Search NASA⌕ Search

SEARCH · Search NASA

Results for “reasoning about programs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Airtightness Results of Roof-Only Air Sealing Strategies on 1-1/2 Story Homes in Cold Climates

In this second study on solutions to ice dams in 1-1/2 story homes, five test homes located in both cold and very cold climates were analyzed for air leakage reduction rates following modifications by independent contractors on owner-occupied homes. The reason for choosing this house type was they are very common in our area and very difficult to air seal and insulate effectively. Two projects followed a roof-only Exterior Thermal Moisture Management System (ETMMS) process. One project used an interior-only approach to roof air sealing and insulation. The remaining two projects used a deep energy retrofit approach for whole house (foundation wall, above grade wall, roof) air leakage and heat loss reduction. All were asked to provide information regarding project goals, process, and pre and post-blower door test results. Additional air leakage reduction data was provided by several NorthernSTAR Building America industry partners for interior-applied, roof-only modifications on 1-1/2 story homes. The data represents homes in the general market as well as homes that were part of the state of Minnesota weatherization program. A goal was to compare exterior air sealing methods with interior approaches. This pool of data enabled us to compare air tightness data from over 220 homes using similar air seal methods.

1 1/2 STORY BUNGALOW↗

Reduction of Iron (III) Oxide in Microwaves Toward Gasification Studies

The purpose of this study is to reduce hematite (Fe2O3) using hydrogen (H2), carbon monoxide (CO), and methane (CH4) gases using microwave irradiation. Conventional temperature programmed reduction of iron phase transformation under H2, CO, and CH4 agree with the literature. Furthermore, the activation energy for the iron phase transformation in a conventional reactor was in the order of H2>CO>CH4, suggesting that CH4 was the best reductant to initiate the reduction at a much lower temperature than CO, and CO was significantly better than H2 atmosphere. Due to the uneven temperature distribution, the apparent activation energy of microwave reduction under H2 was approximately 1/4th when compared to the conventional reduction in H2. X-ray diffraction (XRD) analysis showed a mixed oxide phase in microwave reduction as opposed to the clear phase transformation in conventional studies. To combat the temperature measurement issues in microwave studies, fiber optic sensors and Forward Looking InfraRed (FLIR) sensors were used to acquire the actual temperature distribution in the catalyst bed. Therefore, a reasonably accurate activation energy estimation was achieved in the catalyst bed. Combining these with the characterization and quantification of the different iron phases in microwave reduction will provide a blueprint for future microwave-assisted gasification studies.

Aireddy, Divakar Reddy↗

Building America Case Study: Project Overcoat: Airtightness Strategies and Impacts for 1-1/2 Story Homes, Minneapolis, Minnesota (Fact Sheet)

In this second study on solutions to ice dams in 1-1/2 story homes, five test homes located in both cold and very cold climates were analyzed for air leakage reduction rates following modifications by independent contractors on owner-occupied homes. The reason for choosing this house type was they are very common in our area and very difficult to air seal and insulate effectively. Two projects followed a roof-only Exterior Thermal Moisture Management System (ETMMS) process. One project used an interior-only approach to roof air sealing and insulation. The remaining two projects used a deep energy retrofit approach for whole house (foundation wall, above grade wall, roof) air leakage and heat loss reduction. All were asked to provide information regarding project goals, process, and pre and post-blower door test results. Additional air leakage reduction data was provided by several NorthernSTAR Building America industry partners for interior-applied, roof-only modifications on 1-1/2 story homes. The data represents homes in the general market as well as homes that were part of the state of Minnesota weatherization program. A goal was to compare exterior air sealing methods with interior approaches. This pool of data enabled us to compare air tightness data from over 220 homes using similar air seal methods.

1 1/2 STORY BUNGALOW↗

Convective Heat Transfer in Decay Heat Exchanger of Sodium-cooled Fast Reactor

Sodium-to-sodium heat exchangers such as the decay heat exchanger (DHX) are key components of the prototype generation [V sodium-cooled fast reactor (PGSFR). The DHX transfers the decay heat generated in the reactor core to the decay heat removal loop after a reactor shutdown. Shell-and-tube type with straight tube arrangement has been widely adopted for the sodium-to-sodium heat exchanger of the sodium-cooled fast reactor. Thus liquid metal heat transfer characteristics inside the tube and around the tube bundle have to be fully understood to design the sodium-to-sodium heat exchanger and evaluate its thermal performance accurately. Plenty of studies on the convective heat transfer of the liquid metals were conducted to present the Nusselt number (Nu) correlations with respect to the Peclet number (Pe). However, those correlations still deviated from each other considerably and few of correlations for low Pe range (less than 100) have been reported. Accordingly, it is difficult for a design code developer to choose a proper heat transfer coefficient correlation for the sodium-to-sodium heat exchanger particularly in a low flow rate range. Recently, a separate effect test for the DHX has been completed using the STELLA-1 facility at KAERI according to the STELLA program which aims at establishment of separate and integral test database (DB) for the design of the PGSFR. The heat transfer performance test of the DHX was successfully conducted under major operating conditions. The objective of this work is to suggest proper convective heat transfer correlations for tube- and shell-sides of the sodium-to-sodium heat exchanger based on the test DB obtained from STELLA-1. The Pe range of the analyzed experimental data is concentrated on less then 100. The adequacy of the suggested correlations is evaluated by applying to the DHX design code, SHXSA. Based on the DHX test DB of the STELLA-1, the proper convective heat transfer correlations for the tube- and shell-side of sodium-to-sodium heat exchangers were suggested. Two correlation combinations for each side were proposed and turned out to be reasonable through the evaluation using the SHXSA design code: Suggestion no. 1: - Lyon correlation (constant = 4) for tube-side; - Lubarsky-Kaufman correlation for shell-side. Suggestion no. 2: - Modified Lyon correlation (constant = 1.45) for tube-side; - Schad-modified correlation for shell-side The Pe ranges of the DHX test DB were 53 - 225 for the tube-side and 45 - 148 for the shell-side, but most of test conditions were concentrated on the Pe range of less than 100. Two correlation suggestions can be practically used for the design of sodium-to-sodium heat exchangers. However, by utilizing more test DB, it needs to be verified which one is closer to real phenomena. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Shape-Selective Catalysts for Fischer-Tropsch Chemistry: January 1, 2001 - December 31, 2008 (Final Report)

Argonne National Laboratory carried out a research program to create, prepare, and evaluate catalysts to promote Fischer-Tropsch (FT) chemistry-specifically, the reaction of hydrogen with carbon monoxide to form long-chain hydrocarbons. In addition to needing high activity, it was desirable that the catalysts have high selectivity and stability with respect to both mechanical strength and aging properties. It was desired that selectivity be directed toward producing diesel fraction components and avoiding excess yields of both light hydrocarbons and heavy waxes. The original goal was to produce shape-selective catalysts that had the potential to limit the formation of long-chain products and yet retain the active metal sites in a protected 'cage.' This cage would also restrict their loss by attrition during use in slurry-bed reactors. The first stage of this program was to prepare and evaluate iron-containing particulate catalysts. Such catalysts were prepared with silica-containing fractal cages. The activity and strength was essentially the same as that of catalysts without the cages. Since there was no improvement, the program plan was modified as discussed below. A second experimental stage was undertaken to prepare and evaluate active FT catalysts formed by atomic-layer deposition [ALD] of active components on supported membranes and particulate supports. The concept was that of depositing active metals (i.e. ruthenium, iron or cobalt) upon membranes with well defined flow channels of small diameter and length such that the catalytic activity and product molecular weight distribution could be controlled. In order to rapidly evaluate the catalytic membranes, the ALD coating processes were performed in an 'exploratory mode' in which ALD procedures from the literature appropriate for coating flat surfaces were applied to the high surface area membranes. Consequently, the Fe and Ru loadings in the membranes were likely to be smaller than those expected for complete monolayer coverage. In addition, there was likely to be significant variation in the Fe and Ru loading among the membranes due to difficulties in nucleating these materials on the aluminum oxide surfaces. The first series of experiments using coated membranes demonstrated that the technology needed further improvement. Specifically, observed catalytic FT activity was low. This low activity appeared to be due to: (1) low available surface area, (2) atomic deposition techniques that needed improvements, and (3) insufficient preconditioning of the catalyst surface prior to FT testing. Therefore, experimentation was expanded to the use of particulate silica supports having defined channels and reasonably high surface area. An effective FT catalyst consisting of ALD-deposited Co and Pt on a silica support has been prepared and demonstrated. This catalyst was more effective than a similar catalyst deposited upon a support of ALD-deposited Al 2 O 3 on silica. This result implies that the deposition of Al 2 O 3 to form a support is not as effective as desired. The addition of Pt as a Co-containing catalyst promoter has been demonstrated; it appears to primarily affect the catalyst pre-conditioning step. Co on Al 2 O 3 catalyst prepared by the Center for Applied Energy Research (CAER) is more effective than Argonne-prepared ALD-deposited Co on ALD-deposited Al 2 O 3 catalyst. The FT activity of ALD-coated Co catalyst on Al 2 O 3 is about linear with Co level from about 9 to 25%. A cooperative research effort was undertaken to test the deposition of platinum on Co FT catalysts; this Pt influences the effectiveness of catalyst conditioning and its continuing activity. In summary, the ALD Pt at a low concentration (0.1 wt %) was as effective as that of the wet chemical deposition technique of CAER (specifically incipient deposition on a Co catalyst that had been prepared and calcined before the Pt deposition.) The ALD technique appeared to be nominally better than the incipient wetness technique that involved co-deposition of Pt and Co prior to calcination. The activation energy of the rate of CO conversion was tightly grouped about an average of 29.2 Kcal/mol when all of the Co-containing catalysts other than those with high Pt promoter levels were taken into account; this implies a uniform reaction mechanism. Catalysts containing Pt and Ru that were ALD-deposited on an ALD-Al 2 O 3 coated catalyst support were found to be relatively inactive. Additional tests were made with a low concentration (0.1 wt %) of Ru or Ir deposited on the reference Co catalyst. The Ir coated catalysts were particularly effective. In support of the above, there was an opportunity to undertake a study of cobalt/promoter/support interaction using the Advanced Photon Source (APS) of Argonne. A number of catalysts (including reference cobalt oxide and iron oxides) were tested using temperature programmed EXAFS/XANES experiments.

08 HYDROGEN↗

Metrics and Benchmarks for Quantum Processors: State of Play

A compelling narrative has taken hold as quantum computing explodes into the commercial sector: Quantum computing in 2018 is like classical computing in 1965. In 1965 Gordon Moore wrote his famous paper about integrated circuits, saying: "At present, [minimum cost] is reached when 50 components are used per circuit. But... the complexity for minimum component costs has increased at a rate of roughly a factor of two per year... by 1975, the number of components per integrated circuit for minimum cost will be 65,000." This narrative is both appealing (we want to believe that quantum computing will follow the incredibly successful path of classical computing!) and plausible (2018 saw IBM, Intel, and Google announce 50-qubit integrated chips). But it is also deeply misleading. Here is an alternative: Quantum computing in 2018 is like classical computing in 1938. In 1938, John Atanasoff and Clifford Berry built the very first electronic digital computer. It had no program, and was not Turing-complete. Vacuum tubes — the standard "bit" for 20 years — were still 5 years in the future. ENIAC and the achievement of "computational supremacy" (over hand calculation) wouldn't arrive for 8 years, despite the accelerative effect of WWII. Integrated circuits and the information age were more than 20 years away. Neither of these analogies is perfect. Quantum computing technology is more like 1938, while the level of funding and excitement suggest 1965 (or later!). But the point of the cautionary analogy to 1938 is simple: Quantum computing in 2018 is a research field. It is far too early to establish metrics or benchmarks for performance. The best role for neutral organizations like IEEE is to encourage and shape research into metrics and benchmarks, so as to be ready when they become necessary. This white paper presents the evidence and reasoning for this claim. We explain what it means to say that quantum computing is a "research field", and why metrics and benchmarks for quantum processors also constitute a research field. We discuss the potential for harmful consequences of prematurely establishing standards or frameworks. We conclude by suggesting specific actions that IEEE or similar organizations can take to accelerate the development of good metrics and benchmarks for quantum computing.

97 MATHEMATICS AND COMPUTING↗

Measurements of the Neutron Magnetic Form Factor and the Two-Photon Exchange Contribution to the Electron-Neutron Elastic Scattering Cross Section

The Super BigBite Spectrometer (SBS) program in Experimental Hall A of Jefferson Lab is a series of high-precision, large ?2 , electromagnetic form factor experiments. GMn and nTPE were the first two experiments of the SBS program and ran from Oc?tober 2021 through February 2022. Both experiments detect neutron-tagged ?(?, ???) and proton-tagged ?(?, ???) quasi-elastic electrons scattering from a deuterium tar?get. The GMn experiment is a measurement of the magnetic form factor of the neutron, ?? ?, via the ratio method over a ?2 range of 3.5 to 13.5 (GeV/c)2 . The nTPE experiment ran in-parallel with the GMn experiment and shared an overlap?ping kinematic point with GMn. nTPE extends the GMn experiment to assess the differences between Rosenbluth Slop and the single-photon exchange approximation. The nTPE experiment had two kinematic settings corresponding to different electron scatting angles at a fixed ?2 of 4.5 (GeV/c)? . Comparisons of nucleon form factor ratio measurements acquired through polarization transfer and LT separation reveal discrepancies as ?2 increases. Two-photon exchange is strongly favored as the reason for this discrepancy. ?? ? has been extracted at two kinematic settings corresponding to ?2 values of 3.0 and 4.5 (GeV/c)2 . Additionally, I will present an assessment of the differences between Rosenbluth Separation and single-photon exchange measure?ments.

Boyd III, John Alan↗

Lessons Learned from Performing a Human Factors Engineering Validation of an Upgraded Digital Control System in a Nuclear Power Plant Control Room

The United States' fleet of nuclear power plants (NPPs) have exceeded their original 40-year licenses and many are seeking license renewals to continue operations into the future. To support continued operation the Department of Energy's (DOE) Light Water Reactor Sustainability Program (LWRS) provides support for utilities to maintain and upgrade their power production capabilities. Control room modernization is one focus area, which aims to modernization the analog control rooms with digital controls and human-system interfaces (HSIs). The Turbine Control System (TCS) is a non-safety related system undergoing modernization efforts at multiple plants and utilities. Considerable human factors research efforts, comprised of expert reviews and operator in the loop studies were performed to develop human factors compliant and usable TCS. This report documents the final phase of the human factors engineering program used to design and validate the new digital TCS. According to the NUREG-0711 review guide, one of the last steps of human factors engineering program prior to implementation is human factors validation. This report details the method, results and conclusions from the human factors validation study of a collaborating utilities TCS slated to be implemented in one of their plants. One control room team consisting of two control room supervisors and two reactor operators participated in the validation. All team members had participated in the BNP TCS training program foregoing the TCS validation. Performance measures included task performance, situation awareness and workload, expert observation of any negative influences of human-system interface features on control room team performance, and interviews with the participating operators. Performance criteria were based on the performance scores and the topics identified by interviews and expert observations. The results showed that the crew using the new TCS clearly could achieve their overall objectives in the test scenarios with sufficient situation awareness. The new TCS compared to the old system provided clear improvements of the control room work regarding shell and chest warming and regarding valve and other system testing. However, a number of Human Engineering Discrepancies (HEDs) were identified. HEDs were prioritized (level 1, 2 or 3) according to potential safety, plant availability, operability or personnel performance consequences. Since no priority 1 HEDs were identified there is no HFE reason not to continue implementation of the TCS. The TCS upgrade is acceptable if the Priority 2 HEDs are resolved and dispositioned in a satisfactory way. Priority 3 HEDs should be noted and considered for future modifications.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

ARCUS Vertical-Axis Wind Turbine (Final Scientific/Technical Report)

While land-based wind energy has become economically competitive with traditional energy generation sources in the U.S., offshore wind is not. For floating offshore wind this difference is even more substantial where the levelized cost of energy (LCOE) is projected to be around 3-5 times more expensive than land-based wind. The turbine capital costs represent around 50% of the LCOE for land-based wind sites, but the increased system costs for floating offshore wind reduce this to 20%. The platform and mooring costs are the single largest contributor to the LCOE for floating offshore wind where their mass must counteract the overturning moment caused by the turbine’s thrust force. Despite the high costs of the platform and relatively low cost of the turbine, current offshore wind turbines are designed essentially the same as for land-based sites. Reducing the LCOE is the greatest challenge to realize the benefits of sustained development of floating offshore wind in the U.S. Reducing the complicated system costs of floating offshore wind will enable the industry to continue to grow and outpace current projections if reduced cost curves can be reached. The ideal wind energy system would remove all mass and cost that is not directly capturing energy from the wind. For floating offshore wind energy systems, this objective is even more significant as increased mass above the water level must be supported by larger and more expensive floating platforms. For this reason, vertical-axis wind turbines (VAWTs) are ideal for floating offshore sites and have several advantages over horizontal-axis wind turbines (HAWTs) at this scale. Large VAWTs offer opportunities for improved energy capture over HAWTs as single units and with reduced wind plant aerodynamic losses through enhanced wake recovery. Additionally, the platform-level placement of the VAWT drivetrain greatly reduces the demands placed on the floating platform and its mass and cost. The ARCUS vertical-axis wind turbine concept (U.S. 11,421,650 B2) is an iteration beyond traditional Darrieus-type VAWTs that replaces the rigid tower with blades that are bent into shape and held in place with tensioned center supports, like a bow. The ARCUS design has been shown to further decrease the VAWT rotor mass properties, with a 50% reduction over traditional Darrieus VAWTs quantified in the ATLANTIS program. The ARCUS VAWT’s efficient use of material for the rotor and turbine support structures combined with its lowered center of gravity enables a tension-leg platform (TLP) with simplified installation procedures. TLPs have been an emerging platform architecture in the Oil and Gas industry and demonstrated to have the lowest hull mass requirements while maintaining stability with minimal roll and pitch deflections in operation. A 22 MW ARCUS turbine has been designed with a three-column TLP that enables quayside integration of the turbine while maintaining system stability during tow-out and installation and having optimal mass and cost properties. A comprehensive analysis shows the optimal ARCUS TLP system design minimizes LCOE through efficient material usage and increased energy capture to yield a competitive LCOE estimate of $\$$55/MWh. A comparison with a reference HAWT, having the same swept area, quantifies the advantages that helped to produce this improved LCOE for the ARCUS concept: (1) 30% reduction in total turbine mass, (2) 70% reduction in turbine center of gravity, and (3) 45% increase in energy production over what is optimal for a HAWT. Intellectual property has been generated through the ATLANTIS program providing opportunities to further reduce the LCOE and improve the performance of the ARCUS turbine and TLP system, expanding the list of innovations to support commercial development of the ARCUS concept.

17 WIND ENERGY↗

Back from the Brink with Something for Everyone - The Final Executed Memorandum of Agreement for Interpretation of the East Tennessee Technology Park and the K-25 Building - 13370

When the Environmental Management (EM) Program at the Oak Ridge Office of the Department of Energy (DOE) began its major decontamination and decommissioning (D and D) program activities in the mid-1990's, it was understood that the work to demolish the gaseous diffusion process buildings at the K-25 Site, as it was then known, would be challenging. Nothing of that size and breadth had ever been done within the DOE complex and the job brought about a full menu of unique attributes: radiological contamination with enriched materials entrained in certain areas of the system, a facility that was never designed not to operate but had been shut down since 1964, and a loyal following of individuals and organizations who were committed to the physical preservation of at least some portion of the historic Manhattan Project property. DOE was able to solve and resolve the issues related to nuclear materials management, contamination control, and determining the best way to safely and efficiently deconstruct the massive building. However, for a variety of reasons, resolution of the historic preservation questions - what and how much to preserve, how to preserve it, where to preserve it, how to interpret it, how much to spend on preservation, and by and for whom preservation should occur - remained open to debate for over a decade. After a dozen years, countless meetings, phone calls, discussions and other exchanges, and four National Historic Preservation Act (NHPA) [1] Memoranda of Agreement (MOA), a final MOA [2] has been executed. The final executed MOA's measures are robust, creative, substantive, and will be effective. They include a multi-story replica of a portion of the K-25 Building, the dedication of the K-25 Building footprint for preservation purposes, an equipment building to house authentic Manhattan Project and Cold War equipment, a virtual museum, an on-site history center, a grant to preserve a historically-significant Manhattan Project-era hotel in Oak Ridge, and more. The MOA was designed to offer something for everyone. The MOA for the K- 25 Building and interpretation of the East Tennessee Technology Park (ETTP; formerly the K-25 Site) was executed by all of the signatory parties on August 7, 2012 - almost 67 years to-the-day after the 'product' of the K-25 process building became known to more than just a small group of scientists and engineers working on a secret project for the Army Corps of Engineers Manhattan District. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Mechanically-Cooled, Highly-Portable, HPGe-Based, Coded-Aperture Gamma-Ray Imager

Coded-aperture gamma-ray imaging is a mature technology that is capable of providing accurate and quantitative images of nuclear materials. Although it is potentially of high value to the safeguards and arms-control communities, it has yet to be fully embraced by those communities. One reason for this is the limited choice, high-cost, and low efficiency of commercial instruments; while instruments made by research organizations are frequently large and / or unsuitable for field work. In this paper we present the results of a project that mates the coded-aperture imaging approach with the latest in commercially-available, position-sensitive, High Purity Germanium (HPGe) detec-tors. The instrument replaces a laboratory prototype that, was unsuitable for other than demonstra-tions. The original instrument, and the cart on which it is mounted to provide mobility and pointing capabilities, has a footprint of ~ 2/3 m x 2 m, weighs ~ 100 Kg, and requires cryogen refills every few days. In contrast, the new instrument is tripod mounted, weighs of order 25 Kg, operates with a laptop computer, and is mechanically cooled. The instrument is being used in a program that is ex-ploring the use of combined radiation and laser scanner imaging. The former provides information on the presence, location, and type of nuclear materials while the latter provides design verification information. To align the gamma-ray images with the laser scanner data, the Ge imager is fitted and aligned to a visible-light stereo imaging unit. This unit generates a locus of 3D points that can be matched to the precise laser scanner data. With this approach, the two instruments can be used completely independently at a facility, and yet the data can be accurately overlaid based on the very structures that are being measured.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Physical Security Model Development of an Electrochemical Facility.

Nuclear facilities in the U.S. and around the world face increasing challenges in meeting evolving physical security requirements while keeping costs reasonable. The addition of security features after a facility has been designed and without attention to optimization (the approach of the past) can easily lead to cost overruns. Instead, security should be considered at the beginning of the design process in order to provide robust, yet efficient physical security designs. The purpose of this work is to demonstrate how modeling and simulation can be used to optimize the design of physical protection systems. A suite of tools, including Scribe3D and Blender, were used to model up a generic electrochemical reprocessing facility. Physical protection elements such as sensors, portal monitors, barriers, and guard forces were added to the model based on best practices for physical security. One outsider theft scenario was examined with 4-8 adversaries to determine security metrics. This work fits into a larger Virtual Test Bed 2020 Milestone in the Material Protection, Accounting, and Control Technologies (MPACT) program through the Department of Energy (DOE). The purpose of the milestone is to demonstrate how a series of experimental and modeling capabilities across the DOE complex provide the capabilities to demonstrate complete Safeguards and Security by Design (SSBD) for nuclear facilities. ACKNOWLEDGEMENTS This work was funded by the Materials Protection, Accounting, and Control Technologies (MPACT) working group as part of the Nuclear Technology Research and Development Program under the U.S. Department of Energy, Office of Nuclear Energy.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Joint Inversion of Surface Electrical Resistivity Tomography and Seismic Refraction Data between the 200 Areas

Geologic stratigraphy on the Hanford Site influences groundwater and contaminant migration through the aquifer system and the vadose zone. The current geologic framework model (GFM) relies heavily on a sparse distribution of borehole data in some locations to map geologic contacts and hydrologic properties in the subsurface. Non-invasive geophysical methods such as electrical resistivity tomography (ERT), transient electromagnetic surveying, and seismic imaging are being used at Hanford to map subsurface structure in areas with limited well observations. This is to develop and mature the capability of geophysical methods to aid in GFM refinement, to identify regions of subsurface complexity, and for optimal well siting. A joint inversion of co-located seismic refraction and ERT data was carried out for data collected on a ~2.3-km profile between the 200 Areas on the Hanford Site. While ERT and seismic refraction images have sensitivity to overlapping physical properties (porosity, moisture content, lithology), the resolution and physics used to acquire each of these datasets are different and therefore information can be different or mutually complementary. Performing a joint inversion provides a reasonable option for a coherent, coupled interpretation for mutually complementary datasets. Between the 200 Areas, there are few boreholes to interpret the geologic framework model, and these data sets were obtained to provide a first line of evidence toward identifying stratigraphic structure. The seismic refraction and ERT data were independently inverted during fiscal year 2022 and broadly showed a two-layer structure with a trough-like feature that is ~1 km wide and upwards of 150 m deep. The depth of the trough feature was greater in the ERT image compared to the seismic image, which indicated a maximum depth of approximately 110 m. The objective of the joint inversion described in this report was to invert the seismic refraction and ERT data together while constraining the ERT image to be structurally similar to the seismic refraction image. The approach was applied using the geophysical inverse modeling program E4D, which has the capability to invert first-arrival times from seismic refraction data and ERT resistances using a “cross-gradient” constraint. The application of cross-gradient constraints with different weights produces ERT models that show a high degree of similarity within the upper 100 m (above ~120 m elevation). None of the ERT models show an improved structural similarity to the seismic result; therefore, it is recommended that further attempts to jointly interpret these models focus on petrophysics and image resolution. Petrophysical measurements of core samples would improve knowledge of what drives the ERT response in this region and, along with downhole geophysical measurements, could be used to “ground truth” the surface-based geophysical results. Image resolution studies would provide insight into which regions of the inverted images are reliable and which regions are poorly constrained.

58 GEOSCIENCES↗

On-Site Disposition of Concrete During Decommissioning and Decontamination: A Data Quality Objective-Based Approach

On-site disposition of concrete derived during decommissioning and demolition (D and D) of buildings at industrial sites is a cost-effective, waste minimization alternative to off-site disposal. Because the concrete is to be left on-site it becomes part of the solid matrix of the site and is subject to the compositional constraints governing site soils. In addition, the concrete and its contained-in materials may be subject to physical constraints such as size and shape which do not apply to soils. When considering on-site disposition of concrete, the data quality objective (DQO) process should be used to determine the compositional and physical constraints on the concrete and for developing the characterization approach to determine whether those constraints have been met. The information inputs to the compositional and physical constraints on the concrete constitute the concrete acceptance criteria (CAC) which become the basis for developing decision rules - the yes/no statements that unequivocally state the compositional and physical conditions under which concrete may be left on site. An important DQO boundary concept is concrete classification. The cost of concrete characterization can be minimized with a thorough data gap assessment by focusing resources on the concrete most in need of characterization. Concrete for which a yes/no decision can be made with reasonable certainty based on a comparison of existing data to the CAC receives a lesser amount of characterization scrutiny than does concrete for which existing data is non-existent or ambiguous relative to the CAC. In conclusion: Developing acceptance criteria for the on-site disposition of concrete through the DQO process provides a systematic methodology for determining and documenting what decisions will be made and what information is necessary to support those decisions. At each step in the process, input from all individuals or organizations that have a role in making the ultimate decision must be invited. The primary goal of the DQO process is the development of a clear and defensible set of decision rules that are acceptable, unanimously agreed upon, and approved by all decision makers. By conducting the DQO process in an analytical and systematic manner, unexpected and, perhaps, costly changes to an operational program resulting from last minute second-guessing can be prevented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Right-Sized Reuse - Use a Systematic Process, and Design for a Specialized, Yet Flexible Result - 13558

The process of transferring real property from the U.S. Department of Energy (DOE) is always the same - except when it's not. The most frequently asked questions in the process are: how can this take so long and be so complex, and why is it different every time? The process of transferring real property from the Department of Energy is always the same - except when it's not. Repeat as needed. The authority for DOE to transfer property is found in the Atomic Energy Act of 1954 (AEA). Specifically, the transfer of real property for mission-related purposes is done pursuant to the AEA Section 161(g). Another rule that can provide certain unique benefits to the transferee is found in 10 Code of Federal Regulations (CFR) Part 770, Transfer of Real Property at Defense Nuclear Facilities for Economic Development; it can be followed for economic development purposes at defense nuclear facilities. All federal real property transfers include at minimum a National Environmental Policy Act (NEPA) review and a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) chap. 120(h) environmental due diligence evaluation. The end-point objective is to be able to demonstrate that a transfer is protective of human health and the environment - typically attained via a risk evaluation. That's it...mostly. None of these requirements are new; their processes are well-known. So, why is it different every time there is a transfer and what can be done to move things along? Time and the perception of open-ended schedules kill projects. Economic development projects that are proposed by Community Reuse Organizations (CROs) and others or by parties who need private capital are especially time-sensitive. It is not reasonable to expect business interests or investors to wait two years while the property transfer process is carried out. Lenders are also risk-sensitive and not solely business-risk sensitive. After all, these are federal properties where contamination is a factor. What are some of the things you can do to address those time and risk issues? Issues of time and complexity arise from several variables. Short-sighted vision and lack of project definition lead to wasted effort and lengthy delays. Some variability on the input side of the process can be controlled in a way that will save you time and actually work to your advantage. Steps can be taken to systematize the transfer process on the agency's part and on the requester/grantee's part. Having the right mix of dedicated people from the beginning, planning with flexibility, coordinating with the clean-up program at your site, knowing the interests and issues of your stakeholders, and working with the CRO/economic development authorities - all of these measures and others can and will help you. The key is not simply knowing the steps and making a punch-list, but understanding the steps and how to work with and use them. These concepts can be applied to create a vision of success for those engaged in real property transfer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of Preliminary Remediation Goals for Indoor Dust at the Colonie FUSRAP Site - 12273

The Colonie FUSRAP Site is located in the Town of Colonie, Albany County, New York. The U.S. Army Corps of Engineers is currently addressing environmental contamination associated with the Site under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) process as part of the Formerly Utilized Sites Remedial Action Program (FUSRAP). Soil remediation activities have been substantially completed at the Colonie FUSRAP Site and its vicinity properties under the FUSRAP. A study unrelated to FUSRAP was recently performed by an independent party to establish the distribution of DU contamination in various media in the environs of the Site. As part of this study, dust samples were collected in residencies and businesses in the immediate vicinity of the Site. These samples were collected in non-living areas such as basement window sills and garages. Many of these samples tested positive for DU. An assessment was performed to establish preliminary remediation goals (PRGs) for indoor dust in non-living areas of residential homes and businesses in the vicinity of the Site. The results of this assessment provide estimates of dose-based, carcinogenic risk-based, and noncarcinogenic-based PRGs derived from a hypothetical exposure scenario with reasonable levels of conservatism. Ultimately, the PRGs will be compared to results of dust sampling and analyses in residences and businesses in proximity of the Site to determine whether a response action is appropriate. This assessment estimates PRGs for DU contaminated dust in non-living areas of residences in the vicinity of the Colonie FUSRAP site based on a reasonably conservative exposure scenario. Estimated PRGs based on residential receptors are considered to be conservatively representative of workers in nearby businesses based on the considerably longer exposure duration of residents relative to workers. This assessment provides reasonably conservative estimates of PRGs for DU contaminated dust in non-living areas within residences in the vicinity of the Site. It should be noted that the PRGs include hypothetical exposures resulting from activities in both the living areas and non-living areas of a residence. The PRGs are derived and presented in terms of DU dust concentration in non-living areas to facilitate comparison to results of a planned Site Investigation that will characterize concentrations of DU in dust in non-living areas. It is important to recognize that the exposure assumptions used to derive these PRGs are based on average dust DU concentrations in non-living areas. It is inappropriate to compare these PRGs to the dust DU concentration in an isolated small area. The ongoing Site Investigation addresses this consideration and is designed to provide reasonable estimates of average dust DU concentrations in non-living areas of vicinity properties. In order to accomplish this, sampling is conducted in accordance with EPA Guidance for the Sampling and Analysis of Lead in Indoor Residential Dust for Use in the Integrated Exposure Uptake Biokinetic (IEUBK) Model, (EPA 2008), which specifically addresses estimating average contaminant concentrations in dust. Four (4) large-area samples are collected from each VP in accordance with this guidance. It is anticipated that the results of the Site Investigation will be used in conjunction with the results of this assessment, and/or subsequent assessments, to establish whether or not a response action is appropriate. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Wallula Basalt Pilot Demonstration Project: Post-injection Results and Conclusions

Deep underground geologic formations are emerging as a reasonable option for long-term storage of CO 2 , including large continental flood basalt formations. At the GHGT-11 and GHGT-12 conferences, progress was reported on the initial phases for Wallula Basalt Pilot demonstration test (located in Eastern Washington state), where nearly 1,000 metric tons of CO 2 were injected over a 3-week period during July/August 2013. The target CO 2 injection intervals were two permeable basalt interflow reservoir zones with a combined thickness of ~20 m that occur within a layered basalt sequence between a depth of 830-890 m below ground surface. During the two-year post-injection period, downhole fluid samples were periodically collected during this post-injection monitoring phase, coupled with limited wireline borehole logging surveys that provided indirect evidence of on-going chemical geochemical reactions/alterations and CO 2 disposition. A final detailed post-closure field characterization program that included downhole fluid sampling, and performance of hydrologic tests and wireline geophysical surveys. Included as part of the final wireline characterization activities was the retrieval of side-wall cores from within the targeted injection zones. These cores were examined for evidence of in-situ mineral carbonization. Visual observations of the core material identified small globular nodules, translucent to yellow in color, residing within vugs and small cavities of the recovered basalt side-wall cores, which were not evident in pre-injection side-wall cores obtained from the native basalt formation. Characterization by x-ray diffraction identified these nodular precipitates as ankerite, a commonly occurring iron and calcium rich carbonate. Isotopic characterization (δ 13 C, δ 18 O) conducted on the ankerite nodules indicate a distinct isotopic signature that is closely aligned with that of the injected CO 2 . Both the secondary mineral nodules and injected CO 2 are measurably different from the isotopic content of basalt, injection zone groundwater and for naturally occurring calcite. Final post-injection wireline geophysical logging results also indicate the presence of free-phase CO 2 at the top of the two injection interflow zones, with no vertical migration of CO 2 above the injection horizons. Furthermore, these findings are significant and demonstrate the feasibility of sequestering CO 2 in a basalt formation.

54 ENVIRONMENTAL SCIENCES↗

Maximum entropy principal for transportation

In this work we deal with modeling of the transportation phenomenon for use in the transportation planning process and policy-impact studies. The model developed is based on the dependence concept, i.e., the notion that the probability of a trip starting at origin i is dependent on the probability of a trip ending at destination j given that the factors (such as travel time, cost, etc.) which affect travel between origin i and destination j assume some specific values. The derivation of the solution of the model employs the maximum entropy principle combining a priori multinomial distribution with a trip utility concept. This model is utilized to forecast trip distributions under a variety of policy changes and scenarios. The dependence coefficients are obtained from a regression equation where the functional form is derived based on conditional probability and perception of factors from experimental psychology. The dependence coefficients encode all the information that was previously encoded in the form of constraints. In addition, the dependence coefficients encode information that cannot be expressed in the form of constraints for practical reasons, namely, computational tractability. The equivalence between the standard formulation (i.e., objective function with constraints) and the dependence formulation (i.e., without constraints) is demonstrated. The parameters of the dependence-based trip-distribution model are estimated, and the model is also validated using commercial air travel data in the U.S. In addition, policy impact analyses (such as allowance of supersonic flights inside the U.S. and user surcharge at noise-impacted airports) on air travel are performed.

97 MATHEMATICS AND COMPUTING↗