projection angle. The CBCT DTS image set can then be registered to the reference DTS image set as a means for localization. Contour data from the planning CT's associate RT Structure file and forward projected similarly to the planning CT data. DTS images are created for each contoured structure, which can then be overlaid onto the DTS images for organ volume visualization. Results: High resolution DTS images generated from CBCT projections show fine anatomical detail, including small blood vessels, within the patient. However, the reference DTS images generated from forward projection of the planning CT lacks this level of detail due to the low resolution of the CT voxels as compared to the pixel size in the projection images; typically 1mm-by-1mm-by-3mm (lat, vrt, lng) for the planning CT vs. 0.4mm-by-0.4mm for CBCT projections. Overlaying of the contours onto the DTS image allows for visualization of structures of interest. Conclusion: The ability to generate DTS images over a limited range of projection angles allows for reduction in the amount of respiratory motion within each acquisition. DTS may provide improved visualization of structures and lesions as compared to CBCT for highly mobile tumors.

60 APPLIED LIFE SCIENCES↗

Carbon Capture and Sequestration (via Enhanced Oil Recovery) from a Hydrogen Production Facility in an Oil Refinery

The project proposed a commercial demonstration of advanced technologies that would capture and sequester CO2 emissions from an existing hydrogen production facility in an oil refinery into underground formations in combination with Enhanced Oil Recovery (EOR). The project is led by Praxair, Inc., with other project participants: BP Products North America Inc., Denbury Onshore, LLC (Denbury), and Gulf Coast Carbon Center (GCCC) at the Bureau of Economic Geology of The University of Texas at Austin. The project is located at the BP Refinery at Texas City, Texas. Praxair owns and operates a large hydrogen production facility within the refinery. As part of the project, Praxair would construct a CO2 capture and compression facility. The project aimed at demonstrating a novel vacuum pressure swing adsorption (VPSA) based technology to remove CO2 from the Steam Methane Reformers (SMR) process gas. The captured CO2 would be purified using refrigerated partial condensation separation (i.e., cold box). Denbury would purchase the CO2 from the project and inject the CO2 as part of its independent commercial EOR projects. The Gulf Coast Carbon Center at the Bureau of Economic Geology, a unit of University of Texas at Austin, would manage the research monitoring, verification and accounting (MVA) project for the sequestered CO2, in conjunction with Denbury. The sequestration and associated MVA activities would be carried out in the Hastings field at Brazoria County, TX. The project would exceed DOE’s target of capturing one million tons of CO2 per year (MTPY) by 2015. Phase 1 of the project (Project Definition) is being completed. The key objective of Phase 1 is to define the project in sufficient detail to enable an economic decision with regard to proceeding with Phase 2. This topical report summarizes the administrative, programmatic and technical accomplishments completed in Phase 1 of the project. It describes the work relative to project technical and design activities (associated with CO2 capture technologies and geologic sequestration MVA), and Environmental Information Volume. Specific accomplishments of this Phase include: 1. Finalization of the Project Management Plan 2. Development of engineering designs in sufficient detail for defining project performance and costs 3. Preparation of Environmental Information Volume 4. Completion of Hazard Identification Studies 5. Completion of control cost estimates and preparation of business plan During the Phase 1 detailed cost estimate, project costs increased substantially from the previous estimate. Furthermore, the detailed risk assessment identified integration risks associated with potentially impacting the steam methane reformer operation. While the Phase 1 work identified ways to mitigate these integration risks satisfactorily from an operational perspective, the associated costs and potential schedule impacts contributed to the decision not to proceed to Phase 2. We have concluded that the project costs and integration risks at Texas City are not commensurate with the potential benefits of the project at this time.

03 NATURAL GAS↗

Real time computations of cryogenic He properties

The Fermilab PIP-II (proton improvement plan - II) project is being constructed at Fermilab to deliver $800\,MeV$ protons of $>1\,MW$ beam power to replace the present LINAC and provide protons to the remainder of the existing accelerator complex. The new LINAC consists of a warm front end, 23 superconducting RF cryomodules, and a beam transfer line to the existing complex. The cryomodules (CMs) are to be tested at Fermilab's CryoModule Test Facility (CMTF).An important measurement in cryogenic testing is the heat load of each CM. Traditionally, at Fermilab, these measurements were made collecting archived data offline and analyzing it. The new control system for PIP-II is being developed with the EPICS (Experimental Physics and Industrial Control System) framework, which allows us to compute the heat load in real time using the HePak library.We are exploring other $He$ properties, such as flow, where flow meters are not available, which can also be calculated in real time and fed back to the cryogenics engineers.This paper details the real time heat load calculation and $He$ flow software developed for CM testing at CMTF, as well as the first results from the prototype HB650 CM. Future plans for 2-phase $LHe$ flow will also be outlined.

Hanlet, Pierrick [Fermilab]↗

Sampling and Analysis Plan for Supplemental Environmental Project: Aquatic Life Surveys

As part of a settlement agreement for nuclear waste incidents in 2014, several supplemental environment projects (SEPs) were initiated at Los Alamos National Laboratory (LANL or the Laboratory) between the U.S. Department of Energy and the state of New Mexico. One SEP from this agreement consists of performing aquatic life surveys and will be used to assess the applicability of using generic ambient water-quality criteria (AWQC) for aquatic life. AWQC are generic criteria developed by the U.S. Environmental Protection Agency (EPA) to cover a broad range of aquatic species and are not unique to a specific region or state. AWQC are established by a composition of toxicity data, called species sensitivity distributions (SSDs), and are determined by LC50 (lethal concentration of 50% of the organisms studied) acute toxicity experiments for chemicals of interest. It is of interest to determine whether aquatic species inhabiting waters on the Pajarito Plateau are adequately protected using the current generic AWQC. The focus of this study will determine which aquatic species are present in ephemeral, intermittent, and perennial waters within LANL boundaries and from reference waters adjacent to LANL. If the species identified from these waters do not generally represent species used in the SSDs, then SSDs may need to be modified and AWQC may need to be updated. This sampling and analysis plan details the sampling methodology, surveillance locations, temporal scheduling, and analytical approaches that will be used to complete aquatic life surveys. A significant portion of this sampling and analysis plan was formalized by referring to Appendix E: SEP Aquatic Life Surveys DQO (Data Quality Objectives).

54 ENVIRONMENTAL SCIENCES↗

Introduction to Flight Test Engineering [Introduction Aux Techniques Des Essais En Vol]

Flight test is at the core of what organizations must do in order to validate the operation and systems on an aircraft. While the AGARDograph series 300 and 160 series deal with aspects of this testing, this volume pulls it all together as an introduction to the process required to do effective flight test engineering. This volume was originally published in 1995. Its utility has been proven in that many flight test organizations and universities have requested copies for their engineers and students. It was felt that re-issuing it in a new format designed for electronic publication would be valuable to the community. This second printing changes none of the text, but rather reformats it. All the original references to AGARD (instead of RTO) are left in place so that none of the flavor of the original publication is lost. This is the Introductory Volume to the Flight Test Techniques Series. It is a general introduction to the various activities and aspects of Flight Test Engineering that must be considered when planning, conducting, and reporting a flight test program. Its main intent is to provide a broad overview to the novice engineer or to other people who have a need to interface with specialists within the flight test community. The first two Sections provide some insight into the question of why flight test and give a short history of flight test engineering. Sections 3 through 10 deal with the preparation for flight testing. They provide guidance on the preliminary factors that must be considered; the composition of the test team; the logistic support requirements; the instrumentation and data processing requirements; the flight test plan; the associated preliminary ground tests; and last, but by no means least, discuss safety aspects. Sections 11 through 27 describe the various types of flight tests that are usually conducted during the development and certification of a new or modified aircraft type. Each Section offers a brief introduction to the topic under consideration, and the nature and the objectives of the tests to be conducted. It lists the test instrumentation (and, where appropriate, other test equipment and facilities) required, describes the test maneuvers to be executed, and indicates the way in which the test data is selected, analyzed, and presented. The various activities that should take place between test flights are presented next. Items that are covered are: who to debrief; what type of reports to send where: types of data analysis required for next flight; review of test data to make a comparison to predicted data and some courses of action if there is not good agreement; and comments on selecting the next test flight. The activities that must take place upon completion of the test program are presented. The types of reports and briefings that should take place and a discussion of some of the uses of the flight test data are covered. A brief forecast is presented of where present trends may be leading.

Test facilities↗

Scale-up of Novel Low-Cost Carbon Fibers Leading to High-Volume Commercial Launch

The project started in September, 2012 with the goal of scaling up from the existing laboratory scale process for producing carbon fiber (CF) from polyolefin (PO) based precursor fiber using a Dow proprietary sulfonation-desulfonation stabilization process. The award was used to develop a process that was capable of producing market development quantities of CF from PO precursor fiber at a rate of 4 kg/h of CF. The CF would target properties that met or exceeded the Department of Energy (DOE) Vehicles Technology [1] standard; i.e., 172 GPa modulus and 1.72 GPa strength at greater than or equal to 1% strain. The Dow proprietary process was capable of meeting and exceeding these targets properties. Project DE-EE0005760 resulted from a Collaborative Research and Development Agreement (CRADA) between Dow and Oak Ridge National Laboratory (ORNL) with support from the Michigan Economic Development Corporation (MEDC) and DOE. In the first budget period, the main goal was to design a sulfonation-desulfonation market development plant capable of stabilizing PO precursor fiber at a rate of 5 kg/h using a sulfonation solution. The detailed design, location, and cost estimate were determined as scheduled in the Project Management Plan (PMP). In parallel with this DOE award project was a fundamentals and economic evaluation funded by The Dow Chemical Company (Dow). The goal of the Dow sponsored project was to finalize the mass balances, energy balances, and levelized cost to produce CF using the Dow process. A Go-No-Go decision was scheduled in June, 2013 based on the findings of the DOE sponsored scale up project and the Dow sponsored project. In June, 2013, Dow made the No-Go decision to halt and abandon the Dow proprietary sulfonation-desulfonation process for stabilizing PO precursor fibers for the manufacturing of CF. This No-Go decision was identified in the original proposal and at the start of this project, and the decision was made as scheduled. The decision was based on the high levelized economic cost of the process relative to the manufacture of CF from polyacrylonitrile (PAN) precursor fibers. The capital required to sulfonate the fibers adds a significant cost to the process due to the need for investment in a sulfuric acid recovery plant. This high additional capital over the capital for a PAN based CF plant, reduces the levelized economic cost to slightly advantaged over PAN based CF. The sulfonation-desulfonation stabilization route failed to meet the Dow’s return on investment criterion and the cost advantage target set forth for the DOE project. The DOE and Dow decided to halt spending on the project until a new PO fiber stabilization process could be identified that met the DOE physical properties standard and the levelized economic cost constraints of Dow. When the new technology was developed, then award DE-EE0005760 would be re-started with the same goals of the development of a market development plant capable of producing CF at 4 kg/h with the properties that met or exceed those set forth by the Department of Energy Vehicles Technology standard. Progress on the development of the new process has been slow and thus has delayed the scale up project. Dow’s efforts to date have not progressed to the point of demonstrating a commercially-viable process for production of low cost CF from PO precursors for Dow’s rigorous economic constraints. After extensive discussions within Dow and consultation with DOE’s Advanced Manufacturing Office (AMO) Headquarters and Golden Field Office teams, Dow has decided to proceed with the formal recommendation to terminate subject project. DOE’s AMO Headquarters and Golden Field Office teams agreed with the termination of the project.

36 MATERIALS SCIENCE↗

Amine-Appended Metal–Organic Frameworks as Switch-Like Adsorbents for Energy-Efficient Carbon Capture

The goal of this final project report is to comprehensively summarize the work conducted on project FP-00006194. In accordance with the Project Management Plan (PMP) revised May 2019, and Statement of Project Objectives (SOPO) within, Lawrence Berkeley National Laboratory (LBNL), with industrial partners such as Mosaic Materials, Svante, and Electricore, as well as CCSI 2 , has developed a cost-effective post-combustion CO 2 capture system using diamineappended metal–organic frameworks (MOFs). This project involved (i) synthesis and characterization of framework materials that exhibit a switch-like CO 2 adsorption behavior, (ii) scaling-up of MOF production, development of production cost models, and fabrication of materials, and (iii) deployment of materials in a patented VeloxoTherm process and characterization to optimize the material’s performance in the context of real process streams and conditions. During each of the four project budget periods, the project team met Success Criteria for Year 1 to 3; however, because of the decision to halt the project in Q1 2021, Success Criteria for Year 4 were not achieved.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗