Search NASA⌕ Search

SEARCH · Search NASA

Results for “full scale testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Materials for Advanced Ultra-Supercritical (AUSC) Steam Turbines – AUSC Component Demonstration

The work by the United States Department of Energy (U.S. DOE)/Ohio Coal Development Office (OCDO) Advanced Ultra-Supercritical (AUSC) Steam Boiler and Turbine Materials Consortia from 2001 through September 2015 was primarily focused on lab scale and pilot scale materials testing. The field testing included air-cooled probes and steam-cooled “loops” that were installed into existing utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion due to the constituents in the coal ash. Successful research and development resulted in identification of metallic alloy materials and fabrication processes suited for power generation applications with metal temperatures up to approximately 1472°F (800°C). These materials or alloys have shown, in extensive laboratory tests and shop fabrication studies, to have excellent applicability for high-efficiency low CO2 transformational power generation technologies. However, as valuable as these material field tests have been for obtaining information, their scale is significantly below that required to minimize the risk associated with a power company building a multi-billion-dollar AUSC power plant. To decrease the identified risk barriers to full-scale implementation of these advanced materials, the U.S. DOE/OCDO AUSC Steam Boiler and Turbine Materials Consortia identified the key areas of the technology that need to be tested at a larger scale. Based upon the recommendations and outcome of a Consortia-sponsored workshop with the U.S.’s leading utilities, a Component Test (ComTest) Program for AUSC was proposed. The AUSC ComTest program would define materials performance requirements, plan for overall advanced system integration, design critical component tests, fabricate components for testing from advanced materials, and carry out the tests. A Pre-FEED evaluation of the test facility including the evaluation of three potential sites has been completed and previously reported. This report describes the Front-End Engineering Design (FEED), Detailed Engineering and the Environmental Assessment of the ComTest project. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as INCONEL 740H or HAYNES 282 alloys. Pathways to supply these components for ComTest have been identified as well as any further development that would be required. Every project of this nature has challenges and this project was no exception. The greatest challenge has been the project cost. Largely due to the infrastructure and balance of plant equipment upgrades required for Youngstown Thermal, the estimated project cost for the “base case” project was greater than originally budgeted. The project team spent a significant amount of time exploring opportunities for reducing the project cost. These options included: • Youngstown Thermal was exploring building a Combined Heat and Power (CHP) unit at their facility. The Youngstown Thermal staff, supported by Thermal Engineering Group, worked with the project team to determine whether it was economically desirable to supply ComTest with steam and other utilities, which would be supplied by the CHP project. • The project team also evaluated opportunities to optimize the project scope to reduce cost, such as reducing project scope by eliminating the Superheater Outlet Header test. • Southern Company had offered two sites as possible host locations for ComTest. Both sites had infrastructure in place such as steam from an existing unit, natural gas, cooling water and ample electrical power that would be required to be added at the Youngstown Thermal site. Utilizing this existing infrastructure could reduce the project cost. An additional project challenge was the departure of Babcock and Wilcox from the project in September 2016. This project setback was overcome by GE Power’s willingness to assume the design of the ComTest superheater. Since the project could not proceed without the superheater, this was a very positive project development. The merger of the GE Power and Alstom Power steam turbine divisions created synergies leading to the conclusion that instead of building a small-scale turbine, a more practical and useful endeavor would be to validate the manufacturing technology and supplier readiness for fabricating and machining full scale steam turbine components. Consequently, in March 2017, GE Power decided that a steam turbine test would not be necessary as part of the ComTest demonstration. Removing the operational testing of the steam turbine from ComTest further reduced the total project cost. Additionally, there was an opportunity to move ComTest from Youngstown Thermal to one of the Southern Company sites and operate ComTest at supercritical steam conditions and test the steam turbine main stop/control valve at a temperature and pressure that would be representative of the conditions of a high pressure steam turbine inlet valve. The steam could also possibly be returned to the host boiler so there would be no economic penalty of using this steam for ComTest. Relocating the project could further reduce the project cost due to the infrastructure already in place, including high pressure natural gas and cooling water, and the potential for heat integration, allowing a reduction of operating costs. Due to these potential cost reductions, it was decided to move the project away from Youngstown Thermal in March 2017. As integrating ComTest at the Southern Company site was explored, an issue was raised regarding the integration of the ComTest cycle with the plant steam cycle. Steam would be supplied to ComTest at nominally ~3865 psia and 775°F. The steam would be heated with natural gas to 1400°F for the valve test and then cooled to 1000°F so that the steam would be returned to the host boiler at the same conditions as their high pressure steam turbine inlet. However, there were concerns raised that the addition of the energy (natural gas) to the steam could trigger a New Source Review on the unit. Southern Company did not want ComTest to cause this review, so condensing all of the steam exiting ComTest and returning it to the host steam cycle as condensate was explored to insure there would be no implication that ComTest was adding energy to the host plant’s steam cycle. Ultimately, Southern Company decided that they wanted to “decouple” ComTest from the operating unit, making ComTest self-supporting, similar to the Youngstown Thermal “base case.” Without the steam turbine, the project team reached a consensus that operating the ComTest Superheater and steam turbine valves at the typical pressure of a package boiler (~1000 psig) would not generate enough useful technical information to justify the cost of the test. Therefore, it was decided in the December 2017 project quarterly meeting to cancel the operational phase of ComTest. Throughout the engineering phase of ComTest, manufacturing and supply chain challenges were identified. When GE Power recommended dropping the steam turbine test from ComTest, they identified many important manufacturing issues that should be evaluated and demonstrated. Other challenges had been raised by the GE Power group designing the superheater as well as those engineering components such as pressure relief and steam turbine bypass valves. In the December 2017 meeting, the project team decided that it was more beneficial to the AUSC technology to pursue these manufacturing and supply chain issues as Phase 2 of the ComTest project. This report is organized in the following manner: • Section 2 discusses the ComTest project background and organization. • Section 3 discussed project management. • Section 4 discusses the design of the ComTest AUSC components – the Superheater, steam turbine and Superheater Outlet Header. • Section 5 discusses the implementation of ComTest at Youngstown Thermal and the Southern Company site. • Section 6 discusses the development of the AUSC Supply Chain • Section 7 discusses the recommended plan for Phase 2 of ComTest

01 COAL, LIGNITE, AND PEAT↗

Long-Term Evaluation of Remedial Technology Performance in the Laboratory: Multi-year Experimental Test Plan

An understanding of the long-term effectiveness of remediation technologies is central to sustainable environmental cleanup. Long-term experiments are valuable for reducing uncertainty and predicting remediation outcomes at scales required for regulatory compliance. However, these types of tests can be costly and challenging to interpret. Therefore, contaminated sites often rely on short-term laboratory experiments that may not account for the potentially significant effects of gradual, time- dependent processes governing contaminant retention, release, and species transformation. For example, short-term lab experiments (from months to a year) conducted with sediments from the unsaturated and saturated zones at the Hanford Site play an important role in initial evaluations of remediation technologies but cannot capture the full extent of time-dependent reactions, leaving uncertainties in field-scale deployment. Here, long-term testing will be conducted on select technologies based on their performance in short-term testing. The overall objective is to directly address the challenges described above by generating and analyzing data on long-term (2–10 years) efficacy of selected remediation technologies, integrating this understanding into models, and providing critical input for remediation planning, monitoring, and 5-year review cycles for field-implemented remedies. Specific objectives include: 1. Evaluating long-term efficiency of promising remedies under site-specific conditions. 2. Generating robust parameters for modeling, reducing uncertainty in predictive simulations. 3. Advancing integrated monitoring by combining geochemical and geophysical observations. 4. Informing field-scale implementation by incrementally advancing technologies, identifying failure mechanisms early, and prioritizing robust, cost-effective remedies. Through systematic evaluation of technologies in laboratory-scale column experiments, integrated monitoring, and modeling support, this project is designed to bolster confidence in the long-term robustness of selected technologies. The ultimate outcome is the identification and deployment of more reliable, cost-effective remedies that safeguard human health and the environment while reducing the uncertainties that have historically hindered cleanup progress at Hanford Site. An experimental approach was developed and initiated for long-term testing potentially up to 10 years. The table below summarizes the experimental approach developed for testing select technologies and presented in this multi-year experimental test plan.

54 ENVIRONMENTAL SCIENCES↗

Hi-Q Rotor - Low Wind Speed Technology

The project objective was to optimize the performance of the Hi-Q Rotor. Early research funded by the California Energy Commission indicated the design might be advantageous over state-of-the-art turbines for collecting wind energy in low wind conditions. The Hi-Q Rotor is a new kind of rotor targeted for harvesting wind in Class 2, 3, and 4 sites, and has application in areas that are closer to cities, or 'load centers.' An advantage of the Hi-Q Rotor is that the rotor has non-conventional blade tips, producing less turbulence, and is quieter than standard wind turbine blades which is critical to the low-wind populated urban sites. Unlike state-of-the-art propeller type blades, the Hi-Q Rotor has six blades connected by end caps. In this phase of the research funded by DOE's Inventions and Innovation Program, the goal was to improve the current design by building a series of theoretical and numeric models, and composite prototypes to determine a best of class device. Development of the rotor was performed by aeronautical engineering and design firm, DARcorporation. From this investigation, an optimized design was determined and an 8-foot diameter, full-scale rotor was built and mounted using a Bergey LX-1 generator and furling system which were adapted to support the rotor. The Hi-Q Rotor was then tested side-by-side against the state-of-the-art Bergey XL-1 at the Alternative Energy Institute's Wind Test Center at West Texas State University for six weeks, and real time measurements of power generated were collected and compared. Early wind tunnel testing showed that the cut-in-speed of the Hi-Q rotor is much lower than a conventional tested HAWT enabling the Hi-Q Wind Turbine to begin collecting energy before a conventional HAWT has started spinning. Also, torque at low wind speeds for the Hi-Q Wind Turbine is higher than the tested conventional HAWT and enabled the wind turbine to generate power at lower wind speeds. Based on the data collected, the results of our first full-scale prototype wind turbine proved that higher energy can be captured at lower wind speeds with the new Hi-Q Rotor. The Hi-Q Rotor is almost 15% more productive than the Bergey from 6 m/s to 8 m/s, making it ideal in Class 3, 4, and 5 wind sites and has application in the critical and heretofore untapped areas that are closer to cities, 'load centers,' and may even be used directly in urban areas. The additional advantage of the Hi-Q Rotor's non-conventional blade tips, which eliminates most air turbulence, is noise reduction which makes it doubly ideal for populated urban areas. Hi-Q Products recommends one final stage of development to take the Hi-Q Rotor through Technology Readiness Levels 8-9. During this stage of development, the rotor will be redesigned to further increase efficiency, match the rotor to a more suitable generator, and lower the cost of manufacturing by redesigning the structure to allow for production in larger quantities at lower cost. Before taking the rotor to market and commercialization, it is necessary to further optimize the performance by finding a better generator and autofurling system, ones more suitable for lower wind speeds and rpms should be used in all future testing. The potential impact of this fully developed technology will be the expansion and proliferation of energy renewal into the heretofore untapped Class 2, 3, 4, and 5 Wind Sites, or the large underutilized sites where the wind speed is broken by physical features such as mountains, buildings, and trees. Market estimates by 2011, if low wind speed technology can be developed are well above: 13 million homes, 675,000 commercial buildings, 250,000 public facilities. Estimated commercial exploitation of the Hi-Q Rotor show potential increase in U.S. energy gained through the clean, renewable wind energy found in low and very low wind speed sites. This new energy source would greatly impact greenhouse emissions as well as the public sector's growing energy demands.

17 WIND ENERGY↗

Effect of inlet throttling on thermohydraulic instability in a large scale water-based RCCS: An experimental study

The objective of the present experimental study is to investigate the effect of inlet throttling on the thermohydraulic stability of a large scale water-based Reactor Cavity Cooling System (RCCS). The test was performed using the water-based Natural convection Shutdown heat removal Test Facility (NSTF) at Argonne, which represented a ½ axial scale and 12.5° sector slice of the full scale Framatome 625 MW t SC-HTGR RCCS concept. A two-phase steady state was first established through direct condensate refill, followed by increased inlet throttling over 10 stages, corresponding to a loss coefficient K over the range of 0.05–653. With the inlet throttling gradually increased, the system experienced a unique transition process between stabilization and destabilization. Through a stability analysis, three instability mechanisms were identified in the present test, including a compound mechanism due to both natural circulation oscillations (NCOs) and density wave oscillations (DWOs), Type-II DWOs, and geysering.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

High-Temperature Multi-Process Sensor Development and Demonstration at a Full-scale PC Combustion System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Full-scale Demonstration of Multi-process Sensor at a Cycling PC-fired Boiler

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Oilwell Conversion (Well API 121913310501) to Geothermal Heat Storage Well for Flexible Electricity Storage

Geothermal growth is limited by a lack of geographically dispersed high-temperature thermal resources and high initial upfront investment in characterization and well construction. This project intended to address the challenges of energy supply intermittency and enhance grid resilience, reliability, and energy security by storing energy provided from currently available renewable resources in the subsurface to harvest it a later time during at-peak energy demand. This project intended to improve geothermal adoption, reduce initial project risk, and improve price competitiveness through utilizing existing oil and gas infrastructure such as non-productive wells, non-economic fields, dry holes, and orphaned wells. The project also intended to address the lack of geographically dispersed thermal resources and enhance grid resilience, reliability, and energy security by introducing an economical method for storing energy from currently available renewable resources in the subsurface for usage during at-peak energy demand. During this research, the project furthered the understanding of the feasibility of utilizing abandoned oil and gas wells as geothermal heat storage wells. The project team investigated the heat storage and hydrogeological characteristics of subsurface reservoirs in the Illinois Basin to evaluate their response to heat injection for determining the evolution of temperature profiles and heat losses over time using existing and available data sets. The project team then performed modeling and simulation to evaluate the heat losses of returning fluids during heat extraction. The outputs were used to select an optimal candidate reservoir and location in Southern Illinois. The team designed and performed a small-scale field test in an existing oil well to refine the model and to demonstrate the permitting and regulatory pathways necessary for the conversion of oil and gas assets to geothermal use. The field test also serves as a proof of concept and can guide the procedures for future research and implementation. Additionally, the project team, conducted initial market research and customer discovery to develop a go to market strategy for an Advanced Geothermal Energy Storage (AGES) system. The project team in this research also identified the parameters to be refined in future research, to improve the current go to market strategy economic model. To this end several subject matter experts were also identified to assist in future research with geothermal infrastructure setup, energy storage policy and law, energy storage market demand, potential siting based on demand etc. Future research will involve further sophistication of the site commercial modeling, implementing a larger-scale test, and further refinement of the thermodynamic modeling/simulation process. The output will be lifecycle costs and economics suitable for comparison to alternative approaches from a validated full-scale demonstration for venture capital investment into this technology. The project successfully demonstrated the ability to leverage existing oilfield infrastructure, permits, and land access and leasing agreements, to enable geothermal storage projects to come online faster and cheaper than a greenfield development could. This technology could allow for greater energy independence and security through long-term energy storage solutions. The longer duration allows for greater storage for renewables currently limited by hours-long storage durations of lithium-ion. The AGES system would support the growth of renewable energy farms, and provide greater opportunities for a cleaner energy infrastructure.

15 GEOTHERMAL ENERGY↗

Drying of Crystalline Silicotitanate (CST) Beds by Air Flow

The Direct Feed Low-Activity Waste (DFLAW) process has been proposed to support early production of immobilized low-activity waste (LAW) at the Hanford Site. The tank farm contractor Washington River Protection Solutions, LLC (WRPS) is developing the Tank-Side Cesium Removal (TSCR) system to accomplish the treatment objectives. The TSCR system is being designed and built by AVANTech, Inc. for WRPS and will use a filter to remove any entrained solids in the LAW and will use columns of crystalline silicotitanate (CST) ion exchange media to remove 137 Cs. A key step in preparing used columns of CST for transportation and interim storage is draining and drying of the CST beds. The purpose of this study is to document testing activities that quantify the drying of full-height beds of CST material in a laboratory column that is scaled to represent the drying process of the planned full-scale CST columns to be used in the TSCR system. The purpose also includes demonstrating that CST material within the scaled column, when dried with air injection, will pass the U.S. Environmental Protection Agency’s Paint Filter Liquids Test.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TEAMER Technical Support for Aquantis (Materials) (Final Report)

The Aquantis Tidal Power Tug is a unique synthesis of best-available technologies and materials configured as a novel spar vessel to create an optimal platform for tidal stream energy conversion. The Power Tug utilizes an upstream-facing horizontal, 2-bladed rotor. To drive down capital costs and extend life, Aquantis proposes to employ new materials for the blades that are both less expensive than current state-of-the-art materials and are potentially better suited for survival in a submerged, seawater environment. Coupons from a novel geopolymer material will be tested in a load frame to characterize material properties. The Requestor is requesting technical assistance for evaluating mechanical properties of a novel geopolymer material for application in tidal stream energy conversion systems. This work will establish characteristic properties of a geopolymer material under dry and saturated conditions through material coupon testing. Material coupons will be tested to characterize properties including: a) Tensile strength, b) Compression strength, c) Flexural strength, d) Modulus of elasticity, e) Fatigue strength at varying load levels. The types of material tests performed will be guided by characteristics required to validate material properties for use in full-scale structures. Characterization of material properties that consider the demands of a full-scale structure is a necessary step in research and development that can enable the use of geopolymer materials in tidal stream energy conversion systems.

16 TIDAL AND WAVE POWER↗

Effect of recycled fibers and shredded intermediates variation on the mechanical properties and energy absorption of fiber‐reinforced composite panels

Abstract The global composite industry generates large quantities of waste which mostly ends up in landfills due to a lack of established end‐use applications for multiple waste streams. The scrap from end‐of‐life (EoL) includes manufacturing waste such as dry chopped fiber tows, loose fibers, shredded fibers from fabric textile operations, cured/semi‐cured prepregs, and fully cured composite structure waste from aircraft, automobiles, wind blades, boats, and pressure vessels. In this work, different composite waste streams were reduced to shredded intermediates, followed by simple blending, and subjected to wet compression molding to produce composite panels. The panels/plaques were tested for mechanical properties (flexure and impact), fiber‐matrix wet‐out, and property bounds. It was found that wet‐compression molding was a viable and scale‐able approach to produce recycled panels from EoL composites shredded scrap. Furthermore, full‐scale size panels for use in truck bodies and intermodal shipping container flooring were manufactured and their impact resistance was tested using a drop weight impact test. They were tested both for high‐ and low‐velocity load. In the case of high‐velocity load, the average impact load was 14,673 N; the average absorbed energy was 101.6 J; the average elastic energy was 11.7 J and the impact resistance was 1065 J/m. In the case of the low‐velocity drop weight impact test, it was found that the average impact load was 7877.358 N; the average absorbed energy was 9.718 J; the average elastic energy was 9.14 J, and the impact resistance was 184.1 J/m. The shredded composite was shown to be a candidate material for the manufacture of truck bodies and intermodal containers’ flooring panels. Highlights By using shredded intermediates from different composite waste streams, it is possible to manufacture composite panels. Wet–compression process is an appropriate technique for manufacturing recycled fiber composite panels. Regardless of the source of scrap, the mechanical properties of the produced composite panels were improved. The recycling process technology can be transformed to commercial scale to produce full‐size transportation flooring panels. A product pathway is established in consideration of lower cost and improved recyclability.

Vaidya, Uday↗

OTEC Cold Water Pipe-Platform Subsystem Dynamic Interaction Validation

A commercial floating 100-megawatt (MW) ocean thermal energy conversion (OTEC) power plant will require a cold water pipe (CWP) with a diameter of 10-meter (m) and length of up to 1,000 m. The mass of the cold water pipe, including entrained water, can exceed the mass of the platform supporting it. The offshore industry uses software-modeling tools to develop platform and riser (pipe) designs to survive the offshore environment. These tools are typically validated by scale model tests in facilities able to replicate real at-sea meteorological and ocean (metocean) conditions to provide the understanding and confidence to proceed to final design and full-scale fabrication. However, today’s offshore platforms (similar to and usually larger than those needed for OTEC applications) incorporate risers (or pipes) with diameters well under one meter. Secondly, the preferred construction method for large diameter OTEC CWPs is the use of composite materials, primarily a form of fiber-reinforced plastic (FRP). The use of these material results in relatively low pipe stiffness and large strains compared to steel construction. These factors suggest the need for further validation of offshore industry software tools. The purpose of this project was to validate the ability to model numerically the dynamic interaction between a large cold water-filled fiberglass pipe and a floating OTEC platform excited by metocean weather conditions using measurements from a scale model tested in an ocean basin test facility.

13 HYDRO ENERGY↗

Hydrogen Selective Inorganic membranes for Gas Separations under High Pressure Intermediate Temperature Hydrocarbonic Envrionment

In this project, we have successfully developed a full scale commercially ready carbon molecular sieve (CMS) based membrane for applications in H 2 recovery from refinery waste and other aggressive gas streams. Field tests at a refinery pilot plant and a coal gasification facility have successfully demonstrated its ability to recovery hydrogen from hydrotreating and raw syngas respectively. High purity H 2 and excellent stability of the membrane permeance and selectivity were obtained in testing conducted over >500 hours at each site. The results from these field tests as well as laboratory testing conclude that the membranes can be operated at high pressures (up to 1,000 psig) and temperatures (up to 300°C) in presence of aggressive contaminants, such as sulfur and nitrogen containing species (H 2 S, CO 2 , NH 3 , etc), condensable hydrocarbons, tar-like species, heavy metals, etc. with no observable effect on membrane performance. By comparison, similar operating conditions and/or environments would rapidly destroy competing membranes, such as polymeric, palladium, zeolitic, etc. Significant cost savings can be achieved through recovering H 2 from refinery waste gas using this newly developed CMS membrane. Annual savings of $\$$2 to 4MM/year (per 20,000 scfd of waste gas) can be realized by recovering the H 2 for reuse (versus fuel). Projecting these values over the entire US market, potential H 2 savings from refinery waste gases on the order of 750 to 1,000MM scfd and $\$$750 to $\$$1,000MM per year are possible. In addition to the cost savings, potential energy savings are projected to be ca. 150 to 220 tBTU/yr and CO 2 gas emission reductions are projected to be ca. 5,000 to 6,500MMtons/year. The full scale membrane bundle developed as part of this project, i.e., 85 x 30 inch ceramic membrane tubes packaged into a full ceramic potting, is an important accomplishment. No comparable commercial scale product exists in the inorganic membrane field. Further, this newly developed full scale bundle concept can be extended to other thin film inorganic membrane technology (Pd, zeolite, etc), providing a potential commercialization pathway for these membrane materials that demonstrate high potential in a variety of separation applications yet remain a laboratory 'novelty' for lack of a full scale support. Overall, the project has been highly successful and all of the project objectives have been met. We have developed the first of its kind commercial scale carbon molecular sieve membrane and demonstrated its performance in field testing under aggressive operating conditions and in the presence of chemical contaminants that would rapidly destroy alternative organic and inorganic membranes. This innovative membrane permits H 2 recovery from gas streams that up until now have not been successfully treated with membrane or conventional technology. Our end user participant is currently pursuing the field demonstration of this membrane for hydrogen recovery at its refinery site.

01 COAL, LIGNITE, AND PEAT↗

Developing the Irradiation Plan for U-10Mo LEU Fuel Qualification for the Advanced Test Reactor

The Department of Energy (DOE), National Nuclear Security Administration’s Office of Material Management and Minimization (M3) mission is to convert, remove, and dispose of vulnerable nuclear material located at civilian sites worldwide. As part of its mission, M3’s Office of Convert works around the world to convert research reactors and isotope production facilities to non-weapon-usable nuclear material, both domestically and abroad. In support of this, the Office of Convert is working with the Idaho National Laboratory (INL) to develop and qualify new fuels and technologies to support conversion efforts domestically and abroad. The INL also supports the Office of Convert by working on converting the Advanced Test Reactor (ATR) and the Advanced Test Reactor Critical (ATRC) from using High Enriched Uranium (HEU) fuel to Low Enriched Uranium (LEU) fuel. To ensure the viability of ATR LEU fuel, the fuel system should meet a similar functional and operational envelope as the current HEU fuel. A series of irradiation tests of the U-10Mo LEU fuel system is required to support the qualification of the fuel system for use in the ATR and several other U.S. High-Performance Research Reactors (USHPRRs). These irradiation tests include: • Mini-Plate tests (MP-1, MP-2, and MP-ATR), • Full-Size Plate tests (FSP-1, and FSP-ATR), and • Element Tests (ET-1, ET-2, and ET-3). The MP tests will use multiple small-scale samples that will provide sufficient data across a wide variety of irradiation conditions to qualify the fuel. The FSP tests will use a small number of full-sized fuel plates to confirm the MP test results are representative of the prototypic plate geometry performance. The MP and FSP irradiation tests occur in ATR test locations. The ETs will use full-sized fuel elements located in ATR core driver positions to explore the full operating ranges of the ATR and other USHPRRs and to confirm that the MP and FSP test results are representative of the prototypic element geometry performance. The established testing functional and operational requirements of MP-1, MP-2, FSP-1, and ET 1 achieve the base fuel qualification needs of the USHPRRs, while the high-level purposes of MP-ATR, FSP ATR, ET 2, and ET-3 are focused on demonstrating U-10Mo fuel for ATR use.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An Evaluation of Dynamical Downscaling Methods Used to Project Regional Climate Change

In the past decade, dynamical downscaling using “pseudo-global-warming” (PGW) techniques has been applied frequently to project regional climate change. Such techniques generate signals by adding mean global climate model (GCM)-simulated climate change signals in temperature, moisture, and circulation to lateral and surface boundary conditions derived from reanalysis. An alternative to PGW is to downscale GCM data directly. This technique should be advantageous, especially for simulation of extremes, since it incorporates the GCM's full spectrum of changing synoptic-scale dynamics in the regional solution. Here, we test this assumption, by comparing simulations in Europe and Western North America. We find that for warming and changes in temperature extremes, PGW often produces similar results to direct downscaling in both regions. For mean and extreme precipitation changes, PGW generally also performs surprisingly well in many cases. Moisture budget analysis in the Western North America domain reveals why. Large fractions of the downscaled hydroclimate changes arise from mean changes in large-scale thermodynamics and circulation, that is, increases in temperature, moisture, and winds, included in PGW by design. The one component PGW may have difficulty with is the contribution from changes in synoptic-scale variability. When this component is large, PGW performance could be degraded. Global analysis of GCM data shows there are regions where it is large or dominant. Hence, our results provide a road map to identify, through GCM analyses, the circumstances when PGW would not be expected to accurately regionalize GCM climate signals.

54 ENVIRONMENTAL SCIENCES↗

Advanced Techniques for Seismic Protection of Historical Buildings: Experimental and Numerical Approach

The seismic protection of historical and monumental buildings, namely dating back from the ancient age up to the 20th Century, is being looked at with greater and greater interest, above all in the Euro-Mediterranean area, its cultural heritage being strongly susceptible to undergo severe damage or even collapse due to earthquake. The cultural importance of historical and monumental constructions limits, in many cases, the possibility to upgrade them from the seismic point of view, due to the fear of using intervention techniques which could have detrimental effects on their cultural value. Consequently, a great interest is growing in the development of sustainable methodologies for the use of Reversible Mixed Technologies (RMTs) in the seismic protection of the existing constructions. RMTs, in fact, are conceived for exploiting the peculiarities of innovative materials and special devices, and they allow ease of removal when necessary. This paper deals with the experimental and numerical studies, framed within the EC PROHITECH research project, on the application of RMTs to the historical and monumental constructions mainly belonging to the cultural heritage of the Euro-Mediterranean area. The experimental tests and the numerical analyses are carried out at five different levels, namely full scale models, large scale models, sub-systems, devices, materials and elements.

58 GEOSCIENCES↗

Quantum theory for 1D X-ray free electron laser

Classical 1D X-ray Free Electron Laser (X-ray FEL) theory has stood the test of time by guiding FEL design and development prior to any full-scale analysis. Future X-ray FELs and inverse-Compton sources, where photon recoil approaches an electron energy spread value, push the classical theory to its limits of applicability. After substantial efforts by the community to find what those limits are, there is no universally agreed upon quantum approach to design and development of future X-ray sources. We offer a new approach to formulate the quantum theory for 1D X-ray FELs that has an obvious connection to the classical theory, which allows for immediate transfer of knowledge between the two regimes. In conclusion, we exploit this connection in order to draw quantum mechanical conclusions about the quantum nature of electrons and generated radiation in terms of FEL variables.

42 ENGINEERING↗