Search NASA⌕ Search

SEARCH · Search NASA

Results for “RADIATION MONITORING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Assessing Cumulative Impacts from Source Units within Hanford's Inner Area - 16546

The Central Plateau area at the Hanford Site has a complex mix of waste sites in several operable units, with many co-mingled source contamination and groundwater plumes. A key component of the evaluation process involves a planned assessment of the potential cumulative impacts resulting from co-mingled plumes and potential contribution from waste sites sources throughout the Inner Area, about 26 million square meters (10 square miles) area located in the middle of the Central Plateau. This assessment will evaluate the fate and transport of contamination at each waste site and remedial actions at those waste sites, providing an integrated vadose zone and groundwater fate and transport assessment. Although DOE's goal is to remediate the entire Inner Area to meet standard requirements in the National Contingency Plan (NCP), the complexity of the contamination including continuing contaminant sources in the Inner Area may not allow restoration of groundwater in a reasonable timeframe. DOE and regulatory agencies may need to evaluate the technical practicability of remedial actions and the potential for establishment of one or more waste management areas where drinking water standards can be obtained and maintained. The cumulative impacts evaluation is the tool to evaluate remedial action effects across source and groundwater operable units, contribute to technical impracticability evaluations, support remedial design and remedial process optimization efforts, identify additional monitoring requirements, and evaluate standard and conditional points of compliance for use considering all contaminant sources and groundwater plumes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Crystal Growth Scale-Up and Stability of RbSr 2 X 5 :Eu Scintillators

The discovery and development of new scintillation materials support national security needs. In these applications, large volumes of scintillator crystals are needed to achieve efficient screening for contraband. Therefore, one important step in the discovery of new scintillator compositions is testing their feasibility for scale-up and their stability. In this work, high-quality Ø22 mm crystals of two new scintillators RbSr 2 Br 5 :Eu and RbSr 2 I 5 :Eu were grown via the Vertical Bridgman method, and their scintillation properties were characterized. Here, the Ø22 mm RbSr 2 I 5 :Eu crystals could be grown with fast translation rates up to 3.5 mm/h. Both RbSr 2 Br 5 :Eu and RbSr 2 I 5 :Eu had high scintillation performance, including light yields of 46,000 and 61,000 ph/MeV, respectively, for Ø22 × 35 mm crystals. Additionally, properties related to physical stability were investigated, including the coefficients of thermal expansion via high-temperature X-ray diffraction (HTXRD) as well as moisture sensitivity. HTXRD confirmed the absence of solid–solid phase transitions and showed that RbSr 2 Br 5 had minimal thermal expansion anisotropy compared to RbSr 2 I 5 and some other inorganic metal halide scintillators, which favors the growth of large-sized crystals.

36 MATERIALS SCIENCE↗

SU-E-T-379: Evaluation of An EPID-Based System for Daily Dosimetry Check by Comparison with a Widely-Used Ionization Chamber-Based Device

Purpose: To examine the feasibility of using Varian’s EPID-based Machine Performance Check (MPC) system to track daily machine output through comparison with Sun Nuclear’s DailyQA3 (DQA) device. Methods: Daily machine outputs for two photon energies (6 and 16MV) and five electron energies (6, 9, 12, 16, 20MeV) were measured for one month using both MPC and DQA. Baselines measurements for MPC were taken at the start of the measurement series, while DQA baselines were set at an earlier date. In order to make absolute comparisons with MPC, all DQA readings were referenced to the average of the first three DQA readings in that series, minimizing systematic differences between the measurement techniques due to baseline differences. In addition to daily output measurements, weekly averages were also calculated and compared. Finally, the electron energy dependence of each measurement technique was examined by comparing energy-specific measurements to the average electron output of all energies each day. Results: For 6 and 16MV photons, the largest absolute percent differences between MPC and DQA were 0.60% and 0.73%, respectively. Weekly averages were within 0.17% and 0.23%, respectively. For all five electron energies, the greatest absolute percent differences between MPC and DQA for each energy ranged from 0.49%–0.83%. Weekly averages ranged from 0.07%–0.28%. DQA energy-specific electron readings matched the average electron output within 0.29% for all days and all energies. MPC energy-specific readings matched the average within 0.21% for 9–20MeV. However, 6MeV showed a larger distribution about the average with four days showing a difference greater than 0.30% and a maximum difference of 0.51%. Conclusion: MPC output measurements correlated well with the widely-used DQA3 for most beam energies, making it a reliable back up technique for daily output monitoring. However, MPC may display an energy dependence for lower electrons energies, requiring additional investigation.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Treatment of Chlorinated Solvents in Groundwater Beneath an Occupied Building at The Young - Rainey STAR Center (Science, Technology, and Research Center) - 16342

Groundwater contamination, consisting of two dissolved-phase plumes originating from chlorinated solvent source areas, in the southeastern portion of the Young- Rainey Star Center (also known as the Pinellas County, Florida, Site) in Largo, Florida, has migrated beyond the property boundary, beneath the roadways, and beneath adjacent properties to the south and east. Groundwater contamination will persist as long as the onsite contaminant source remains. The origin of the contamination appears to be multiple long-term point sources beneath Building 100, a 4.5 ha (11 acre) building that housed manufacturing facilities during US DOE operations at the site. The site is now owned by Pinellas County, and most of the space inside the building is leased to private companies, so DOE chose not to conduct characterization or remediation through the floor of the building, instead choosing to conduct all work from outside the building. Injection of emulsified soybean oil and a microbial culture has been used at other areas of the site to accelerate naturally occurring bacterial processes that degrade groundwater contaminants to harmless compounds, and that same approach was chosen for this task. The technical approach consisted of installing horizontal wells from outside the building footprint, extending through and around the identified subsurface treatment areas, and terminating beneath the building. Two 107 m (350 ft) long wells, two 122 m (400 ft) long wells, and four 137 m (450 ft) long wells have been installed to intersect the inferred source areas and confirmed contaminant plumes beneath the building. DOE then injected emulsified vegetable oil and a microbial culture into the horizontal wells at each of several target areas beneath the building where the highest groundwater contaminant concentrations have been detected. The target areas are the northwest corner of the building between the old drum storage pad locations and monitoring well PIN12-S35B, the vicinity of former monitoring well PIN12-S57B, and hydraulically up-gradient from the south plume and the east plume at the points where they exit from beneath the building. We describe the details of designing and constructing horizontal injection wells for bioremediation beneath a large, occupied industrial production facility, including lessons learned; technical, logistical, and environmental challenges; community relations; and regulatory relations. Because of the expected lag in biological acclimation and response, distance between the treatment areas and associated monitoring points, and low groundwater velocity, it will likely be years before the full impact of the project will be realized. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Need for an Independent Monitoring of Nuclear Waste Repository: Lessons from WIPP Experience - 18130

The Waste Isolation Pilot Plant (WIPP) is the only operating deep geological repository for the permanent disposal of defense transuranic (TRU) waste in the world. The facility recently resumed waste disposal operations after recovering from a February 2014 accident involving a radiological release from a waste container in the WIPP underground. WIPP had been a DOE success story, operating nearly 15 years with no significant incidents or accidents. Many factors contributed to this success, one of the most important being the overwhelming support exhibited by the local community and the local elected officials. One component of the broad public acceptance by the citizens of Southeast New Mexico has been the concept of independent, third party monitoring of environmental effluents at the site. Independent environmental monitoring ensures a role for the local community in ongoing evaluation of the safety and performance of the site. At WIPP this has been achieved through an independent environmental monitoring program operated by the Carlsbad Environmental Monitoring and Research Center (CEMRC). The CEMRC has been conducting independent environmental monitoring activities on and around the WIPP site since 1991 and makes the results of monitoring activities available and easily accessible to members the general public. The public's free and open access to this data and their direct participation in the CEMRC's whole body counting program provides transparency, which is key to maintaining public trust and confidence. The circumstances following the 2014 radiological release event at WIPP reinforced the value of independent environmental monitoring in order to maintain the high level of transparency necessary for long term local acceptance and support for nuclear facilities. Following what was a minor radiological release event, there were understandably fearful reactions from a number of citizens residing in Carlsbad and the nearby communities of Hobbs, Loving, and Artesia. CEMRC's independent environmental monitoring program and their early public engagement proved invaluable in providing timely and accurate environmental data to local community leaders and members of the general public. The data, and open communication from CEMRC, helped reassure citizens in Carlsbad and the surrounding area that the release was extremely low and the extent was very limited. CEMRC further communicated that the probability of any environmental or health impacts from the release was extremely low. It is unlikely the local community would have placed the same level of trust in similar assurances of safety coming from DOE or other State and Federal regulators. The CEMRC's performance in the days following the release meant the local community had access to independent monitoring data and an independent voice in the dialogue with DOE and state officials that shaped the recovery and eventual re-opening of the WIPP facility. The WIPP radiological release event yielded a plethora of lessons learned that will frame the next phase of operational, oversight, and emergency planning surrounding the facility. In this presentation we will be discussing the value and viability of federally-funded, university-housed independent monitoring programs in maintaining trust of state officials and the local communities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Directional Drilling Technology for HLW Disposal - Long Term Monitoring in the Borehole - 16079

Central Research Institute of Electric Power Industry (CRIEPI) has been conducting a project for the directional drilling and measurement/logging technologies to survey hydro-geological condition at the stage of the preliminary investigation (PI) of site selection for the deep geological disposal of HLW. 1000 m length borehole which intersects the Omagari fault was drilled by directional drilling technology in order to verify the drilling technology in Hokkaido. Long term monitoring to clarify pore water pressure and water chemistry in the drilled borehole was also developed. We set measurement intervals on a hanging wall side of a main fracture and started the measurement of pore water pressure in February 2014. We assume that long term monitoring for several boreholes will be achieved in vast areas where power supply and/or communication networks are not available at the PI stage. Thus, we have been developing an automatic data acquisition system for long term monitoring, which enables us to access data remotely. The monitoring system, which was set in Horonobe-town in Hokkaido, is an automatic data acquisition system that performs long term monitoring of pore water pressure. This paper provides an overview of the development of monitoring technologies of pore water pressure measurement in the borehole as well as the automatic data acquisition system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned Concerning the Onsite Disposal Facility at the Fernald Preserve, Harrison, Ohio - 16176

An onsite disposal facility (OSDF) was constructed at the Fernald Preserve, Ohio, for the disposal of contaminated soil and debris generated during a Comprehensive Environmental Response, Compensation, and Liability Act site cleanup. Completed in October of 2006, the 30 ha facility contains 2.26 million m{sup 3} of waste materials, has a maximum height of approximately 19.8 m, and consists of eight individual cells. The dimensions of cells 1-7 are approximately 213 m x 122 m each, or 26,000 m{sup 2} (2.60 ha). The dimensions of cell 8 (the last cell constructed) are larger than those of the other cells (approximately 3.8 ha). Each cell was constructed with a leachate collection system (LCS) that collected rainwater and storm-water runoff during waste placement and prevented it from entering the underlying environment. Other engineered features include a multilayer composite liner system, a leak detection system (LDS) positioned beneath the primary liner, and a multilayer composite cover that was placed over each cell following the completion of waste-placement activities. The LCS and LDS layers are designed to convey (by gravity) any leachate/fluid that enters the system through pipes to the west side of the facility and into tanks located in valve houses. From there, leachate can be sampled and conveyed to treatment. Groundwater is monitored beneath each cell via monitoring wells. In November 2006, the US DOE Office of Legacy Management (LM) assumed responsibility for the long-term care and maintenance of the OSDF. LM has nine years of monitoring and maintenance experience with the Fernald OSDF. Monitoring data is reported each year in the Fernald Annual Site Environmental Report. The data collected and inspections conducted indicate that the facility is operating as designed. The past nine years has provided LM with the opportunity to evaluate how well many of the design and as-built features of the facility have functioned over time as they pertain to environmental monitoring, valve-house operation and maintenance, and leachate transmission. Lessons learned concerning the long-term care and maintenance of the OSDF at the Fernald Preserve are presented. The main lessons learned include the following: How bivariate plots can be used to address environmental monitoring challenges created by installing an engineered disposal facility in a location where contamination is above the background level but below cleanup standards. How valve-house design decisions can help to alleviate long-term monitoring challenges. How scale buildup can lead to leachate transmission issues. Some additional minor lessons learned are also presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Report of AAPM Therapy Physics Committee Task Group 74: In-air output ratio, S{sub c}, for megavoltage photon beams

The concept of in-air output ratio (S{sub c}) was introduced to characterize how the incident photon fluence per monitor unit (or unit time for a Co-60 unit) varies with collimator settings. However, there has been much confusion regarding the measurement technique to be used that has prevented the accurate and consistent determination of S{sub c}. The main thrust of the report is to devise a theoretical and measurement formalism that ensures interinstitutional consistency of S{sub c}. The in-air output ratio, S{sub c}, is defined as the ratio of primary collision water kerma in free-space, K{sub p}, per monitor unit between an arbitrary collimator setting and the reference collimator setting at the same location. Miniphantoms with sufficient lateral and longitudinal thicknesses to eliminate electron contamination and maintain transient electron equilibrium are recommended for the measurement of S{sub c}. The authors present a correction formalism to extrapolate the correct S{sub c} from the measured values using high-Z miniphantom. Miniphantoms made of high-Z material are used to measure S{sub c} for small fields (e.g., IMRT or stereotactic radiosurgery). This report presents a review of the components of S{sub c}, including headscatter, source-obscuring, and monitor-backscattering effects. A review of calculation methods (Monte Carlo and empirical) used to calculate S{sub c} for arbitrary shaped fields is presented. The authors discussed the use of S{sub c} in photon dose calculation algorithms, in particular, monitor unit calculation. Finally, a summary of S{sub c} data (from RPC and other institutions) is included for QA purposes.

61 RADIATION PROTECTION AND DOSIMETRY↗

Directional Drilling Technology for HLW Disposal - Outline of System and its Application - 16078

During high-level waste (HLW) disposal site selection, borehole measurement and logging to investigate the hydro-geological and geo-mechanical conditions of the host rocks is a very important way to examine the potential of the disposal candidates. In Japan, attention is being given to Neogene soft sedimentary rock as the host rock for HLW disposal. In particular, the soft sedimentary rock in coastal areas is thought to be one of the best candidates, because there is little driving force from underground water. Directional drilling is supposed to be efficient under limited topographic and geological conditions, and the Central Research Institute of Electric Power Industry (CRIEPI) has been conducting a project on directional drilling and logging/measurement technologies since 2000. Basic directional drilling system was developed and the system was applied to the Neogene normal sedimentary rock at the Hokushin area of the Horonobe town in Hokkaido. The borehole was drilled to the 700 m long and the applicability of the system was confirmed until 2004. A basic directional drilling system was developed, and the system was applied to the Neogene normal sedimentary rock in the Hokushin area, in the town of Horonobe in Hokkaido. A 700-m borehole was drilled, and the applicability of the system was confirmed in 2004. After conducting a seismic reflection survey for the Omagari fault distribution at the Kami-Horonobe area in the town of Horonobe, a drilling site was selected, and a borehole trace was planned to perpendicularly intersect the fault zone in 2005. Considering the planned trace, a 1000-m-long borehole was drilled to a depth of 450 m. From 750 m to the bottom (1000 m), the borehole was horizontal. The total core recovery was 99.8%, even though it was drilled in the fault zone. The geological, hydrological, geo-mechanical, geophysical, and geochemical data were collected using borehole logging/measurement/survey and core logging/measurement/analysis, and the Omagari fault was characterized. After conducting all the work in the borehole, a steel pipe was inserted into the borehole to case the wall. Open hole sections for monitoring were constructed considering the hydro-geological conditions throughout the hole. Then, the monitoring system was inserted and set up to obtain the initial conditions of the groundwater pressure and chemistry. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Applicability of Wireless Power Transfer for Monitoring Technology of Radioactive Waste Geological Disposal - 16156

To assure the engineered barrier of a high-level radioactive waste repository functions correctly, long-term monitoring inside the backfilled deposition holes and tunnels is planned. Cables are used to power monitoring equipment and send signals however complete isolation will not be possible. Previously developed monitoring systems send information wirelessly and used batteries. Due to the limited battery life, these systems cannot be used for long-term monitoring. In this paper a wireless power transfer method based on magnetic resonant coupling is presented. The necessary transmitter and receiver coils have been developed. The performance of the individual coils has been tested. The performance of the system of transmitter and receiver with both air and bentonite as medium was tested. The results showed that the system with bentonite performed similarly well as the system with air. Wireless power transfer based on magnetic resonant coupling is therefore a feasible method for high-level radioactive waste repository monitoring applications which could in principle work for a period of 100 year or longer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementation of Enhanced Attenuation at the DOE Mound Site OU-1 Landfill: Accelerating Progress and Reducing Costs - 16270

A field demonstration of enhanced attenuation (EA) was initiated in 2014 to expedite the remediation of industrial solvents in the groundwater impacted by the former landfill Operable Unit 1 (OU-1) at the US Department of Energy (DOE) Mound, Ohio, Site. EA uses active engineering solutions to alter the target site so that the contaminant plume will passively stabilize and shrink. For OU-1, the EA was implemented by targeted injection of an electron donor (vegetable oil) to create 'structured geochemical zones'. Volatile organic compounds (VOCs) in the altered subsurface system encounter alternating anaerobic and aerobic environments along the plume flow path. The effect of these structured geochemical zones is effective and rapid degradation of parent compounds such as trichloroethene (TCE) and tetrachloroethene (PCE), and daughter compounds such as cis-1,2-dichloroethene and vinyl chloride. EA at Mound OU-1 provides a transition to natural attenuation and is an alternative to the baseline pump-and-treat (P and T) system. Industrial solvents (primarily TCE) and other VOCs that originated from the former solid-waste landfill contaminated the groundwater in the Buried Valley Aquifer beneath the Mound site. A groundwater P and T system was initiated in 1996 to control the plume, and a soil vapor extraction system was installed and operated from 1997 to 2003 to remove the bulk of the VOC sources from the vadose zone. Physical removal of the landfill waste and contaminated soil was performed between 2006 and 2010. Approximately 76,100 cubic meters (99,500 cubic yards) of material were removed from the OU-1 landfill area. Operation of the groundwater P and T system continued throughout this period. The principles and technical basis of the ongoing EA field demonstration were developed by the Interstate Technology and Regulatory Council. The goal of the EA implementation is to provide a bridge between active groundwater treatments and monitored natural attenuation. EA relies on understanding and manipulating the contaminant mass balance. Technologies are applied to sustainably reduce the contaminant loading from the source and/or increase the rate of natural attenuation processes within the plume. In 2014, a core team that included DOE, the US Environmental Protection Agency (EPA), the Ohio EPA, and technical support organizations evaluated remedial options for OU-1. During the 2014 evaluation, the team projected a cleanup time frame for the baseline P and T system of 26 additional years and a cleanup time frame for the EA remedy of 13 years. On the basis of that evaluation, EPA approved the implementation of the EA remedy that required the shutdown of the P and T system. The combination of technologies implemented for OU-1 EA included (a) neat vegetable oil in the vadose zone in the former landfill and (b) emulsified vegetable oil within the footprint of the groundwater plume. In the first part of the deployment, neat oil spreads laterally and forms a thin layer on the water table beneath residual soil sources to intercept and reduce future VOC loading and to reduce oxygen inputs to the local groundwater. In the second part of the deployment, emulsified oil forms active bioremediation anaerobic treatment zones within the plume footprint to degrade existing groundwater contaminants (via reductive dechlorination, co-metabolism, or both) and stimulates long-term attenuation capacity in the down-gradient aerobic plume (via co-metabolism). The results from the first year of the field demonstration indicate that the dissolved TCE and PCE plumes have decreased in size and mass. Statistical tests indicate that the VOC concentrations in the majority of the source-area wells are decreasing. The VOC concentrations throughout the plume are projected to be below the target maximum contaminant level of 2 to 5 μg/L within 5 to 10 years-sooner than the design projection of 13 years. The biogeochemistry and microbial community within the structured geochemical zones are consistent with the design and appear to be stable. At Mound OU-1, EA has accelerated progress toward the remedial action objectives and reduced costs. Ongoing monitoring will determine whether the EA remedy has transitioned the site into monitored natural attenuation status and whether the EA will continue to be effective, timely, and sustainable. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Search for effects of Comet S-L 9 fragment impacts on low radio frequency emission from Jupiter

Decametric radio observations of Jupiter were made before, during, and after the impacts of the fragments of the comet S-L 9 with the planet, from the University of Florida Radio Observatory, the Maipu Radio Astronomy Observatory of the University of Chile, and the Owens Valley Radio Observatory of the California Institute of Technology. The decametric radiation was monitored at frequencies from 16.7 to 32 MHz. The minimum detectable flux densities were on the order of 30 kJy, except for that of the large 26.3 MHz array in Florida, which was about 1 kJy. There was no significant enhancement or suppression of the decametric L-burst or S-burst emission with respect to normal activity patterns that might be attributed to the fragment entries. A burst of left-hand elliptically polarized radiation having a considerably longer duration than an L-burst was observed almost simultaneously with the impact of the large fragment Q2, and another with right-hand elliptical polarization was observed simultaneously with Q1. We consider the possibility that these two bursts were emitted just above the local electron cyclotron frequencies from the southern and northern ends, respectively, of magnetic flux tubes that had been excited in some way by the proximity of fragments Q2 and Q1. A search was conducted for possible comet-enhanced Jovian synchrotron radiation at 45 MHz using a large dipole antenna array at the observatory in Chile.

Carr, T. D.↗

Monitoring gross alpha and beta activity in liquids by using ZnS(Ag) scintillation detectors

In this work the possibility of monitoring gross alpha and beta activity in liquids using EJ-444 was investigated. Specific tests were carried out to determine the change of the detector properties in water tests. Possible protecting coating is also proposed and tested. Alpha/beta real-time monitoring in liquids is a goal of the EU project TAWARA{sub R}TM. (authors)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

SU-E-T-199: How Number of Control Points Influences the Dynamic IMRT Plan Quality and Deliverability

Purpose: To study the influence of number of control points on plan quality and deliverability. Methods: Five previously treated patients of carcinoma of rectum were selected. Planning target volume (PTV) and organs at risk (OARs) i.e. bladder and bowel were contoured. Dynamic IMRT plans (6MV, 7-fields, 45Gy/25 fractions and prescribed at 95% isodose) were created in Eclipse (Varian medical system, Palo Alto, CA) treatment planning system (TPS) for Varian CL2300C/D linear-accelerator. Base plan was calculated with 166 control points, variable mode (Eclipse Default). For generating other plans, all parameters were kept constant, only number of control points (Fixed mode) was varied as follows: 100, 166 and 200. Then, plan quality was analyzed in terms of maximum and mean dose received by the PTV and OARs. For plan deliverability, TPS calculated fluence was verified with I’matriXX (IBA Dosimetry, Germany) array and compared with TPS dose-plane using gamma index criteria of 3% dose difference and 3mm distance to agreement (DTA). Total number of monitor units (MU) required to deliver a plan was also noted. Results: The maximum variation for the PTV maximum with respect to eclipse default control point (166) was 0.28% (0.14Gy). Similarly, PTV mean varied only up to 0.22 %( 0.11Gy). Bladder maximum and bladder mean varied up to 0.51% (0.24Gy) and 0.16% (0.06Gy). The variation for the bowel maximum and bowel mean was also only 0.39% (0.19Gy) and 0.33% (0.04Gy). Total MU was within 0.32 % (4MU). Average gamma pass rate using different control points for five patients are 98.75±0.33%, 99.37±0.09%, 99.29±0.12%, 98.14±0.13% and 99.25±0.14% respectively. Conclusion: Slight variation (<1%) in PTV and OARs maximum and mean doses was observed with varying number of control points. Monitor unit was also not varied much. Reducing number of control points did not showed any comprise in plan deliverability in terms of gamma index pass rate.

60 APPLIED LIFE SCIENCES↗

SU-E-T-434: Evaluation of the Machine Performance Check (MPC) Program for Truebeam 2.0

Purpose: Machine Performance Check (MPC) is a software application used to verify that the TrueBeam machine is operating within major specifications prior to treatment. Used in combination with a phantom named Isocal, it verifies beam output, beam uniformity, treatment isocenter size, coincidence of treatment and imaging isocenters, positioning accuracy of kV and MV imaging systems, accuracy of collimator and gantry rotation angle, positioning accuracy of jaws and MLC leafs, and couch positioning. The tests can be performed semi-automatically and requires approximately 10 minutes of machine time. It is the purpose of this study to report the performance of this program. Methods: A pre-release version of the MPC tool was installed on a Truebeam linac with 6D couch at our center. Baseline beam output measurements were taken for 5 photon beams (6–15 MV, 6 FFF, 10 FFF) and 5 electron beams (6–20 MeV). Deviations from the baseline output were subsequently recorded for several days and compared against independent measurements from a PTW farmer chamber and our daily QA device (Fluke Biomedical Tracker) as part of an ongoing evaluation. Results: The beam output deviations between the MPC and the PTW chamber measurements were within ±0.7% for photons beams and ±1.0% for electrons beams. This was similar to the tracker performance. There were some isolated incidents where the MPC measurements had unexplained spikes (>3%) that disappeared on a repeat measurement. MPC was also able to detect maximum positioning errors in the jaws (1.12 mm), MLCs (1.14 mm), and couch roll (0.11°). Conclusion: Overall, the ability of the MPC to monitor linac output stability was comparable to that of ionization chamber-based measurements. MPC also provided fast daily mechanical tests not currently available in the clinic. How best to utilize this previously unavailable data is still under investigation.

07 ISOTOPE AND RADIATION SOURCES↗

The Enhanced Sealing Project, Monitoring a Full-Scale Shaft Seal at Canada's Underground Research Laboratory (2009-2015) - 16070

A full-scale shaft seal was designed and installed in the 5-m-diameter main shaft at Canada's Underground Research Laboratory (URL) in 2009. Located where the main shaft intersects a water-bearing fracture zone at a depth of approximately 273 m, a 6-m-thick clay component was sandwiched between two 3-m-thick concrete components. The clay component was 40:60 mixture of bentonite and quartz/feldspar sand and spans approximately 1 m beyond the maximum identified vertical extent of the fracture zone. Its purpose is to limit the mixing of saline groundwater from the deeper region with the fresher, near-surface groundwater. Its construction was part of Canada's Nuclear Legacy Liabilities Program (NLLP). The 1. phase of the Enhanced Sealing Project (ESP), a jointly-funded Research, Development and Demonstration (RD and D) project was started in 2009 to monitor the saturation of the shaft seal until the end of 2013. The 2. phase, extended monitoring of the ESP is supported by Posiva (Finland), Andra (France) and CNL (Canada) and this will run until the end of 2016. The slow evolution of the seal and its surroundings and complete removal of the surface facilities at the URL site in 2014, has meant that the ESP monitoring has evolved to a stand-alone, lower frequency data collection program. Information gained from the ESP monitoring is applicable to support the development of sealing technology to safely close a deep geological repository for the permanent disposal of radioactive wastes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fission Product Gas Monitoring During Fuel Drying Operations - 20094

The goal of the project was to devise and implement a method of accurately qualifying any noble gas emitted during fuel drying operations (part of the dry fuel storage process) in order to provide the data needed to validate the off-site dose calculations. The imputes of the project was the NRC publishing Information Notice 18-01, 'Noble Fission Gas Releases During Spent Fuel Cask Loading Operations' in February 2018. The information notice describes some industry events that occurred during vacuum drying operations as part of a dry fuel campaign. The solution was devised by Fort Calhoun Station staff in partnership with Mirion Technologies technical staff. The monitoring was accomplished by directing all the effluent from the fuel storage cask vacuum drying machine through a sample chamber containing a compact ISOCS characterized CZT based gamma spectrometer connected to a Mirion Data Analyst. This resulted near real-time quantification of the radionuclides of concern. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Monitoring Temperatures of Tires Using Luminescent Materials

A method of noncontact, optical monitoring of the surface temperature of a tire has been devised to enable the use of local temperature rise as an indication of potential or impending failures. The method involves the use of temperature-sensitive paint (or filler): Temperature-sensitive luminescent dye molecules or other luminescent particles are incorporated into a thin, flexible material coating the tire surface of interest. (Alternatively, in principle, the luminescent material could be incorporated directly into the tire rubber, though this approach has not yet been tested.) The coated surface is illuminated with shorter-wavelength light to excite longer-wavelength luminescence, which is observed by use of a charge-coupled-device camera or a photodetector (see Figure 1). If temporally constant illumination is used, then the temperature can be deduced from the known temperature dependence of the intensity response of the luminescence. If pulsed illumination is used, then the temperature can be deduced from the known temperature dependence of the time or frequency response of the luminescence. If sinusoidally varying illumination is used, then the temperature can be deduced from the known temperature dependence of the phase response of the luminescence. Unlike a prior method of monitoring the temperature at a fixed spot on a tire by use of a thermocouple, this method is not restricted to one spot and can, therefore, yield information on the spatial distribution of temperature: in particular, it enables the discovery of newly forming hot spots where damage may be starting. Also unlike in the thermocouple method, the measurements in this method are not vulnerable to breakage of wires in repeated flexing of the tire. Moreover, unlike in another method in which infrared radiation is monitored as an indication of surface temperature, the luminescence measurements in this method are not significantly affected by changes in infrared emissivity. This method has been demonstrated in application to the outside surface of a tire (see Figure 2), using both constant and pulsed light sources for illumination and cooled, slow-scan, gated CCD cameras for detection. For observing the temperature of the inside surface of a tire (this has not yet been done), it would probably be necessary to use fiber optics and/or windows for coupling excitation light into, and coupling luminescence out of, the interior volume.

Bencic, Timothy J↗