Search NASA⌕ Search

SEARCH · Search NASA

Results for “System Operator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

SPRUCE Enclosure Corral and Sump System: Description, Operation, and Calibration

This document describes the subsurface corral system that has been designed and constructed to measure water flow and allow the collection of water samples from the outflow of each experimental enclosure at the Spruce and Peatland Responses Under Changing Environments (SPRUCE) experimental site within the Marcell Experimental Forest in northern Minnesota, USA. SPRUCE implemented 10 years of whole-ecosystem warming, deep peat heating, and elevated carbon dioxide (CO2) treatments from 2015-2025 to assess the response of northern peatland ecosystems to increases in temperature and exposures to elevated atmospheric CO2 concentrations. This document: 1. Describes belowground corrals, sump systems, and the operation of sump systems, which are used to calculate the volumes of water that naturally drain enclosures and to trigger automatic collection of water samples; 2. Describes the calibration between water level and water volume in the sump system. This relationship is used to calculate near-surface lateral runoff (“outflow” in L/s) from each enclosure by measuring the change in water level over time. The water volume vs. water level relationship must be re-calibrated if water level sensors (or components) are replaced; and 3. Describes the data and data products that are and will be available from outflow measurements.

54 ENVIRONMENTAL SCIENCES↗

Operational Probabilistic Tools for Solar Uncertainty (OPTSUN) (Final Project Report for DOE Solar Forecasting II Project)

Increasing levels of solar PV can challenge system operations and may require novel methods to operate the power system reliably and efficiently. Power system operating plans generally use deterministic forecasts, in which the variable energy resources are represented by the expected value for each interval of the decision horizon. Probabilistic forecasts are relatively new but have the potential to address the shortfalls of deterministic forecasts. However, understanding how best to use such forecasts is still a key gap in industry and was the focus of this project. The project had three workstreams. In a forecasting workstream, improvements were made to baseline probabilistic forecasts using a number of new approaches such as machine learning methods and improved input data. In a design workstream, advanced simulation tools used these forecasts to investigate newly proposed reserve determination methods. Lastly, in a demonstration workstream a scheduling management platform (SMP) was developed to leverage probabilistic forecasts in a modular and customizable manner. In order to study the benefits that could be accrued, the project team collaborated with three utility partners (Duke Energy, Southern Company and Hawaiian Electric) to deliver improved probabilistic forecasts for each region and to model each region in case studies using advanced production cost modeling tools. Different methods to determine operating reserve requirements from probabilistic forecasts were developed, simulated, and tested across each region. The benefits of using these newly proposed methods varied by utility, but, in general, using probabilistic forecasts as well as historical data to set the reserve requirements seems to improve reliability related results, with less risk of reserve or supply shortfalls. The cost implications were not always straightforward; in some cases the new methods could show a reduction in expected operating costs, but often the increase in reserves associated with better risk mitigation using probabilistic forecasts could result in an increase in operating costs in the simulations. The SMP tool was developed to process probabilistic forecasts from their initial receipt through to scheduling decisions. This open-source tool consists of several modules for scenario development, reserve requirements calculation, and visualization. The SMP tool was demonstrated to a wide range of operators and stakeholders at all three utilities and further improved based on their feedback. The tool will be available on www.epri.com/optsun. The proposed probabilistic information-based reserve determination approaches have the potential to be implemented by different regions to ensure an economic and reliable power system operation on power systems integrating increasing levels of variable renewable resources. The innovative yet practical methods developed in this project demonstrated tangible benefits from using probabilistic forecasts beyond just study-based assessments to include three unique balancing areas. The demonstrated benefits across the multiple utility environments, are expected to provide system operators in all regions the confidence required and a platform to adopt the new forecasting and operating methods.

14 SOLAR ENERGY↗

A Comprehensive Comparison of Current Operating Reserve Methodologies

Electric power systems are currently experiencing a paradigm shift from a traditionally static system to a system that is becoming increasingly more dynamic and variable. Emerging technologies are forcing power system operators to adapt to their performance characteristics. These technologies, such as distributed generation and energy storage systems, have changed the traditional idea of a distribution system with power flowing in one direction into a distribution system with bidirectional flows. Variable generation, in the form of wind and solar generation, also increases the variability and uncertainty in the system. As such, power system operators are revisiting the ways in which they treat this evolving power system, namely by modifying their operating reserve methodologies. This paper intends to show an in-depth analysis on different operating reserve methodologies and investigate their impacts on power system reliability and economic efficiency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Preventive Power Outage Estimation Based on a Novel Scenario Clustering Strategy

The increasing occurrence of extreme weather events is challenging power grid operation. For extreme weather events, the system operator is responsible for estimating the power outages and scheduling the restoration resources. This paper proposes an outage evaluation framework to identify the possible unserved load profiles, vulnerable areas, and mobile energy adequacy. The outputs of an outage prediction model tool are used to generate numerous faulted line scenarios. Next, each scenario's nodal unserved load profile is obtained by solving a three-phase restoration model that considers repair crews and mobile energy resources (MERs). Then, a novel scenario clustering strategy is developed to cluster the unserved load profiles into multiple representative profiles which the system operator can focus on. Finally, case studies on a distribution system evaluate the damage caused by an extreme weather event and verify the effectiveness of the proposed scenario clustering strategy.

MATHEMATICS AND COMPUTING,POWER TRANSMISSION AND D↗

Method and apparatus for controlling a vehicle including an adaptive cruise control system

Operating a subject vehicle equipped with an adaptive cruise control system includes setting initial states for control parameters, including setting a desired vehicle speed and determining a desired following gap range, wherein the desired following gap range is associated with a lead vehicle. Operation is controlled via the adaptive cruise control system based upon the initial states for the control parameters. Operation also includes monitoring for presence of the lead vehicle. Upon detecting presence of the lead vehicle, an actual following gap is determined between the subject vehicle and the lead vehicle, and the initial states of the control parameters associated with the adaptive cruise control system are adjusted based upon the actual following gap between the subject vehicle and the lead vehicle, and the desired following gap range. Operation is controlled via the adaptive cruise control system based upon the adjusted initial states of the control parameters.

Zhao, Junfeng↗

Designing a configuration control mechanism for a flight software validation facility

Embedded computer systems and supporting operating systems have recently enabled the automation of many time-critical flight functions. This automation requires the integration of computer hardware and software, aircraft hardware, and the flight application. To properly integrate and control these critical functions requires a real-time environment that is provided by the onboard flight computer, a real-time operating system, and a real-time flight application that supplies the input commands to the aircraft and responds to the resulting actions. The increased complexity of developing and testing such real-time applications can best be supported by a separate test facility that provides the processing visibility and control which is virtually impossible in the actual real-time operating environment. Such a flight software validation facility has been developed at the NASA Langley Research Center to support applications using the Shuttle real-time language HAL/S. The development and control of this facility are described. Some of the management techniques used were project schedules, status monitoring, code walk-throughs, configuration control, phased releases, validation suites, and modern programming techniques.

Smith-Taylor, R.↗

Performance Monitoring using Pecos (V.0.1)

Advances in sensor technology have rapidly increased our ability to monitor natural and human-made physical systems. In many cases, it is critical to process the resulting large volumes of data on a regular schedule and alert system operators when the system has changed. Automated quality control and performance monitoring can allow system operators to quickly detect performance issues. Pecos is an open source python package designed to address this need. Pecos includes built-in functionality to monitor performance of time series data. The software can be used to automatically run a series of quality control tests and generate customized reports which include performance metrics, test results, and graphics. The software was developed specifically for solar photovoltaic system monitoring, and is intended to be used by industry and the research community. The software can easily be customized for other applications. The following Pecos documentation includes installation instructions and examples, description of software features, and software license. It is assumed that the reader is familiar with the Python Programming Language. References are included for additional background on software components.

47 OTHER INSTRUMENTATION↗

Deep Factorization Machine Learning for Disaggregation of Transmission Load Profiles with High Penetration of Behind-The-Meter Solar

The ever-growing integration of distributed energy resources (DERs), especially behind-the-meter (BTM) solar generations, poses imperative operational challenges to system operators such as regional transmission organizations (RTOs). It is important for RTOs to effectively and accurately extract actual load profiles at the transmission level for a single node with significant BTM solar injection. This paper first illustrates the necessity of disaggregating the daily actual load profile of a single node. Furthermore, by segmenting nodes with selected timeseries features, nodes with significant BTM solar generation are identified. Lastly, a bi-level framework is proposed, comprising reference node disaggregation and DeepFM nodal disaggregation, aimed at disaggregating the nodal load profiles from which system operators require more information. By adopting a hybrid Deep Factorization Machine (DeepFM) model, the model achieve accurate results by extracting both linear and nonlinear relations between nodes in the same region and the zonal load and nodal load profile. To overcome the lack of ground truth, this paper segments the load profile into daytime, nighttime, and zero-crossing points and utilizes the latter two for evaluation purposes. The proposed disaggregation procedure is validated using real world, minute-level, normalized, and anonymized nodal data in the PJM service territory.

42 ENGINEERING↗

Power Market Primers

The National Energy Technology Laboratory (NETL) has developed a series of primers on independent system operators (ISOs) and regional transmission organizations (RTOs). The primers primarily explore the history, workings, and types of electricity markets composing the seven ISOs/RTOs in the United States (U.S.) (Exhibit 1-1). The primer series includes sixteen documents. A general introduction to ISOs/RTOs is given in Independent System Operators and Regional Transmission Organizations. Specific details about the seven existing ISOs/RTOs in the United States are given in seven additional primers: California Independent System Operator, ERCOT Independent System Operator, ISO New England Regional Transmission Operator, MISO Regional Transmission Operator, New York Independent System Operator, PJM Regional Transmission Operator, and Southwest Power Pool, Inc. These primers provide a history of each ISO/RTO, short explanations of products and services (different types of electricity markets) offered by ISO/RTO, and the ISO/RTO generation mix. Readers who are not familiar with the different types of markets and their mechanisms can find basic information in six additional primers titled: Power Markets, Energy Market, Capacity Market, Comparisons of Different ISO/RTO Capacity Market Structures, Ancillary Services, and Financial Transmission Rights. Additionally, the primer North American Electric Reliability Corporation introduces the electric reliability organization, which is responsible for reliability of the bulk power system and Federal Energy Regulatory Commission introduces the federal commission responsible for overseeing the nation's electric power markets and related energy and financial markets and issuing market related rules and regulations. All the primers are very short and concise documents. They are accompanied by a Glossary of Terms in which many of the technical terms used in these primers are defined.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Generator Interconnection Costs to the Transmission System in non-ISO Balancing Authorities [Slides]

Electric transmission system operators—including Independent System Operators (ISOs), Regional Transmission Organizations (RTOs), and utilities—require proposed power plants to undergo a series of interconnection studies before connecting to the grid. These studies assess what transmission upgrades or new infrastructure may be necessary and assign the associated costs to the project. Lawrence Berkeley National Laboratory has compiled, aggregated, and cleaned interconnection cost data, originally for ISOs/RTOs, and now for five non-ISO Balancing Authorities: PacifiCorp, Bonneville Power Authority, Duke Energy Progress, Duke Energy Carolinas and Duke Energy Florida. Insufficient transparency in interconnection cost data may contribute to rapidly expanding interconnection queues, with active queue capacities tripling between 2020 and 2024 in the studied BAs. Most projects withdraw after receiving high interconnection cost estimates. Interconnection costs have increased since the early 2000s, with average costs for "complete" projects reaching $194/kW between 2018 and 2024. Active queue projects and withdrawn projects incur substantially higher costs, primarily due to rising network upgrade costs. Recent interconnection costs in non-ISO balancing authorities are higher than in ISO regions, potentially due to a greater willingness to pay among developers. Utility-scale solar, wind, and storage projects have interconnection costs that exceed those for natural gas. However, when focusing on projects that do not withdraw from the queue, the interconnection costs for these technologies are more similar to natural gas projects. Other key findings include: (1) Larger generation projects benefit from lower proportional interconnection costs, (2) capacity transmission service (NRIS) often requires additional network investments, and (3) projects with high network upgrade costs are often clustered geographically. The dataset includes results from 2,104 interconnection studies conducted between 2000 and 2024, covering projects that are operational, withdrawn, or still progressing through the study process. The Excel file contains (a) the complete project-level interconnection cost dataset, and (b) seven additional tabs summarizing cost metrics across dimensions such as time, market structure, cost category (point of interconnection vs. broader network upgrades), fuel type, service type (ERIS vs. NRIS), generator size, and geography.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Novel Method for Setting Meaningful Thresholds for RMS-Energy Oscillation Detectors

Oscillation detection and mitigation is a crucial aspect of reliable power system operation. Several transmission system operators and reliability coordinators use the RMS-energy method of oscillation detection, but the process of setting thresholds is time and labor intensive. The current industry practice in the United States is to set thresholds based on the RMS-energy's value during ambient conditions, which can often lead to nuisance alarms that require thresholds to be manually retuned. In this paper, we propose a method for setting RMS-energy thresholds that directly accounts for oscillation amplitudes specified by the user. A theoretical analysis of the statistical properties of the RMS-energy incorporates these user-specified amplitudes, resulting in thresholds that reliably detect oscillations of interest while avoiding nuisance alarms. Theoretical results are validated with simulated measurements and the real-world practicality of the method is established with publicly available field-measured data from the Grid Event Signature Library.

Follum, James D.↗

IT vs. OT: Trends and Incidents

This presentation discusses the differences between information systems (IT) and operational systems (OT) and why that difference is important in the context of cybersecurity for the energy sector.

29 - ENERGY PLANNING, POLICY AND ECONOMY↗

Production Operations Management System (POMS) for Fermilab Experiments

The Production Operations Management System (POMS) software allows production teams and analysis groups across multiple Fermilab experiments to launch, modify and monitor large scale campaigns of related Monte Carlo or data processing jobs, and currently manages the majority of production computing of experiments at Fermilab.POMS provides a web service interface that enables automated job submission on distributed resources according to customers’ requests, as well as subsequent monitoring of those submissions as well as recovery of failed submissions, debugging and record keeping.POMS interfaces with existing HEP data access, processing, movement and monitoring tools at Fermilab, including Jobsub (for job submission), SAM (for data management), and Landscape (for monitoring), and in combination with them handles the creation of intermediate datasets of files for multistage campaigns.POMS visualizes these campaigns with an interactive GUI interface. An important feature of POMS is a one-to-one connection between the GUI campaign visualizer and a text based representation of the complete campaign configuration. An extensible library of template campaign configurations is available. The templates are user modifiable and map cleanly to and from the GUI description of the campaign.This paper will discuss the current usage, history, and some technical details of POMS, as well as planned future extensions, particularly interfacing with Rucio as well as SAM for file movement.

Mengel, Marc↗

Space Operations Center system analysis study extension. Volume 4, book 2: SOC system analysis report

The Space Operations Center (SOC) orbital space station research missions integration, crew requirements, SOC operations, and configurations are analyzed. Potential research and applications missions and their requirements are described. The capabilities of SOC are compared with user requirements. The SOC/space shuttle and shuttle-derived vehicle flight support operations and SOC orbital operations are described. Module configurations and systems options, SOC/external tank configurations, and configurations for geostationary orbits are described. Crew and systems safety configurations are summarized.

Source record↗

A Computuerized Operator Support System Prototype

A report was published by the Idaho National Laboratory in September of 2012, entitled Design to Achieve Fault Tolerance and Resilience, which described the benefits of automating operator actions for transients. The report identified situations in which providing additional automation in lieu of operator actions would be advantageous. It recognized that managing certain plant upsets is sometimes limited by the operator’s ability to quickly diagnose the fault and to take the needed actions in the time available. Undoubtedly, technology is underutilized in the nuclear power industry for operator assistance during plant faults and operating transients. In contrast, other industry sectors have amply demonstrated that various forms of operator advisory systems can enhance operator performance while maintaining the role and responsibility of the operator as the independent and ultimate decision-maker. A computerized operator support system (COSS) is proposed for use in nuclear power plants to assist control room operators in addressing time-critical plant upsets. A COSS is a collection of technologies to assist operators in monitoring overall plant performance and making timely, informed decisions on appropriate control actions for the projected plant condition. The COSS does not supplant the role of the operator, but rather provides rapid assessments, computations, and recommendations to reduce workload and augment operator judgment and decision-making during fast-moving, complex events. This project proposes a general model for a control room COSS that addresses a sequence of general tasks required to manage any plant upset: detection, validation, diagnosis, recommendation, monitoring, and recovery. The model serves as a framework for assembling a set of technologies that can be interrelated to assist with each of these tasks. A prototype COSS has been developed in order to demonstrate the concept and provide a test bed for further research. The prototype is based on four underlying elements consisting of a digital alarm system, computer-based procedures, PI&D system representations, and a recommender module for mitigation actions. At this point, the prototype simulates an interface to a sensor validation module and a fault diagnosis module. These two modules will be fully integrated in the next version of the prototype. The initial version of the prototype is now operational at the Idaho National Laboratory using the U.S. Department of Energy’s Light Water Reactor Sustainability (LWRS) Human Systems Simulation Laboratory (HSSL). The HSSL is a full-scope, full-scale glass top simulator capable of simulating existing and future nuclear power plant main control rooms. The COSS is interfaced to the Generic Pressurized Water Reactor (gPWR) simulator with industry-typical control board layouts. The glass top panels display realistic images of the control boards that can be operated by touch gestures. A section of the simulated control board was dedicated to the COSS human-system interface (HSI), which resulted in a seamless integration of the COSS into the normal control room environment.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Computuerized Operator Support System Prototype

A report was published by the Idaho National Laboratory in September of 2012, entitled Design to Achieve Fault Tolerance and Resilience, which described the benefits of automating operator actions for transients. The report identified situations in which providing additional automation in lieu of operator actions would be advantageous. It recognized that managing certain plant upsets is sometimes limited by the operator’s ability to quickly diagnose the fault and to take the needed actions in the time available. Undoubtedly, technology is underutilized in the nuclear power industry for operator assistance during plant faults and operating transients. In contrast, other industry sectors have amply demonstrated that various forms of operator advisory systems can enhance operator performance while maintaining the role and responsibility of the operator as the independent and ultimate decision-maker. A computerized operator support system (COSS) is proposed for use in nuclear power plants to assist control room operators in addressing time-critical plant upsets. A COSS is a collection of technologies to assist operators in monitoring overall plant performance and making timely, informed decisions on appropriate control actions for the projected plant condition. The COSS does not supplant the role of the operator, but rather provides rapid assessments, computations, and recommendations to reduce workload and augment operator judgment and decision-making during fast-moving, complex events. This project proposes a general model for a control room COSS that addresses a sequence of general tasks required to manage any plant upset: detection, validation, diagnosis, recommendation, monitoring, and recovery. The model serves as a framework for assembling a set of technologies that can be interrelated to assist with each of these tasks. A prototype COSS has been developed in order to demonstrate the concept and provide a test bed for further research. The prototype is based on four underlying elements consisting of a digital alarm system, computer-based procedures, PI&D system representations, and a recommender module for mitigation actions. At this point, the prototype simulates an interface to a sensor validation module and a fault diagnosis module. These two modules will be fully integrated in the next version of the prototype. The initial version of the prototype is now operational at the Idaho National Laboratory using the U.S. Department of Energy’s Light Water Reactor Sustainability (LWRS) Human Systems Simulation Laboratory (HSSL). The HSSL is a full-scope, full-scale glass top simulator capable of simulating existing and future nuclear power plant main control rooms. The COSS is interfaced to the Generic Pressurized Water Reactor (gPWR) simulator with industry-typical control board layouts. The glass top panels display realistic images of the control boards that can be operated by touch gestures. A section of the simulated control board was dedicated to the COSS human-system interface (HSI), which resulted in a seamless integration of the COSS into the normal control room environment.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Bilevel Voltage Regulation Operation for Distribution Systems With Self-Operated Microgrids

The emerging of microgrids in distribution systems has significantly enhanced the resilience of power grids. However, the operators of a distribution system and microgrids therein can be different and have accessibility to different devices. To model the operation of such a grid, this work proposes a bilevel formulation and probes into the voltage regulation operation, considering the interaction between different systems. The proposed bilevel formulation considers the cooperation of active energy resources (AER), transformer tap-changers, and capacitor banks that are controlled by different operators. To facilitate the solution time of the target bilevel optimization, the lower-level problems with different objectives are modeled using deep neural networks (DNNs) which are then converted into a set of constraints. Hence, the bilevel problem can be reformed to a single-level problem. Lastly, the proposed solution procedures are validated using a customized joint system constructed by the IEEE 123-bus system and a real distribution system in Iowa. According to the numerical validation results, the solution time of the proposed nonlinear activation function based DNN model is 69 times faster than other methods in solving voltage regulation with a bilevel structure.

24 POWER TRANSMISSION AND DISTRIBUTION↗