Search NASA⌕ Search

SEARCH · Search NASA

Results for “program management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Bubbly Suspension Generated in Low Gravity

Bubbly suspensions are crucial for mass and heat transport processes on Earth and in space. These processes are relevant to pharmaceutical, chemical, nuclear, and petroleum industries on Earth. They are also relevant to life support, in situ resource utilization, and propulsion processes for long-duration space missions such as the Human Exploration and Development of Space program. Understanding the behavior of the suspension in low gravity is crucial because of factors such as bubble segregation, which could result in coalescence and affect heat and mass transport. Professors A. Sangani and D. Koch, principal investigators in the Microgravity Fluid Physics Program managed by the NASA Glenn Research Center at Lewis Field, are studying the physics of bubbly suspension. They plan to shear a bubbly suspension in a couette cell in microgravity to study bubble segregation and compare the bubble distribution in the couette gap with the one predicted by the suspension-averaged equations of motion. Prior to the Requirement Definition Review of this flight experiment, a technology for generating a bubbly suspension in microgravity has to be established, tested, and verified.

Nahra, Henry K.↗

STS-114/Discovery Flight Readiness Review Press Briefing

This press briefing on Flight Readiness Review (FRR) for the STS-114 Discovery flight is shown. Dean Acosta, Deputy Associate Administrator for Public Affairs, introduces the panel. The panel consist of: Michael Griffin, NASA Administrator, William Readdy, Associate Administrator of Space Operations, Bill Parsons, Space Shuttle Program Manager, and Mike Leinbach, NASA Launch Director. Questions from the media includes the following topics: certification, countdown, ice on the external tank, debris, and safety of the Space Shuttle Discovery.

Source record↗

The Status of Simulant Materials of Lunar Regolith: Requirements, Feasibility, and Recommendations

Introduction: As NASA turns its exploration ambitions towards the Moon once again, the research and development of new technologies for lunar operations face the challenge of meeting the milestones of a fast-pace schedule, reminiscent of the 1960 s Apollo program. While the lunar samples returned by the Apollo and Luna missions have revealed much about the Moon, these priceless materials exist in too scarce quantities to be used for technology development and testing. The need for mineral materials chosen to simulate the characteristics of lunar regoliths is a pressing issue that is being addressed today through the collaboration of scientists, engineers and NASA program managers. While the larger size fraction of the lunar regolith has been reproduced in several simulants in the past, little attention has been paid to the fines fraction, commonly refered to as lunar dust. As reported by McKay and Carrier, this fraction of the lunar regolith below 20 microns can represent up to 30% by mass of the total regolith. The issue of reproducing the properties of lunar regolith for research and technology development purposes was addressed by the recently held Workshop on Lunar Regolith Simulant Materials at Marshall Space Flight Center. Preliminary conclusions from the workshop and considerations concerning the feasibility of producing such materials will be presented here.

Sibille, Laurent↗

STS-114: Discovery Post MMT Briefing

Wayne Hale, Space Shuttle Deputy Program Manager and Steve Poulos, Manager Orbit Project Office at Johnson Space Center is seen during a post Mission Management Team (MMT) briefing. The purpose of this briefing is to talk about the status of the Space Shuttle Discovery Orbiter, the Thermal Protection System (TPS) and the External Tank. Hale presents pictures of the missing foam off of the Hydrogen Protuberance Air Load (PAL) ramp and trajectory debris particles. Poulos explains in detail diagrams of the reinforced carbon-carbon system, possible scuff on the wing panel, coating damage, protruding gap filler and damaged tile blanket. Poulos tells what concerns him the most in terms of tile damage to the Space Shuttle Discovery.

Source record↗

STS-114: Discovery Mission Status/Post MMT Briefing

Bob Castle, Mission Operations Representative, and Wayne Hale, Space Shuttle Deputy Program Manager are seen during a post Mission Management Team (MMT) briefing. Bob Castle talks about the Multi-Purpose Logistics Module (MPLM) payload and its readiness for unberthing. Wayne Hale presents pictures of the Space Shuttle Thermal Blanket, Wind Tunnel Tests, and Space Shuttle Blanket Pre and Post Tests. Questions from the news media about the Thermal Protection System after undocking and re-entry of the Space Shuttle Discovery, and lessons learned are addressed.

Source record↗

STS-114: Discovery Post Landing Press Briefing

A post landing discussion of the STS-114 Space Shuttle Discovery is shown. Dean Acosta, Deputy Assistant Administrator of Public Affairs introduces the panel. The panel consists of: Michael Griffin, NASA Administrator, Bill Parsons, Space Shuttle Program Manager, Mike Leinbach, NASA Launch Director, and Bill Readdy, Associate Administrator for Space Operations. Mike Griffin answers questions from the news media about the amount of damage to the Space Shuttle and the possibility of returning to space, Mike Leinbach addresses the question about the process of bringing Discovery back to Kennedy Space Center and Bill Parsons talks about milestones reached during this mission.

Source record↗

STS-114: Discovery Post MMT Briefing

Wayne Hale, Space Shuttle Deputy Program Manager, discusses the topics covered at the Mission Management Team (MMT) meeting. The topics include: 1) Wing leading edge reinforced carbon-carbon clearance; 2) Protruding blanket on the side of the Space Shuttle Discovery Orbiter; 3) Control Moment Gyroscope (CMG) replacement; 4) Transfer items; and 5) EVA procedures. Questions from the news media about the possibility of a CMG failure, Space Shuttle re-entry, gap fillers, and dangers during the EVA to repair the Space Shuttle Discovery are answered.

Source record↗

STS-114: Discovery Post MMT Briefing

Wayne Hale, Space Shuttle Deputy Program Manager and Terri Murphy, Space Shuttle Imagery Integration Manager are seen in this post Mission Management Team (MMT) briefing. Hale begins with showing a video that was recovered from the Solid Rocket Booster (SRB) looking at the external tank during ascent. Pictures of the RH Nose Landing Gear Damage (NLGD), Protruding gap filler near chine and protruding gap fillers are shown. Terri Murphy talks about the imagery from debris, integrated simulations and radar data collected from the launch. Hale answers questions from the news media about the location of the gap fillers, possible EVA to remove the gap fillers and the thermal protection system.

Source record↗

STS-114: Discovery Post MMT Press Conference

Bruce Buckingham of NASA Public Affairs hosted this press conference. Wayne Hill, Space Shuttle Deputy Program Manager; John Muratore, Shuttle Systems and Integration Manager; Mike Wetmore, Director for Shuttle Processing were present. Wayne started with a video from Shuttle Logistics Depot showing details of a point sensor box commonly named the black box. Work with the trouble shooting continues on a day to day basis, no definite launching date is set. John reports that they are in a mission support mode all over the country until the sensor problem is solved. Mike reports his team will complete scrub and securing tasks through the next day, restore the facility to its normal mode, and will start to a four day process of getting back to launch once trouble shooting is completed. Tanking test, thermal environment, problem identification, engine cut-off sensor problems, sensors, risk, design reviews, test and analysis, correlation of the problem with Columbia, are some of the topics covered with the News media.

Source record↗

UEET Overview

NASA's role in civil aeronautics is to develop high risk, high payoff technologies to meet critical national aviation challenges. One of NASA's 10 Aerospace Technology objectives is to significantly reduce aircraft emissions within 10 years, and the Ultra-Efficient Engine Technology (UEET) Program is working to make this objective a reality. The UEET program will develop and hand off revolutionary turbine engine propulsion technologies that will enable future generation vehicles over a wide range of flight speeds. The primary goals are to address two of the most critical propulsion issues: performance/efficiency and reduced emissions. High performance, low emissions engine systems will lead to significant improvement in local air quality, minimum impact on ozone depletion, reduction in fuel consumption, and an overall reduction in the aviation contribution to global warming. The UEET Program, managed by the Glenn Research Center in Cleveland, Ohio, includes participation from three other NASA centers (Ames, Goddard, and Langley), as well as five engine companies (GE Aircraft Engines, Pratt & Whitney, Honeywell, Allison/Rolls Royce, and Williams International) and two airplane manufacturers (Boeing and Lockheed Martin). In addition, strategic partnerships are being formed with the Department of Defense and DARPA, the Department of Energy, the Environmental Protection Agency, the Federal Aviation Administration, as well as key universities, on technology development and technology requirements definition.

Shaw, Robert J.↗

True Cost of Amateur Clean rooms

This viewgraph document reviews the cost factors for clean rooms that are not professionally built, monitored or maintained. These amateur clean rooms are built because scientist and engineers desire to create a clean room to build a part of an experiment that requires a clean room, and the program manager is looking to save money. However, in the long run these clean rooms may not save money, as the cost of maintenance may be higher due to the cost of transporting the crews, and if the materials were of lesser quality, the cost of modifications may diminish any savings, and the product may not be of the same quality. Several examples are shown of the clean rooms that show some of the problems that can arise from amateur clean rooms.

Ramsey, W. Lawrence↗

STS-114: Discovery Flight Day 7 Post MMT Meeting

Wayne Hale Space Shuttle Deputy Program Manager, and Chuck Campbell Subsystem Engineer in Aerothermodynamics are seen in this post mission management teem briefing on this seventh day of space flight. Wayne Hale begins with talking about how the International Space Station has been resupplied with its necessities, and that the Control Moment Gyroscope (CSG) has been replaced. Hale expresses his concern about the health of the Space Shuttle Discovery with the two protruding gap fillers present, and the aerothermodynamics surrounding the gap fillers. These concerns led to the conclusion to have spacewalker Stephen Robinson remove the gap fillers during EVA-3. Campbell shows a video of the protruding gap filler aft of Nose Landing Gear Door (NLGD). Campbell and Hale answer questions from the news media about the risks of performing this spacewalk, boundary layer transitions, flight safety, inspections, and temperature concerns.

Source record↗

STS-114: Discovery Post MMT Press Conference

Bruce Buckingham, NASA Public Affairs hosted this conference. Bill Parsons, Space Shuttle Program Manager; John Muratore, Shuttle System and Integration Manager; Mike Wetmore, Shuttle Processing Director were present. The Panel summarizes that thorough effort of analysis and test techniques and great amount of work is being done to fix the sensor problem and will be ready to call the stations for a launch countdown process after the trouble shooting is fully completed. Launch time, grounding problem, sensor failure, trouble shooting, tanking test, pin swap, and heaters were topics covered with the News media. For clarification, Bruce Buckingham provided information that preferred launch time is at 10:39am on July 26, Eastern Time.

Source record↗

STS-114: Discovery Post Landing Press Briefing

Dean Acosta, NASA Public Affairs Deputy Assistant Administrator hosted this press briefing. Michael Griffin, NASA Administrator; Bill Parsons, Shuttle Program Manager; Michael Leinbach, Shuttle Launch Director; and Bill Ready, Space Operations Associate Administrator were present. The Panel specifically honored the Columbia crew as they praised Commander Eileen Collin's performance in bringing the Discovery and crew safe back to Earth. Re-entry, test flight and next test flight, thermal insulation, heat, vehicle inspection, turn around processing, and ferrying Discovery back to the Kennedy Space Center were topics covered with the News media. Michael Griffin announced the launching of Mars Reconnaissance Orbiter will take place the following morning.

Source record↗

STS-114: Discovery Launch Readiness Press Conference

Michael Griffin, NASA Administrator; Wayne Hale, Space Shuttle Deputy Program Manager; Mike Wetmore, Director of Shuttle Processing; and 1st Lieutenant Mindy Chavez, Launch Weather Officer-United States Air Force 45th Weather Squadron are in attendance for this STS-114 Discovery launch readiness press conference. The discussion begins with Wayne Hale bringing to the table a low level sensor device for everyone to view. He talks in detail about all of the extensive tests that were performed on these sensors and the completion of these ambient tests. Chavez presents her weather forecast for the launch day of July 26th 2005. Michael Griffin and Wayne Hale answer questions from the news media pertaining to the sensors and launch readiness. The video ends with footage of Pilot Jim Kelly and Commander Eileen Collins conducting test flights in a Shuttle Training Aircraft (STA) that simulates Space Shuttle landing.

Source record↗

STS-114: Discovery Post MMT Briefing

Wayne Hale, Space Shuttle Deputy Program Manager, is presented in this STS-114 Discovery Post Mission Management Team (MMT) briefing. He begins by talking about obtaining clearance from the Reinforced Carbon-Carbon (RCC) material. He then describes the supplies such as eleven water containers and the transfer of 50 additional pounds of Oxygen to the International Space Station. Hale presents a video of a billowed thermal blanket next to the commander's window on the port side of the Space Shuttle Discovery that seems to be of some concern. He answers questions from the news media about the dimensions of this blanket, and the dangers of getting close to this blanket during the Extravehicular Activity (EVA) to repair the gap fillers.

Source record↗

Human Missions to Europa and Titan - Why Not?

This report describes a long-term development plan to enable human exploration of the outer solar system, with a focus on Europa and Titan. These are two of the most interesting moons of Jupiter and Saturn, respectively, because they are the places in the solar system with the greatest potential for harboring extraterrestrial life. Since human expeditions to these worlds are considered impossible with current capabilities, the proposal of a well-organized sequence of steps towards making this a reality was formulated. The proposed Development Plan, entitled Theseus, is the outcome of a recent multinational study by a group of students in the framework of the Master of Space Studies (MSS) 2004 course at the International Space University (ISU). The Theseus Program includes the necessary development strategies in key scientific and technological areas that are essential for identifying the requirements for the exploration of the outer planetary moons. Some of the topics that are analysed throughout the plan include: scientific observations at Europa and Titan, advanced propulsion and nuclear power systems, in-situ resource utilization, radiation mitigation techniques, closed life support systems, habitation for long-term spaceflight, and artificial gravity. In addition to the scientific and technological aspects of the Theseus Program, it was recognized that before any research and development work may begin, some level of program management must be established. Within this chapter, legal issues, national and international policy, motivation, organization and management, economic considerations, outreach, education, ethics, and social implications are all considered with respect to four possible future scenarios which enable human missions to the outer solar system. The final chapter of the report builds upon the foundations set by Theseus through a case study. This study illustrates how such accomplishments could influence a mission to Europa to search for evidence of life in its subsurface oceans. The future remains unpredictable, as does the realization of any of these possibilities. However, projects such as this remind us that the final frontier for humans is truly outer space, and only our imagination will determine where the frontier stops. We can dream of visiting other planetary systems and perhaps even galaxies, but we must begin closer, and considering the scope of our known universe, Europa and Titan are very close indeed.

FROM↗

Astro-D Prelaunch Mission Operation Report (MOR)

The Prelaunch Mission Operation Report for the Astro-D mission is enclosed for your information. Astro-D is a Japanese-led program involving the United States as a participating partner. The Japanese Institute of Space and Astronautical Science (ISAS) provides overall program management, the launch vehicle, the spacecraft, and two Gas Scintillation Imaging System detectors. NASA is providing four nested, thin-foil, grazing-incidence telescope mirrors and two X-ray charged-coupled device solid-state detectors. NASA also provides telemetry tracking support using Deep Space Network ground stations. In return for its scientific instrument contribution, the U.S. will receive 15 percent of the observing time and will share an additional 25 percent for collaborative U.S./Japan scientific investigations. Launch is scheduled for mid- February 1993 from the ISAS launch center near Kagoshima in southern Japan. This MOR: (a) describes the NASA objectives for the Astro-D mission; (b) provides brief descriptions of the spacecraft and its scientific instruments; (c) provides a chronology of launch and deployment; and (d) describes the ground operation elements that support the mission. .

Source record↗