Search NASA⌕ Search

SEARCH · Search NASA

Results for “adaptive structures space structures”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

706 records · Page 40

Evaluation of Crew-Centric Onboard Mission Operations Planning and Execution Tool: Year 2

Currently, mission planning for the International Space Station (ISS) is largely affected by ground operators in mission control. The task of creating a week-long mission plan for ISS crew takes dozens of people multiple days to complete, and is often created far in advance of its execution. As such, re-planning or adapting to changing real-time constraints or emergent issues is similarly taxing. As we design for future mission operations concepts to other planets or areas with limited connectivity to Earth, more of these ground-based tasks will need to be handled autonomously by the crew onboard.There is a need for a highly usable (including low training time) tool that enables efficient self-scheduling and execution within a single package. The ISS Program has identified Playbook as a potential option. It already has high crew acceptance as a plan viewer from previous analogs and can now support a crew self-scheduling assessment on ISS or on another mission. The goals of this work, a collaboration between the Human Research Program and the ISS Program, are to inform the design of systems for more autonomous crew operations and provide a platform for research on crew autonomy for future deep space missions. Our second year of the research effort have included new insights on the crew self-scheduling sessions performed by the crew through use on the HERA (Human Exploration Research Analog) and NEEMO (NASA Extreme Environment Mission Operations) analogs. Use on the NEEMO analog involved two self-scheduling strategies where the crew planned and executed two days of EVAs (Extra-Vehicular Activities). On HERA year two represented the first HERA campaign where we were able to perform research tasks. This involved selected flexible activities that the crew could schedule, mock timelines where the crew completed more complex planning exercises, usability evaluation of the crew self-scheduling features, and more insights into the limit of plan complexity that the crew could effectively self-schedule. In parallel we have added in new features and functionality in the Playbook tool based off of our insights from crew self-scheduling in the NASA analogs. In particular this year we have added in the ability for the crew to add, edit, and remove their own activities in the Playbook tool, expanding the type of planning and re-planning possible in the tool and opening up the ability for more free form plan creation. The ability to group and manipulate groups of activities from the plan task list was also added, allowing crew members to add predefined sets of activities onto their mission timeline. In addition we also added a way for crew members to roll back changes in their plan, in order to allow an undo like capability. These features expand and complement the initial self-scheduling features added in year one with the goal of making crew autonomous planning more efficient. As part of this work we have also finished developing the first version of our Playbook Data Analysis Tool, a research tool built to interpret and analyze the unobtrusively collected data obtained during the NASA analog missions through Playbook. This data which includes user click interaction as well as plan change information, through the Playbook Data Analysis Tool, allows us to playback this information as if a video camera was mounted over the crewmember's tablet. While the primary purpose of this tool is to allow usability analysis of crew self-scheduling sessions used on the NASA analog, since the data collected is structured, the tool can automatically derive metrics that would be traditionally tedious to achieve without manual analysis of video playback. We will demonstrate and discuss the ability for future derived metrics to be added to the tool. In addition to the current data and results gathered in year two we will also discuss the preparation and goals of our International Space Station (ISS) onboard technology demonstration with Playbook. This technology demonstration will be preformed as part of the CAST payload starting in late 2016.

onboard planning↗

Clearance Analysis of Node 3 Aft CBM to the Stowed FGB Solar Array

In early 2011, the ISS Vehicle Configuration Office began considering the relocation of the Permanent Multipurpose Module (PMM) to the aft facing Common Berthing Mechanism (CBM) on Node 3 to open a berthing location for visiting vehicles on the Node 1 nadir CBM. In this position, computer-aided design (CAD) models indicated that the aft end of the PMM would be only a few inches from the stowed Functional Cargo Block (FGB) port solar array. To validate the CAD model clearance analysis, in the late summer of 2011 the Image Science and Analysis Group (ISAG) was asked to determine the true geometric relationship between the on-orbit aft facing Node 3 CBM and the FGB port solar array. The desired measurements could be computed easily by photogrammetric analysis if current imagery of the ISS hardware were obtained. Beginning in the fall of 2011, ISAG used the Dynamic Onboard Ubiquitous Graphics (DOUG) program to design a way to acquire imagery of the aft face of Node 3, the aft end-cone of Node 1, the port side of pressurized mating adapter 1 (PMA1), and the port side of the FGB out to the tip of the port solar array using cameras on the Space Station Remote Manipulator System (SSRMS). This was complicated by the need to thread the SSRMS under the truss, past Node 3 and the Cupola, and into the space between the aft side of Node 3 and the FGB solar array to acquire more than 100 images from multiple positions. To minimize the number of SSRMS movements, the Special Purpose Dexterous Manipulator (SPDM) would be attached to the SSRMS. This would make it possible to park the SPDM in one position and acquire multiple images by changing the viewing orientation of the SPDM body cameras using the pan/tilt units on which the cameras are mounted. Using this implementation concept, ISAG identified four SSRMS/SPDM positions from which all of the needed imagery could be acquired. Based on a photogrammetric simulation, it was estimated that the location of the FGB solar array could be measured within an accuracy of about 1 in. in each axis relative to the ISS Analysis Coordinate System (ISSACS). In October 2011, a proposed image-acquisition plan was drafted by ISAG and released for review. The ISS Robotics flight control team (ROBO) proposed minor changes to SPDM positions 1 and 4 to meet ISS proximity requirements. The updated image acquisition plan and draft chit were presented to and approved by the Systems Working Group (SWG) November 18 and were sent to the Vehicle Configuration Board (VCB) in early December 2011. Working with ROBO on 3 successive days (February 21, 22, and 23), ISAG collected 161 images of the ISS. Approximately 40 images were collected from each of the four different SSRMS/SPDM positions, with each set mapping the region from the Node 3 end cone, across Node 1, along the forward port side portion of the FGB, and out the port side FGB solar arrays. From this imagery, the best 80 images were selected for use in the analysis. The images were radiometrically enhanced to improve color and contrast and loaded into the FotoG analysis software along with the camera parameters and control data, which consisted of the coordinates for 54 handrail attachment bolts on the aft face of Node 3, in the ISSACS coordinate system. The results of this analysis produced the measured coordinates of 116 points distributed across the face of the FGB solar array panels (see figure 3) along with propagated uncertainty estimates in each coordinate axis. These results were sent to the ISS Vehicle Configuration Office, which sent them to the Configuration Analysis Modeling and Mass Properties (CAMMP) team for comparison with the Russian-provided CAD model for the retracted FGB solar arrays. The CAMMP analysis unexpectedly showed that the measured location of the port FGB solar array was up to 41-in. further outboard than the design and was slightly twisted about its rotational axis. The unexpected comparison results produced some initial concern regarding the accuracy of the photogrammetric measurements. To verify the measured results, ISAG personnel conducted a second analysis using just the imagery of the solar arrays in an arbitrary coordinate system defined by the three corner points of the inboard-most panel, with the design distance between points A1 and A10 as the only scale. The new measurements agreed with the original results to within less than 1 in. RMS in each axis, confirming the original solar array measurements. ISAG produced a final report for the ISS Vehicle Configuration Office documenting an apparent anomaly in the retracted configuration of the port FGB solar arrays. A copy of the measurement report was translated and sent to the Russian Space Agency. During a Vehicle Integrated Performance and Resources (VIPeR) teleconference September 24, 2012, the Russians acknowledged receipt of a translated copy of the ISAG report. The Russian representative stated that the head of the solar array design team claimed that the measured configuration was impossible unless the structure was physically broken. The Russians acknowledged that they had no expertise in photogrammetry, so the analysis technique employed was a "black box" to them, and they did not know how to use the ISAG results. They asked for a single image in which the overextension of the port solar array could be obviously seen. On November 10, 2012, during a face-to-face meeting with their Russian counterparts at JSC, ISAG presented nadir-view imagery of the FGB acquired during Space Shuttle rendezvous. Using the known width of the pressurized portion of the FGB as a scale, this analysis clearly showed that the port FGB solar array was extended outboard further than the Russian design for the retracted solar array.

Liddle, Donn↗

Configuration and Projected Capabilities of the Common Habitat Medical Care Facility

The Common Habitat is a large, long-duration habitat being explored as part of a conceptual study (not an active NASA program) that uses an SLS core stage Liquid Oxygen (LOX) tank as its primary structure. It is intended for use on the Moon as part of a permanently occupied outpost, on Mars as part of an outpost that will be occupied for hundreds of days at a time, and in deep space as part of the Deep Space Exploration Vehicle where it will support crewed missions up to 1200 days in duration. A study of internal orientation and crew size resulted in a Common Habitat configuration sized for a crew of eight with a three-deck horizontal orientation. Additional work outside the scope of this paper is developing a vertical translation system, a crew mobility aids system based on wearable gecko-derived grippers, and a crew seating/restraint system. These systems are all assumed for use in conjunction with the Medical Care Facility, which is needed to maintain crew well-being during these missions, where distance from Earth precludes the possibility of evacuation to Earth. This paper describes recent improvements in the Common Habitat Medical Care Facility and associated benefits for crew survivability in long duration missions beyond Earth orbit. These improvements were made with the assistance of a NASA Pathways intern whose experience includes a tour of duty in Afghanistan as an Army combat medic with the 691st GHOST-T, attached to the 1st and 7th US Special Forces Groups as part of Operation Freedom’s Sentinel, where he helped provide far-forward surgical capabilities in austere combat environments. The initial baseline Medical Care Facility was developed working in conjunction with University of Houston Space Architecture graduate students. The facility was placed on the upper deck of the Common Habitat in a location that provided privacy, operational volume, and was close to the vertical translation pathway. The notional outfitting repurposed component CAD models from unrelated studies and notionally indicated a level of care roughly equivalent to that aboard the International Space Station. The CAD modeling provided notional stowage volumes, a deployable surface, some fixed equipment, an ultrasound, and a potentially reconfigurable treatment table. While this facility is clearly a competent arrangement, it was desired to leverage available expertise and upgrade the station given the vast distances from Earth to be experienced by the Common Habitat. Key driving requirements applied to the upgrade included to provide Medical Level of Care V, offer enhanced telemedicine capabilities, provide patient physical accommodation, provide caregiver access to the patient from all sides, include sliding pocket doors for access to hygiene and to the Vertical Translation System, and to add any additional capability possible for the best achievable medical care. The first step in the facility upgrade was to quantify the current medical inventory on the International Space Station and ensure that sufficient stowage volume was present for this purpose. To that end, the ISS medical kits were reviewed, and eight full size mid deck lockers were placed in the facility. A number of additional devices were also added, based on the intern’s combat medic experience. Also, two fixed shelves and one horizontal work surface were added to the Medical Care Facility, with the shelves providing storage space for the additional devices and the work surface providing a location for the caregiver to work or stage equipment. Four display monitors were added to the wall above the horizontal work surface, supporting data display, telemedicine, conferencing, or other needs. The existing treatment table was replaced with a mobile surgical stretcher-chair. Two additional doors were added to the Medical Care Facility. One leads directly to the hygiene compartment, allowing it to support medical operations in addition to providing galley/wardroom support. The other door leads directly into the Vertical Translation System. The wall adjacent to the subsystems bay was moved, adding additional volume to the Medical Care Facility. This improved caregiver access to the patient and allowed for a larger number of caregivers to be present. It also provided options for relocation of support equipment relative to the patient as needed. In the upgraded Medical Care Facility, the Surgical Stretcher-Chair and the Vertical Translation System can work together to provide incapacitated crew member transport from a site of injury on any deck of the Common Habitat to the Medical Care Facility. It can also support patient treatment in a variety of positions including a variety of sitting postures and a supine posture at a variety of pitch angles. The facility can also support caregiver office work for review of examination results, private consultation, inventory and maintenance, and a variety of other purposes. A forward activity will be to conduct evaluations of the Medical Care Facility with different medical scenarios. Additionally, ambient and task lighting selections remain as forward work. The eight mid deck lockers can be augmented to use as portable equipment carts, similar to a manner in which maintenance facility stowage was used as portable carts during the NASA Desert Research and Technology Studies in the Constellation Program. Trash accommodation will also need forward work to assess, including provision for wet trash, dry trash, and biological waste. It will be important to assess a redesign of the surgical stretcher-chair. The commercial version used in the upgrade can only enable vertical translation in the seated configuration, requiring the patient to bend both hips and knees. A possible redesign of the chair will allow for vertical translation without requiring any bending at the hip or knees. Also, the commercial version is wheeled, making it mobile in gravity but unanchored in microgravity. Work will be needed to adapt the chair for gravity-independent performance. The hygiene compartment can be redesigned for dual-use medical scrub and galley handwash facility. Pending sufficient volume, it may also be possible to place sanitation equipment in this location to clean medical tools. Finally, most space architectures have never allowed for more than one incapacitated crew member, but several scenarios could potentially injure two or more crew in the same incident. This facility could be assessed to determine its present ability to address two or more injured crew in parallel and determine the potential upper limit for number of treatable crew in a multi-crew injury scenario, or to treat polytrauma of a single patient.

Habitat↗

Configuration and Projected Capabilities of the Common Habitat Medical Care Facility

The Common Habitat is a large, long-duration habitat being explored as part of a conceptual study (not an active NASA program) that uses an SLS core stage Liquid Oxygen (LOX) tank as its primary structure. It is intended for use on the Moon as part of a permanently occupied outpost, on Mars as part of an outpost that will be occupied for hundreds of days at a time, and in deep space as part of the Deep Space Exploration Vehicle where it will support crewed missions up to 1200 days in duration. A study of internal orientation and crew size resulted in a Common Habitat configuration sized for a crew of eight with a three-deck horizontal orientation. Additional work outside the scope of this paper is developing a vertical translation system, a crew mobility aids system based on wearable gecko-derived grippers, and a crew seating/restraint system. These systems are all assumed for use in conjunction with the Medical Care Facility, which is needed to maintain crew well-being during these missions, where distance from Earth precludes the possibility of evacuation to Earth. This paper describes recent improvements in the Common Habitat Medical Care Facility and associated benefits for crew survivability in long duration missions beyond Earth orbit. These improvements were made with the assistance of a NASA Pathways intern whose experience includes a tour of duty in Afghanistan as an Army combat medic with the 691st GHOST-T, attached to the 1st and 7th US Special Forces Groups as part of Operation Freedom’s Sentinel, where he helped provide far-forward surgical capabilities in austere combat environments. The initial baseline Medical Care Facility was developed working in conjunction with University of Houston Space Architecture graduate students. The facility was placed on the upper deck of the Common Habitat in a location that provided privacy, operational volume, and was close to the vertical translation pathway. The notional outfitting repurposed component CAD models from unrelated studies and notionally indicated a level of care roughly equivalent to that aboard the International Space Station. The CAD modeling provided notional stowage volumes, a deployable surface, some fixed equipment, an ultrasound, and a potentially reconfigurable treatment table. While this facility is clearly a competent arrangement, it was desired to leverage available expertise and upgrade the station given the vast distances from Earth to be experienced by the Common Habitat. Key driving requirements applied to the upgrade included to provide NASA’s Medical Level of Care V, offer enhanced telemedicine capabilities, provide patient physical accommodation, provide caregiver access to the patient from all sides, include sliding pocket doors for access to hygiene and to the Vertical Translation System, and to add any additional capability possible for the best achievable medical care. The first step in the facility upgrade was to quantify the current medical inventory on the International Space Station and ensure that sufficient stowage volume was present for this purpose. To that end, the ISS medical kits were reviewed, and eight full size mid deck lockers were placed in the facility. A number of additional devices were also added, based on the co-author’s combat medic experience. Also, two fixed shelves and one horizontal work surface were added to the Medical Care Facility, with the shelves providing storage space for the additional devices and the work surface providing a location for the caregiver to work or stage equipment. Four display monitors were added to the wall above the horizontal work surface, supporting data display, telemedicine, conferencing, or other needs. The existing treatment table was replaced with a mobile surgical stretcher-chair. Two additional doors were added to the Medical Care Facility. One leads directly to the hygiene compartment, allowing it to support medical operations in addition to providing galley/wardroom support. The other door leads directly into the Vertical Translation System. The wall adjacent to the subsystems bay was moved, adding additional volume to the Medical Care Facility. This improved caregiver access to the patient and allowed for a larger number of caregivers to be present. It also provided options for relocation of support equipment relative to the patient as needed. In the upgraded Medical Care Facility, the Surgical Stretcher-Chair and the Vertical Translation System can work together to provide incapacitated crew member transport from a site of injury on any deck of the Common Habitat to the Medical Care Facility. It can also support patient treatment in a variety of positions including a variety of sitting postures and a supine posture at a variety of pitch angles. The facility can also support caregiver office work for review of examination results, private consultation, inventory and maintenance, and a variety of other purposes. A forward activity will be to conduct evaluations of the Medical Care Facility with different medical scenarios. Additionally, ambient and task lighting selections remain as forward work. The eight middeck lockers can be augmented to use as portable equipment carts, similar to a manner in which maintenance facility stowage was used as portable carts during the NASA Desert Research and Technology Studies in the Constellation Program. Trash accommodation will also need forward work to assess, including provision for wet trash, dry trash, and biological waste. It will be important to assess a redesign of the surgical stretcher-chair. The commercial version used in the upgrade can only enable vertical translation in the seated configuration, requiring the patient to bend both hips and knees. A possible redesign of the chair will allow for vertical translation without requiring any bending at the hip or knees. Also, the commercial version is wheeled, making it mobile in gravity but unanchored in microgravity. Work will be needed to adapt the chair for gravity-independent performance. The hygiene compartment can be redesigned to serve both as a medical scrub facility and for galley hand washing. Pending sufficient volume, it may also be possible to place sanitation equipment in this location to clean medical tools. Finally, most space architectures have never allowed for more than one incapacitated crew member, but several scenarios could potentially injure two or more crew in the same incident. This facility could be assessed to determine its present ability to address two or more injured crew in parallel and determine the potential upper limit for number of treatable crew in a multi-crew injury scenario, or to treat polytrauma of a single patient.

Common Habitat↗