Search NASA⌕ Search

SEARCH · Search NASA

Results for “draft”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Waste-Incidental-to-Reprocessing Evaluation for the West Valley Demonstration Project Vitrification Melter - 12167

The Department of Energy (DOE) has determined that the vitrification melter used in the West Valley Demonstration Project can be disposed of as low-level waste (LLW) after completion of a waste-incidental-to-reprocessing evaluation performed in accordance with the evaluation process of DOE Manual 435.1-1, Radioactive Waste Management Manual. The vitrification melter - which consists of a ceramic lined, electrically heated box structure - was operated for more than 5 years melting and fusing high-level waste (HLW) slurry and glass formers and pouring the molten glass into 275 stainless steel canisters. Prior to shutdown, the melter was decontaminated by processing low-activity decontamination flush solutions and by extracting molten glass from the melter cavity. Because it could not be completely emptied, residual radioactivity conservatively estimated at approximately 170 TBq (4,600 Ci) remained in the vitrification melter. To establish whether the melter was incidental to reprocessing, DOE prepared an evaluation to demonstrate that the vitrification melter: (1) had been processed to remove key radionuclides to the maximum extent technically and economically practical; (2) would be managed to meet safety requirements comparable to the performance objectives for LLW established by the Nuclear Regulatory Commission (NRC); and (3) would be managed by DOE in accordance with DOE's requirements for LLW after it had been incorporated in a solid physical form with radionuclide concentrations that do not exceed the NRC concentration limits for Class C LLW. DOE consulted with the NRC on the draft evaluation and gave other stakeholders an opportunity to submit comments before the determination was made. The NRC submitted a request for additional information in connection with staff review of the draft evaluation; DOE provided the additional information and made improvements to the evaluation, which was issued in January 2012. DOE considered the NRC Technical Evaluation Report as well as comments received from other stakeholders prior to making its determination that the vitrification melter is not HLW, does not require permanent isolation in a geologic repository, and can be disposed of as LLW. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Final Radiological Conditions at Areas of the Niagara Falls Storage Site Remediated under the Formerly Utilized Sites Remedial Action Program - 12184

The U.S. Department of Energy (DOE) methods and protocols allow evaluation of remediation and final site conditions to determine if remediated sites remain protective. Two case studies are presented that involve the Niagara Falls Storage Site (NFSS) and associated vicinity properties (VPs), which are being remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). These properties are a part of the former Lake Ontario Ordnance Works (LOOW). In response to stakeholders concerns about whether certain remediated NFSS VPs were putting them at risk, DOE met with stakeholders and agreed to evaluate protectiveness. Documentation in the DOE records collection adequately described assessed and final radiological conditions at the completed VPs. All FUSRAP wastes at the completed sites were cleaned up to meet DOE guidelines for unrestricted use. DOE compiled the results of the investigation in a report that was released for public comment. In conducting the review of site conditions, DOE found that stakeholders were also concerned about waste from the Separations Process Research Unit (SPRU) at the Knolls Atomic Power Laboratory (KAPL) that was handled at LOOW. DOE agreed to determine if SPRU waste remained at that needed to be remediated. DOE reviewed records of waste characterization, historical handling locations and methods, and assessment and remediation data. DOE concluded that the SPRU waste was remediated on the LOOW to levels that pose no unacceptable risk and allow unrestricted use and unlimited exposure. This work confirms the following points as tenets of an effective long-term surveillance and maintenance (LTS and M) program: - Stakeholder interaction must be open and transparent, and DOE must respond promptly to stakeholder concerns. - DOE, as the long-term custodian, must collect and preserve site records in order to demonstrate that remediated sites pose no unacceptable risk. - DOE must continue to maintain constructive relationships with the U.S. Army Corps of Engineers and state and federal regulators. After review of historical site documentation, DOE reports, and USACE radiological data, DOE concluded the following: - DOE had access to adequate documentation to evaluate site conditions at the former LOOW. This is important to confirm now, while institutional knowledge of early FUSRAP work remains available. - DOE remediated the completed VPs to conditions that are protective for unrestricted residential use. Sample and walkover gamma scan results indicate that no wastes remain that exceed cleanup criteria. - Process knowledge and field observations establish that Cs-137 is the predominant radionuclide in the KAPL waste stream. Cs-137, a strong gamma emitter, was used as an indicator for remediation of KAPL waste. Other radionuclides were present in much lower relative concentrations and were likely also removed during remediation of the VPs. - KAPL contaminants were removed during remedial activities at the former LOOW as either co-located or co-mingled with other radionuclides. - For the active VPs (VP-E, VP-E', and VP-G), results of DOE's cleanup of the accessible portions of these properties indicate that KAPL waste does not remain at concentrations greater than the DOE cleanup limit: - Inaccessible areas were not associated with historic KAPL waste handling. Therefore, it is unlikely that KAPL waste remains on the active VPs. - Because gamma activity was used by DOE during remediation/verification activities for excavation control, additional USACE cleanup of FUSRAP wastes on these properties will likely result in the remediation of any co-located residual KAPL wastes to acceptable levels or identification of KAPL waste that is not co-located. - Although USACE has not established a cleanup level for Cs-137 on the active NFSS VPs, DOE assessment and remediation data indicate that assessed Cs-137 was remediated and significant Cs-137 is unlikely to remain. Because of the low likelihood of encountering significant KAPL waste on the active NFSS VPs, additional remediation is not anticipated at these properties. - USACE assessment soil sampling results on the NFSS proper indicate that KAPL waste does not exceed the DOE cleanup level for Cs-137. USACE has not established a cleanup level for Cs-137 on NFSS proper. The USACE cleanup of FUSRAP wastes on the NFSS proper will likely result in the remediation of any co-located residual KAPL wastes or identification of KAPL waste that is not co-located. DOE is drafting a report of the investigation of KAPL waste at LOOW. The report will be released to the public for comment when the draft is complete. DOE responses to stakeholder inquiries resulted in a common understanding of site conditions and site risk. DOE expects additional interaction with stakeholders at the former LOOW as USACE completes remediation of the active VPs and the NFSS proper, and these relationships will hopefully have built trust between DOE and the stakeholders that DOE will perform its duties in an open and transparent manner that includes stakeholders as stewards for remediated FUSRAP sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Experimental test plan for PWR sister rods in the high burnup spent fuel data project

The High Burnup Spent Fuel Data Project (herein referred to as the 'project'), sponsored by the US Department of Energy (DOE) Office of Nuclear Energy (NE), is focused on experimentally defining the effects of long-term storage and transportation on high burnup (HBU) pressurized water reactor (PWR) fuel (>45 gigawatt days per metric ton uranium). The goals of the project are to provide confirmatory data for model validation and potential improvement; to provide input to future dry storage cask design; to support license renewals and new licenses for Independent Spent Fuel Storage Installation facilities; and to support transportation licensing for high burnup used fuel. In support of these project goals, an instrumented TN-32B bolted-lid cask at the North Anna reactor site will be loaded with intact, HBU PWR fuel assemblies (project assemblies) having four different kinds of cladding: standard Zircaloy-4, low-tin Zircaloy-4, ZIRLO, and M5. In approximately 10 years, the instrumented cask will be opened for inspection and several fuel rods from the project assemblies will be characterized. To support the project goals, the project pulled 25 'sister rods', 9 from the project assemblies and 16 from similar HBU assemblies, for characterization. The 25 sister rods are all high burnup and cover the range of cladding alloys. The 25 sister rods were shipped to Oak Ridge National Laboratory (ORNL) in early 2016 for detailed nondestructive and destructive examination. Examinations are intended to provide baseline data on the initial physical state of the cladding and fuel prior to the loading, drying, and long-term dry storage process. Further examinations are focused on determining the effects of temperatures encountered during and following drying. Similar tests will be performed on rods taken from the project assemblies at the end of the storage period (the 'cask rods') to identify any significant changes in the fuel rods that may have occurred during the dry storage period. Additionally, some of the sister rods will be used for separate effects testing to expand the applicability of the project data to the fleet, and to address some of the data-related gaps associated with extended storage and subsequent transportation of high burnup fuel. A draft test plan is being developed that describes the experimental work to be conducted on the sister rods. This paper summarizes the draft test plan and necessary coordination activities for the multi-year experimental program to supply data relevant to the assessment of the safety of long-term storage followed by transportation of high burnup used fuel. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A National Disposal Facility for Radioactive Waste for Iraq - 16610

Radioactive waste resulted in the past in Iraq from a number of nuclear activities and facilities all of them seriously damaged or destroyed during the Gulf war. The task of decommissioning such facilities and managing the resulting waste is being supported by the International Atomic Energy Agency (IAEA), the European Union (EU), and the United States (US). A national policy for radioactive waste management for Iraq has been drafted by the Ministry of Science and Technology (MoST); a draft strategy for radioactive waste management implementation is in preparation. In this framework, Iraq is considering locating a radioactive waste disposal facility at the Al-Tuwaitha site, near the capital city of Bagdad. In the framework of its Instrument for Nuclear Safety Cooperation the EU has recently started a cooperation project named 'Feasibility Study, Basic Design, and Engineering Design of an Engineered Radioactive Waste Disposal Facility' for Iraq (Project IQ4.01/11). The project aims at producing the design of a repository for the radioactive waste resulting from the decommissioning activities and from the continuing use of radioisotopes in medicine and the oil and gas industry in the country. The contract for this cooperation project was awarded by the European Commission in April 2015 to the consortium of two international engineering companies, Nukem Technologies Engineering Services GmbH and DBE Technology GmbH, both of Germany, and Javys a.s., the national waste management agency of Slovakia. The planned Iraqi near-surface repository is constrained by the complex security conditions in the country. This has led to the decision of using whenever possible the Al-Tuwaitha site, were most of the waste is located, as the repository location. The project work will therefore focus on assessing whether and which part of the waste expected to result from the decommissioning and remediation activities is amenable for surface disposal in an appropriately engineered facility. In addition, careful review of the site characteristics shall provide enough elements to justify and validate the political decision of disposing of the waste in Al Tuwaitha. Thereafter, the project work will focus on the conceptual and later the engineering design of the repository. Finally, a Safety Analysis will provide the basis for regulatory decisions about the further steps for realization of the Iraqi final disposal facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decontamination and Decommissioning Activities of a Radiopharmaceuticals Production Facility - 18067

On May 2012, Best Medical Belgium S.A. (BMB), a manufacturer of pharmaceutical products located on the nuclear site of Fleurus, was declared bankrupt. According to the Belgian law, ONDRAF/NIRAS (Belgian Radioactive Waste Management Agency) was entrusted with the clean-up and decommissioning operations of the former BMB facilities, nowadays known as 'ONDRAF Site Fleurus' (ONSF). In June 2015, ONSF launched a Decontamination and Decommissioning (D and D) program, for which Tractebel: - Supports the definition of the clean-up and decommissioning strategies; - Drafts the Final Decommissioning Plan (FDP) and Safety Analysis Report (SAR) that will be submitted to FANC/AFCN (Belgian Federal Agency for Nuclear Control) in order to get the License for decommissioning; - Drafts the technical specifications of the public tendering process related to the D and D program; - Ensures the day to-day follow-up of the D and D activities on site. Four nuclear buildings are part of the D and D activities. One of them, building 14 (B14), represents the most challenging and extensive task with the clean-up of highly contaminated areas and its further decommissioning up to the final state. This building features two cyclotrons (CGR and IBA cyclotrons) successively used to produce radioisotopes, as well as hot cells and glove boxes used for their purification and the conditioning of the final pharmaceutical product. The present paper aims at presenting the most recent development steps of the clean-up phase regarding the adaptations of existing facilities and the upcoming activities in preparation of the decommissioning activities. To allow the sorting and the treatment of the radioactive material identified in the physical and radiological inventory, several workshops have been implemented within the B14 building in order to deal with radioactive materials arising from the clean-up and D and D activities. Following the conceptual design phase, Tractebel has actively monitored the on-site activities for the construction of those workshops such as: - The modification of the civil works; - The revamping of the ventilation system; - The installation of dedicated lifting equipment and workstations equipped with cutting devices; - The assembly of a docking station for filling the radioactive packages. The removal of the activated concrete surrounding the IBA cyclotron requires the erection of a containment structure and an extension structure. The containment structure, composed of light metallic beams, is located above the cyclotron and its irradiation zones. For operational security reasons and working efficiency, the cutting process of the concrete ceilings and walls will be performed from the top inside the containment structure by means of an eight tons overhead bridge crane. Concrete blocks resulting from the cutting process will then be lifted, without any loss of containment, towards the extension zone of the nuclear zone of the IBA cyclotron for further resizing, sorting and evacuation towards the identified waste routes. To prepare this task which will be performed during the decommissioning phase, Tractebel sets up the necessary technical specifications. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Status Update on IAEA MODARIA II Working Group 1 (Assessment and Decision Making) - 19391

During WM2018, the work being done under the International Atomic Energy Agency (IAEA)'s Modelling and Data for Radiological Impact Assessments (MODARIA) II Programme (https://wwwns.iaea.org/projects/modaria/modaria2.asp?s=8 and l=129) was introduced. The Programme comprises seven working groups covering a wide range of topics. Amongst them, Working Group 1 (WG1) is focused on dose assessment and decision aiding tools to address existing exposure situations due to past practices involving naturally occurring radioactive material (NORM) and nuclear legacy sites. Specifically, this covers the development of methods and toolsets for risk-informed decision-making for such complex sites, and includes practical demonstration of decision-making processes and tools through case studies. During 2018 WG1 participants met twice to discuss the status and plans of work being conducted by the WG. The group held its Second Interim Meeting from 7 to 11 May 2018 at the Jozef Stefan Institute (JSI) in Ljubljana, Slovenia. The objectives of the meeting were to: (1) Discuss the status of WG1 work; (2) Start preparation of the interim draft version of the MODARIA II WG1 Report (herein referred to as the 'Interim Report'); (3) Review the progress of planned data analyses, model-model comparisons, and model-data comparisons being conducted through case studies for the Tessenderlo Chemie Site in Belgium, the Zapadnoe Uranium Mill Tailings Site in Ukraine, and a Former Tin Processing Facility Site in Brazil; (4) Discuss calculations conducted for a NORM Site in China for potential addition to the WG1 case studies; (5) Report on progress on topical studies and other assignments performed to support the preparation of several sections of the Interim Report; and (6) Discuss plans for incorporating some preliminary case studies considered by MODARIA I WG1 and MODARIA I WG3. During the meeting in Slovenia, WG1 participants also visited the Zirovski vrh (RZV) Uranium Mine and Mill Tailings Site near Ljubljana. From 22 to 25 October 2018, WG1 members also participated in the MODARIA II Third Technical Meeting in Vienna, Austria. The meeting facilitated analysis of the progress made so far by the seven working groups, as well as exploration of the dissemination of the results of the MODARIA II Programme through publication in scientific journals dealing with the various subject areas covered by the Programme. WG1 participants focused on the preparation of its Interim Report, and engaged in technical exchanges with the IAEA Le Trench Project on characterization, assessment, remediation and management of buried waste at legacy trench sites, as well as the To Enhance uncertainties Reduction and stakeholders Involvement Towards integrated and graded Risk management of humans and wildlife In long-lasting radiological Exposure Situations (TERRITORIES) project (https://territories.eu/). Currently, WG1 is in the process of preparing a draft report to document the results of its various case studies and special topics, and is preparing for the final Interim Meeting in May 2019 and the final Technical Meeting in October 2019, before the conclusion of the MODARIA II Program at the end of 2019. This paper will provide a status update of these activities, along with preliminary information on the WG1 report, including potential recommendations for future activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EM Program Expectations on Implementation of DOE O 458: Radiation Protection of Public/Environment - 19553

DOE Order 458.1, Radiation Protection of the Public and Environment, was issued in 2011. DOE sites were given 18 months to implement. The revised Order promulgates requirements for property clearance actions and independent verification. DOE Order 458.1 allows for preapproved authorized limits for the clearance of property. However, when property with the potential to contain residual radioactive material does not meet preapproved authorized limits, an authorized limits package must be developed. The Order contains a range of requirements for demonstrating with reasonable assurance that dose constraints are met for any actual or likely future use of the property to be released. EM has developed a draft guidance document that provides the elements of an authorized limits package. These elements are used to review all authorized limits packages that are submitted to EM. Expected elements include property description and process knowledge documentation, current and likely future use, the conceptual site model, dose modeling methodologies, specific authorized limits, dose- or concentration-based constraints, collective dose estimate to the potentially exposed population, stakeholder communications, description of the As Low As Reasonably Achievable (ALARA) analysis, implementation plan, evaluation of difficult to assess surfaces, and independent verification plan. The draft guidance document also provides further explanation of the desired elements of an independent verification (IV) plan. An IV plan should describe the planning phase, implementation phase, assessment phase, and decision phase of an activity. The planning phase includes scope and cost, concurrent with cleanup contractor procurement, and review and approval of site radiological survey clearance program and IV program plans. The implementation phase assures sufficient collection of data and adjustment can be made as necessary. During the assessment phase, data and reports are reviewed, and coordination between the clean-up contractor and IV personnel occurs. A decision of whether or not the clearance actions need to be altered occurs during the decision phase. IV certification that the clearance action is complete also occurs during the decision phase. Issuance of the final guidance document is meant to improve the consultation process and minimize iterative interactions with EM. Standardizing and formalizing property clearance and IV actions also helps assure that cleanup actions are transparent and sustainable for future scrutiny. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

IEEE STD. 1012 and NEI 96-07, Appendix D - Strange bedfellows? - 149

The final draft of a revision to IEEE Std. 1012-2012, 'IEEE Standard for System, Software and Hardware Verification and Validation', is expected to be approved for publication in June 2017. A draft of NEI 96-07, Appendix D, 'Supplemental Guidance for Application of 10 CFR 50.59 to Digital Modifications', has been submitted to the NRC staff for review and endorsement. What, if any, relationship exists between these two documents? How can the nuclear industry utilize the first one to help ensure success when applying the second one? NRC Regulatory Guides only endorse digital system and software related industry standards for application to safety-related systems and components, but the vast majority of digital modifications are made to non-safety related systems and components, so are these industry standards of little or no use when performing digital upgrades to non-safety related equipment? This paper answers these and other related questions and shows how application of a graded approach to verification and validation, utilizing the IEEE Std. 1012 concept of 'integrity level', can increase the likelihood of a 10 CFR 50.59 evaluation outcome that does not require prior NRC review and approval for non-safety related digital modifications. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Contribution to the IRPHEP handbook since Physor 2018

The Organisation for Economic Co-operation and Development (OECD), the Nuclear Energy Agency (NEA), the International Reactor Physics Experiment Evaluation Project (IRPhEP) continue to preserve and evaluate integral reactor physics experiment data to support nuclear energy and technology needs. International contributions are collated within the International Handbook of Evaluated Reactor Physics Benchmark Experiments (IRPhEP Handbook). The 2021 edition of the IRPhEP Handbook now contains data for 57 unique nuclear facilities with benchmark specifications for 169 experimental series, of which four are draft evaluations. Distributed with the IRPhEP Handbook and available online is the IRPhEP Database and Analysis Tool (IDAT), allowing users to search and interrogate the data. Since Physor 2018, there have been 11 minor revisions to existing benchmark evaluations, significant revisions to two evaluations, one draft evaluation, and nine new evaluations. The corona virus pandemic has delayed international activities supporting the production of additional content for the IRPhEP Handbook. However, efforts continue for numerous endeavors to complete new reactor physics benchmark evaluations to support current and future validation needs. Those interested in serving as evaluators and/or reviewers are strongly encouraged to participate. This paper provides a summary of IRPhEP content and activities since Physor 2018. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Quantum-Classical Co-Design Towards Useful Quantum Computers

I am defending my PhD thesis soon at Georgia Institute of Technology. The work contained in Chapter 4, sections 1 through 5, has been done with Sandia during my internship, while everything else has been done independently and through the NDSEG fellowship program while at Georgia Tech. This approval is needed to send the draft to my committee as soon as possible before an August 5th defense date, with the goal of publishing the finished draft by August 23rd.

Miller, Nathan Eli↗

Major Modification Determination Process Utilized for Proposed Idaho National Laboratory Projects

Over the past three years, several new projects with the potential for major modifications to existing facilities have been considered for implementation at the Idaho National Laboratory (INL). These projects were designated to take place in existing nuclear facilities with existing documented safety analyses. 10 CFR 830.206 requires the contractor for a major modification to a Hazard Category 1, 2, or 3 nuclear facility to obtain Department of Energy (DOE) approval for the nuclear facility design criteria to be used for preparation of a preliminary documented safety analysis (PDSA), as well as creation and approval of the PDSA, before the contractor can procure materials or components or begin construction on the project. Given the significant effort and expense of preparation and approval of a PDSA, a major modification determination for new projects is warranted to determine if the rigorous requirements of a major modification are actually required. Furthermore, performing a major modification determination helps to ensure that important safety aspects of a project are appropriately considered prior to modification construction or equipment procurement. The projects considered for major modification status at the INL included: treatment and packaging of unirradiated, sodium-bonded highly enriched uranium (HEU) fuel and miscellaneous casting scrap in the Materials and Fuels Complex (MFC) Fuel Manufacturing Facility (FMF); post irradiation examination of Advance Fuel Cycle Initiative (AFCI) fuel in the MFC Analytical Laboratory (AL); the Advanced Test Reactor (ATR) gas test loop (GTL); and the hydraulic shuttle irradiation system (HSIS) at ATR. The major modification determinations for three of the proposed projects resulted in a negative major modification. On the other hand, the major modification determination for the GTL project concluded that the project would require a major modification. This paper discusses the process, methods, and considerations used by the INL for the four major modification determinations. Three of the four major modification determinations discussed herein were completed using the guidance specified in the draft of DOE STD-1189, “Integration of Safety into the Design Process.” DOE-STD-1189 was released as a draft document in March 2007 and provides guidance for integrating safety considerations into the early design activities for constructing new facilities or making modifications to existing nuclear facilities. The fourth major modification determination was prepared prior to the existence of DOE STD-1189 and was evaluated solely by the definition of a major modification given in 10 CFR 830.206. For all four projects, consideration was given to: • Facility hazard categorization change and material inventory • Facility footprint change with the potential to adversely affect credited safety function • New or changed processes resulting in a change to the safety basis • The use of new technology or equipment not approved for use in the facility • The need for new or revised safety basis controls • Hazards not previously evaluated in the safety basis.

10 CFR 830↗

ILC Reference Design And Challenges

The International Linear Collider (ILC) is a 500 GeV center-of-mass electron-positron linear collider based on 1.3 GHz superconducting rf. For the past two years, the ILC design has been developed by an international collaboration, the Global Design Effort. A draft Reference Design Report (RDR) for the ILC was released in February 2007 and, after international review, the final draft will be published in mid-July, 2007. This talk will describe the ILC design along with the outstanding R&D and engineering challenges. The next step is to complete an Engineering Design (EDR) by 2010, and plans for this phase will also be discussed.

43 PARTICLE ACCELERATORS↗

Genome Sequence Databases (Overview): Sequencing and Assembly

From the date its role in heredity was discovered, DNA has been generating interest among scientists from different fields of knowledge: physicists have studied the three dimensional structure of the DNA molecule, biologists tried to decode the secrets of life hidden within these long molecules, and technologists invent and improve methods of DNA analysis. The analysis of the nucleotide sequence of DNA occupies a special place among the methods developed. Thanks to the variety of sequencing technologies available, the process of decoding the sequence of genomic DNA (or whole genome sequencing) has become robust and inexpensive. Meanwhile the assembly of whole genome sequences remains a challenging task. In addition to the need to assemble millions of DNA fragments of different length (from 35 bp (Solexa) to 800 bp (Sanger)), great interest in analysis of microbial communities (metagenomes) of different complexities raises new problems and pushes some new requirements for sequence assembly tools to the forefront. The genome assembly process can be divided into two steps: draft assembly and assembly improvement (finishing). Despite the fact that automatically performed assembly (or draft assembly) is capable of covering up to 98% of the genome, in most cases, it still contains incorrectly assembled reads. The error rate of the consensus sequence produced at this stage is about 1/2000 bp. A finished genome represents the genome assembly of much higher accuracy (with no gaps or incorrectly assembled areas) and quality ({approx}1 error/10,000 bp), validated through a number of computer and laboratory experiments.

59 BASIC BIOLOGICAL SCIENCES↗

Terrestrial Biological Carbon Sequestration: Science for Enhancement and Implementation

Fossil-fuel combustion and land-use change have elevated atmospheric CO2 concentrations from 280 ppmv at the beginning of the industrial era to more than 381 ppmv in 2006. Carbon dioxide emissions from fossil fuels and cement rose 71% during 1970–2000 to a rate of 7.0 PgC/y (1). Canadell et al. (2) estimated that CO2 emissions rose at a rate at 1.3% per year during 1990–1999, but since 2000 it has been growing at 3.3% per year. Emissions reached 8.4 PgC/y in 2006. It is likely that the current 2-ppm annual increase will accelerate as the global economy expands, increasing the risk of climate system impacts. There is good agreement that photosynthetic CO2 capture from the atmosphere and storage of the C in above- and belowground biomass and in soil organic and inorganic forms could be exploited for safe and affordable greenhouse gas (GHG) mitigation (3). Nevertheless, C sequestration in the terrestrial biosphere has been a source of contention before and since the drafting of the Kyoto Protocol in 1997. Concerns have been raised that C sequestration in the biosphere is not permanent, that it is difficult to measure and monitor, that there would be “carbon leakage” outside of the mitigation activity, and that any attention paid to environmental sequestration would be a distraction from the central issue of reducing GHG emissions from energy production and use. A decade after drafting the Kyoto Protocol, it is clear that international accord and success in reducing emissions from the energy system are not coming easily and concerns about climate change are growing. It is time to re-evaluate all available options that might not be permanent yet have the potential to buy time, bridging to a future when new energy system technologies and a transformed energy infrastructure can fully address the climate challenge. Terrestrial sequestration is one option large enough to make a contribution in the coming decades using proven land-management methods and with the possibility that new technologies could significantly enhance the opportunity. Here we review progress on key scientific, economic, and social issues; postulate the extent to which new technologies might significantly enhance terrestrial sequestration potential; and address remaining research needs.

Post, W M↗

Paenibacillus aquistagni sp. nov., isolated from an artificial lake accumulating industrial wastewater

Strain 11 T was isolated from water of an artificial lake accumulating industrial wastewater on the outskirts of Celje, Slovenia. In this paper, phenotypic characterisation showed strain 11 T to be a Gram-stain positive, spore forming bacterium. The 16S rRNA gene sequence identified strain 11 T as a member of the genus Paenibacillus, closely related to Paenibacillus alvei (96.2%). Genomic similarity with P. alvei 29 T was 73.1% (gANI), 70.2% (ANIb), 86.7% (ANIm) and 21.7 ± 2.3% (GGDC). The DNA G+C content of strain 11 T was determined to be 47.5%. The predominant menaquinone of strain 11 T was identified as MK-7 and the major fatty acid as anteiso-C 15:0 . The peptidoglycan was found to contain meso-diaminopimelic acid. In contrast to its close relatives P. alvei DSM 29 T , Paenibacillus apiarius DSM 5581 T and Paenibacillus profundus NRIC 0885 T , strain 11 T was found to be able to ferment d-fructose, d-mannose and d-xylose. A draft genome of strain 11 T contains a cluster of genes associated with type IV pilin synthesis usually found in clostridia, and only sporadically in other Gram-positive bacteria. Finally, genotypic, chemotaxonomic, physiological and biochemical characteristics of strain 11 T presented in this study support the creation of a novel species within the genus Paenibacillus, for which the name Paenibacillus aquistagni sp. nov. is proposed, with strain 11 T (=ZIM B1027 T =LMG 29561 T =CCM 8679 T ) as the type strain.

54 ENVIRONMENTAL SCIENCES↗

Sea-ice thickness from field measurements in the northwestern Barents Sea: SEA-ICE THICKNESS, NW BARENTS SEA

The Barents Sea is one of the fastest changing regions of the Arctic, and has experienced the strongest decline in winter-time sea-ice area in the Arctic, at 22364% decade21. Sea-ice thickness in the Barents Sea is not well studied. We present two previously unpublished helicopter-borne electromagnetic(HEM) ice thickness measurements from the northwestern Barents Sea acquired in March 2003 and 2014.The HEM data are compared to ice thickness calculated from ice draft measured by ULS deployed between1994 and 1996. These data show that ice thickness varies greatly from year to year; influenced by the thermodynamic and dynamic processes that govern local formation vs long-range advection. In a year with a large inflow of sea-ice from the Arctic Basin, the Barents Sea ice cover is dominated by thick multiyear ice;as was the case in 2003 and 1995. In a year with an ice cover that was mainly grown in situ, the ice will be thin and mechanically unstable; as was the case in 2014. The HEM data allow us to explore the spatial and temporal variability in ice thickness. In 2003 the dominant ice class was more than 2 years old; and modal sea-ice thickness varied regionally from 0.6 to 1.4 m, with the thinner ice being either irst-year ice, or multiyear ice which had come into contact with warm Atlantic water. In 2014 the ice cover was predominantly locally grown ice less than 1 month old (regional modes of 0.5–0.8 m). These two situations represent two extremes of a range of possible ice thickness distributions that can present very different conditions for shipping traffic; or have a different impact on heat transport from ocean to atmosphere.

54 ENVIRONMENTAL SCIENCES↗

Genomes to Proteomes

Biologists are awash with genomic sequence data. In large part, this is due to the rapid acceleration in the generation of DNA sequence that occurred as public and private research institutes raced to sequence the human genome. In parallel with the large human genome effort, mostly smaller genomes of other important model organisms were sequenced. Projects following on these initial efforts have made use of technological advances and the DNA sequencing infrastructure that was built for the human and other organism genome projects. As a result, the genome sequences of many organisms are available in high quality draft form. While in many ways this is good news, there are limitations to the biological insights that can be gleaned from DNA sequences alone; genome sequences offer only a bird's eye view of the biological processes endemic to an organism or community. Fortunately, the genome sequences now being produced at such a high rate can serve as the foundation for other global experimental platforms such as proteomics. Proteomic methods offer a snapshot of the proteins present at a point in time for a given biological sample. Current global proteomics methods combine enzymatic digestion, separations, mass spectrometry and database searching for peptide identification. One key aspect of proteomics is the prediction of peptide sequences from mass spectrometry data. Global proteomic analysis uses computational matching of experimental mass spectra with predicted spectra based on databases of gene models that are often generated computationally. Thus, the quality of gene models predicted from a genome sequence is crucial in the generation of high quality peptide identifications. Once peptides are identified they can be assigned to their parent protein. Proteins identified as expressed in a given experiment are most useful when compared to other expressed proteins in a larger biological context or biochemical pathway. In this chapter we will discuss the automatic annotation and the generation of high quality gene models, the setup and execution of global proteomics experiments that are quantitative and statistically rigorous and finally add biological context to proteomics.

59 BASIC BIOLOGICAL SCIENCES↗

Instability and treatments of the coupled discrete element and lattice Boltzmann method by the immersed moving boundary scheme

The immersed moving boundary (IMB) scheme has been extensively used to couple the discrete element method (DEM) with the lattice Boltzmann method (LBM). In the literature, only the formulation of IMB for lattice nodal cells covered by a single-solid particle was given. The treatment of situations where a nodal cell is covered by two or more solid particles is seldom discussed. It is found that some numerical instability can occur for such situations due to an inappropriate computation of the weighting function in the IMB formulation. This work presents an enhanced treatment that can resolve the issue and validates it using some benchmark tests. Furthermore, to avoid the extra costs associated with the treatment and simplify the complicated procedure introduced, a simplified IMB scheme is proposed. The accuracy of both enhanced and simplified IMB schemes are validated by test cases including single-particle sedimentation, two-particle drafting-kissing-tumbling phenomenon, and multiple-particle sedimentation. Then, the robustness of both schemes is examined and discussed using a specially designed flow past cylinders test. Overall, the simplified IMB scheme is proved to be robust and sufficiently accurate and simpler and more effective than the enhanced scheme.

42 ENGINEERING↗