Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling Service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Landsat Data Continuity Mission

The Landsat Data Continuity Mission (LDCM) is currently under development and is on schedule to launch the 8th satellite in the Landsat series in December of 2012. LDCM is a joint project between the National Aeronautics and Space Administration (NASA) and the United States Geological Survey (USGS). NASA is responsible for developing and launching the flight hardware and on-orbit commissioning and USGS is responsible for developing the ground system and operating the system onorbit after commissioning. Key components of the flight hardware are the Operational Land Imager (OLI), nearing completion by Ball Aerospace & Technologies Corp in Boulder, CO, the Thermal Infrared Sensor (TIRS), being built by NASA's Goddard Space Flight Center and the spacecraft, undergoing integration at Orbital Sciences Corp in Gilbert, Arizona. The launch vehicle will be an Atlas-5 with launch services provided by NASA's Kennedy Space Center. Key ground systems elements are the Mission Operations Element, being developed by the Hammers Corporation, and the Collection Activity Planning Element, Ground Network Element, and Data Processing and Archive System, being developed internally by the USGS Earth Resources Observations and Science (EROS) Center. The primary measurement goal of LDCM is to continue the global coverage of moderate spatial resolution imagery providing continuity with the existing Landsat record. The science goal for this imagery is to monitor land use and land cover, particularly as it relates to global climate change. Together the OLI and TIRS instruments on LDCM replace the ETM+ instrument on Landsat-7 with significant enhancements. The OLI is a pushbroom design instrument where the scanning mechanism of the ETM+ is effectively replaced by a long line of detectors. The OLI has 9 spectral bands with similar spatial resolution to ETM+: 7 of them similar to the reflective spectral bands on ETM+ and two new bands. The two new bands cover (1) the shorter wavelength blue part of the spectrum to help with coastal studies and aerosol analyses/atmospheric correction and (2) an atmospheric water absorption band, where the Earth surface is generally not visible, but Cirrus clouds are, to aid in cloud detection and screening. The radiometry of OLI benefits from improved SNR, dynamic range and quantization. OLI is undergoing system testing with a delivery scheduled for Spring 2011. The TIRS is also a pushbroom design and used QWIPS detectors that require cooling to 43K using a cryocooler. It.has two spectral bands, effectively splitting the ETM+ band 6 in half, that can be used as a split window to aid in atmospheric correction. It has nominally 100 m spatial resolution as opposed to the 60 m of Landsat-7 ETM+: TIRS has commenced integration and test, with a delivery to the spacecraft vendor scheduled for Winter 2011-2012. The Orbital spacecraft currently being integrated for LDCM will have improved capabilities for pointing over previous missions. These capabilities will allow the OLI and TIRS instruments to point off-nadir the equivalent of one WRS-2 path to increase the chances of coverage for high priority targets, particularly in the event of natural disasters. Also, the pointing capability will allow the calibration of the OLI using the sun (roughly weekly), the moon (monthly), stars (during commissioning) and the Earth (at 90 deg from normal orientation, a.k.a., side slither) quarterly. The solar calibration will be used for OLI absolute and relative calibration, the moon for trending the stability of the OLI response, the stars will be used for Line of Sight determination and the side slither will be an alternate OLI and relative gain determination methodology. The spacecraft is scheduled to begin integration with the OLI instrument in Summer 2011. The LDCM data processing and archive system (DPAS), located at USGS EROS, generates the products for distribution to users. Like Landsat-7 this includes an image assessment system for characrizing instrument performance and updating calibration parameters. Products will be generated that include the spectral bands from both instruments, terrain corrected and registered to the geoid. Also, like Landsat-7, data products will be distributed at no charge to the user. The current status and plans of the space and ground segments of the LDCM project will be presented along with performance predictions as available. More detailed information on the two instruments is intended to be presented in separate papers.

Markham, Brian↗

Dispatchable Solar Power Plant Project

As penetration of intermittent renewable power increases, grid operators must manage greater variability in the supply and demand on the grid. One result is that utilities are planning to build many new natural gas peaking power plants that provide added flexibility needed for grid management. This report discusses the development of a dispatchable solar power (DSP) plant that can be used in place of natural gas peakers. Specifically, a new molten-salt tower (MST) plant has been developed that is designed to allow much more flexible operation than typically considered in concentrating solar power plants. As a result, this plant can provide most of the capacity and ancillary benefits of a conventional natural gas peaker plant but without the carbon emissions. The DSP system presented was designed to meet the specific needs of the Arizona Public Service (APS) utility 2017 peaking capacity request for proposals (RFP). The goal of the effort was to design a MST peaker plant that had the operational capabilities required to meet the peaking requirements of the utility and be cost competitive with the natural gas alternative. The effort also addresses many perceived barriers facing the commercial deployment of MST technology in the US today. These include MST project development issues such as permitting, avian impacts, visual impacts of tower CSP projects, project schedule, and water consumption. The DSP plant design is based on considerable analyses using sophisticated solar system design tools and in-depth preliminary engineering design. The resulting DSP plant design uses a 250 MW steam power cycle, with solar field designed to fit on a square mile plot of land that has a design point thermal rating of 400 MWt. The DSP plant has an annual capacity factor of about 16% tailored to deliver greater than 90% capacity during the critical Arizona summer afternoon peak. The table below compares the All-In energy cost and capacity payment of conventional combustion turbines to DSP plants. These results estimate that the cost of the DSP plant is about 10% higher than a similarly-sized and operated frame combustion turbine and slightly cheaper than an aero derivative combustion turbine when APS reference fuel and emissions costs are included. The DSP plant cost is based on a single, first-of-a-kind plant, and it is likely that subsequent plants would be less expensive.

14 SOLAR ENERGY↗

The Applied Meteorology Unit: Nineteen Years Successfully Transitioning Research into Operations for America's Space Program

The Applied Meteorology Unit (AMU) provides technology transition and technique development to improve operational weather support to the Space Shuttle and the entire American space program. The AMU is funded and managed by NASA and operated by a contractor that provides five meteorologists with a diverse mix of advanced degrees, operational experience, and associated skills including data processing, statistics, and the development of graphical user interfaces. The AMU's primary customers are the U.S. Air Force 45th Weather Squadron at Patrick Air Force Base, the National Weather Service Spaceflight Meteorology Group at NASA Johnson Space Center, and the National Weather Service Melbourne FL Forecast Office. The AMU has transitioned research into operations for nineteen years and worked on a wide range of topics, including new forecasting techniques for lightning probability, synoptic peak winds,.convective winds, and summer severe weather; satellite tools to predict anvil cloud trajectories and evaluate camera line of sight for Space Shuttle launch; optimized radar scan strategies; evaluated and implemented local numerical models; evaluated weather sensors; and many more. The AMU has completed 113 projects with 5 more scheduled to be completed by the end of 2010. During this rich history, the AMU and its customers have learned many lessons on how to effectively transition research into operations. Some of these lessons learned include collocating with the operational customer and periodically visiting geographically separated customers, operator submitted projects, consensus tasking process, use of operator primary advocates for each project, customer AMU liaisons with experience in both operations and research, flexibility in adapting the project plan based on lessons learned during the project, and incorporating training and other transition assistance into the project plans. Operator involvement has been critical to the AMU's remarkable success and many awards from NASA, the National Weather Association, and two citations from the Navy's Center of Excellence for Best Manufacturing Practices. This paper will present the AMU's proven methods and explain how they may be applied by other organizations to effectively transition research into operations.

Madura, John T.↗

Deep Space Network-Wide Portal Development: Planning Service Pilot Project

The Deep Space Network (DSN) is an international network of antennas that supports interplanetary spacecraft missions and radio and radar astronomy observations for the exploration of the solar system and the universe. DSN provides the vital two-way communications link that guides and controls planetary explorers, and brings back the images and new scientific information they collect. In an attempt to streamline operations and improve overall services provided by the Deep Space Network a DSN-wide portal is under development. The project is one step in a larger effort to centralize the data collected from current missions including user input parameters for spacecraft to be tracked. This information will be placed into a principal repository where all operations related to the DSN are stored. Furthermore, providing statistical characterization of data volumes will help identify technically feasible tracking opportunities and more precise mission planning by providing upfront scheduling proposals. Business intelligence tools are to be incorporated in the output to deliver data visualization.

project development↗

Optimizing vehicle recharging to maximize use of energy generated from particular identified sources

Implementations of the present invention contemplate utilizing a communicative infrastructure represented by a telematics unit of an electric vehicle and a telematics service provider (TSP) communicatively coupled to the telematics unit to control an amount of power reserved for a charging event of the vehicle. Specifically, the TSP utilizes information provided by the telematics unit, electrical power utilities, and electrical power metering devices to determine the characteristics of electrical energy available for charging the vehicle. The TSP can utilize the characteristics of the available energy along with additional information, such as charging preferences established by a subscriber of the TSP and vehicle use schedules, to determine an amount of power to reserve for the charging event. The amount of power reserved for the charging event may be determined based on cost, greenhouse gas emissions, a combination thereof, and on other factors.

33 ADVANCED PROPULSION SYSTEMS↗

Orion European Structural Test Article Propellant Tank Fill and Drain Carts

Environmental testing of the Orion European Structural Test Article (E-STA), which contains the Orion European Service Module (ESM), required that the onboard propellant tanks be filled and drained with fuel and oxidizer simulant fluids as well as pressurized and depressurized with an ullage gas. This conference paper will elaborate on how these objectives were fulfilled by presenting the development of derived requirements definition, initial fill and drain concepts, selection of simulant fluids, finalization of pump and pressurization design, selection of components, and selection of transfer hoses and interface connections as well as development and maintenance of budgets, schedules, reviews, construction, documentation, and test procedures. This paper also describes the implementation of checkout and commissioning activities leading to successful fluid cart pumping and pressurization operations for the test campaign. The development, construction, and operation of the fluid cart pumping and pressurization systems for the environmental testing of the Orion E-STA, took place at NASA's Plum Brook Station Space Environments Complex (SEC) during 2015 and 2016.

FLUID TRANSFER↗

Design and Characterization of the Engineering Model of the Spectrometer Onboard LuSEE‐Night

Abstract The Lunar Surface Electromagnetics Explorer—Night, LuSEE‐Night, is a low‐frequency radio astronomy experiment that will explore the cosmic Dark Ages signal on the radio‐quiet farside of the Moon. The LuSEE‐Night carries a radio frequency spectrometer consisting of a set of antennas, analog and digital processing electronics, and will be launched by NASA's Commercial Lunar Payload Services in 2025. The spectrometer is designed to observe the spectrum of the radio sky in the 0.5−50 MHz band. The engineering model (EM) of the four‐channel spectrometer has been developed. The EM has been characterized for linearity, gain, noise, and their temperature dependence, confirming that the EM meets all the requirements for LuSEE‐Night. Three mitigation techniques have been implemented and verified to suppress self‐induced electromagnetic interference. The flight model of the spectrometer is currently being developed and is scheduled to be shipped to the integration site in early 2024.

Tamura, Emi↗

Orion European Structural Test Article Propellant Tank Fill and Drain Carts

Environmental testing of the Orion European Structural Test Article (E-STA), which contains the Orion European Service Module (ESM), required that the onboard propellant tanks be filled and drained with fuel and oxidizer simulant fluids as well as pressurized and de-pressurized with an ullage gas. This conference paper will elaborate on how these objectives were fulfilled by presenting the development of derived requirements definition, initial fill and drain concepts, selection of simulant fluids, finalization of pump and pressurization design, selection of components, selection of transfer hoses and interface connections, as well as development and maintenance of budgets, schedules, reviews, construction, documentation, and test procedures. This paper also describes implementation of checkout and commissioning activities leading to successful fluid cart pumping and pressurization operations for the test campaign. The development, construction, and operation of the fluid cart pumping and pressurization systems for the Environmental testing of the Orion European Structural Test Article (E-STA), took place at the NASA Glenn Research Center's Plum Brook Station Space Environments Complex (SEC) during 2015 and 2016.

Pressurization↗

An Agent-Based Model for Analyzing Control Policies and the Dynamic Service-Time Performance of a Capacity-Constrained Air Traffic Management Facility

Simple agent-based models may be useful for investigating air traffic control strategies as a precursory screening for more costly, higher fidelity simulation. Of concern is the ability of the models to capture the essence of the system and provide insight into system behavior in a timely manner and without breaking the bank. The method is put to the test with the development of a model to address situations where capacity is overburdened and potential for propagation of the resultant delay though later flights is possible via flight dependencies. The resultant model includes primitive representations of principal air traffic system attributes, namely system capacity, demand, airline schedules and strategy, and aircraft capability. It affords a venue to explore their interdependence in a time-dependent, dynamic system simulation. The scope of the research question and the carefully-chosen modeling fidelity did allow for the development of an agent-based model in short order. The model predicted non-linear behavior given certain initial conditions and system control strategies. Additionally, a combination of the model and dimensionless techniques borrowed from fluid systems was demonstrated that can predict the system s dynamic behavior across a wide range of parametric settings.

Conway, Sheila R.↗

How Many Trip Requests Could We Support? An Activity-Travel Based Vehicle Scheduling Approach

In a world of ever-changing travel behavior and ever-increasing modal options, is vital to have integrated models that could capture the interactions between supply and demand layers of travel. Addressing this need, we propose three different versions of network representation and mathematical models for the activity-based vehicle routing problem to connect activity-travel graphs of passengers (demand layer) to spatio-temporal networks of vehicles (supply layer). Versions I and II are arc-based, while version III is path-based. In version I, we introduce the concept of activity-travel graphs for passengers. For vehicles, we construct space–time networks and add a new dimension, called “under-service state”, to track the execution status of trip requests at any location and time. In version II, we reduce the complexity of the network structure by eliminating the state dimension and some other modifications in the structure of the passengers’ and vehicles’ network. Although both versions can capture various behavioral constraints of the activity-based vehicle routing problem (e.g., mandatory and optimal activities, duration of activities, chain of activities, preferred starting and ending times of activities), due to the high level of complexity of the network structure, both versions can only solve small-sized problems. To tackle the computational complexity, we propose a path-based network representation in version III, and to make a balance between the disutility of passengers and vehicles, we present a tolled user equilibrium problem. Mathematical models are coded in C and GAMS and implemented on real-world Phoenix regional transportation network with more than 39 million trip requests, which demonstrate the effectiveness of the proposed solution for the original and restricted master problems.

33 ADVANCED PROPULSION SYSTEMS↗

NDE Technology Engineering Program for Hanford DST Non-Visual Volumetric Inspection Technology: Phase II RAVIS Radiation Tolerance Test Report

This test report provides the results of radiation tolerance robustness testing that was performed on samples of robotic components and an ultrasonic guided wave air-slot sensor that represent components/sub-systems of the Robotic Air-slot Volumetric Inspection System (RAVIS) that has been engineered for volumetric inspection of Hanford tank bottom plates via under-tank refractory pad air-slots. The specific components tested for 1) functionality during active irradiation and 2) tolerance to cumulative radiation dose (until failure or upon reaching a cumulative dose test limit) were: • four samples each of a printed circuit board (PCB) and direct current (DC) motor, which are robotic components, and • 26 ultrasonic piezoelectric elements (samples) inside an air-slot sensor. The robotic components are part of the RAVIS air-slot inspection crawler drive control system that is responsible for remote communication with and actuation of the air-slot inspection crawler. The failure of either of these components during under-tank deployment would require manual retrieval via the crawler’s tether, which risks damage to the robot/refractory/tank. Preemptive replacement of the components at appropriately conservative dose/time intervals informed by failure dose would reduce the likelihood of under-tank failure. The components were included in radiation tolerance testing to quantify their failure doses to inform replacement intervals. The air-slot sensor is responsible for collecting ultrasonic inspection data (scan images) for the tank bottom plates during under-tank deployment. Compromised signal quality due to elevated noise levels caused by gamma radiation would compromise inspection performance. The air-slot sensor was included in radiation tolerance testing to quantify the impact of active irradiation on sensor signal quality. The irradiation and in-situ functional tests of the PCBs, DC motors and air-slot sensor took place in June and July 2020 at the Pacific Northwest National Laboratory. Testing was performed at a gamma dose rate near 300 rad/hr., which, in the absence of under-tank dose rate data, has been conservatively estimated to be the upper-bound dose rate beneath the primary tanks at Hanford. Irradiation took place at elevated temperatures of 150-200°F to determine failure doses that reflect the compounding effects of gamma radiation and heat. The test results revealed: • The DC motors can tolerate being actively irradiated at the high dose rate at 200°F and can tolerate a cumulative dose of 300,000 rad, that which would be incurred after 5 years of service at the 300 rad/hr dose rate. The component therefore meets minimum and preferred radiation tolerance and lifecycle requirements for robotic components. • The air-slot sensor can tolerate being actively irradiated at the high dose rate at 150°F and can tolerate a cumulative dose of 60,000 rad, that which would be incurred after 1 year of service at the 300 rad/hr dose rate. The sensor therefore meets minimum radiation tolerance and lifecycle requirements. • The PCB can tolerate being actively irradiated at the high dose rate, but can only tolerate a cumulative dose of 19,000 rad at 150-200°F. The PCB does not meet minimum radiation tolerance and lifecycle requirements; however, because the component is considered replaceable, it can be replaced before a cumulative dose of 19,000 rad is reached, determined through either monitoring with a dosimeter or scheduled time intervals that are calculated based on conservative estimates of under-tank dose rates.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Carbon Dioxide Observational Platform System (CO-OPS), feasibility study

The Carbon Dioxide Observational Platform System (CO-OPS) is a near-space, geostationary, multi-user, unmanned microwave powered monitoring platform system. This systems engineering feasibility study addressed identified existing requirements such as: carbon dioxide observational data requirements, communications requirements, and eye-in-the-sky requirements of other groups like the Defense Department, the Forestry Service, and the Coast Guard. In addition, potential applications in: earth system science, space system sciences, and test and verification (satellite sensors and data management techniques) were considered. The eleven month effort is summarized. Past work and methods of gathering the required observational data were assessed and rough-order-of magnitude cost estimates have shown the CO-OPS system to be most cost effective (less than $30 million within a 10 year lifetime). It was also concluded that there are no technical, schedule, or obstacles that would prevent achieving the objectives of the total 5-year CO-OPS program.

Bouquet, D. L.↗

Big Results From a Smaller Gearbox

Many people will be sad to see the Hubble Space Telescope go, as it was the first instrument of its kind to provide us with such a wealth of imagery and information about the galaxy. The telescope has served us well since its launch in spring of 1990, but it is nearly time for its retirement. The science, however, will continue, as NASA plans the launch of a new, more modern orbiting telescope, the James Webb Space Telescope. Named after the man who ran NASA from 1961 to 1968, years fraught with the anxiety and uncertainty of the Space Race, the scope is scheduled for launch in fall of 2011. It is designed to study the earliest galaxies and some of the first stars formed after the Big Bang. NASA scientists at the Goddard Space Flight Center are busy developing the technologies to build this new machine. Many of the new technologies are available for commercial licensing and development. For example, the NASA Planetary Gear System technology developed to give precise nanometer positioning capabilities for the James Webb Space Telescope is now being employed by Turnkey Design Services, LLC (TDS), of Blue Island, Illinois, to improve electric motors. This revolutionary piece of technology allows more efficient operation of the motors, and is more cost- effective than traditional gearbox designs.

Source record↗

Real-time Ridesharing for Transportation Hubs with Demand and Supply Uncertainty

Transportation hubs in major cities generate a significant amount of trips by taxis and for-hail vehicles (FHV), with many of the trips sharing similar destinations. This suggests promising opportunities to leverage the collective travel needs with dedicated ridesharing solutions to reduce the externalities of excessive traffic at transportation hubs. In this study, we develop a novel dynamic ridesharing approach to serve trips from the transportation hub by considering (1) demand (new passengers) and supply (newly available vehicles) in the near future and (2) the uncertainty of future predictions. Our approach consists of two stages. In the first stage, we develop a data structure called hub mobility tree to generate potential combinations of shareable trips as candidate schedules efficiently. Then the generated schedules are used in the second stage to formulate the stochastic hub-based ridesharing problem (SHRP), which is a stochastic integer programming problem with the objective to maximize the total expected ridesharing profit over time. Due to the prohibitive number of shareable trips, we then approximately solve SHRP by the sample average approximate method (SAA), and a dual Lagrangian technique is implemented to further improve the scalability of the solution approach. We demonstrate the performances of the proposed method by simulating the ridesharing service at JFK airport using NYC taxi and FHV data. The results indicate that the proposed method outperforms the myopic ridesharing (maximize profit for a single time step) and the rolling horizon method with point estimation of future demand and supply.

dynamic ridesharing↗

Maintenance of Maywood Laboratory Operations Support During Contractor Transition and Replacement of the Project Databases - 16329

In December 2013, Cabrera Services (Cabrera) executed transition of the FUSRAP Maywood Superfund Site remediation project operations, including an on-site accredited environmental lab, from a large business that had established technology infrastructure in place for over a decade which required updating to support the expected remediation scope and client needs. As of November 2015, Cabrera has shipped over 116,000 yd{sup 3} of contaminated soil to disposal facilities. During the transition, the USACE FUSRAP Maywood Laboratory (UFML) continued to support project operations, providing the expected timely and reliable results and maintaining their New Jersey Department of Environmental Protection certification for all parameters of concern, while having to cope with new challenges and additional tasks having the potential to disrupt the laboratory's ability to support project operations. This case study examines the challenges with maintaining a certified radiochemistry laboratory and an aggressive remediation schedule during a period of prime contractor transition which included a complete IT infrastructure overhaul, and conversion of the existing Microsoft Access laboratory database and project Electronic Data Management System (EDMS) to a customized commercial solution. Challenges: I. Procurement of a new database subcontractor and working closely with them to achieve the following: a. Migration of all environmental (including radiological, chemical, and quality control), health and safety, and spatial data as well as reports, queries, and analytical instrument software processes from a MS Access data management system to a SQL server system; and b. Verification that the functionality and data integrity of the databases remained intact. II. The onsite laboratory was changed over to a new onsite network and the following tasks were completed with little or no interruption to site operations by January 10, 2014: i. Installation of new instrument personal computers (PCs) and making them fully operational; ii. Configuration of the lab domain and server to host the LIMS (replaced all servers/domain/workstations with Windows 7 and Server 2012 machines). iii. Networking of the laboratory building into the rest of the project site via fiber optic cabling across the site. iv. Upgrade of the wide area network (WAN) data connection to high-speed Fiber Optic service; v. Upgrade of the telephones into voice over internet protocol (VOIP) phones. vi. Splitting of the database into front ends and a centralized back-end hosted on the new server to allow simultaneous access for fixes and improvements. III. Phone service interruption; phone systems were operational by January 10, 2014. Additional Tasks: I. Revision of the USACE FUSRAP Maywood Laboratory (UFML) Quality Systems Manual Rev. 1 Submitted 01/16/14; II. Writing of the Uniform Federal Policy Quality Assurance Project Plan Rev. 1 (UFP-QAPP) submitted 1/21/14. This document replaced the prior project data quality plan, the Chemical Data Quality Management Plan. III. Support of USACE communications to the New Jersey Department of Environmental Protection (NJDEP) on lab management and personnel transition to Cabrera. This work was important since it ensured a smooth transition and shows how critical project records infrastructure such as databases, can be upgraded with minimal interruption of project support. Such work may provide benefit to other similar projects, especially long term projects where database infrastructure upgrades may be beneficial in terms of improved efficiencies in data recording and transfer, and improved security in data storage. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of High Temperature (>700°C) Molten Salt Pump Technology for Generation 3 Solar Power Tower Systems

Bearings are required for long-shafted pumps historically used in concentrating solar thermal power applications. For molten chloride salts, bearings for such service conditions are not commercially available, nor has a design been demonstrated to work. Therefore, a project was sponsored by the Department of Energy’s Solar Energy Technologies Office for the development and demonstration of a submerged bearing for use in chloride salt pumps. This project’s tasks covered the tribological testing of candidate materials and the design, fabrication, testing, and post-test analysis of full-scale salt-compatible bearings. This work expands upon previous work. The effects of potential particulate in the salt were investigated through tribological bench testing. Through 11 tests, the MgO particulate size and concentration in a molten chloride salt were varied, and the effects on friction, wear rate, and wear characteristics were recorded. Novel journal bearings for chloride salt service were designed and fabricated based on these results. The bearings were of a relevant scale (i.e., for a 1.5 in. pump shaft) to demonstrate the technology with respect to further scale-up. The bearings were made of Haynes 244 and Yttria Partially Stabilized Zirconia. A custom bearing test rig, salt tanks, and associated infrastructure (e.g., heaters, tanks, transfer lines, gas flow control) were designed, procured, and installed. A few issues were encountered in the system fabrication process, resulting in delay of the project schedule. The system was successfully fabricated and assembled. Heating, cover gas, and pump motor systems were integrated into the control logic. This progress of the bearing test system represents a significant step forward towards demonstrating this promising technology. Nevertheless, the project ended before testing of the full-scale bearings could be performed.

14 SOLAR ENERGY↗

A Framework to Analyze the Requirements of a Multiport Megawatt-Level Charging Station for Heavy-Duty Electric Vehicles

Widespread adoption of heavy-duty (HD) electric vehicles (EVs) will soon necessitate the use of megawatt (MW)-scale charging stations to charge high-capacity HD EV battery packs. Such a station design needs to anticipate possible station traffic, average and peak power demand, and charging/wait time targets to improve throughput and maximize revenue-generating operations. High-power direct current charging is an attractive candidate for MW-scale charging stations at the time of this study, but there are no precedents for such a station design for HD vehicles. We present a modeling and data analysis framework to elucidate the dependencies of a MW-scale station operation on vehicle traffic data and station design parameters and how that impacts vehicle electrification. This framework integrates an agent-based charging station model with vehicle schedules obtained through real-world vehicle telemetry data analysis to explore the station design and operation space. A case study applies this framework to a Class 8 vehicle telemetry dataset and uses Monte Carlo simulations to explore various design considerations for MW-scale charging stations and EV battery technologies. The results show a direct correlation between optimal charging station placement and major traffic corridors such as cities with ports, e.g., Los Angeles and Oakland. Corresponding parametric sweeps reveal that while good quality of service can be achieved with a mix of 1.2-megawatt and 100-kilowatt chargers, the resultant fast charging time of 35–40 min will need higher charging power to reach parity with refueling times.

33 ADVANCED PROPULSION SYSTEMS↗

Application of Gr/PMR-15 to commercial aircraft

Following from early experience with polyimides on the SST program and Shuttle aft flap studies the Boeing Company is now working on collaborative programs with its principal nacelle suppliers to pursue the development of Gr/PMR-15 nacelle components. Two programs are currently in effect. The first program is directed specifically towards the flight test and service evaluation at the earliest possible date of a 747 nacelle core cowl structure. The second program seeks to firmly establish the producibility and cost of a 757 thrust reverser C duct in a production environment. The near term objectives of these programs include: (1) the comparison of estimated cost and weight of Gr/PMR-15 versus metal structure, (2) the engine test of representative composite structure, (3) the preliminary design and analysis of the C duct structure, and (4) the preparation of cost data and time schedules for the development and producibility program. In addition to powerplant structure, the propulsion ducting system has shown to be a strong candidate for Gr/PMR-15 application. Currently, the Boeing 747 Organization is evaluating the use of PMR-15 matrix composites to replace nearly 800 lbs of titanium ducting per airplane.

Postlewaite, J.↗