Search NASA⌕ Search

SEARCH · Search NASA

Results for “mining”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Data Mining Techniques to Estimate Plutonium, Initial Enrichment, Burnup, and Cooling Time in Spent Fuel Assemblies

The Next Generation Safeguards Initiative (NGSI), Office of Nonproliferation and Arms Control (NPAC), National Nuclear Security Administration (NNSA) of the U.S. Department of Energy (DOE) has sponsored a multi-laboratory, university, international partner collaboration to (1) detect replaced or missing pins from spent fuel assemblies (SFA) to confirm item integrity and deter diversion, (2) determine plutonium mass and related plutonium and uranium fissile mass parameters in SFAs, and (3) verify initial enrichment (IE), burnup (BU), and cooling time (CT) of facility declaration for SFAs. A wide variety of nondestructive assay (NDA) techniques were researched to achieve these goals [Veal, 2010 and Humphrey, 2012]. In addition, the project includes two related activities with facility-specific benefits: (1) determination of heat content and (2) determination of reactivity (multiplication). In this research, a subset of 11 integrated NDA techniques was researched using data mining solutions at Los Alamos National Laboratory (LANL) for their ability to achieve the above goals.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Conversion of Coal Mine Gas to LNG

This project evolved from a 1995, DOE-NETL competitive solicitation for practical CMM capture and utilization concepts. Appalachian Pacific was one of three companies selected to proceed with the construction and operation of a cost-shared demonstration plant. In the course of trying to proceed with this demonstration plant, AP examined several liquefaction technologies, discussed obtaining rights to coal mine methane with a number of coal companies, explored marketing potential with a wide variety of customers in many sections of the United States, studied in great detail the impact of a carbon credit exchange, and developed a suite of analytical tools with which to evaluate possible project options. In the end, the newness of the product, reluctance on the part of the coal companies to venture away from time tested practices, difficulty with obtaining financing, the failure of a carbon credit market to develop and the emergence of shale derived gas production prevented a demonstration plant from being built.

20 FOSSIL-FUELED POWER PLANTS↗

Intermediate-Scale Hydraulic Fracturing in a Deep Mine - kISMET Project Summary 2016

In support of the U.S. DOE SubTER Crosscut initiative, we established a field test facility in a deep mine and designed and carried out in situ hydraulic fracturing experiments in the crystalline rock at the site to characterize the stress field, understand the effects of rock fabric on fracturing, and gain experience in monitoring using geophysical methods. The project also included pre- and post-fracturing simulation and analysis, laboratory measurements and experiments, and we conducted an extended analysis of the local stress state using previously collected data. Some of these activities are still ongoing. The kISMET (permeability (k) and Induced Seismicity Management for Energy Technologies) experiments meet objectives in SubTER’s “stress” pillar and the “new subsurface signals” pillar. The kISMET site was established in the West Access Drift of SURF 4850 ft (1478 m) below ground (on the 4850L) in phyllite of the Precambrian Poorman Formation. We drilled and cored five near-vertical boreholes in a line on 3 m spacing, deviating the two outermost boreholes slightly to create a five-spot pattern around the test borehole centered in the test volume at ~1528 m (5013 ft). Laboratory measurements of core from the center test borehole showed P-wave velocity heterogeneity along each core indicating strong, fine-scale (~1 cm or smaller) changes in the mechanical properties of the rock. The load-displacement record on the core suggests that the elastic stiffness is anisotropic. Tensile strength ranges between 3-7.5 MPa and 5-12 MPa. Permeability measurements are planned, as are two types of laboratory miniature hydraulic fracturing experiments to investigate the importance of rock fabric (anisotropy and heterogeneity) on near-borehole hydraulic fracture generation. Pre-fracturing numerical simulations with INL’s FALCON discrete element code predicted a fracture radius of 1.2 m for a corresponding injection volume of 1.2 L for the planned fractures, and negligible microseismicity. Field measurements of the stress field by hydraulic fracturing showed that the minimum horizontal stress at the kISMET site averages 21.7 MPa (3146 psi) pointing approximately N-S (356 degrees azimuth) and plunging slightly NNW at 12°. The vertical and horizontal maximum stress are similar in magnitude at 42-44 MPa (6090-6380 psi) for the depths of testing which averaged approximately 1530 m (5030 ft). Hydraulic fractures were remarkably uniform suggesting core-scale and larger rock fabric did not play a role in controlling fracture orientation. Monitoring using ERT and CASSM in the four monitoring boreholes, and passive seismic accelerometer-based measurements in the West Access Drift, was carried out during the generation of a larger fracture (so-called stimulation test) at a depth of 40 m below the invert. ERT was not able to detect the fracture created, nor were the accelerometers in the drift, but microseismicity was detected for first (deepest) hydraulic-fracturing stress measurement. The CASSM data have not yet been analyzed. Analytical solutions suggest fracture radius of the large fracture (stimulation test) was more than 6 m, depending on the unknown amount of leak-off. The kISMET results for stress state are consistent with large-scale mid-continent estimates of stress. Currently we are using the orientation of the stress field we determined to interpret a large number of borehole breakouts recorded in nearby boreholes at SURF to generate a more complete picture of the stress field and its variations at SURF. The efforts on the project have prompted a host of additional follow-on studies that we recommend be carried out at the kISMET site.

02 PETROLEUM↗

Uranium Mining and Milling

The starting point for material accountancy under INFCIRC/153-type comprehensive safeguards agreements (paragraph 34(c)) with an Additional Protocol envisions a shifting toward earlier in the nuclear fuel cycle than current practice. The design of effective and efficient safeguards requires a more detailed process-level understanding of front-end activities, to include conducting a survey of uranium mining, concentration, and purification processes in commercial use to catalog technological options for producing uranium ore concentrate, also known as yellow cake. Based on this survey, a process flow diagram (PFD) illustrating front-end process options will be created to illustrate pre-34(c) material flows and support the identification of material control points.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Commissioning and Decommissioning of Illinois No. 6 Coal Mine

Calculates fuel consumption and resulting emissions to commission and decommission an Illinois No. 6 underground, bituminous coal mine in Illinois. Decommissioning values represented as a percentage of the commissioning values. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=1B5D9F83-8350-4B51-B3F8-E5E98DD73885

01 COAL, LIGNITE, AND PEAT↗

Commissioning and Decommissioning of Powder River Basin Coal Mine

Calculates fuel consumption and resulting emissions to commission and decommission a surface mine for Powder River Basin subbituminous coal in Wyoming. Decommissioning values represented as a percentage of the commissioning values. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=969D14BE-694A-415E-9031-11544E1CE535

01 COAL, LIGNITE, AND PEAT↗

Commissioning and Decommissioning of Rosebud Coal Mine

Calculates fuel consumption and resulting emissions to commission and decommission a surface mine for Rosebud subbituminous coal in Montana. Decommissioning values represented as a percentage of the commissioning values. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=DA7918B2-214E-4263-9B7A-8545C5501F74

01 COAL, LIGNITE, AND PEAT↗

Illinois No. 6 Underground Bituminous Coal Mine Site, Construction

Construction materials for concrete structures and asphalt paving for an Illinois No. 6 coal mine site. Assumes concrete structures and paving are composed entirely of cement or asphalt, respectively. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=7A80A4B3-6CC8-4168-8FA1-BC6231AF9089

01 COAL, LIGNITE, AND PEAT↗

In Situ Uranium Mine Construction

This process encompasses the materials, drilling energy, and consequent emissions for the construction of a representative in situ mine used to extract uranium, normalized to 1 kg of produced uranium. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=A27D2D79-AF9D-4043-9F7C-8825073CB4A4

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Open Pit Uranium Mine, Construction

This process encompasses the materials required for the construction of a representative open pit uranium mine. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=BE7CA243-2AD5-449B-873A-C2716491DC85

42 ENGINEERING↗

Storage/Disposal Coal Mine Tailings

Storage/Disposal Coal Mine Tailings in Pond, Piles, or Backfill. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=84A03556-8A92-4B6C-BB6F-CC789B1F2260

01 COAL, LIGNITE, AND PEAT↗

Wastewater Treatment Plant, Underground Coal Mine, Construction

Includes material requirements for construction of the underground Illinois No. 6 bituminous coal mine wastewater treatment plant, which consists of settling ponds plus minor supporting infrastructure: pumps, pipes, wiring, and cement structures. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=39E48F89-E0BA-4814-BF26-E034E6B90281

01 COAL, LIGNITE, AND PEAT↗

Ventilation Energy for Underground Mine

The amount of electricity required to ventilate an underground coal mine. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=1C16842F-D22F-4C79-B4A4-5423557721F3

01 COAL, LIGNITE, AND PEAT↗

Closure Monitoring Report for Corrective Action Unit 97: Yucca Flat/Climax Mine, Underground Test Area, Nevada National Security Site, Nevada (Rev.1)

This report presents the results of monitoring conducted for water quality, water levels, and institutional controls in FY 2020 by DOE/EM Nevada Program UGTA Activity at CAU 97, Yucca Flat/Climax Mine at the Nevada National Security Site. This report also presents analytical laboratory results (including results of quality assurance/quality control samples, such as field duplicates); and verification of use restrictions, institutional controls, and water use.

54 ENVIRONMENTAL SCIENCES↗

Post-Closure Monitoring Letter Report for Corrective Action Unit (CAU) 97: Yucca Flat/Climax Mine; CAU 98: Frenchman Flat; and CAU 99: Rainier Mesa/Shoshone Mountain, Underground Test Area, Nevada National Security Site, Nevada, for Calendar Year 2020 (Rev. 1, May 2021)

This letter serves as the annual post-closure letter for Corrective Action Unit (CAU) 97, Yucca Flat/Climax Mine (YF/CM); CAU 98, Frenchman Flat (FF); and CAU 99, Rainier Mesa/Shoshone Mountain (RM/SM) for calendar year (CY) 2020. This letter will discuss the post-closure monitoring activities that occurred during CY 2020, identify any triggers reached, and summarize water usage on the Nevada National Security Site (NNSS) and surrounding hydrographic basins at the three CAUs.

54 ENVIRONMENTAL SCIENCES↗

Development and Testing of an Integrated Acid Mine Drainage (AMD) Treatment and Rare Earth/Critical Mineral Plant

The overall objective of this project was to design, construct, and test a pilot-scale continuous process for efficiently treating acid mine drainage (AMD) while producing rare earth element/critical mineral (REE/CM) concentrates. The process technology evaluated in this project included two distinct operations: 1. an upstream pre-concentration unit that treats raw AMD to environmentally compliant discharge standards while capturing an REE/CM preconcentrate, and 2. a downstream REE purification process that further enriches the pre-concentrate while producing mixed or partially separated rare earth oxides (REOs). The project team members successfully completed all of the proposed goals of the project and advanced the technology readiness levels (TRL) of the constituent operations to TRL 7 for the upstream concentration unit (full-scale system demonstration) and TRL 6 for the downstream purification process (pilot-scale demonstration).

01 COAL, LIGNITE, AND PEAT↗