Search NASA⌕ Search

SEARCH · Search NASA

Results for “grid code”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

717 records · Page 40

What you get is not always what you see—pitfalls in solar array assessment using overhead imagery

Effective integration planning for small, distributed solar photovoltaic (PV) arrays into electric power grids requires access to high quality data: the location and power capacity of individual solar PV arrays. Unfortunately, national databases of small-scale solar PV do not exist; those that do are limited in their spatial resolution, typically aggregated up to state or national levels. While several promising approaches for solar PV detection have been published, strategies for evaluating the performance of these models are often highly heterogeneous from study to study. The resulting comparison of these methods for practical applications for energy assessments becomes challenging and may imply that the reported performance evaluations overly optimistic. The heterogeneity comes in many forms, each of which we explore in this work: the degree of diversity of the locations and sensors (e.g. different satellites, aerial photography) from which the training and validation data originate, the validation of ground truth (manual annotation of imagery vs known solar PV locations), the level of spatial aggregation (e.g. array-level vs regional estimates), and inconsistencies in the training and validation datasets (e.g. different datasets are used for each study and those data are not always made accessible). For each, we discuss emerging practices from the literature to address them or suggest directions of future research. As part of our investigation, we evaluate solar PV identification performance in two large regions: the entire state of Connecticut and the city of San Diego, CA. In Connecticut, we also use 33,114 known parcel-level solar PV installations from Berkeley Lab’s Tracking the Sun dataset to evaluate parcel-level performance and evaluate capacity estimates using 169 municipalities. We also make our code (which we call SolarMapper), pre-trained models, training data, and predictions publicly available and provide a web portal for interactively inspecting each prediction that was made. Here our findings suggest that traditional performance evaluation of the automated identification of solar PV from satellite imagery may be optimistic due to common limitations in the validation process. The takeaways from this work are intended to inform and catalyze the large-scale practical application of automated solar PV assessment techniques by energy researchers and professionals.

14 SOLAR ENERGY↗

Improving Predictive Capability in REHEDS Simulations with Fast, Accurate, and Consistent Non-Equilibrium Material Properties

Predictive design of REHEDS experiments with radiation-hydrodynamic simulations requires knowledge of material properties (e.g. equations of state (EOS), transport coefficients, and radiation physics). Interpreting experimental results requires accurate models of diagnostic observables (e.g. detailed emission, absorption, and scattering spectra). In conditions of Local Thermodynamic Equilibrium (LTE), these material properties and observables can be pre-computed with relatively high accuracy and subsequently tabulated on simple temperature-density grids for fast look-up by simulations. When radiation and electron temperatures fall out of equilibrium, however, non-LTE effects can profoundly change material properties and diagnostic signatures. Accurately and efficiently incorporating these non-LTE effects has been a longstanding challenge for simulations. At present, most simulations include non-LTE effects by invoking highly simplified inline models. These inline non-LTE models are both much slower than table look-up and significantly less accurate than the detailed models used to populate LTE tables and diagnose experimental data through post-processing or inversion. Because inline non-LTE models are slow, designers avoid them whenever possible, which leads to known inaccuracies from using tabular LTE. Because inline models are simple, they are inconsistent with tabular data from detailed models, leading to ill-known inaccuracies, and they cannot generate detailed synthetic diagnostics suitable for direct comparisons with experimental data. This project addresses the challenge of generating and utilizing efficient, accurate, and consistent non-equilibrium material data along three complementary but relatively independent research lines. First, we have developed a relatively fast and accurate non-LTE average-atom model based on density functional theory (DFT) that provides a complete set of EOS, transport, and radiative data, and have rigorously tested it against more sophisticated first-principles multi-atom DFT models, including time-dependent DFT. Next, we have developed a tabular scheme and interpolation methods that compactly capture non-LTE effects for use in simulations and have implemented these tables in the GORGON magneto-hydrodynamic (MHD) code. Finally, we have developed post-processing tools that use detailed tabulated non-LTE data to directly predict experimental observables from simulation output.

36 MATERIALS SCIENCE↗

TuckerMPI: A Parallel C++/MPI Software Package for Large-scale Data Compression via the Tucker Tensor Decomposition

With this study, our goal is compression of massive-scale grid-structured data, such as the multi-terabyte output of a high-fidelity computational simulation. For such data sets, we have developed a new software package called TuckerMPI, a parallel C++/MPI software package for compressing distributed data. The approach is based on treating the data as a tensor, i.e., a multidimensional array, and computing its truncated Tucker decomposition, a higher-order analogue to the truncated singular value decomposition of a matrix. The result is a low-rank approximation of the original tensor-structured data. Compression efficiency is achieved by detecting latent global structure within the data, which we contrast to most compression methods that are focused on local structure. In this work, we describe TuckerMPI, our implementation of the truncated Tucker decomposition, including details of the data distribution and in-memory layouts, the parallel and serial implementations of the key kernels, and analysis of the storage, communication, and computational costs. We test the software on 4.5 and 6.7 terabyte data sets distributed across 100 s of nodes (1,000 s of MPI processes), achieving compression ratios between 100 and 200,000×, which equates to 99--99.999% compression (depending on the desired accuracy) in substantially less time than it would take to even read the same dataset from a parallel file system. Moreover, we show that our method also allows for reconstruction of partial or down-sampled data on a single node, without a parallel computer so long as the reconstructed portion is small enough to fit on a single machine, e.g., in the instance of reconstructing/visualizing a single down-sampled time step or computing summary statistics. The code is available at https://gitlab.com/tensors/TuckerMPI.

97 MATHEMATICS AND COMPUTING↗

Initial Atmospheric Transport of Particles

A new version of the Initial Atmospheric Transport (IAT) model has been developed. This report fully characterizes the new model. IAT is designed to model heat release into the atmosphere that contains contaminated particles. The heat release forms a buoyant puff or plume. Buoyancy is quickly dissipated in 10's to 100's of seconds through drag and entrainment of ambient air. The final location of contaminant particles in the atmosphere after dissipation of abnormal heat is an important input to long term transportation codes such as the National Oceanic and Atmospheric Administration's (NOAA) Hybrid Single Particle Lagrangian Integrated Trajectory (HYSPLIT) code. Ultimately the settling of contaminants after long term transport provides a basis for estimating health consequences. In comparison to the old version, the new model includes explicit simulation of particles, newly formulated equations of motion for a rising puff, and a new plume model. The plume model releases many instances of a single puff along a single trajectory in a way that balances energy released over a longer period than would be appropriate for a single puff. The puff model has additions for vorticity, turbulence, virtual mass, drag, and entrainment. The particle model leads to direct interfacing between IAT and the long-term transport code HYSPLIT. Previously, particle locations were given a pattern based on IAT's puff trajectory with no particle simulation. Now, particles are explicitly simulated, and 3-D spatial distributions of particles are output based on final positions. Ballistic particles are thrown outward at high velocity from explosive events and tend to hit the ground before the end of the simulation. Non-ballistic particles tend to get pulled into the rising puff s ring of vorticity with some escaping to ambient conditions as buoyant energy dissipates. A new model verification and validation effort was made for the new plume model. The Wallops Island Solid Rocket Propellant (SRP) fire plume was extracted to a 3-D transient dataset. After calibration, the model performs better than previous single puff attempts. Even so, error levels in the process used to estimate location and ambient weather conditions approach 30%. This leads to the conclusion that unplanned photogrammetry evaluations of the IAT model are useful but not sufficiently accurate to quantify model parameters. Like previous attempts, the vertical motion entrainment parameters come out much too high in comparison to values for other studies in the literature. It is suspected that a new model of shear entrainment would alleviate this problem. Unfortunately, IAT already has more calibration parameters than the data comparisons thus far can resolve with statistical certainty. This underscores the need to verify and validate the IAT model using detailed CFD studies that allow ideal statistical comparison with the IAT model for hundreds of cases. Even so, validation by comparison to carefully planned experiments (i.e. with acceptable error levels) is also necessary because the dynamics of entrainment are at a sub-grid level for CFD. Though better validation and verification are most important, many new enhancements are still envisioned for future IAT development. These include particle rain out due to condensation and agglomeration of water, direct connection to the North American Mesoscale (NAM) weather dataset, dynamic weather conditions, including ambient particle entrainment into the puff, and detrainment at the puff to ambient mixing interface. In general, including detailed aerosol dynamics is the greatest coming challenge which will require an entire new sub-model in IAT. This is very important if contaminant particles change in such a way that they increase or decrease in their potential harm to the environment.

54 ENVIRONMENTAL SCIENCES↗

Innovations in Building Energy Modeling: Research and Development Opportunities for Emerging Technologies

Building energy modeling (BEM) is a multipurpose tool for building energy efficiency (EE). The U.S. Department of Energy Building Technologies Office (BTO) seeks to expand the use and effectiveness of BEM in the design and operation of commercial and residential buildings with the goal of achieving lasting reductions in total and peak energy use. This report identifies gaps and outlines recommended initiatives to achieve this goal, based on a combination of technical analysis and stakeholder input. In addition to BTO, this report can benefit BEM professionals (architects, mechanical engineers, energy consultants, building auditors, equipment manufacturers, and BEM software vendors) and BEM clients (building owners and operators, EE program administrators, EE service providers, policymakers, and policy and code jurisdictions such as states and cities). This report was developed in two phases. In the first, BTO worked with a team from Navigant Consulting (now Guidehouse) to characterize objectives, opportunities, and current activities; identify gaps and barriers; and define initiatives. To collect input, Navigant conducted telephone interviews and workshops with industry experts. The initial phase produced a draft report, which was released for public review in 2016 and yielded over 400 comments. Based on these comments, BTO compiled a second draft report that addressed many of those comments while acknowledging changes that had occurred both at BTO and in the industry. Unlike the first draft report, the second focused much more heavily on BTO’s own role, portfolio, and activities. BTO is a direct player in the BEM field - it funds the development of several significant software packages that are embedded in commercial products - and transparency about its goals and future plans is requisite. BTO recognizes that a great number of other public and private organizations contribute to the BEM enterprise. With the second draft report, BTO did not attempt to produce a blueprint for the industry as a whole, but rather a working document BTO can use to iteratively solicit stakeholder input and synthesize it into a program. BTO released the second draft report for public review in 2019. The second round of review generated 83 pages of feedback and comments - almost exactly the length of the draft report itself - a significant portion of which was collected and synthesized by IBPSA-USA Advocacy Committee. This final report incorporates this feedback. This report does not address the use of BEM in support of building-based grid services, a recent BTO initiative called Grid-interactive Efficient Buildings (GEB). In 2019, BTO published a report that specifically addresses the role of BEM - and other “integration” technologies - in GEB.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Electric Vehicles at Scale (EVs@Scale) Laboratory Consortium Deep-Dive Technical Meetings: High Power Charging (HPC) Summary Report

Electric vehicle (EV) adoption will change the composition of EV charging load to higher-power charging as more medium- (MD) and heavy-duty (HD) applications are electrified, and as all vocations, including light-duty (LD) vehicles, are capable of faster charging. These shifts provide the opportunity for high-power charging (HPC) and facility equipment to evolve and improve efficiency, cost, and space. High-Power Electric Vehicle Charging Hub Integration Platform (eCHIP) project designs and develops a high-power, interoperable charging experimental platform to research, develop, and demonstrate the integration approaches and technology solutions. The project addresses (1) interconnection and management of a grid-tied inverter; (2) development of a DC distribution system that is responsible for system energy management, interoperability, and DC protection; (3) modular DC/DC conversion for vehicle charging; (4) EV charging interface and DC/DC integration; and (5) smart charge control and vehicle-to-edge (vehicle-to-building [V2B], vehicle-to-everything [V2X]) capability. This summary presentation is the first technical progress output of the project. It provides insight for the first deep-dive technical meeting outputs in terms of research presentations and also includes summary of the discussions occurred in the follow-up breakout sessions. The summary presentation covers three technical areas: (1) HPC: State of the art power architectures and the design of the power electronics, (2) Modeling, energy management, and power control in the HPC station, and (3) Next Generation Profiles for high power charging characterization.

ADVANCED PROPULSION SYSTEMS↗

Package Data for CERF-Data Centers

This dataset contains sample input 100m resolution raster files for running the CERF-DC python package (see https://github.com/IMMM-SFA/cerf_data_centers) at the state level across the CONUS. Due to data availability constraints, some of the items included in this dataset are proxies or assumptions for siting factors used in the model. These are individually noted in the item descriptions and can be exchanged with more detailed information upon availability. Data Descriptions The following raster files are included in the data download: state_siting_region.tif — State areas identified by state FIPS code composite_siting_suitability.tif — Value of 1 indicates suitable siting location, 0 otherwise. The following areas are excluded from siting: Areas within 300m of a federal airport runway Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory Protected Areas Database of the United States (PAD-US) areas Railroads, major roadways, and minor roadways Military areas and training grounds Developed lands Areas >0.8 km (0.5 miles) from developed lands land_value_dollar_per_sqft.tif — USD per square foot (sqft) derived from USDA $/acre land cost personal_property_tax_rate.tif — Personal property tax rate by state. Uses an assumed 0.0125 personal property tax rate for states with personal property tax, 0 for states without personal property tax. real_property_tax_rate.tif — Real property tax rate. Based on county level residential real estate property tax rates. sales_tax_rate.tif — Sales tax rate by state. mechanical_cooling_fraction.tif — Fraction of year (values between 0 and 1, inclusive) that the data center would be cooled through mechanical processes based on local water stress and humidity levels. water_cooling_fraction.tif — Fraction of year (values between 0 and 1, inclusive) that the data center would be cooled through evaporative (water cooled) processes based on local water stress and humidity levels. distance_to_substation.tif — Distance to nearest substation in hundreds of meters (i.e., value of 1 equals a distance of 100m). Offshore areas have a value of 0. industrial_electricity_rates_dollar_per_kwh.tif — USD/kWh industrial electricity rates. Represents the average industrial rate across all utilities that operate within a given county. Values are derived from the US Utility Rate Database. commercial_electricity_rates_dollar_per_kwh.tif — USD/kWh commercial electricity rates. Represents the average commercial rate across all utilities that operate within a given county. Values are derived from the US Utility Rate Database. data_center_market_locations.tif — Grid cells with positive values represent the centroid of existing data center market clusters. The value of non-zero grid cells represents the number of data centers in the market cluster. All other grid cells have a value of 0. Geospatial Metadata CRS: Albers Equal Area Conic (ESRI:102003) Extent: -2415585.0000000023283064,-1441981.2605773280374706 : 2384414.9999999976716936,1708018.7394226719625294 Dimensions: X: 48000 Y: 31500 Bands: 1 Origin: -2415585.0000000023283064,1708018.7394226719625294 Pixel Size: 100,-100 Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall↗

Package Data for CERF-Data Centers

This dataset contains sample input 100m resolution raster files for running the CERF-DC python package (see https://github.com/IMMM-SFA/cerf_data_centers) at the state level across the CONUS. Due to data availability constraints, some of the items included in this dataset are proxies or assumptions for siting factors used in the model. These are individually noted in the item descriptions and can be exchanged with more detailed information upon availability. Data Descriptions The following raster files are included in the data download: state_siting_region.tif — State areas identified by state FIPS code composite_siting_suitability.tif — Value of 1 indicates suitable siting location, 0 otherwise. The following areas are excluded from siting: Areas within 300 m of a federal airport runway or within an airport area boundary Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory USGS Protected Areas Database of the United States (PAD-US) GAP status 1, 2, or 3 areas US National Parks Wetlands USFWS critical habitats BIA land areas Railroads, major roadways, and minor roadways Military areas and training grounds NLCD developed lands Areas >0.8 km (0.5 miles) from NLCD developed lands land_value_dollar_per_sqft.tif — USD per square foot (sqft) derived from USDA $/acre land cost personal_property_tax_rate.tif — Personal property tax rate by state. Uses an assumed 0.0125 personal property tax rate for states with personal property tax, 0 for states without personal property tax. real_property_tax_rate.tif — Real property tax rate. Based on county level residential real estate property tax rates. sales_tax_rate.tif — Sales tax rate by state. mechanical_cooling_fraction.tif — Fraction of year (values between 0 and 1, inclusive) that the data center would be cooled through mechanical processes based on local water stress and humidity levels. water_cooling_fraction.tif — Fraction of year (values between 0 and 1, inclusive) that the data center would be cooled through evaporative (water cooled) processes based on local water stress and humidity levels. distance_to_substation.tif — Distance to nearest substation in hundreds of meters (i.e., value of 1 equals a distance of 100m). Offshore areas have a value of 0. industrial_electricity_rates_dollar_per_kwh.tif — USD/kWh industrial electricity rates. Represents the average industrial rate across all utilities that operate within a given county. Values are derived from the US Utility Rate Database. commercial_electricity_rates_dollar_per_kwh.tif — USD/kWh commercial electricity rates. Represents the average commercial rate across all utilities that operate within a given county. Values are derived from the US Utility Rate Database. data_center_market_locations.tif — Grid cells with positive values represent the centroid of existing data center market clusters. The value of non-zero grid cells represents the number of data centers in the market cluster. All other grid cells have a value of 0. Geospatial Metadata CRS: Albers Equal Area Conic (ESRI:102003) Extent: -2415585.0000000023283064,-1441981.2605773280374706 : 2384414.9999999976716936,1708018.7394226719625294 Dimensions: X: 48000 Y: 31500 Bands: 1 Origin: -2415585.0000000023283064,1708018.7394226719625294 Pixel Size: 100,-100 Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall↗

Environmental Flow Requirements from FERC Licenses Across the US

Environmental flow requirements included in Federal Energy Regulatory Commission (FERC) hydropower licenses are important for balancing natural properties and benefits of river ecosystems (e.g., healthy species, recreation, water supply, flood control) supporting hydropower production. In some cases, environmental flow requirements may limit operational flexibility given current operational schemes and make a hydropower plant less able to provide power to the electric grid on demand. Hydropower plants may gain some flexibility as hydropower scheduling time periods are made to be more responsive to the short-term needs of an energy grid increasingly reliant on intermittent renewables. However, many flow requirements focus on the daily, monthly, or seasonal flow fluctuations which matches the time scale of most paradigms linking flow alterations to the health of river ecosystems. This dataset seeks to provide a greater understanding of how flexibility in environmental requirements can be leveraged to create positive outcomes for both the power system and the environment. It contains information on environmental flow requirements from the Protection, Mitigation, and Enhancement section of 50 randomly selected FERC licenses: 25 issued from 1998-2013 that were also included in the ORNL Mitigation Database (Schramm et al. 2015) and 25 issued from 2014-present. The information on environmental flow requirements was extracted from the PM&E section of 50 randomly selected FERC licenses: 25 issued from 1998-2013 that were also included in the ORNL Mitigation Database (Schramm et al. 2015) and 25 issued from 2014-present. The flow requirements were then categorized into flow augmentation categories based on whether the license stated a specific water management purpose for the given requirement called augmentation categories (i.e., fisheries or habitat, recreation or boating, industry, and general or unspecified; Table B). Requirements were also grouped into flow type categories (e.g., minimum flow rate, maximum flow rate, ramping rate). Additional information related to flow requirements such as the augmentation time-period and whether the flow rate was continuous (i.e., condition must be present at all-times) or instantaneous (i.e., condition present at a point in time) was also extracted from the licenses. Some licenses had specific flow requirements based on whether the project was in a wet, dry, or normal water year. If that information was presented in the license, it was also included in the data set. The location within the project was noted, hereafter, zone, in the dataset for flow requirements relating to specific areas of hydropower projects (Dam, Powerhouse, Bypass Reach). Maximum discharge capacities of hydropower facilities were also extracted from both the Existing Hydropower Assets (EHA) data set and the National Inventory of Dams (NID) databases. Each facility was coded with project identification codes from the EHA dataset to facilitate cross-referencing between datasets.

13 HYDRO ENERGY↗

Informative Path Planning for Mapping Radiation

This project involves making measurements of contaminated areas using portable radiation detectors and small robots. Tasks involve operating detectors and small robots, combining data acquisition for the two systems, and automating the systems. The end result is a radiation map of contamination areas. Localization of radioactive sources and mapping of contamination distribution is essential when responding to emergencies, or when dealing with cleanup efforts. Radiation maps are used for situational awareness and for establishing a safe perimeter. However, it may be hazardous or impossible for humans to safely enter the site and survey the area. Informative Path Planning (IPP) is used to design a path for a robotic sensor platform to gather the most information about the radiation distribution while operating under the set of constraints given by the dynamics of the robot and other requirements such as minimizing the overall mission time. The key challenge for IPP is the tight coupling in multiple layers of decisions: Selection of locations to visit; Allocation of sensors to those locations; Processing of information gathered. Given a robot equipped with a basic gamma detector and Lidar sensor, how can we efficiently explore an unknown environment in such a way that we can satisfy the robot's constraints while simultaneously maximizing the accuracy of the map and minimizing the total runtime? This work presents a systematic procedure for IPP and environmental mapping that: Selects the best locations at which to sample; Finds the best path for robots; Estimates the measurement value at unknown locations using a Gaussian Process regression framework. Given a set of points where radiation measurements were taken, we are utilizing a Gaussian Process Regression with a Matern kernel to reconstruct the shape of the underlying ground truth. Mapping is done via the Robot Operating System's OpenSlam Gmapping package, which creates a 2D occupancy grid map. Simulated trials were run with a radiation source placed at random locations, and allowing the robot to select and move towards 20 samples at separate locations, as well as sampling along the path while moving. The simulated sensor model assumed an efficiency of 0.3, collection time of 1 second. Various weighting schemes were tested and compared. Quantitative evaluations often favored exploitation-heavy weighting schemes where μ was emphasized, with the Root Mean Squared Error (RMSE) quickly tending towards 2, whereas qualitative comparisons would favor exploration-biased schemes with greater weight on σ. The difference comes from operators often favoring knowing the general location of a source, rather than the exact properties of a source. Weighting of the path-length π often reduced the quality of the regression as less exploration occurred, however this may be deemed a worthwhile trade-off under certain circumstances, such as with sensitive robots. Successfully developed a methodology for informative path-planning for a robot to efficiently gather information and create a map of radiation. In the future, we would like to focus on: Hardware trials with integration of the robot platform and the IPP software; More refined sensor and environmental modeling; Multiple robot platforms.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Efficient high-fidelity TRISO statistical failure analysis using Bison: Applications to AGR-2 irradiation testing

The ability of tri-structural isotropic (TRISO) fuel to contain fission products is largely dictated by the quality of the manufacturing process, since most of the fission product release is expected to occur due to coating layer failure in a small number of particles containing defects. The Bison fuel performance code has capabilities to predict failure in individual particles, accounting for the presence of defects, and to apply statistical analysis methods to compute the probability of failure in a set of fuel particles. Bison has recently undergone significant development both to improve its physical representations of fuel particle behavior and to improve the efficiency of its statistical failure calculations. Physical model improvements include new capabilities to account for the pressure generated by fission gases on inner pyrolytic carbon (IPyC) crack surfaces and to use local material coordinate orientation to accurately incorporate the anisotropy in the material properties in aspherical particles. To improve statistical modeling efficiency, a direct integration approach which involves directly integrating the failure probability function associated with statistically varying parameters has been developed. The direct integration approach is much more efficient than the Monte Carlo (MC) schemes commonly employed, and allows Bison to directly run high-dimensional fuel performance models, which improves the accuracy of failure probability calculations. Finally, a set of benchmark problems is considered here to compare the MC and direct integration approaches, and a statistical failure analysis of compacts in the Advanced Gas Reactor (AGR)-2 experiments is performed using the direct integration approach.

36 MATERIALS SCIENCE↗

The Building ENergy Demand (BEND) Model: A Comprehensive Composite Building Energy Modeling Framework

The Building ENergy Demand (BEND) model was developed at Pacific Northwest National Laboratory (PNNL) to simulate climate-dependent hourly building energy demand with the ability to disaggregate down to or aggregate up to any geographic area of interest, including counties, states, electric utility service territories, and census regions. The BEND modeling framework is designed to study the effects of climate change, economics, technology advancement, and various mitigation policies on aggregate building energy demand. To make the process computationally feasible, BEND reduces granularity in building characteristics and weather forcing while maintaining enough detail to minimize systematic differences (biases) between BEND results and data from the Energy Information Administration (EIA). Based on the Commercial Building Energy Consumption Survey (CBECS) and Residential Energy Consumption Survey (RECS) databases, BEND establishes a set of representative buildings with predefined sets of building types, sizes, and vintages. These representative buildings are defined for each of the four U.S. census regions and the five climate zones used by the EIA for building surveys (hereafter “EIA climate zones”). BEND’s representative buildings are based on a statistical analysis of the CBECS and RECS databases that infers detailed parameters such as construction type, thermal properties, internal loads, equipment and mechanical systems, and operation schedules from the high-level descriptors in those databases (building type, vintage, size, and location). The representative buildings are simplified and consolidated into a set of prototype buildings for the purpose of simulating building energy demand. Combining the prototype buildings with weather files from selected locations and years, BEND creates a set of simulation-ready building models to be run using the EnergyPlus simulation engine (EnergyPlus). The base spatial unit of each BEND simulation is a subregion that is the intersection of an International Energy Conservation Code climate zone, a census region, and an EIA climate zone; analysis for each spatial unit is influenced by the weather file BEND selects to represent the climate-similar area. The major simulation outputs of interest to BEND are hourly energy consumption values for each simulated year, possibly for multiple fuel types. Based on building-stock weights derived from the CBECS/RECS data, the hourly output streams are aggregated to a single, 8760-hour load profile for each of the major building categories—residential and commercial—with the possibility of segregating by fuel types. To correct for biases inherent in the use of a limited suite of representative buildings, BEND is calibrated against observational targets of total annual building energy consumption and hourly load profiles (including peak demand) obtained for the decision-relevant geographic scales of interest (e.g., total electric load data for individual balancing authorities available from EIA). Based on available data such as population distribution, BEND is able to aggregate both up and down scales, allowing the study of building energy demand over a range of spatial scales (e.g., states or counties within the Western Electricity Coordinating Council, Eastern Interconnection, or the entire U.S.) and/or subsets of building types (e.g., office buildings with particular size ranges).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Demonstration of μCHP in Light Commercial Hot Water Applications

Internal combustion engine driven combined heat and power (CHP) systems produce power while the waste heat is recovered and used for another purpose. For µCHP systems (less than 50kWe output) overall efficiencies can reach over 90% for products currently on the market throughout the world. On a fuel basis this offers an advantage over using grid-based power and another fuel for heat. Additionally, the cost of natural gas on an energy unit basis is significantly less expensive than electric power. This difference can lead to substantial savings for the end user of a CHP system. In some parts of the world, particularly Germany and Japan, µCHP has become a common part of the heat and distributed generation equipment mix. Market analysis conducted in 2012 showed that in North America there is potential of a 5,300 units per year market for µCHP, resulting in an annual energy savings of approximately 13.5 TBtu and more than $84 million in annual customer savings. However, µCHP still has not seen much market penetration in North America. This study helps to identify some of the reasons why, address roadblocks that still need to be overcome and provide experience to established best practices. Nine commercial sites were initially identified (fitness club, surgical center, senior community, resort and spa, commercial laundry, two multi-family housing, restaurant and manufacturing facility). Systems from two different manufacturers were installed at five sites total, but due to unforeseen circumstances, only three of those sites were finally commissioned: test data were collected by Oak Ridge National Laboratory. While not all systems were installed as intended, the project resulted in the following key findings: Micro combined heat and power is an unfamiliar technology for building owners and plumbing and electrical contractors that serve the buildings most suited for µCHP. Manufacturers will need to be aggressive in providing training and providing broad support to successfully bring the technology to market.; The proper integration of µCHP into other building systems is the most critical part of a successful installation. Manufacturers will need to be able to provide the expertise to train, advise and support the mechanical contractors during the design and installation of the heat integration system.; Regulations governing µCHP varies across the country. There are a few UL standards (UL 2200 and UL 1741) that apply nationally. Emissions are governed by EPA except in California where the California Air Resources Board (CARB) has established their own standard. Requirements that dictate installation and interconnection are dependent on local building codes and local utility processes and requirements. Some out of date building codes do not offer clear guidance for these requirements, leading to confusion. This makes developing training and determining broadly applicable best practices difficult.; Installation costs of µCHP are a key factor in making an installation successful. It is critical that these costs and all national, state and local regulations be understood and accounted for by all parties involved in the installation before a project is undertaken.; A robust customer service organization is important to meet the needs of the customers. These systems require annual maintenance and service and local capability is needed to keep costs inline.

03 NATURAL GAS↗

2023 National Offshore Wind data set (NOW-23)

The 2023 National Offshore Wind data set (NOW-23) is the latest wind resource data set for offshore regions in the United States, which supersedes, for its offshore component, the Wind Integration National Dataset (WIND) Toolkit, which was published about a decade ago and is currently one of the primary resources for stakeholders conducting wind resource assessments in the continental United States. The NOW-23 data set was produced using the Weather Research and Forecasting Model (WRF) version 4.2.1. A regional approach was used: for each offshore region, the WRF setup was selected based on validation against available observations. The WRF model was initialized with the European Centre for Medium Range Weather Forecasts 5 Reanalysis (ERA-5) data set, using a 6-hour refresh rate. The model is configured with an initial horizontal grid spacing of 6 km and an internal nested domain that refined the spatial resolution to 2 km. The model is run with 61 vertical levels, with 12 levels in the lower 300m of the atmosphere, stretching from 5 m to 45 m in height. The MYNN planetary boundary layer and surface layer schemes were used the North Atlantic, Mid Atlantic, Great Lakes, Hawaii, and North Pacific regions. On the other hand, using the YSU planetary boundary layer and MM5 surface layer schemes resulted in a better skill in the South Atlantic, Gulf of Mexico, and South Pacific regions. A more detailed description of the WRF model setup can be found in the WRF namelist files linked at the bottom of this page. For all regions, the NOW-23 data set coverage starts on January 1, 2000. For Hawaii and the North Pacific regions, NOW-23 goes until December 31, 2019. For the South Pacific region, the model goes until 31 December, 2022. For all other regions, the model covers until December 31, 2020. Outputs are available at 5 minute resolution, and for all regions we have also included output files at hourly resolution. The NOW-23 data are provided here as HDF5 files. Examples of how to use the HSDS Service to Access the NOW-23 files are linked below. A list of the variables included in the NOW-23 files is also linked below. No filters have been applied to the raw WRF output.

Array↗

Technoeconomic Design Optimization for Fast Reactors. Part II: Impact of Technoeconomic Constraints on Optimal Design

There is a current drive toward optimizing reactors, particularly small/micro reactors to minimize cost and maximize performance. Previous work has investigated the development of technoeconomic workflows for the design optimization of pool-type fast reactors that aim to deploy into district energy grids. Initial scoping studies verified that the workflow was capable of capturing design trends throughout a variety of design configurations and problem formulations while remaining sufficiently flexible. In this paper, this methodology is applied to understand how cost functions and technoeconomic constraints can drive optimal reactor design. Specifically, the UPu10Zr-fueled fast reactor model from Part I is adapted to include changes in the fissile content limits, control rod worth limits, control rod drive cost, and assumed fuel form. In the case of constraint relaxation at fixed power (fissile content and control rod worth limits), cost sensitivities of 5% to 10% were uncovered. Multi-objective optimization at varying reactor power levels with individualized control rod drives for each assembly (as opposed to one operational and one safety drive) increased cost by $\$10$ to $\$25$ million and substantially altered the optimal core geometry, favoring geometries with substantially fewer control rod placements relative to baseline optimization. Finally, a multi-objective optimization was performed at varying power levels with the fuel form overhauled to metallic, high-assay low-enriched uranium–based U10Zr with more refined fuel cost models. In the case of uranium fueling, the costs increased by at least $50 million relative to the baseline case. Furthermore, economic fuel zoning and lower reactivity swing cores were recovered. Each case serves to demonstrate the value of applying technoeconomic workflows to initial reactor design scoping studies to better understand the trade-off for a proposed concept between different design options.

Argonne Reactor Computation (ARC) codes↗