Search NASA⌕ Search

SEARCH · Search NASA

Results for “payload challenges”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Parametric Study for Increasing On-Station Duration via Unconventional Aircraft Launch Approach

The need for better atmospheric predictions is causing the atmospheric science community to look for new ways to obtain longer, higher-resolution measurements over several diurnal cycles. The high resolution, in-situ measurements required to study many atmospheric phenomena can be achieved by an Autonomous Aerial Observation System (AAOS); however, meeting the long on-station time requirements with an aerial platform poses many challenges. Inspired by the half-scale drop test of the deployable Aerial Regional-scale Environmental Survey (ARES) Mars airplane, a study was conducted at the NASA Langley Research Center to examine the possibility of increasing on-station time by launching an airplane directly at the desired altitude. The ARES Mars airplane concept was used as a baseline for Earth atmospheric flight, and parametric analyses of fundamental configuration elements were performed to study their impact on achieving desired on-station time with this class of airplane. The concept involved lifting the aircraft from the ground to the target altitude by means of an air balloon, thereby unburdening the airplane of ascent requirements. The parameters varied in the study were aircraft wingspan, payload, fuel quantity, and propulsion system. The results show promising trends for further research into aircraft-payload design using this unconventional balloon-based launch approach.

Kuhl, Christopher A.↗

Medical Challenges of the First Canadian Long-Duration Space Mission: Lessons Learned

In 2008, Dr. Thirsk was assigned to the crew of Expedition 20/21. This Expedition represented a milestone for the Canadian Space Program since it was the first time that a Canadian would take part in a long-duration mission. Robert Thirsk had the privilege of expanding the boundaries of space exploration by living and working on board the International Space Station for six months. The launch took place on May 27, 2009 aboard a Soyuz rocket from the Cosmodrome in Baikonur, Kazakhstan. This abstract was written before Dr. Thirsk returned to Kazakhstan. Objective: To gather all medically relevant data needed to support the first Canadian long-duration mission in space, and process it to derive lessons learned for presentation and for public disclosure. Methods: Sources of data used for analysis for Expedition 20 on International Space Station included flight selection data, maintenance annual physicals, Flight Medicine Clinic visits, parabolic flight experiments, preflight exams and baseline data collections, daily in-flight exercise countermeasure and science payloads, weekly periodic fitness, nutrition, radiation and payload assessments, postflight medical exams, rehabilitation, and science activities.

Hamilton, Douglas R.↗

An Acceleration Measurement Capability on International Space Station Supporting Microgravity Science Payloads

The conditions present in low-earth-orbit have enabled various scientific investigations to be conducted. A fundamental reason that space is a useful environment for science is the presence of a decreased effect of gravity while in orbital free-fall. Science investigations are conducted to study phenomena occurring as a result of reductions in buoyancy forces and phenomena enabled as a result of the apparent lack of gravity. The science community requires knowledge of the environment in which their experiments are being conducted. A general purpose measurement system was developed in the 1980's to supply scientific investigators with data of the residual acceleration environment. The Space Acceleration Measurement System, or SAMS, has flown aboard the NASA shuttle fleet over fourteen times, successfully acquiring acceleration measurement data in support of microgravity science experiments. As NASA continues its development of the International Space Station and its associated research payloads, it once again becomes necessary to address the requirement to measure the residual acceleration in support of the planned scientific investigations. As a follow-on to the SAMS project, SAMS-2 was initiated to investigate the requirements and develop the measurement system to support the microgravity science payloads aboard the International Space Station. The characteristics of the payload complement to be supported by SAMS-2 and the different capabilities provided by the station requires a fresh look at the design implementation of a general purpose measurement system. Not only is there a requirement for measurements in support of numerous, potentially simultaneous experiments, but this support is required to be provided for at least ten years of on-orbit operation as compared to a ten to fourteen day mission on shuttle. These differences in fundamental requirements result in the design configuration of the space station-based SAMS-2 being significantly different than that of the shuttle-based SAMS. This paper describes these differences in requirements and the planned features to be provided to the science user community. Some of the unique challenges faced in developing a general purpose measurement system are also discussed.

Sutliff, Thomas J.↗

Technology Development for 3-D Wide Swath Imaging Supporting ACE

The National Academy of Sciences Decadal Survey (DS) Aerosol-Cloud-Ecosystems Mission (ACE) aims to advance our ability to observe and predict changes to the Earth's hydrological cycle and energy balance in response to climate forcing, especially those changes associated with the effects of aerosol on clouds and precipitation. ACE is focused on obtaining measurements to reduce the uncertainties in current climate models arising from the lack in understanding of aerosol-cloud interactions. As part of the mission instrument suite, a dual-frequency radar comprised of a fixed-beam 94 gigahertz (W-band) radar and a wide-swath 35 gigahertz (Ka-band) imaging radar has been recommended by the ACE Science Working Group.In our 2010 Instrument Incubator Program project, we've developed a radar architecture that addresses the challenge associated with achieving the measurement objectives through an innovative, shared aperture antenna that allows dual-frequency radar operation while achieving wide-swath (100 kilometers) imaging at Ka-band. The antenna system incorporates 2 key technologies; a) a novel dual-band reflectorreflectarray and b) a Ka-band Active Electronically Scanned Array (AESA) feed module. The dual-band antenna is comprised of a primary cylindrical reflectorreflectarray surface illuminated by a point-focus W-band feed (compatible with a quasi-optical beam waveguide feed, such as that employed on CloudSat); the Ka-band AESA line feed provides wide-swath across-track scanning. The benefits of this shared-aperture approach include significant reductions in ACE satellite payload size, weight, and cost, as compared to a two aperture approach. Four objectives were addressed in our project. The first entailed developing the tools for the analysis and design of reflectarray antennas, assessment of candidate reflectarray elements, and validation using test coupons. The second objective was to develop a full-scale aperture design utilizing the reflectarray surface and to detail specific requirements and trades for the Ka-band AESA line feed. As part of the third objective a subscale antenna, similar to the full-scale aperture design, was developed, integrated, and flown with the Cloud Radar System during the 2014 Integrated Precipitation and Hydrology Experiment. The fourth and ongoing objective entails developing a GaN MMIC (Gallium Nitride Monolithic Microwave Integrated Circuits) power amplifier for use in the Ka-band AESA. An overview of the progress made on this project and a look ahead at the 2013 IIP (Instrument Incubator Program) award selection will be presented.

Antenna↗

History of POIC Capabilities and Limitations to Conduct International Space Station Payload Operations

Payload science operations on the International Space Station (ISS) have been conducted continuously twenty-four hours per day, 365 days a year beginning February, 2001 and continuing through present day. The Payload Operations Integration Center (POIC), located at the Marshall Space Flight Center in Huntsville, Alabama, has been a leader in integrating and managing NASA distributed payload operations. The ability to conduct science operations is a delicate balance of crew time, onboard vehicle resources, hardware up-mass to the vehicle, and ground based flight control team manpower. Over the span of the last ten years, the POIC flight control team size, function, and structure has been modified several times commensurate with the capabilities and limitations of the ISS program. As the ISS vehicle has been expanded and its systems changed throughout the assembly process, the resources available to conduct science and research have also changed. Likewise, as ISS program financial resources have demanded more efficiency from organizations across the program, utilization organizations have also had to adjust their functionality and structure to adapt accordingly. The POIC has responded to these often difficult challenges by adapting our team concept to maximize science research return within the utilization allocations and vehicle limitations that existed at the time. In some cases, the ISS and systems limitations became the limiting factor in conducting science. In other cases, the POIC structure and flight control team size were the limiting factors, so other constraints had to be put into place to assure successful science operations within the capabilities of the POIC. This paper will present the POIC flight control team organizational changes responding to significant events of the ISS and Shuttle programs.

Grimaldi, Rebecca↗

NASA's Exploration and In-Space Services (NExIS) Division OSAM-1 Propellant Transfer Subsystem Progress 2020

National Aeronautics and Space Administration (NASA)’s Exploration and In-Space Services (NExIS) Division of Goddard Space Flight Center has been developing technology for the On-orbit Servicing, Assembly and Manufacturing Mission 1 (OSAM-1) to robotically refuel heritage and new satellites on-orbit. OSAM-1, formerly known as Restore-L, successfully passed an important NASA milestone called Key Decision Point-C (KDP-C), receiving agency-level approval for its implementation. The decision point also establishes the mission’s official schedule and budget. The OSAM-1 spacecraft, Servicing Payload and the Space Infrastructure Dexterous Robot (SPIDER) payload will refuel a satellite in space, assemble a communications antenna and manufacture a beam. By demonstrating these capabilities, the mission is advancing never-before tested technologies for use in future missions (by NASA and other government organizations and private industry). The mission is funded by the Technology Demonstration Missions program within NASA’s Space Technology Mission Directorate. This paper covers a review of servicing extensibility and critical technologies that are being developed within NExIS with a focus on the fluid transfer refueling technology within the framework of the Propellant Transfer Subsystem (PTS). An overview of the planned initial technology demonstration servicing mission via the OSAM-1 Space Vehicle is provided as an extension of the technology development progress reported in 20181, and 20192. The general objectives, challenges, and key technologies are presented as an introduction to the context of the OSAM-1 mission, and a precursor to the OSAM-1 PTS specific development status. Development and progress of the Hose Management Assembly (HMA) and Propellant Transfer Assembly (PTA) are discussed. HMA risk reduction test results including those of thermal vacuum testing are presented. Important analytical results are discussed and progress of drawings and procedures developed for the fabrication and testing phase are shown. A summary of the PTS overall verification status and design activities prepared for the critical design peer review are presented. Procurement progress is shown with status on long, medium, and short term efforts to acquire the hardware required to support the mission objectives. Technology development, challenges, and testing status are discussed with particular regard to the OSAM-1 specific key assemblies including the PTA and HMA along with the overall integrated flight mockup of the spacecraft to client fluid transfer testing conducted in the servicing testbeds. The paper concludes with key milestones leading to the goal of on-orbit refueling to be demonstrated in 2024. The overall mission Launch Readiness Date (LRD) has been realigned to accommodate budget profiles and incorporation of additional on-orbit assembly and manufacturing demonstration efforts.

Propellant transfer, satellite servicing↗

Microbial Monitoring of the International Space Station

Humans living and working in the harsh environment of space present many challenges for habitability engineers and microbiologists. Spacecraft must provide an internal environment in which physical (gas composition, pressure, temperature, and humidity), chemical, and biological environmental parameters are maintained at safe levels. Microorganisms are ubiquitous and will accompany all human-occupied spacecraft, but if biological contamination were to reach unacceptable levels, long-term human space flight would be impossible. Prevention of microbiological problems, therefore, must have a high priority. Historically, prevention of infectious disease in the crew has been the highest priority, but experience gained from the NASA-Mir program showed that microbial contamination of vehicle and life-support systems, such as biofouling of water and food, are of equal importance. The major sources of microbiological risk factors for astronauts include food, drinking water, air, surfaces, payloads, research animals, crew members, and personnel in close contact with the astronauts. In our efforts to eliminate or mitigate the negative effects of microorganisms in spacecraft, the National Aeronautics and Space Administration (NASA) implemented comprehensive microbial analyses of the major risk factors. This included the establishment of acceptability requirements for food, water, air, surfaces, and crew members. A robust monitoring program was then implemented to verify that the risks were within acceptable limits. Prevention of microbiological problems is preferred over mitigation of problems during flight, and preventive steps must begin very early in the design phase. Spacecraft development must include requirements to control free water from humidity, condensate, hygiene activities, and other releases. If water is available, microbes are likely to grow because sufficient nutrients are potentially available. Materials selected for the spacecraft must not promote or support microbial growth. Air filtration can dramatically reduce the number of airborne bacteria, fungi, and particulates in spacecraft breathing air. Waterborne bacteria can be reduced to acceptable levels by thermal inactivation of bacteria during water processing, along with a residual biocide, and filtration at the point of use can ensure safety. System design must include onboard capability to achieve recovery of the system from contamination. Robust housekeeping procedures that include periodic cleaning and disinfection will prevent high levels of microbial growth on surfaces. Food for consumption in space must be thoroughly tested for excessive microbial content and pathogens before launch. Thorough preflight examination of flight crews, consumables, payloads, and the environment can greatly reduce pathogens in spacecraft. Many of the lessons learned from the Space Shuttle and previous programs were applied in the early design phase of the International Space Station, resulting in the safest space habitat to date. This presentation describes the monitoring program for the International Space Station and will summarize results from preflight and on-orbit monitoring.

Pierson, Duane L.↗

Development of a Two-Stage Mars Ascent Vehicle Using In-Situ Propellant Production

Mars Sample Return (MSR) and Mars In-Situ Resource Utilization (ISRU) present two main challenges for the advancement of Mars science. MSR would demonstrate Mars lift-off capability, while ISRU would test the ability to produce fuel and oxidizer using Martian resources, a crucial step for future human missions. A two-stage Mars Ascent Vehicle (MAV) concept was developed to support sample return as well as in-situ propellant production. The MAV would be powered by a solid rocket first stage and a LOX-propane second stage. A liquid second-stage provides higher orbit insertion reliability than a solid second stage as well as a degree of complexity eventually required for manned missions. Propane in particular offers comparable performance to methane without requiring cryogenic storage. The total MAV mass would be 119.9 kg to carry an 11 kg payload to orbit. The feasibility of in-situ fuel and oxidizer production was also examined. Two potential schemes were evaluated for production capability, size and power requirements. The schemes examined utilize CO2 and water as starting blocks to produce LOX and a propane blend. The infrastructure required to fuel and launch the MAV was also explored.

Paxton, Laurel↗

NASA's Space Launch System Takes Shape: Progress Toward Safe, Affordable, Exploration

Development of NASA's Space Launch System (SLS) exploration-class heavy lift rocket has moved from the formulation phase to implementation in 3 years and will make significant progress this year toward its first launch, slated December 2017. SLS represents a safe, affordable, and evolutionary path to development of an unprecedented capability for future human and robotic exploration and use of space. For the United States current development is focused on a configuration with a 70 metric ton (t) payload to low Earth orbit (LEO), more than double any operational vehicle. This version will launch NASA's Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back, as well as the first crewed Orion flight. SLS is designed to evolve to a 130 t lift capability that can reduce mission costs, simplify payload design, reduce trip times, and lower overall risk. Each vehicle element completed its respective Preliminary Design Reviews, followed by the SLS Program. The Program also completed the Key Decision Point-C milestone to move from formulation to implementation in 2014. NASA hasthorized the program to proceed to Critical Design Review, scheduled for 2015. Accomplihments to date include: manufacture of core stage test hardware, as well as preparations for testing the world's most powerful solid rocket boosters and main engines that flew 135 successful Space Shuttle missions. The Program's success to date is due to prudent use of existing technology, infrastructure, and workforce; streamlined management approach; and judicious use of new technologies. This paper will discuss SLS Program successes over the past year and examine milestones and challenges ahead. The SLS Program and its elements are managed at NASA's Marshall Space Flight Center (MSFC).

Askins, Bruce R.↗

A High Inclination Solar Mission Enabled by Near-Term Solar Sail Propulsion

Our current understanding of the Sun, its atmosphere, and the heliosphere is severely limited by a lack of good observations of the Sun’s polar regions. A High Inclination Solar Mission (HISM) mission would go into a 0.48-AU circular solar orbit with at least a 60° inclination to conduct long-term observations of the Sun’s poles using both situ and remote-sensing instruments to study the connections between the Sun, the solar wind, and solar energetic particle events. The propulsion requirements to implement HISM are beyond the capability of conventional chemical propulsion and extremely challenging even for highly efficient solar electric propulsion. To enable HISM and a host of other propulsion-intense space science missions, NASA is actively developing solar sail propulsion, capable of continuous low thrust for the extended periods of time required to meet the delta V requirements of HISM. Upcoming solar sail missions include the Near Earth Asteroid (NEA) Scout (2021 planned launch) and Solar Cruiser (candidate for flight in 2024).Solar sails use sunlight to propel vehicles through space by reflecting solar photons from a large, highly-reflective sail. This continuous photon pressure provides propellantless thrust, allowing for very high delta V maneuvers on long-duration, deep-space exploration. Since the Sun supplies the necessary propulsive energy, solar sails require no onboard propellant, thereby potentially increasing useful payload mass. The NASA MSFC Advanced Concepts Office recently completed a detailed mission concept study of HISM based on the solar sail propulsion technologies being developed for NEA Scout and Solar Cruiser. The HISM spacecraft concept envisions carrying a Doppler & Stokes Imager, a coronagraph, magnetometer, Faraday Cup, a plasma spectrometer, and a radio and plasma wave package to meet the science objectives established for a solar polar orbiting mission in the Heliophysics Decadal Survey. This paper will describe the mission concept and its solar sail propulsion system

Solar Sail↗

Application of Stereo PIV on a Supersonic Parachute Model

The Mars Science Laboratory (MSL) is the next step in NASA's Mars Exploration Program, currently scheduled for 2011. The spacecraft's descent into the Martian atmosphere will be slowed from Mach 2 to subsonic speeds via a large parachute system with final landing under propulsive control. A Disk-Band-Gap (DBG) parachute will be used on MSL similar to the designs that have been used on previous missions, however; the DBG parachute used by MSL will be larger (21.5 m) than in any of the previous missions due to the weight of the payload and landing site requirements. The MSL parachute will also deploy at higher Mach number (M 2) than previous parachutes, which can lead to instabilities in canopy performance. Both the increased size of the DBG above previous demonstrated configurations and deployment at higher Mach numbers add uncertainty to the deployment, structural integrity and performance of the parachute. In order to verify the performance of the DBG on MSL, experimental testing, including acquisition of Stereo Particle Imaging Velocimetry (PIV) measurements were required for validating CFD predictions of the parachute performance. A rigid model of the DBG parachute was tested in the 10x10 foot wind tunnel at GRC. Prior to the MSL tests, a PIV system had never been used in the 10x10 wind tunnel. In this paper we discuss some of the technical challenges overcome in implementing a Stereo PIV system with a 750x400 mm field-of-view in the 10x10 wind tunnel facility and results from the MSL hardshell canopy tests.

Wernet, Mark P.↗

Exercise Equipment Usability Assessment for a Deep Space Concept Vehicle

With international aspirations to send astronauts to deep space, the world is now faced with the complex problem of keeping astronauts healthy in unexplored hostile environments for durations of time never before attempted by humans. The great physical demands imparted by space exploration compound the problem of astronaut health, as the astronauts must not only be healthy, but physically fit upon destination arrival in order to perform the scientific tasks required of them. Additionally, future deep space exploration necessitates the development of environments conducive to long-duration habitation that would supplement propulsive vehicles. Space Launch System (SLS) core stage barrel sections present large volumes of robust structure that can be recycled and used for long duration habitation. This assessment will focus on one such conceptual craft, referred to as the SLS Derived Habitat (SLS-DH). Marshall Space Flight Center's (MSFC) Advanced Concepts Office (ACO) has formulated a high-level layout of this SLS-DH with parameters such as floor number and orientation, floor designations, grid dimensions, wall placement, etc. Yet to be determined, however, is the layout of the exercise area. Currently the SLS-DH features three floors laid out longitudinally, leaving 2m of height between the floor and ceilings. This short distance between levels introduces challenges for proper placement of exercise equipment such as treadmills and stationary bicycles, as the dynamic envelope for the 95th percentile male astronauts is greater than 2m. This study aims to assess the optimal equipment layout and sizing for the exercise area of this habitat. Figure 1 illustrates the layout of the DSH concept demonstrator located at MSFC. The exercise area is located on the lower level, seen here as the front half of the level occupied by a crew member. This small volume does not allow for numerous or bulky exercise machines, so the conceptual equipment has been limited to a treadmill and stationary bicycle. With the most current treadmill aboard the International Space Station (ISS), the Combined Operational Load-Bearing External Resistance Treadmill (COLBERT), being located in an International Standard Payload Rack (ISPR), the bottom of the conceptual treadmill features a height of 38in. Making the treadmill flush with the floor would be impossible in this rack configuration, as the distance from the outer wall of the spacecraft to the bottom floor would be too shallow. From preliminary sizing, the 38in required for the bottom of the treadmill combined with a 78in operational envelope for a 95th percentile may not be accommodated in the exercise area in a vertical orientation. Figure 2 demonstrates the volume required (in maroon) for an ISPR-bound treadmill in the concept demonstrator. Early indications as seen in this figure indicate that the crew members would contact the ceiling in such an arrangement. An assessment will be conducted to evaluate various orientations of exercise equipment in the concept demonstrator. Orientations to be tested include putting the bottom of the treadmill on the wall, having the treadmill at an angle in the floor both horizontally and vertically, and having a shorter (non-rack bound) treadmill in a vertical orientation on the floor. This assessment will yield findings regarding sizing of the area and how well participants feel they could exercise in such an environment. Due to the restrictions of assessing a microgravity vehicle in a normal-gravity environment, simulations in MSFC's Virtual Environments Lab (VEL) may be necessary. Final deliverables will include recommendations regarding the location and size of possible exercise equipment aboard the SLS-Derived DSH.

Rhodes, Brooke M.↗

An Efficient Focal Plane Alignment Methodology with Application to the ASTERIA Nanosatellite Space Telescope

The process of aligning an instrument focal plane toprecursor optics such as a telescope can be a difficult and timeconsuming process. The final alignment must achieve sufficientperformance at multiple locations across the field of view. Inthe case of instruments with infinite conjugates, such as a spacetelescope, there are practical challenges in illuminating the system at multiple off-axis field points simultaneously. Iterationduring the alignment process can cause a lengthy search for localminima within the performance cost function.This paper presents a focal plane alignment methodology thatavoids the above difficulties and obtains the desired level ofoptical performance in an efficient manner. The approach isbased on systematically measuring spot size across a set of fieldpoints and defocus positions, and then using a least squaresfit to determine the optimal location for the focal plane. Thisapproach has the additional benefit of revealing the amount offield curvature present in the instrument. It also provides theanalyst with a direct calculation of the shims needed to place thefocal plane at the computed best-fit location.This approach was successfully applied to the Arcsecond SpaceTelescope Enabling Research In Astrophysics (ASTERIA) payload. ASTERIA is a cubesat mission that was deployed intolow-Earth orbit in November 2017 and operated until December2019. In addition to presenting the theoretical basis for themethodology, this paper will present laboratory measurementsobtained during the payload alignment campaign. This approach is applicable to future space-borne optical instrumentsthat require an efficient methodology for focal plane alignmentwith limited cost or schedule resources.

Smith, Matthew W↗

Trajectory Design and Orbit Determination for the Lunar CRater Observation and Sensing Satellite (LCROSS)

The Lunar CRater Observation and Sensing Satellite (LCROSS) was competitively selected by the National Aeronautical and Space Administration (NASA) Exploration Systems Mission Directorate (ESMD) as a low-cost (< $80M) 1000 kg secondary payload to be launched with the Lunar Reconnaissance Orbiter (LRO) in October of 2008. LCROSS is a lunar impactor mission that will investigate the presence or absence of water in a permanently shadowed crater. Following launch, trans-lunar injection (TLI) and separation from LRO, LCROSS will remain attached to the launch vehicle's approximately 2300 kg spent Earth Departure Upper Stage (EDUS) and will guide it toward an impact of a permanently shadowed crater at the lunar South Pole. Hours prior to impact, LCROSS will separate from the EDUS and perform a braking maneuver that will allow the spacecraft to take measurements of the resulting EDUS impact ejecta cloud for several minutes, before impacting the crater as well. As a cost-capped secondary mission that must accommodate specific LRO launch dates, LCROSS faces unique challenges and constraints that must be carefully reconciled in order to satisfy an ambitious set of science observation requirements. This paper examines driving mission requirements and constraints and describes the trajectory design and navigation strategy that shape the LCROSS mission.

Galal, Ken↗

Status of NASA's Space Launch System

NASA's Space Launch System (SLS) continued to make significant progress in 2015, completing hardware and testing that brings NASA closer to a new era of deep space exploration. The most significant program milestone of the year was completion of Critical Design Review (CDR). A team of independent reviewers concluded that the vehicle design is technically and programmatically ready to move to Design Certification Review (DCR) and launch readiness in 2018. Just four years after program start, every major element has amassed development and flight hardware and completed key tests that will set the stage for a growing schedule of manufacturing and testing in 2016. Key to SLS' rapid progress has been the use of existing technologies adapted to the new launch vehicle. The space shuttle-heritage RS-25 engine is undergoing adaptation tests to prove it can meet SLS requirements and environments with minimal change. The four-segment shuttle-era booster has been modified and updated with an additional propellant segment, new insulation, and new avionics. The Interim Cryogenic Upper Stage is a modified version of an existing upper stage. The first Block I SLS configuration will launch a minimum of 70 metric tons (t) of payload to low Earth orbit (LEO). The vehicle architecture has a clear evolutionary path to more than 100t and, ultimately, to 130t. Among the program's major accomplishments in 2015 were the first booster qualification hotfire test, a series of seven RS-25 adaptation hotfire tests, manufacturing of most of the major components for both core stage test articles and first flight tank, delivery of the Pegasus core stage barge, and the upper stage simulator. Renovations to the B-2 test stand for stage green run testing was completed at NASA Stennis Space Center. This year will see the second booster qualification motor hotfire, flight and additional development RS-25 engine tests, and completion of core stage test articles and test stands and several flight article sections. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Lyles, Garry↗

NASA’s Space Launch System: Progress Toward Launch

The Space Launch System (SLS), NASA’s cornerstone launch capability for a new generation of deep space exploration, has begun assembly at Kennedy Space Center (KSC) in preparation for launch in 2021. SLS will provide an unparalleled launch capability for human and robotic deep space exploration missions. Its proven propulsion system, upgrade path to more powerful vehicles, and high-volume payload fairings make it the foundation for ambitious and demanding as part of the Artemis program. Artemis is NASA’s 21st-century plan to put boots on the Moon and to perform sustainable, long-term science in deep space, with eyes toward sending explorers to Mars. The initial SLS vehicle to fly, Block 1 in the crew configuration – with the new Orion spacecraft – is scheduled to lift off from revitalized launch facilities at KSC in 2021 for an uncrewed test flight known as Artemis I. Manufacturing is complete on the vehicle and all elements have been delivered to the Exploration Ground Systems (EGS) Program, except the core stage. The program’s all-new development, the core stage is currently in the midst of a “Green Run” test campaign at Stennis Space Center (SSC). Eight progressively more challenging tests in the Green Run series will culminate in a hot-fire of four flight-proven liquid hydrogen/liquid oxygen (LH2/LOX) RS25 engines. Following the Green Run hotfiring, the core stage will ship to KSC. Already at KSC, aft sections of the fivesegment solid rocket boosters are being assembled. Previously delivered elements, including the upper stage, are undergoing final checkouts in preparation for stacking. An exciting 2021 will include such milestones as stacking SLS and Orion in KSC’s Vehicle Assembly Building (VAB), modal testing, roll out to Launch Pad 39B, Wet Dress Rehearsal (WDR), and launch. Teams across the country are preparing for launch by finalizing procedures, defining launch constraints and flight rules, training console operators, performing simulations, and more. With the SLS Block 1 vehicle for Artemis I nearing integration and launch, the second Block 1 vehicle in the crew configuration, which will carry astronauts on an Artemis II hybrid lunar flyby mission, has several elements manufactured. In fact, the solid rocket motor segments and RS-25 engines are complete. Those program elements are processing hardware for the third flight and working toward manufacturing the second SLS variant to fly, Block 1B, which will onramp a powerful new upper stage, the Exploration Upper Stage (EUS).

John Honeycutt↗

The National Aerospace Initiative (NAI): Technologies For Responsive Space Access

The Secretary of Defense has set new goals for the Department of Defense (DOD) to transform our nation's military forces. The Director for Defense Research and Engineering (DDR&E) has responded to this challenge by defining and sponsoring a transformational initiative in Science and Technology (S&T) - the National Aerospace Initiative (NAI) - which will have a fundamental impact on our nation's military capabilities and on the aerospace industry in general. The NAI is planned as a joint effort among the tri-services, DOD agencies and National Aeronautics and Space Administration (NASA). It is comprised of three major focus areas or pillars: 1) High Speed Hypersonics (HSH), 2) Space Access (SA), and 3) Space Technology (ST). This paper addresses the Space Access pillar. The NAI-SA team has employed a unique approach to identifying critical technologies and demonstrations for satisfying both military and civilian space access capabilities needed in the future. For planning and implementation purposes the NAI-SA is divided into five technology subsystem areas: Airframe, Propulsion, Flight Subsystems, Operations and Payloads. Detailed technology roadmaps were developed under each subsystem area using a time-phased, goal oriented approach that provides critical space access capabilities in a timely manner and involves subsystem ground and flight demonstrations. This S&T plan addresses near-term (2009), mid-term (2016), and long-term (2025) goals and objectives for space access. In addition, system engineering and integration approach was used to make sure that the plan addresses the requirements of the end users. This paper describes in some detail the technologies in NAI-Space Access pillar. Some areas of emphasis are: high temperature materials, thermal protection systems, long life, lightweight, highly efficient airframes, metallic and composite cryotanks, advanced liquid rocket engines, integrated vehicle health monitoring and management, highly operable systems and payloads. Implementation strategies for NAI are also described.

Culbertson, Andrew↗

High speed research system study. Advanced flight deck configuration effects

In mid-1991 NASA contracted with industry to study the high-speed civil transport (HSCT) flight deck challenges and assess the benefits, prior to initiating their High Speed Research Program (HSRP) Phase 2 efforts, then scheduled for FY-93. The results of this nine-month effort are presented, and a number of the most significant findings for the specified advanced concepts are highlighted: (1) a no nose-droop configuration; (2) a far forward cockpit location; and (3) advanced crew monitoring and control of complex systems. The results indicate that the no nose-droop configuration is critically dependent upon the design and development of a safe, reliable, and certifiable Synthetic Vision System (SVS). The droop-nose configuration would cause significant weight, performance, and cost penalties. The far forward cockpit location, with the conventional side-by-side seating provides little economic advantage; however, a configuration with a tandem seating arrangement provides a substantial increase in either additional payload (i.e., passengers) or potential downsizing of the vehicle with resulting increases in performance efficiencies and associated reductions in emissions. Without a droop nose, forward external visibility is negated and takeoff/landing guidance and control must rely on the use of the SVS. The technologies enabling such capabilities, which de facto provides for Category 3 all-weather operations on every flight independent of weather, represent a dramatic benefits multiplier in a 2005 global ATM network: both in terms of enhanced economic viability and environmental acceptability.

Swink, Jay R.↗