Search NASA⌕ Search

SEARCH · Search NASA

Results for “Current SCALE Development Activities”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 739 records · Page 41

SRNL Phase 1 Assessment of the WTP Waste Qualification Program

The Hanford Tank Waste Treatment and Immobilization Plant (WTP) Project is currently transitioning its emphasis from an engineering design and construction phase toward facility completion, start-up and commissioning. With this transition, the WTP Project has initiated more detailed assessments of the requirements that must be met during the actual processing of the Hanford Site tank waste. One particular area of interest is the waste qualification program. In general, the waste qualification program involves testing and analysis to demonstrate compliance with waste acceptance criteria, determine waste processability, and demonstrate laboratory-scale unit operations to support WTP operations. The testing and analysis are driven by data quality objectives (DQO) requirements necessary for meeting waste acceptance criteria for transfer of high-level wastes from the tank farms to the WTP, and for ensuring waste processability including proper glass formulations during processing within the WTP complex. Given the successful implementation of similar waste qualification efforts at the Savannah River Site (SRS) which were based on critical technical support and guidance from the Savannah River National Laboratory (SRNL), WTP requested subject matter experts (SMEs) from SRNL to support a technology exchange with respect to waste qualification programs in which a critical review of the WTP program could be initiated and lessons learned could be shared. The technology exchange was held on July 18-20, 2011 in Richland, Washington, and was the initial step in a multi-phased approach to support development and implementation of a successful waste qualification program at the WTP. The 3-day workshop was hosted by WTP with representatives from the Tank Operations Contractor (TOC) and SRNL in attendance as well as representatives from the US DOE Office of River Protection (ORP) and the Defense Nuclear Facility Safety Board (DNFSB) Site Representative office. The purpose of the workshop was to share lessons learned and provide a technology exchange to support development of a technically defensible waste qualification program. The objective of this report is to provide a review, from SRNL's perspective, of the WTP waste qualification program as presented during the workshop. In addition to SRNL's perspective on the general approach to the waste qualification program, more detailed insight into the specific unit operations presented by WTP during the workshop is provided. This report also provides a general overview of the SRS qualification program which serves as a basis for a comparison between the two programs. Recommendations regarding specific steps are made based on the review and SRNL's lessons learned from qualification of SRS low-activity waste (LAW) and high-level waste (HLW) to support maturation of the waste qualification program leading to WTP implementation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Highly Efficient Magnetocaloric Natural Gas Liquefaction (Final Report)

Over the twelve-month project the following achievements were accomplished: • Liquefication of methane as primary component of natural gas was accomplished with a magnetocaloric liquefier (MCL) prototype. This was the first time an MCL was used to liquefy methane. • Improved MCL designs were completed. • Cooling to 135 K from room temperature was achieved for the first time in a single MCL stage with dual, reciprocating four-layer regenerators. • Techno-economic analysis for a multi-stage 5 tonne/day magnetocaloric liquefier was completed. The detailed thermodynamic analysis of this MCL design showed a figure of merit (FOM) of 0.6 was achievable. This is a ~2x improvement over current state of the art. • Cost of an efficient 5 tonne/day LNG multi-stage liquefier was projected to be ~$\$$3.1 MM for the 5 tonne/day MCL with achievable design assumptions. • Market study of U.S. merchant LNG demand by energy sector was completed showing that at beginning of 2019, total use was ~2.5 million gallons/day primarily in three sectors that was filled by ~20 small companies in the merchant LNG supply business producing ~2.3 million gpd. These data exclude LNG produced at dedicated peak shaving and large export plants. • Business case for MCL technology based on LNG market study was completed showing the high FOM feature of MCL reduces cost of plant power, and lower capital cost reduces debt repayment and plant depreciation operating expenses. However, today’s demand for U.S. merchant LNG in most sectors is satisfied with conventional technology. Further, with today’s extremely low natural gas (NG) feedstock costs (e.g., ~$\$$1.8/MMBtu), the cost of fuel for NG gensets and for LNG feedstock is already very low. Therefore, possible new merchant LNG liquefier plant developers anticipating demand growth in the transportation, industrial, and electricity generation sectors do not obtain sufficient cost benefits to adopt new, commercially unproven MCL technology. • Other market factors such as remoteness from existing NG pipelines, or unfilled or unsatisfied applications such as boil-off gas re-liquefaction in LNG vessels, or policy factors such as some form of emissions-related fees may make lower capital costs and higher FOM of MCL technology attractive for new small-scale (~50 tonne/day) LNG plants. Two potentially attractive niche markets for MCL technology were identified: i) re-liquefaction of boil-off gas from large LNG transport vessels where severe transport conditions are problematic for conventional technology; and ii) providing LNG in distributed-scale plants that eliminate road transport costs to meet diverse, smaller-scale, distributed LNG bunkering fuel demands. By eliminating significant cryogenic tanker delivery costs and create an attractive cost-savings benefit with small-scale MCL plants.

03 NATURAL GAS↗

Field Demonstration of The Krauklis Seismic Wave In A Novel Mva Method For Geologic CO 2 Storage

The Energy & Environmental Research Center (EERC) conducted a feasibility study of a new, low-impact geophysics monitoring method designed to incrementally track the saturation front of CO 2 injected into a reservoir. The method leverages a new way of transmitting energy from the surface to the reservoir and employs a new subsurface signal called the Krauklis wave (K-wave) and other guided waves for seismic monitoring. The EERC partnered with Seismos, Inc., the company that holds the exclusive technology license for this method, to advance development of K-wave technology, and Denbury Onshore, LLC, to field-test the system. The system was field-tested at Denbury’s Bell Creek oil field, currently undergoing CO 2 -based enhanced oil recovery (EOR) in southeastern Montana. The K-wave system uses a wellhead-mounted source to propagate energy down the wellbore in the form of a tube wave and through the well perforations into the reservoir. Part of the energy transmitted through the perforations into the reservoir converts to slow moving K-waves and/or other guided waves that are expected to propagate through the formation to neighboring wells. The propagated signal would induce tube waves in the neighboring wells that return to the surface to be recorded with a wellhead-mounted receiver. The propagation time of the signal is directly affected by the presence of CO 2 between the wells, so the difference in transit time of the returning signal between pre- and postinjection data sets could be used to help define the lateral extent of a CO 2 saturation front. Objectives of the study were to demonstrate, validate, and evaluate the K-wave method’s ability to monitor the morphology of injected CO 2 and estimate saturation distribution. Results from the demonstration were to be compared to conventional 4-D surface seismic methods, dynamic reservoir simulations, and CO 2 breakthrough data to validate the technology and provide useful information that may result in improvements. Prior to mobilizing for the full-scale K-wave baseline survey, a field test was conducted to better understand wellhead hardware configurations and test the response from the Bell Creek reservoir using three wells. Useful operational information resulted but signal from the first-generation gas release/gas injection source was not recorded in neighboring wells. After the initial field test, numerical modeling of the K-wave method was initiated using parameters specific to the Bell Creek Field. Modeling results indicated that the fundamental concepts behind the K-wave method exhibited problems and revealed a significantly greater attenuation of the signal at the wellbore perforations than expected, totaling on the order of 10-8 from source well to receiver well over a 400-m well spacing. Modeling also showed that greater source frequency bandwidth was needed to produce guided waves within a 30-foot-thick reservoir layer such as that at Bell Creek and that reservoir layer seismic velocity would need to be slower than the velocities of the bounding layers in order to act as a wave guide opposite to what exists at Bell Creek. Modeling results prompted a second field test with a stronger, second-generation displacement source developed in the interim. Concurrent with the second field test, a 3-D seismic survey was acquired to serve as a baseline for project validation and to serve as a monitor data set for the portion of the project area where CO 2 injection had already commenced. The new source was tested using a four-well geometry and failed to produce a detectable signal, which appeared to confirm modeling results and indicated that the Bell Creek Field is not an ideal site for the K-wave test. It was concluded that a source with sufficient strength and bandwidth could not be built to overcome the factors discovered by the modeling within a reasonable amount of time. Several other sites undergoing CO 2 -based EOR were also evaluated; however, none of these sites was amenable because of geology, limitations of source and receiver hardware, or the advanced state of the CO 2 flood. In addition, two other configurations of the source and receiver layout were considered; however, these design modifications either changed the scope of the project or did not meet the goals of the Carbon Storage Program. In consultation with the U.S. Department of Energy (DOE) Project Manager and Technology Manager, a no-go decision was invoked to forego additional expenditures as the technology would not meet current project objectives. Project activities to date have moved the technology forward by developing modeling equations that can be applied elsewhere, advanced the state of wellhead sensors and sources, and spurred improvements to field operations. The 3-D seismic survey in the project area and the dynamic reservoir simulations done as part of this study have provided value for ongoing and future synergistic activities at Bell Creek related to DOE carbon storage goals.

54 ENVIRONMENTAL SCIENCES↗

Geomechanical and Hydrogeological Evaluation of a Shallow Hydraulic Fracture at the Devine Fracture Pilot Site, Medina County, Texas

UT-Austin’s Devine Fracture Pilot Site, 50 miles southwest of San Antonio, Texas, has been targeted for a comprehensive, multidisciplinary development of fracture diagnostic techniques that are cross-validated by ground-truth data acquisition near a recently created, 175-ft-deep, horizontal hydraulic fracture (Ahmadian et al. 2018 Demonstration of proof of concept of electromagnetic geophysical methods for high resolution illumination of induced fracture networks. In Proceedings of the SPE Hydraulic Fracturing Technology Conference and Exhibition, The Woodlands, Texas, USA, 23–25 January 2018. SPE-189858-MS.). To evaluate the fracture diagnostic methods at this site, we conducted injection tests with a predefined volumetric flow-rate profile, resembling a diagnostic fracture injection test on September 2020. Subsequently, we developed hydrogeological and geomechanical models based on flow-rate and bottomhole-pressure measurements. History-matching efforts using a simplified layer-cake hydrogeological model resulted in the field-scale formation permeability of 9.87 × 10 –15 m 2 (10 mD) and Darcy-scale fracture permeability. The analysis of the bottomhole pressure and injection-rate history showed that (1) the newly created horizontal fracture was closed adjacent to the injection well pre-injection and (2) the initial pump-pressure increase at a nominal volumetric injection rate led to near-well fracture reopening, fluid conductivity increase, and abrupt injection-rate increase. To overcome hydrogeological-model limitations of predicting fracture reopening throughout injection, we extended the modeling to a finite-element, poroelastic analysis of horizontal-fracture growth using a cohesive-zone model. Using this fracture-reopening model, we improved the history match of the transient-pressure response during the experiment by adjusting the hydromechanical properties. Furthermore, post-injection pressure transient analyses helped reduce uncertainty in the overburden-stress gradient, and the initial hydraulic-fracturing simulation verified the plausibility of achieving the surveyed propped fracture area.

02 PETROLEUM↗

Westinghouse Accident Tolerant Fuel Phase 2B with Higher Enriched and Higher Burnup Add-On Project Final Technical Report Deliverable Volume 1

The Westinghouse Electric Company LLC (Westinghouse) accident tolerant fuel (ATF) program funded by Westinghouse and the US Department of Energy (DOE) utilized chromium (Cr) coated zirconium alloy cladding with doped UO 2 (ADOPT(TM)) and uranium silicide (U 3 Si 2 ) high density/high thermal conductivity fuel for its lead test rod (LTR) program with irradiation beginning in 2019. ADOPT is a Cr 2 O 3 +Al 2 O 3 doped UO 2 pellet with increased oxidation resistance and density, and increased resistance to fission gas release. Due to the issues with U 3 Si 2 fuel reaction in pressurized water reactor (PWR) environments, uranium nitride (U 15 N) has been substituted for U 3 Si 2 as a long-term fuel option. Cr coated cladding with ADOPT fuel is the near-term Westinghouse EnCore fuel product. The long-term EnCore ® fuel product is SiGA ® SiC/SiC composite cladding with high density/high thermal conductivity UN fuel. In 2020, the higher burnup and higher enriched and (HBHE) program was integrated into the ATF program. The objective of this expanded program is to extend ATF burnups to at least 75 MWd/kgU to economically facilitate 24-month cycles in PWRs. The ATF program now includes ADOPT fuel with enrichments >5% 235 U. Over the past several years, Westinghouse has tested the Cr coated zirconium (Zr) and silicon carbide (SiC) claddings in Westinghouse Churchill autoclaves and the Massachusetts Institute of Technology (MIT) reactor. Additionally, the Cr coated cladding has been tested in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) and in LTR programs at the Doel 4 and Bryon 2 commercial reactors. High temperature tests at the state-of-the-art Westinghouse facilities in Churchill, PA and at Karlsruhe Institute of Technology (KIT) have been carried out to determine the time and temperature limits for the Cr coated zirconium claddings. These tests indicate that Cr coated Zr cladding can take temperatures up to about 1500°C for short periods of time without becoming totally oxidized. The main issue is the formation of the Cr-Zr eutectic at 1333°C resulting in the migration of this eutectic inward with the formation of ZrCr 2 which rapidly oxidizes to ZrO 2 on the outside of the tube. The Cr coated Zr cladding also delays the bursting of the tube, reduces the burst area, and reduces hydriding and embrittlement of the Zr which is a major benefit for reducing fuel fragmentation, redistribution, and dispersal (FFRD), the major licensing issue faced by HBHE. The manufacturing parameters for the SiC have been found to have a significant effect on the corrosion rate of the SiC in light water reactor (LWR) conditions and significant improvements have been made in the yield, quality, and oxidation resistance of the SiC cladding by identifying and tightening manufacturing process parameters. Current autoclave results for SiC composite claddings indicate that a corrosion rate of fewer than 2 micrometers per year can be achieved which meets corrosion requirements under normal operating conditions. High temperature steam oxidation tests at the state-of-the-art Westinghouse facilities in Churchill, PA and at Karlsruhe Institute of Technology (KIT) have been carried and determined that SiC cladding can withstand temperatures up to about 1800°C to 1900°C before excessive corrosion reactions begin, and that the SiC will not balloon and burst. ADOPT fuel pellets were incorporated into the Westinghouse ATF program because of their increased density and oxidation resistance. A topical report supporting the use of ADOPT pellets has been submitted to the NRC and will be approved shortly. ADOPT pellets have been a product in Europe for over 15 years. The additives work to make larger grain sizes which appear to reduce fission gas release during transients as well as increase the density of the pellet. Fuel rod and assembly design in preparation for the lead test rod (LTR) and lead test assembly (LTA) programs is underway as well as licensing efforts with the Nuclear Regulatory Commission (NRC). Finally, accident analyses coupled with economic evaluations for both operating savings as well as fuel savings have been initiated. Modular Accident Analysis Program 5 (MAAP5) calculations indicate that both Cr coated cladding and SiC composite cladding can increase the time to fuel rod loss of geometry for up to two hours longer than current Zr based cladding in a station blackout scenario. This additional time is due to the much higher oxidation resistance of the SiC and Cr coated cladding. These two hours can be used to implement additional response options instituted through the Diverse and Flexible Mitigation Capability (FLEX) program by reactor operators. Both ATF cladding options also reduce hydrogen production which dramatically reduces primary system and containment pressure and the risk of fission product release beyond containment in the unlikely event of an accident. The lower pressure in the system allows more time to feed cooling water to the core, resulting in the avoidance of fuel melting. The coping time is extended indefinitely if the modest water flow provided by FLEX continues. Experimental work on methods to rapidly fabricate SiC composite structures with high density and reduce the fabrication price of SiC fibers while maintaining a high level of performance is needed. Methods for mitigating or stopping the Cr-Zr eutectic are also needed to further improve the oxidation resistance of Cr coated Zr. Minimal (<1%) swelling of U 3 Si 2 and subsequent fission gas release has been demonstrated up to 20 MWd/kgU. Irradiation experiments with U 3 Si 2 fuel in ATR to determine these properties at 40 MWd/kgU were completed but post irradiation examinations were not done since U 3 Si 2 has been replaced by UN. UN has three issues that are being addressed. The first is increasing the oxidation resistance so that there is not excessive reaction up to ~1500°C. While UN increases the pellet density and additives to the UN postponed the temperature at which rapid oxidation occurred by ~100°C to 200°C, this is not enough, and pellet coating options are now being pursued. The second is developing a method to manufacture that does not require the multi-step process of UF 6 to UO 2 to UC to UN. Efforts are underway looking at UF 6 to UN 2 to UN and UF 6 to UF 4 to UN 2 to UN reactions. Finally, an economically acceptable process for potentially enriching the 15 N content of the nitrogen used to make UN to >95% 15N was identified though not experimentally validated. In addition to the work supported by the DOE, research and testing activities are being carried on in a world-wide effort funded by many countries such as Sweden, United Kingdom, Belgium, Netherlands, Spain, Germany, Japan, and France. This work is being facilitated through the Westinghouse led Collaboration for Advanced Research on Accident Tolerant Fuel (CARAT) program. Annual meetings were organized in 2018 and 2019 by Westinghouse as a venue for presentation of this work and to provide for the cross-fertilization of ideas among the many outstanding researchers in the ATF area. No meetings were held in 2020 and 2021 due to the COVID-19 related restrictions on traveling and gatherings. Since SiC, coated cladding, and high-density fuel options are not currently used in the nuclear industry; support from the government and industry members is needed to further the significant effort of setting new standards. The same is true for the Nuclear Regulatory Commission (NRC) which must review and approve the commercial use of these new fuels since all current regulations are oriented toward Zr/UO 2 fuel. Several meetings have been held with the NRC to generate a fast-track approach to licensing ATF using a combination of atomic modeling, in-rod sensors, and in-reactor testing. This approach was memorialized in an “Accelerated Fuel Qualification White Paper” prepared by the Accelerated Fuel Qualification Working Group lead by General Atomics.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Westinghouse Accident Tolerant Fuel Phase 2B with Higher Enriched and Higher Burnup Add-On Project Final Technical Report Deliverable Volume 2

The Westinghouse Electric Company LLC (Westinghouse) accident tolerant fuel (ATF) program funded by Westinghouse and the US Department of Energy (DOE) utilized chromium (Cr) coated zirconium alloy cladding with doped UO 2 (ADOPT(TM)) and uranium silicide (U 3 Si 2 ) high density/high thermal conductivity fuel for its lead test rod (LTR) program with irradiation beginning in 2019. ADOPT is a Cr 2 O 3 +Al 2 O 3 doped UO 2 pellet with increased oxidation resistance and density, and increased resistance to fission gas release. Due to the issues with U 3 Si 2 fuel reaction in pressurized water reactor (PWR) environments, uranium nitride (U 15 N) has been substituted for U 3 Si 2 as a long-term fuel option. Cr coated cladding with ADOPT fuel is the near-term Westinghouse EnCore ® fuel product. The long-term EnCore fuel product is SiGA ® SiC/SiC composite cladding with high density/high thermal conductivity UN fuel. In 2020, the higher burnup and higher enriched and (HBHE) program was integrated into the ATF program. The objective of this expanded program is to extend ATF burnups to at least 75 MWd/kgU to economically facilitate 24-month cycles in PWRs. The ATF program now includes ADOPT fuel with enrichments >5% 235 U. Over the past several years, Westinghouse has tested the Cr coated zirconium (Zr) and silicon carbide (SiC) claddings in Westinghouse Churchill autoclaves and the Massachusetts Institute of Technology (MIT) reactor. Additionally, the Cr coated cladding has been tested in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) and in LTR programs at the Doel 4 and Bryon 2 commercial reactors. High temperature tests at the state-of-the-art Westinghouse facilities in Churchill, PA and at Karlsruhe Institute of Technology (KIT) have been carried out to determine the time and temperature limits for the Cr coated zirconium claddings. These tests indicate that Cr coated Zr cladding can take temperatures up to about 1500°C for short periods of time without becoming totally oxidized. The main issue is the formation of the Cr-Zr eutectic at 1333°C resulting in the migration of this eutectic inward with the formation of ZrCr 2 which rapidly oxidizes to ZrO 2 on the outside of the tube. The Cr coated Zr cladding also delays the bursting of the tube, reduces the burst area, and reduces hydriding and embrittlement of the Zr which is a major benefit for reducing fuel fragmentation, redistribution, and dispersal (FFRD), the major licensing issue faced by HBHE. The manufacturing parameters for the SiC have been found to have a significant effect on the corrosion rate of the SiC in light water reactor (LWR) conditions and significant improvements have been made in the yield, quality, and oxidation resistance of the SiC cladding by identifying and tightening manufacturing process parameters. Current autoclave results for SiC composite claddings indicate that a corrosion rate of fewer than 2 micrometers per year can be achieved which meets corrosion requirements under normal operating conditions. High temperature steam oxidation tests at the state-of-the-art Westinghouse facilities in Churchill, PA and at Karlsruhe Institute of Technology (KIT) have been carried and determined that SiC cladding can withstand temperatures up to about 1800°C to 1900°C before excessive corrosion reactions begin, and that the SiC will not balloon and burst. ADOPT fuel pellets were incorporated into the Westinghouse ATF program because of their increased density and oxidation resistance. A topical report supporting the use of ADOPT pellets has been submitted to the NRC and will be approved shortly. ADOPT pellets have been a product in Europe for over 15 years. The additives work to make larger grain sizes which appear to reduce fission gas release during transients as well as increase the density of the pellet. Fuel rod and assembly design in preparation for the lead test rod (LTR) and lead test assembly (LTA) programs is underway as well as licensing efforts with the Nuclear Regulatory Commission (NRC). Finally, accident analyses coupled with economic evaluations for both operating savings as well as fuel savings have been initiated. Modular Accident Analysis Program 5 (MAAP5) calculations indicate that both Cr coated cladding and SiC composite cladding can increase the time to fuel rod loss of geometry for up to two hours longer than current Zr based cladding in a station blackout scenario. This additional time is due to the much higher oxidation resistance of the SiC and Cr coated cladding. These two hours can be used to implement additional response options instituted through the Diverse and Flexible Mitigation Capability (FLEX) program by reactor operators. Both ATF cladding options also reduce hydrogen production which dramatically reduces primary system and containment pressure and the risk of fission product release beyond containment in the unlikely event of an accident. The lower pressure in the system allows more time to feed cooling water to the core, resulting in the avoidance of fuel melting. The coping time is extended indefinitely if the modest water flow provided by FLEX continues. Experimental work on methods to rapidly fabricate SiC composite structures with high density and reduce the fabrication price of SiC fibers while maintaining a high level of performance is needed. Methods for mitigating or stopping the Cr-Zr eutectic are also needed to further improve the oxidation resistance of Cr coated Zr. Minimal (<1%) swelling of U 3 Si 2 and subsequent fission gas release has been demonstrated up to 20 MWd/kgU. Irradiation experiments with U 3 Si 2 fuel in ATR to determine these properties at 40 MWd/kgU were completed but post irradiation examinations were not done since U 3 Si 2 has been replaced by UN. UN has three issues that are being addressed. The first is increasing the oxidation resistance so that there is not excessive reaction up to ~1500°C. While UN increases the pellet density and additives to the UN postponed the temperature at which rapid oxidation occurred by ~100°C to 200°C, this is not enough, and pellet coating options are now being pursued. The second is developing a method to manufacture that does not require the multi-step process of UF 6 to UO 2 to UC to UN. Efforts are underway looking at UF 6 to UN 2 to UN and UF 6 to UF 4 to UN 2 to UN reactions. Finally, an economically acceptable process for potentially enriching the 15 N content of the nitrogen used to make UN to >95% 15 N was identified though not experimentally validated. In addition to the work supported by the DOE, research and testing activities are being carried on in a world-wide effort funded by many countries such as Sweden, United Kingdom, Belgium, Netherlands, Spain, Germany, Japan, and France. This work is being facilitated through the Westinghouse led Collaboration for Advanced Research on Accident Tolerant Fuel (CARAT) program. Annual meetings were organized in 2018 and 2019 by Westinghouse as a venue for presentation of this work and to provide for the cross-fertilization of ideas among the many outstanding researchers in the ATF area. No meetings were held in 2020 and 2021 due to the COVID-19 related restrictions on traveling and gatherings. Since SiC, coated cladding, and high-density fuel options are not currently used in the nuclear industry; support from the government and industry members is needed to further the significant effort of setting new standards. The same is true for the Nuclear Regulatory Commission (NRC) which must review and approve the commercial use of these new fuels since all current regulations are oriented toward Zr/UO 2 fuel. Several meetings have been held with the NRC to generate a fast-track approach to licensing ATF using a combination of atomic modeling, in-rod sensors, and in-reactor testing. This approach was memorialized in an “Accelerated Fuel Qualification White Paper” prepared by the Accelerated Fuel Qualification Working Group lead by General Atomics.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Quantum simulations in effective model spaces: Hamiltonian-learning variational quantum eigensolver using digital quantum computers and application to the Lipkin-Meshkov-Glick model

Quantum simulations offer the potential to predict the structure and dynamics of nuclear many-body systems that are beyond the capabilities of classical computing. Generally, preparing the ground state of strongly-interacting many-body systems relevant to nuclear physics is however inefficient, even using ideal quantum computers. In addition, currently available NISQ-era quantum devices possess modest numbers of qubits, limiting the size of quantum many-body systems that can be simulated. In this context, a reformulation of the quantum many-body problems using truncated model spaces and Hamiltonians is desirable to make them more amenable to near-term quantum computers. The importance of symmetries in low-energy theories, including effective field theories (EFTs), lattice quantum chromodynamics (QCD), and effective model spaces for nuclear systems, in particular their interplay with the reduction of active Hilbert spaces, is well known. Lesser known is the fact that the non-commutivity of some symmetries and truncations of the model space can be profitably combined with variational calculations to rearrange the entanglement into localized structures and enable more efficient simulations. Here, the goal of the present study is to explore and utilize the non-commutivity of symmetries and model-space truncations of quantum many-body systems important to nuclear physics, particularly in combination with variational algorithms for quantum simulations and effective Hamiltonian learning. We introduce an iterative hybrid classical-quantum algorithm, Hamiltonian learning variational quantum eigensolver (HL-VQE), that simultaneously optimizes an effective Hamiltonian, thereby rearranging entanglement into the effective model space, and the associated ground-state wavefunction. Quantum simulations, using classical computers and IBM's superconducting-qubit quantum computers, are performed to demonstrate the HL-VQE algorithm, in the context of the Lipkin-Meshkov-Glick (LMG) model of interacting fermions, where the Hamiltonian transformation corresponds to an orbital rotation. We use a mapping where the number of qubits scales with the $\log$ of the size of the effective model space, rather than the particle number. HL-VQE is found to provide an exponential improvement in LMG-model calculations of the ground-state energy and wavefunction, compared to naive truncations without Hamiltonian learning, throughout a significant fraction of the Hilbert space. In the context of EFT, this corresponds to counterterms scaling exponentially with the cut-off as opposed to power law. Implementations on IBM's QExperience quantum computers and simulators for 1- and 2-qubit effective model spaces are shown to provide accurate and precise results, reproducing classical predictions. For a range of parameters defining the LMG model, the HL-VQE algorithm is found to have better scaling of quantum resources requirements than previously explored algorithms. In particular, the HL-VQE scales efficiently over a large fraction of the model space, in contrast to VQE alone. This work constitutes a step in the development of entanglement-driven quantum algorithms for descriptions of nuclear many-body systems. This, in part, leverages the potential of noisy intermediate-scale quantum (NISQ) devices. The exponential scaling of counterterms observed in this study suggests the possibility of more general applicability to other non-perturbative EFTs.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

High Energy Micron Scale Pixel Hybrid Detector

The objective of this technology development project has been to fabricate and characterize a new X-ray area image sensor innovation designed for high efficiency detection and imaging of hard X-rays (>20 KeV) with micron scale pixel resolution. A key technology component consists of a monolithic hybrid X-ray detector built by layering an amorphous Selenium X-ray photoconductor film directly deposited on a small pitch (7.8μm) CMOS active pixel readout array. A specific goal of this work is to provide a new detector tool to researchers working with synchrotron light sources, to extend the depth of exploration into nanoscale structures, and do so cost effectively. Early generation X-ray imaging detector tools fail to provide adequate resolving power and efficiency at high energies and our innovation provides a solution. A majority of proposed phase I tasks were completed. Those tasks included, in collaboration with KA Imaging, successful fabrication of specified a-Se layers on a 1Mpixel CMOS readout array to create the direct hybrid X-ray imaging array, packaging of the imaging array, assembly of electronics into a shielded detector box, loading user interface software for camera control and image capture, and performing initial (no X-ray) detector evaluation at Farrier Microengineering facilities. After initial tests, extensive testing using the X-ray beam line 1-BM source at Argonne National Laboratory Advanced Photon Source(ANL-APS) was performed. Imaging performance studies were conducted at multiple X-ray beam energies. Studies included X-ray response vs. X-ray energy, vs. applied detector field strength (HV), response linearity vs. integration time, MTF vs. beam energy, image lag measurements, and micron scale resolution pattern target imaging. This high energy micron scale X-ray detection technology is a first of a kind to be evaluated at the ANL-APS and is supported by Dr. Antonino Miceli, head of the detector physics group. Accomplishments include the first successful demonstration of a 1Mpix amorphous Selenium on CMOS readout direct hybrid X-ray imaging detector at a DOE sponsored National Laboratory. Modeled performance predictions were confirmed, proving micron scale resolution as well as an order of magnitude increase in conversion efficiency over conventional scintillator detector performance. A discovery of evidence of propagation-based phase contrast edge enhancement was unplanned and will be exploited in future experiments. This phase 1 technology demonstration verifies the efficacy of proposed high energy micron scale pixel X-ray hybrid a-Se imaging array products. The new detector products will cost effectively replace early generation detector technologies that currently fail to address increasing demand for tools to study nano structures and physical processes at high X-ray energies above 20keV. For example, current systems for transmission X-ray microscopy have low efficiency and available large pixel (~55µm) direct detectors do not offer sufficient resolution for Bragg fringe imaging at high energies. This detector innovation will solve these inadequacies. The new detector technology will compete in a $50M scientific X-ray detector market, growing at 6%, and will benefit Microtomography(µCT), X-ray diffractometry (XRD), Coherent Diffraction Imaging (CDI) applications. One application specified by Dr. Miceli at ANL is the 3D reconstruction of compact crystals at high energies requires small pixel high efficiency X-ray detectors. Farrier Microengineering, working with colleagues at KA Imaging and the University of Waterloo, successfully achieved the critical objectives of the Phase I proposal. We have proven the technical feasibility of this innovation by building and successfully testing a 1Mpixel a-Se/CMOS hybrid direct X-ray imaging array. Our commercialization roadmap of detector products will be implemented during a phase II project. We will demonstrate a migration of the technology to larger detector array sizes, improved temporal performance with detector layer engineering, and improved environmental and operational stability. Manufacturability and cost effectiveness are key objectives and product designs will leverage current state of the art CMOS wafer fabrication quality and volume manufacturing economics.

36 MATERIALS SCIENCE↗

Hybrid Membrane/Absorption Process for Post-combustion CO2 Capture

This report summarizes scientific/technical progress made for bench-scale membrane contactor technology for post-combustion CO2 capture from DOE Contract No. DE-FE-0004787. Budget Period 1 (BP1) membrane absorber, Budget Period 2 (BP2) membrane desorber and Budget Period 3 (BP3) integrated system and field testing studies have been completed successfully and met or exceeded the technical targets (≥ 90% CO2 removal and CO2 purity of 97% in one membrane stage). Significant breakthroughs are summarized below: BP1 research: The feasibility of utilizing the poly (ether ether ketone), PEEK, based hollow fiber contractor (HFC) in combination with chemical solvents to separate and capture at least 90% of the CO2 from simulated flue gases has been successfully established. Excellent progress has been made as we have achieved the BP1 goal: ≥ 1,000 membrane intrinsic CO2 permeance, ≥ 90% CO2 removal in one stage, ≤ 2 psi gas side pressure drop, and ≥ 1 (sec)-1 mass transfer coefficient. Initial test results also show that the CO2 capture performance, using activated Methyl Diethanol Amine (aMDEA) solvent, was not affected by flue gas contaminants O2 (~3%), NO2 (66 ppmv), and SO2 (145 ppmv). BP2 research: The feasibility of utilizing the PEEK HFC for CO2-loaded solvent regeneration has been successfully established High CO2 stripping flux, one order of magnitude higher than CO2 absorption flux, have been achieved. Refined economic evaluation based on BP1 membrane absorber and BP2 membrane desorber laboratory test data indicate that the CO2 capture costs are 36% lower than DOE’s benchmark amine absorption technology. BP3 research: A bench-scale system utilizing a membrane absorber and desorber was integrated into a continuous CO2 capture process using contactors containing 10 to 20 ft2 of membrane area. The integrated process operation was stable through a 100-hour laboratory test, utilizing a simulated flue gas stream. Greater than 90% CO2 capture combined with 97% CO2 product purity was achieved throughout the test. Membrane contactor modules have been scaled from bench scale 2-inch diameter by 12-inch long (20 ft2 membrane surface area) modules to 4-inch diameter by 60-inch long pilot scale modules (165 ft2 membrane surface area). Pilot scale modules were tested in an integrated absorption/regeneration system for CO2 capture field tests at a coal-fired power plant (Midwest Generation’s Will County Station located in Romeoville, IL). Absorption and regeneration contactors were constructed utilizing high performance super-hydrophobic, nano-porous PEEK membranes with CO2 gas permeance of 2,000 GPU and a 1,000 GPU, respectively. Field tests using aMDEA solvent achieved greater than 90% CO2 removal in a single stage. The absorption mass transfer coefficient was 1.2 (sec)-1, exceeding the initial target of 1.0 (sec)-1. This mass transfer coefficient is over one order of magnitude greater than that of conventional gas/liquid contacting equipment. The economic evaluation based on field tests data indicates that the CO2 capture cost associated with membrane contactor technology is $54.69 (Yr 2011$)/tonne of CO2 captured when using aMDEA as a solvent. It is projected that the DOE’s 2025 cost goal of $40 (Yr 2011$)/tonne of CO2 captured can be met by decreasing membrane module cost and by utilizing advanced CO2 capture solvents. In the second stage of the field test, an advanced solvent, Hitachi’s H3-1 was utilized. The use of H3-1 solvent increased mass transfer coefficient by 17% as compared to aMDEA solvent. The high mass transfer coefficient of H3-1 solvent combined with much more favorable solvent regeneration requirements, indicate that the projected savings achievable with membrane contactor process can be further improved. H3-1 solvent will be used in the next pilot-scale development phase. The integrated absorption/regeneration process design and high performance membrane contactors developed in the current bench-scale program will be used as the base technology for future pilot-scale development.

Coal-Environmental Processes↗

Secondary waste form testing : ceramicrete phosphate bonded ceramics.

The cleanup activities of the Hanford tank wastes require stabilization and solidification of the secondary waste streams generated from the processing of the tank wastes. The treatment of these tank wastes to produce glass waste forms will generate secondary wastes, including routine solid wastes and liquid process effluents. Liquid wastes may include process condensates and scrubber/off-gas treatment liquids from the thermal waste treatment. The current baseline for solidification of the secondary wastes is a cement-based waste form. However, alternative secondary waste forms are being considered. In this regard, Ceramicrete technology, developed at Argonne National Laboratory, is being explored as an option to solidify and stabilize the secondary wastes. The Ceramicrete process has been demonstrated on four secondary waste formulations: baseline, cluster 1, cluster 2, and mixed waste streams. Based on the recipes provided by Pacific Northwest National Laboratory, the four waste simulants were prepared in-house. Waste forms were fabricated with three filler materials: Class C fly ash, CaSiO{sub 3}, and Class C fly ash + slag. Optimum waste loadings were as high as 20 wt.% for the fly ash and CaSiO{sub 3}, and 15 wt.% for fly ash + slag filler. Waste forms for physical characterizations were fabricated with no additives, hazardous contaminants, and radionuclide surrogates. Physical property characterizations (density, compressive strength, and 90-day water immersion test) showed that the waste forms were stable and durable. Compressive strengths were >2,500 psi, and the strengths remained high after the 90-day water immersion test. Fly ash and CaSiO{sub 3} filler waste forms appeared to be superior to the waste forms with fly ash + slag as a filler. Waste form weight loss was {approx}5-14 wt.% over the 90-day immersion test. The majority of the weight loss occurred during the initial phase of the immersion test, indicative of washing off of residual unreacted binder components from the waste form surface. Waste forms for ANS 16.1 leach testing contained appropriate amounts of rhenium and iodine as radionuclide surrogates, along with the additives silver-loaded zeolite and tin chloride. The leachability index for Re was found to range from 7.9 to 9.0 for all the samples evaluated. Iodine was below detection limit (5 ppb) for all the leachate samples. Further, leaching of sodium was low, as indicated by the leachability index ranging from 7.6-10.4, indicative of chemical binding of the various chemical species. Target leachability indices for Re, I, and Na were 9, 11, and 6, respectively. Degradation was observed in some of the samples post 90-day ANS 16.1 tests. Toxicity characteristic leaching procedure (TCLP) results showed that all the hazardous contaminants were contained in the waste, and the hazardous metal concentrations were below the Universal Treatment Standard limits. Preliminary scale-up (2-gal waste forms) was conducted to demonstrate the scalability of the Ceramicrete process. Use of minimal amounts of boric acid as a set retarder was used to control the working time for the slurry. Flexibility in treating waste streams with wide ranging compositional make-ups and ease of process scale-up are attractive attributes of Ceramicrete technology.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Comparison of methods for the measurement of radiation dose distributions in high dose rate (HDR) brachytherapy: Ge-doped optical fiber, EBT3 Gafchromic film, and PRESAGE{sup Registered-Sign} radiochromic plastic

Purpose: Dose distribution measurement in clinical high dose rate (HDR) brachytherapy is challenging, because of the high dose gradients, large dose variations, and small scale, but it is essential to verify accurate treatment planning and treatment equipment performance. The authors compare and evaluate three dosimetry systems for potential use in brachytherapy dose distribution measurement: Ge-doped optical fibers, EBT3 Gafchromic film with multichannel analysis, and the radiochromic material PRESAGE{sup Registered-Sign} with optical-CT readout. Methods: Ge-doped SiO{sub 2} fibers with 6 {mu}m active core and 5.0 mm length were sensitivity-batched and their thermoluminescent properties used via conventional heating and annealing cycles. EBT3 Gafchromic film of 30 {mu}m active thickness was calibrated in three color channels using a nominal 6 MV linear accelerator. A 48-bit transmission scanner and advanced multichannel analysis method were utilized to derive dose measurements. Samples of the solid radiochromic polymer PRESAGE{sup Registered-Sign }, 60 mm diameter and 100 mm height, were analyzed with a parallel beam optical CT scanner. Each dosimetry system was used to measure the dose as a function of radial distance from a Co-60 HDR source, with results compared to Monte Carlo TG-43 model data. Each system was then used to measure the dose distribution along one or more lines through typical clinical dose distributions for cervix brachytherapy, with results compared to treatment planning system (TPS) calculations. Purpose-designed test objects constructed of Solid Water and held within a full-scatter water tank were utilized. Results: All three dosimetry systems reproduced the general shape of the isolated source radial dose function and the TPS dose distribution. However, the dynamic range of EBT3 exceeded those of doped optical fibers and PRESAGE{sup Registered-Sign }, and the latter two suffered from unacceptable noise and artifact. For the experimental conditions used in this study, the useful range from an isolated HDR source was 5-40 mm for fibers, 3-50 mm for EBT3, and 4-21 mm for PRESAGE{sup Registered-Sign }. Fibers demonstrated some over-response at very low dose levels, suffered from volume averaging effects in the dose distribution measurement, and exhibited up to 9% repeatability variation over three repeated measurements. EBT3 demonstrated excellent agreement with Monte Carlo and TPS dose distributions, with up to 3% repeatability over three measurements. PRESAGE{sup Registered-Sign} gave promising results, being the only true 3D dosimeter, but artifacts and noise were apparent. Conclusions: The comparative response of three emerging dosimetry systems for clinical brachytherapy dose distribution measurement has been investigated. Ge-doped optical fibers have excellent spatial resolution for single-direction measurement but are currently too large for complex dose distribution assessment. The use of PRESAGE{sup Registered-Sign} with optical-CT readout gave promising results in the measurement of true 3D dose distributions but further development work is required to reduce noise and improve dynamic range for brachytherapy dose distribution measurements. EBT3 Gafchromic film with multichannel analysis demonstrated accurate and reproducible measurement of dose distributions in HDR brachytherapy. Calibrated dose measurements were possible with agreement within 1.5% of TPS dose calculations. The suitability of EBT3 as a dosimeter for 2D quality control or commissioning work has been demonstrated.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Advanced Materials Characterization and Processing of Gen II Materials Based Lithium Ion Battery

The purpose of this Cooperative Research and Development Agreement (CRADA) between Oak Ridge National Laboratory (ORNL) and Dow Kokam, LLC was to investigate the microstructure and materials processing on long-term performance of Dow Kokam’s Gen II anodes and cathodes for lithium ion batteries. The findings were implemented into Dow Kokam’s new U.S. based production line, which has a capacity of 600 MWh/yr in total battery output. A principal need for automotive energy storage applications is the ability of the battery pack to satisfy a 10-15 year calendar life in addition to improved safety, high charge-discharge rate capability, high energy density, and high power density. Current cathode chemistries such as those based on LiNixMnyCo1-x-yO2 (NMC) metal oxides are limited to approximately 1500 cycles (or 5-7 year equivalent automotive calendar life). Dow Kokam Gen II technology has shown a 2× cycle life over conventional NMC based materials, while also improving by similar metrics the charge-discharge limits. The impact of this improvement is significant in terms of launching pure electric vehicles and plug-in hybrid electric vehicles with lifetimes comparable to those of the traditional IC engine. However, in order to scale the technology and achieve substantial market penetration, the electrode structure and processing based on the new Gen II material in comparison to that of the traditional NMC needs to be better understood. As the microstructure and chemistry of the new electrode type have been elucidated by this project, scaling and mass production has become the focus. Electrode dispersion formulations, coating parameters, and methods of energy savings were subsequently investigated. The capabilities of ORNL were implemented to assist in these efforts in terms of quality control, materials characterization, and electrochemical testing. Dow Kokam provided raw materials and electrodes, as well as background IP and technical expertise. The current state-of-the-art for NMC cathode durability is 1500 cycles to 100% depth of discharge (DOD) at 1C/-1C charge/discharge rates. This cycle lifetime only satisfies about half of the lifetime requirement for plug-in hybrid electric vehicles (PHEVs) and electric vehicles (EVs). Dow Kokam’s Gen II modified NMC cathode increases cycle life by 2×, depending on the charge/discharge rates, and will be capable of meeting the full 15 year lifetime once scaled to mass production. This improvement will allow PHEV and EV manufacturers to use only one battery pack per vehicle and will result in approximately 50% reduction in energy required to produce battery packs on a per vehicle basis. This further translates into a significantly reduced cost of ownership for PHEVs and EVs based on lithium ion battery technology. However, the chemical and microstructural changes of the modified Gen II anodes and cathodes during long-term operation are not well understood, as well as the effects of the starting material modifications to anode and cathode active material performance (i.e., nanoscale coatings deposited on the surfaces of graphite and NMC). Effects of processing variables related to mixing and coating of the electrode materials on cell performance and durability were also studied. To supplement these materials characterization and processing variable experiments, thorough electrochemical testing was completed by Dow Kokam.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Aluminum Metal Dissolution for Mark-18A Target Processing

The Mark-18A Program was established to preserve the unique materials found in Mark-18A targets for future research and development activity within the Department of Energy or other U.S. government agencies. The Savannah River Site has 65 Mark-18A targets to be provided for the recovery of high valued isotopes. The majority of the recovery work will be performed in the Savannah River National Laboratory (SRNL) Shielded Cells due to dose concerns. The recovered product will be transported to the Oak Ridge National Laboratory (ORNL) for future research and development tasks. The Mark-18A target material will be removed from their current configuration, dissolved, chemically separated, and calcined to a stable oxide. The baseline flowsheet is patterned after the flowsheet ORNL has previously used to process both Mark-18A and Mark-42 targets. However, it is necessary for SRNL to adapt its facility and the ORNL flowsheet to identify process improvements to successfully recover the actinide materials within the constraints of the SRNL Shielded Cells. These studies evaluated and demonstrated a chemical method for cladding removal using a mixture of sodium nitrate (NaNO 3 ) and sodium hydroxide (NaOH). Experiments provided better insights into dissolution of the Mark-18A aluminum cladding. In particular, these studies measured the effects of temperature on dissolution rate, flammable gas generation, and nitrite formation. Using the lessons learned from batch dissolution testing at SRNL, a continuous dissolution flowsheet was successfully demonstrated using prototypic-shaped materials and chemically-conservative materials. The SRNL target dissolution flowsheet departs from the baseline ORNL flowsheet in small but significant ways as discussed in the following paragraphs. These flowsheet changes facilitate faster initial reaction rates at a given temperature, enable cladding removal at a lower process temperature, and yield a more uniform dissolution rate throughout cladding removal. Multiple tests indicate that the total time at the dissolution temperatures will be about six hours for one fourth of a target. The shorter dissolution time provides the benefit of a single-shift dissolver operation. Off gas sampling determined that the quantities of flammable hydrogen (H 2 ) and ammonia (NH 3 ) expected in the process off gas will meet allowable flammable gas generation rates for the Shielded Cells Facility. The SRNL approach enables NaOH to be added at a constant rate, which simplifies operations in the shielded cells. In all six continuous dissolution tests, the process was easy to control with minimal operator interface. Analyses of process solutions throughout the experiments provide a better understanding of system behavior. The data show consistent behavior across several similar but different test conditions. Between the batch-test and continuous-test data, if future changes to the flowsheet are required, sufficient data exist to adequately predict how the system will respond to those changes. Future work will focus on design, fabrication, and evaluation of a system for dissolution of one-fourth of a Mark-18A target, which will be full-scale operations for SRNL. Based on these results, the process parameters are adequately understood and the system can be operated safely.

36 MATERIALS SCIENCE↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Installing Deep Groundwater Monitoring Wells in a Volcanic Dominated Rift Basin: Los Alamos National Laboratory, New Mexico - 17594

Los Alamos National Laboratory (LANL, or the Laboratory) is located in northern New Mexico near the west margin of the Espanola Basin. LANL is underlain by a complex basin-fill sequence of alluvial fan deposits, volcanic tuff, basaltic and dacitic lavas, and riverine deposits. On-going environmental remediation and characterization activities have evolved to improve the performance of groundwater monitoring wells, ensuring they yield representative groundwater and core samples. Groundwater occurs as canyon-fill alluvial water, perched intermediate-depth water associated with the basalts and other local-scale perching horizons, and as a regional-scale aquifer that is the main water supply for the area. Anthropogenic contaminants are found in all three groundwater zones. The regional aquifer below LANL is nominally 1000-1400 feet below ground surface (bgs). Monitoring wells at the Laboratory, are therefore, among the deepest routinely installed in the US. Logistical challenges at LANL include steep terrain, widespread cultural sites, and threatened and endangered species habitat restrictions. Additionally, the cost of installing monitoring wells is high because of groundwater depths and the variable drilling techniques that are required to characterize and install wells in a complex geologic environment. A major challenge to the characterization approach at LANL has been to meet sample quality requirements while minimizing drilling costs. In the late 1990's threaded drill-casing was advanced by rotary drilling methods using compressed air as the only circulation fluid. This resulted in relatively low impacts to the geochemical integrity of rock and groundwater samples, but led to frequent episodes of stuck casing. Additional fluids were introduced to the air-rotary program, improving penetration rates, but also resulting in non-representative groundwater samples due to long-term impacts to the aquifer in the vicinity of the well screen. Mud-rotary drilling was incorporated into the program, but it also had significant long-term impacts on groundwater quality, and often inhibited identification of perched groundwater zones and accurate identification of the water table in the regional aquifer. Current drilling practice makes limited use of fluid additives (e.g. foam) to supplement air circulation methods in order to advance drill casing through the vadose zone. Starting about 100 feet above the water table, drill casing is advanced to the target horizon in the regional aquifer using only air and municipal water (when needed) for circulation. Additionally, the threaded drill casing couplings have been replaced with welded connections, significantly reducing the occurrence of stuck casing. Careful observations of water production and water levels during drilling, coupled with the ability to retract casing for video and geophysical logs, now allows for robust characterization of perched groundwater systems and accurate definition of the top of regional saturation. Recent advances in the drilling program include combined dual-rotary/sonic drilling to depths up to 1150 feet and dual-rotary casing advance at angles up to 25 deg. from vertical. The former allows for core collection with minimal fluid addition, thereby preserving pore water chemistry. The latter method allows for well installation into portions of the aquifer otherwise inaccessible due to constraints at the surface (e.g., cultural sites or topography). Similar to the development of drilling techniques, both well design and groundwater sampling system design have evolved throughout the program. Current well design emphasizes a minimal annulus of filter pack, maximum screen slot size based on formation sieve analyses, and thorough well development to mitigate formation damage due to drilling. To sample groundwater at multiple levels in the same well, earlier sampling systems included Westbay{sup R} multi-zone systems and dual-screen single-pump and dual-screen dual-pump systems designed in collaboration with Baski, Inc. These multi-zone sampling systems proved difficult to develop and maintain given the depth to groundwater, and most current well installations are configured with a single screen and a submersible pump. The ability to purge from a well-developed single-screen well has substantially improved the collection of representative groundwater samples. A carefully crafted groundwater characterization program in target aquifers at depths ranging from 1,000 to 1,400 feet bgs within a complex geologic setting, while also retaining the ability to collect representative core and groundwater samples, may have application at a number of sites throughout the environmental industry. Optimizing each well to meet program objectives while reducing total project costs benefits all environmental investigations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress in preparing scenarios for operation of the International Thermonuclear Experimental Reactor

The development of operating scenarios is one of the key issues in the research for ITER which aims to achieve a fusion gain (Q) of ∼10, while producing 500 MW of fusion power for ≥300 s. The ITER Research plan proposes a success oriented schedule starting in hydrogen and helium, to be followed by a nuclear operation phase with a rapid development towards Q ∼ 10 in deuterium/tritium. The Integrated Operation Scenarios Topical Group of the International Tokamak Physics Activity initiates joint activities among worldwide institutions and experiments to prepare ITER operation. Plasma formation studies report robust plasma breakdown in devices with metal walls over a wide range of conditions, while other experiments use an inclined EC launch angle at plasma formation to mimic the conditions in ITER. Simulations of the plasma burn-through predict that at least 4 MW of Electron Cyclotron heating (EC) assist would be required in ITER. For H-modes at q{sub 95} ∼ 3, many experiments have demonstrated operation with scaled parameters for the ITER baseline scenario at n{sub e}/n{sub GW} ∼ 0.85. Most experiments, however, obtain stable discharges at H{sub 98(y,2)} ∼ 1.0 only for β{sub N} = 2.0–2.2. For the rampup in ITER, early X-point formation is recommended, allowing auxiliary heating to reduce the flux consumption. A range of plasma inductance (l{sub i}(3)) can be obtained from 0.65 to 1.0, with the lowest values obtained in H-mode operation. For the rampdown, the plasma should stay diverted maintaining H-mode together with a reduction of the elongation from 1.85 to 1.4. Simulations show that the proposed rampup and rampdown schemes developed since 2007 are compatible with the present ITER design for the poloidal field coils. At 13–15 MA and densities down to n{sub e}/n{sub GW} ∼ 0.5, long pulse operation (>1000 s) in ITER is possible at Q ∼ 5, useful to provide neutron fluence for Test Blanket Module assessments. ITER scenario preparation in hydrogen and helium requires high input power (>50 MW). H-mode operation in helium may be possible at input powers above 35 MW at a toroidal field of 2.65 T, for studying H-modes and ELM mitigation. In hydrogen, H-mode operation is expected to be marginal, even at 2.65 T with 60 MW of input power. Simulation code benchmark studies using hybrid and steady state scenario parameters have proved to be a very challenging and lengthy task of testing suites of codes, consisting of tens of sophisticated modules. Nevertheless, the general basis of the modelling appears sound, with substantial consistency among codes developed by different groups. For a hybrid scenario at 12 MA, the code simulations give a range for Q = 6.5–8.3, using 30 MW neutral beam injection and 20 MW ICRH. For non-inductive operation at 7–9 MA, the simulation results show more variation. At high edge pedestal pressure (T{sub ped} ∼ 7 keV), the codes predict Q = 3.3–3.8 using 33 MW NB, 20 MW EC, and 20 MW ion cyclotron to demonstrate the feasibility of steady-state operation with the day-1 heating systems in ITER. Simulations using a lower edge pedestal temperature (∼3 keV) but improved core confinement obtain Q = 5–6.5, when ECCD is concentrated at mid-radius and ∼20 MW off-axis current drive (ECCD or LHCD) is added. Several issues remain to be studied, including plasmas with dominant electron heating, mitigation of transient heat loads integrated in scenario demonstrations and (burn) control simulations in ITER scenarios.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Energy Northwest - Horn Rapids Solar and Storage: An Assessment of Battery Technical Performance

Chartered in 1957 as a joint action agency of the state, Energy Northwest (ENW) is a consortium of 27 public utility districts and municipalities across Washington state. ENW takes advantage of economies of scale and shared services to help utilities run their operations more efficiently and at lower cost, to the benefit of more than 1.5 million customers. ENW develops, owns, and operates a diverse mix of electricity generating resources, including hydro, solar, and wind projects – and the Northwest’s only active nuclear energy facility. These projects provide enough reliable, affordable, and environmentally responsible energy to power more than a million homes each year, and that carbon-free electricity is provided at the cost of generation. The agency continually explores new generation projects to meet its members’ needs. In 2017, as part of the second round of funding from the Washington state Clean Energy Fund, the Washington State Department of Commerce granted up to $3 million in matching funds to develop an estimated $6.5 million project that deployed a 4-MW, 20-acre solar generating array of photovoltaic (PV) panels coupled with a 1 MW/5.5 MWh lithium-iron-phosphate battery energy storage system (BESS) in Richland, Washington. The combination of PV and BESS will provide a predictable, renewable generating source and will also serve as a training ground for solar and battery technicians throughout the nation. The City of Richland will purchase the power from the project and utilize the benefits of the energy storage. The project provides Washington state with its first opportunity to integrate a large-scale solar and storage facility into its clean mix of hydro, nuclear, and wind resources. This first-of-its-kind facility combines solar generation with battery storage and technician training. In 2019, Pacific Northwest National Laboratory (PNNL) worked with ENW to assess the integrated PV and BESS in representative use cases that could benefit the City of Richland. Between March and May 2022, extensive testing was conducted, and the results were used to assess the technical performance of the BESS subjected to actual field operations. Both reference performance and use case tests were performed: (A) Reference performance tests assess the general technical capabilities of the BESS, such as energy capacity, round-trip efficiency (RTE), ramp rate, and signal tracking capability. These are the first tests performed (baseline), and they are repeated after use case tests (post cycle). A standardized U.S. Department of Energy (DOE) energy storage performance protocol was used to characterize the BESS, including representative duty cycle profiles, test procedure guidance, and calculation guidance for determining key characteristics. (B) Use case tests examine the performance of the BESS for specific use cases using duty cycles developed by PNNL in collaboration with ENW. Five use cases were selected for testing: 1) demand charge reduction, 2) load shaping, 3) transmission charge reduction, 4) Volt-VAR service, and 5) outage mitigation. The use case duty cycles were developed based on utility and site-specific characteristics in addition to the technical characteristics and physical capabilities of the BESS. Use case tests were performed between the baseline and post cycle tests. This report describes the BESS and its components, presents testing and performance analysis results, and shares key insights and lessons learned from this project. Outcomes of the tests and analyses will help ENW understand the performance of the Horn Rapids BESS in its current state and design appropriate operational strategies for this and other BESSs over the long term.

14 SOLAR ENERGY↗

Play Fairway Analysis: Structurally Controlled Geothermal Systems in the Eastern Great Basin Extensional Regime, Utah

A research team with membership from the University of Utah/Energy & Geoscience Institute, the University of Utah/Dept. of Geology & Geophysics, and the Utah Geological Survey, undertook a play fairway analysis (PFA) for geothermal resources in the Eastern Great Basin (EGB) extensional tectonic regime of western Utah. This is a high-priority region for geothermal exploration because active Basin and Range (B&R) extension with volcanism having a N-S strike is superimposed upon pre-existing E-W belts of plutonic rocks and large-scale structural lineaments. Cumulative heat flow along the N-S strike of the state totals approximately 5 GWt above background stable interior. Three electricity producing power plants currently exist with substantial potential for increase. Succinctly, our PFA approach aims to resolve potential sources of heat and permeability in the region, which are the two principal criteria for establishing a geothermal resource. An initial Phase 1 was carried out using only existing geoscientific data in the area. Criteria selected for focusing heat potential include direct heat flow measurements in boreholes, magnetotelluric (MT) low resistivity anomalies, fluid/gas geochemistry, and proximity to recent volcanic eruptions. Permeability is established through geological structures (fault density, critically stressed areas, seismicity, gravity), and MT low resistivity anomalies. In Phase II of this PFA project, additional geological, geophysical and geochemical data were acquired and analysis carried out primarily over promising composite common risk (CCR) areas initially identified in Phase I in order to focus prospectivity and prepare for drilling recommendations. These prospects are near the Twin Peaks rhyolite field, high heat flow areas north of the producing Cove Fort system, and geophysical structure beneath the Crater Knoll area off the northeast flank of the Mineral Mountains. Additional data included MT site fill-in, structural mapping and analysis using high-resolution imagery, gravity and on-ground mapping, Nodal 3C passive seismic collection, and passive 3He surveying. Heat source and permeability potential are again expressed in terms of their individual common risk segment (CRS) maps, with a color scheme using green for most favorable (low risk) and red for least favorable (high risk). Diverse data types are united through the technique of probability kriging, which establishes prospectivity thresholds for each data type and then computes probability of exceeding that threshold over the PFA area. Modified CRS and CCRS maps are compared to those of Phase I to highlight tighter prospectivity focus. In doing so, the prospectivity threshold for heat was increased significantly to narrow the targeting. In the final Phase III of this project where a recommended deep thermal gradient hole was sited, additional geophysical, geochemical and geological field collection and analysis was carried out to refine drill hole targeting. This includes prospect-scale MT, gravity, structure, passive seismic deployment (Cove Fort area), and detailed 3He isotope profiling. It was the recommendation of the DOE Technical Monitoring Team (TMT) that one or more holes be sited in the north-ern Cove Fort area where legacy TG gradient holes showed high cumulative heat flow. These were to be of moderate depth, 2000-3000 feet, to reach the geothermal fluid table expected to start in excess of 1000 feet depth. The drilling organization stipulated by the DOE/GTO was that of the USGS Research Drilling Program (RDP) centered in Las Vegas, NV. A detailed well plan, appended to this report, was developed principally by Dr. Ben Barker consulting to University of Utah, Dr. Steve Pye on the DOE TMT, Mr. Steven Crawford of the USGS-RDP, and the project PI Phil Wannamaker. However, temperature and possible H 2 S at the systems lead to cancellation of the drilling last-minute as this appeared outside the experience base of the USGS-RDP. We hope to have the opportunity to revisit the test drilling and expand the Play Fairway Analysis of this region at some point in the future.

15 GEOTHERMAL ENERGY↗