Search NASA⌕ Search

SEARCH · Search NASA

Results for “Distributed Energy Resource Management Systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 739 records · Page 41

Impact of climate change on water availability and its propagation through the Western U.S. power grid

Climate impact assessment for power systems has tended to focus on the effects of water availability on generation without explicitly considering how these impacts propagate through the interconnected grid to affect generation in other locations. We investigate the impact of projected water availability on the operations of the contemporary Western U.S. power grid, focusing specifically on regional interdependencies. Hydrologic simulations derived from three GCMs (CCSM4, INMCM4 and GFDL-CM3) and two radiative scenarios (RCP4.5 and RCP8.5) are used to force a large-scale, distributed water management model (MOSART-WM), which translates water availability into power generation constraints at hydropower plants and water-dependent thermo-electric plants. Power system dynamics are evaluated using the production cost model PLEXOS. We find that the inter-regional connections across the Western U.S. electricity infrastructure are key in managing drastic variations in regional water availability. Net generation in the Northwest and Northern California is substantially sensitive to local water availability. Generation from the Desert Southwest emerges as a critical resource to compensate for variations in water availability in those regions. Climate change impacts on Northwestern water availability therefore drive future changes in other regions’ generation and regional power flows. The large inter-annual hydrological variability of Northern California exacerbates grid stress arising from long-term changes in water availability in the Northwest. While the regional power flow directions seem insensitive to long-term variations in water availability, the analysis highlights the need to consider other compounding regional factors such as changes in Southern California net load or changes in regional fuel prices.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Langston University - High Energy Physics (LU-HEP)

This final report is presented by Langston University (LU) for the project entitled "Langston University High Energy Physics" (LUHEP) under the direction of principal investigator (PI) and project director Professor Joel Snow. The project encompassed high energy physics research performed at hadron colliders. The PI is a collaborator on the DZero experiment at Fermi National Accelerator Laboratory in Batavia, IL, USA and the ATLAS experiment at CERN in Geneva, Switzerland and was during the entire project period from April 1, 1999 until May 14, 2012. Both experiments seek to understand the fundamental constituents of the physical universe and the forces that govern their interactions. In 1999 as member of the Online Systems group for Run 2 the PI developed a cross-platform Python-based, Graphical User Interface (GUI) application for monitoring and control of EPICS based devices for control room use. This served as a model for other developers to enhance and build on for further monitoring and control tasks written in Python. Subsequently the PI created and developed a cross-platform C++ GUI utilizing a networked client-server paradigm and based on ROOT, the object oriented analysis framework from CERN. The GUI served as a user interface to the Examine tasks running in the D\O\ control room which monitored the status and integrity of data taking for Run 2. The PI developed the histogram server/control interface to the GUI client for the EXAMINE processes. The histogram server was built from the ROOT framework and was integrated into the D\O\ framework used for online monitoring programs and offline analysis. The PI developed the first implementation of displaying histograms dynamically generated by ROOT in a Web Browser. The PI's work resulted in several talks and papers at international conferences and workshops. The PI established computing software infrastructure at LU and U. Oklahoma (OU) to do analysis of DZero production data and produce simulation data for the experiment. Eventually this included the FNAL SAM data grid system, the SAMGrid (SG) infrastructure, and the Open Science Grid software stacks for computing and storage elements. At the end of 2003 Snow took on the role of global Monte Carlo production coordinator for the DØ experiment. A role which continues til this day. In January of 2004 Snow started working with the SAMGrid development team to help debug, deploy, and integrate SAMGrid with DØ Monte Carlo production. Snow installed and configured SG execution and client sites at LUHEP and OUHEP, and a SG scheduler site at LUHEP. The PI developed a python based GUI (DAJ) that acts as a front end for job submission to SAMGrid. The GUI interfaces to the DZero Mone Carlo (MC) request system that uses SAM to manage MC requests by the physics analysis groups. DAJ significantly simplified SG job submission and was deployed in DZero in an effort to increase the user base of SG. The following year was the advent of SAMGrid job submission to the Open Science Grid (OSG) and LHC Computing Grid (LCG) through a forwarding mechanism. The PI oversaw the integration of these grids into the existing production infrastructure. The PI developed an automatic MC (Automc) request processing system capable of operating without user intervention (other than getting grid credentials), and able to submit to any number of sites on various grids. The system manages production at all but 2 sites. The system was deployed at Fermilab and remains operating there today. The PI's work in distributed computing resulted in several talks at international conferences. UTA, OU, and LU were chosen as the collaborating institutions that form the Southwest Tier 2 Center (SWT2) for ATLAS. During the project period the PI contributed to the online and offline software infrastructure through his work with the Run 2 online group, and played a major role in Monte Carlo production for DZero. During the part of the project period in which the PI served as MC production coordinator MC production increased very significantly. In the first year of the PI's tenure as production coordinator production was 159M events and 6.7~TB of data. During the last year of the project period production was 2,342~M events and 262~TB of data. That is a factor of 15 increase in events and 39 in data volume. The increase occurred with improvements in computer hardware and networks, through the use of grid technology on diverse resources, and through increased automation and efficiency of the production process. LU HEP developed and deployed the automatic MC request processing system in use at FNAL. The complementary strategies of automation and grid production served DZero well. Fermilab has recognized LU HEP's contribution to DZero by allowing the PI to devote full time to research activities by appointing him a guest scientist for the last six years of the project period.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Long Island Smart Energy Corridor

The Long Island Power Authority (LIPA) has teamed with Stony Brook University (Stony Brook or SBU) and Farmingdale State College (Farmingdale or FSC), two branches of the State University of New York (SUNY), to create a “Smart Energy Corridor.” The project, located along the Route 110 business corridor on Long Island, New York, demonstrated the integration of a suite of Smart Grid technologies from substations to end-use loads. The Smart Energy Corridor Project included the following key features: -TECHNOLOGY: Demonstrated a full range of smart energy technologies, including substations and distribution feeder automation, fiber and radio communications backbone, advanced metering infrastructure (AM”), meter data management (MDM) system (which LIPA implemented outside of this project), field tools automation, customer-level energy management including automated energy management systems, and integration with distributed generation and plug-in hybrid electric vehicles. -MARKETING: A rigorous market test that identified customer response to an alternative time-of-use pricing plan and varying levels of information and analytical support. -CYBER SECURITY: Tested cyber security vulnerabilities in Smart Grid hardware, network, and application layers. Developed recommendations for policies, procedures, and technical controls to prevent or foil cyber-attacks and to harden the Smart Grid infrastructure. -RELIABILITY: Leveraged new Smart Grid-enabled data to increase system efficiency and reliability. Developed enhanced load forecasting, phase balancing, and voltage control techniques designed to work hand-in-hand with the Smart Grid technologies. -OUTREACH: Implemented public outreach and educational initiatives that were linked directly to the demonstration of Smart Grid technologies, tools, techniques, and system configurations. This included creation of full-scale operating models demonstrating application of Smart Grid technologies in business and residential settings. Farmingdale State College held three international conferences on energy and sustainability and Smart Grid related technologies and policies. These conferences, in addition to public seminars increased understanding and acceptance of Smart Grid transformation by the general public, business, industry, and municipalities in the Long Island and greater New York region. - JOB CREATION: Provided training for the Smart Grid and clean energy jobs of the future at both Farmingdale and Stony Brook. Stony Brook focused its “Cradle to Fortune 500” suite of economic development resources on the opportunities emerging from the project, helping to create new technologies, new businesses, and new jobs. To achieve these features, LIPA and its sub-recipients, FSC and SBU, each have separate but complementary objectives. At LIPA, the Smart Energy Corridor (1) meant validating Smart Grid technologies; (2) quantifying Smart Grid costs and benefits; and (3) providing insights into how Smart Grid applications can be better implemented, readily adapted, and replicated in individual homes and businesses. LIPA installed 2,550 AMI meters (exceeding the 500 AMI meters in the original plan), created three “smart” substations serving the Corridor, and installed additional distribution automation elements including two-way communications and digital controls over various feeders and capacitor banks. It gathered and analyzed customer behavior information on how they responded to a new “smart” TOU rate and to various levels of information and analytical tools.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Strategies for Continuous Balancing in Future Power Systems with High Wind and Solar Shares

The use of wind power has grown strongly in recent years and is expected to continue to increase in the coming decades. Solar power is also expected to increase significantly. In a power system, a continuous balance is maintained between total production and demand. This balancing is currently mainly managed with conventional power plants, but with larger amounts of wind and solar power, other sources will also be needed. Interesting possibilities include continuous control of wind and solar power, battery storage, electric vehicles, hydrogen production, and other demand resources with flexibility potential. The aim of this article is to describe and compare the different challenges and future possibilities in six systems concerning how to keep a continuous balance in the future with significantly larger amounts of variable renewable power production. A realistic understanding of how these systems plan to handle continuous balancing is central to effectively develop a carbon-dioxide-free electricity system of the future. The systems included in the overview are the Nordic synchronous area, the island of Ireland, the Iberian Peninsula, Texas (ERCOT), the central European system, and Great Britain.

14 SOLAR ENERGY↗

Integration Of PanDA Workload Management System With Supercomputers for ATLAS and Data Intensive Science

The.LHC, operating at CERN, is leading Big Data driven scientific explorations. Experiments at the LHC explore the fundamental nature of matter and the basic forces that shape our universe. ATLAS, one of the largest collaborations ever assembled in the sciences, is at the forefront of research at the LHC. To address an unprecedented multi-petabyte data processing challenge, the ATLAS experiment is relying on a heterogeneous distributed computational infrastructure. The ATLAS experiment uses PanDA (Production and Data Analysis) Workload Management System for managing the workflow for all data processing on over 150 data centers. Through PanDA, ATLAS physicists see a single computing facility that enables rapid scientific breakthroughs for the experiment, even though the data centers are physically scattered all over the world. While PanDA currently uses more than 250,000 cores with a peak performance of 0.3 petaFLOPS, LHC data taking runs require more resources than grid can possibly provide. To alleviate these challenges, LHC experiments are engaged in an ambitious program to expand the current computing model to include additional resources such as the opportunistic use of supercomputers. We will describe a project aimed at integration of PanDA WMS with supercomputers in United States, in particular with Titan supercomputer at Oak Ridge Leadership Computing Facility. Current approach utilizes modified PanDA pilot framework for job submission to the supercomputers batch queues and local data management, with light-weight MPI wrappers to run single threaded workloads in parallel on LCFs multi-core worker nodes. This implementation was tested with a variety of Monte-Carlo workloads on several supercomputing platforms for ALICE and ATLAS experiments and it is in full pro duction for the ATLAS since September 2015. We will present our current accomplishments with running PanDA at supercomputers and demonstrate our ability to use PanDA as a portal independent of the computing facilities infrastructure for High Energy and Nuclear Physics as well as other data-intensive science applications, such as bioinformatics and astro-particle physics.

97 MATHEMATICS AND COMPUTING↗

1.2.2.405 HydroWIRES Topic D1: Capacity Expansion Model (CEM) Enhancements

Long-term grid planning tools have difficulty representing detailed hydropower operating characteristics, which depend not only on technological specifications but also on water management practices and regulations. As a result, the value of hydropower is incompletely characterized, and the potential role of hydropower in the performance and resiliency of the future electric grid is not fully understood. This work will fill that gap by developing new ways to represent hydropower resource, technology, and operational characteristics in electric sector capacity expansion models and implementing them in the open-source version of the National Renewable Energy Laboratory's Regional Energy Deployment System (ReEDS) model. ReEDS is a well-established national scale grid planning tool used since 2003 by the U.S. Department of Energy and others to explore the evolution of the U.S. electric sector. Improvements will include a comprehensive national resource assessment for pumped storage hydropower and methods for modeling multiple hydropower technology categories characterized by technical, regulatory, and economic characteristics. The project will provide guiding principles and strategies for improving hydropower modeling in capacity expansion models and deliver a first-of-its kind versatile PSH dataset. All data, code, and methods will be publicly available, allowing the industry to better identify the value of hydropower in the future electricity system and make more informed planning decisions.

capacity expansion↗

Models and Strategies for Optimal Demand Side Management in the Chemical Industries

Deregulation and the increase of renewable electricity generation from wind and solar photovoltaics have transformed the U.S. electricity market. Economic and environmental benefits notwithstanding, the presence of renewables has increased variability and uncertainty on the supply side of the grid. Managing demand, rather than generation – a strategy referred to as “demand response (DR)” – is an attractive approach for mitigating this imbalance. DR efforts aim to reduce electricity usage during peak demand times, lessening stress on the grid. Industrial users are particularly attractive entities for DR participation since they present large, localized loads that can provide significant relief on grid demand and –unlike other large loads, such as buildings – are minimally dependent on human needs and preferences. In this project, we accomplished three main objectives. (1) We developed data-driven low-order DR scheduling-relevant dynamic models of chemical processes. Concurrently, we studied the formulation and solution of the associated optimal DR production scheduling problems. (a) A prototype air separation unit (ASU) model was used to generate simulated operating data for initial modeling efforts, which enabled the later use of industrial data for data-driven modeling. (b) We utilized Hammerstein-Wiener (HW) and Finite Step Response (FSR) models to represent nonlinear plant dynamics. (c) The HW models were linearized using exact linearization so they could potentially be embedded in power system models, which are formulated as mixed integer linear programs (MILPs). (d) We solved DR optimization problems under uncertainty and found that even naïve predictions of electricity price and product demand led to significant cost savings benefits. (2) Our DR scheduling optimization problem formulations are amenable to real-time solution. (a) We utilized Lagrangian Relaxation (LR) to efficiently solve the optimization problem by decoupling subproblems linked by complicating constraints. (b) We have achieved computation times for the 3-day DR scheduling problem of an ASU as low as 1.88 minutes. (3) Our representations of the DR behavior of chemical process as grid-level batteries were embedded in power system models. (a) For a small-scale grid, we found that incorporating the dynamics of the chemical plant in the optimal power flow calculations resulted in better resource management leading to up to 15% and 46% cost reduction for the grid and chemical plant operations, respectively, during periods of power line congestion. We have published several works dedicated to modeling and solving DR optimization problems from the user side. These were published in top peer-reviewed journals and are summarized in this report. The most recent work (and papers in preparation) considers DR scheduling from the grid side. Future efforts will consider networked plants (e.g., air separation units operating on a common pipeline) for DR participation, which is expected to amplify the capabilities of industrial DR participants to perform load-shifting. Our consideration of uncertainty in DR has inspired future directions in this area as well: we plan to develop multistage methods to fully account for the effects of uncertainty in DR scheduling.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SciDAC's Earth System Grid Center for Enabling Technologies Semiannual Progress Report October 1, 2010 through March 31, 2011

This report summarizes work carried out by the Earth System Grid Center for Enabling Technologies (ESG-CET) from October 1, 2010 through March 31, 2011. It discusses ESG-CET highlights for the reporting period, overall progress, period goals, and collaborations, and lists papers and presentations. To learn more about our project and to find previous reports, please visit the ESG-CET Web sites: http://esg-pcmdi.llnl.gov/ and/or https://wiki.ucar.edu/display/esgcet/Home. This report will be forwarded to managers in the Department of Energy (DOE) Scientific Discovery through Advanced Computing (SciDAC) program and the Office of Biological and Environmental Research (OBER), as well as national and international collaborators and stakeholders (e.g., those involved in the Coupled Model Intercomparison Project, phase 5 (CMIP5) for the Intergovernmental Panel on Climate Change (IPCC) 5th Assessment Report (AR5); the Community Earth System Model (CESM); the Climate Science Computational End Station (CCES); SciDAC II: A Scalable and Extensible Earth System Model for Climate Change Science; the North American Regional Climate Change Assessment Program (NARCCAP); the Atmospheric Radiation Measurement (ARM) program; the National Aeronautics and Space Administration (NASA), the National Oceanic and Atmospheric Administration (NOAA)), and also to researchers working on a variety of other climate model and observation evaluation activities. The ESG-CET executive committee consists of Dean N. Williams, Lawrence Livermore National Laboratory (LLNL); Ian Foster, Argonne National Laboratory (ANL); and Don Middleton, National Center for Atmospheric Research (NCAR). The ESG-CET team is a group of researchers and scientists with diverse domain knowledge, whose home institutions include eight laboratories and two universities: ANL, Los Alamos National Laboratory (LANL), Lawrence Berkeley National Laboratory (LBNL), LLNL, NASA/Jet Propulsion Laboratory (JPL), NCAR, Oak Ridge National Laboratory (ORNL), Pacific Marine Environmental Laboratory (PMEL)/NOAA, Rensselaer Polytechnic Institute (RPI), and University of Southern California, Information Sciences Institute (USC/ISI). All ESG-CET work is accomplished under DOE open-source guidelines and in close collaboration with the project's stakeholders, domain researchers, and scientists. Through the ESG project, the ESG-CET team has developed and delivered a production environment for climate data from multiple climate model sources (e.g., CMIP (IPCC), CESM, ocean model data (e.g., Parallel Ocean Program), observation data (e.g., Atmospheric Infrared Sounder, Microwave Limb Sounder), and analysis and visualization tools) that serves a worldwide climate research community. Data holdings are distributed across multiple sites including LANL, LBNL, LLNL, NCAR, and ORNL as well as unfunded partners sites such as the Australian National University (ANU) National Computational Infrastructure (NCI), the British Atmospheric Data Center (BADC), the Geophysical Fluid Dynamics Laboratory/NOAA, the Max Planck Institute for Meteorology (MPI-M), the German Climate Computing Centre (DKRZ), and NASA/JPL. As we transition from development activities to production and operations, the ESG-CET team is tasked with making data available to all users who want to understand it, process it, extract value from it, visualize it, and/or communicate it to others. This ongoing effort is extremely large and complex, but it will be incredibly valuable for building 'science gateways' to critical climate resources (such as CESM, CMIP5, ARM, NARCCAP, Atmospheric Infrared Sounder (AIRS), etc.) for processing the next IPCC assessment report. Continued ESG progress will result in a production-scale system that will empower scientists to attempt new and exciting data exchanges, which could ultimately lead to breakthrough climate science discoveries.

54 ENVIRONMENTAL SCIENCES↗

Large-scale Hydrogen Storage – Risk Assessment Seattle City Light and Port of Seattle [Abstract]

This CRADA presents the strategy that Pacific Northwest National Laboratory (PNNL) and Sandia National Laboratories (SNL) will take to support Seattle City Light (SCL), and the Port of Seattle (Port) in performing a risk assessment of large-scale hydrogen storage. Risk assessment is often used to ensure that adequate measures are taken to protect workers and the public, the environment, infrastructure, and assets. A detailed risk assessment can also be used to direct funding and upgrades, to specific components and sub-systems in order to mitigate risks to the larger system. In this way risk assessments are often employed as a part of a larger risk management strategy, with the goal of minimizing the occurrence of hazards and to identify means to limit their consequences. Risk assessment is often used to engage and inform regulators, and to communicate how specific regulations are being met. However, it is important to note that the proposed work is not intended for SCL and the Port to use in order to gain regulatory acceptance for their proposed activities. The work performed as a part of this effort will be a preliminary risk assessment for early-stage component and system designs and should be considered research and development (R&D). As such, the proposed work will be performed to a quality level and design maturity consistent with R&D and is not considered appropriate for final safety analysis and regulatory compliance purposes. Previous and on-going work at SCL and the Port demonstrated the utility of deploying hydrogen systems at the Port. The deployment of hydrogen at the Port is a part of a larger vision of using hydrogen to address a range of issues for SCL and the Port. These include large-scale fueling of MD/HD vehicles, cargo-handling equipment (CHE), and harbor vessels to reduce emissions; support of adjacent LD vehicles; support of critical port operations during extreme events (i.e., resiliency); deferral of more capital- and time-intensive electrical distribution system upgrades while still supporting evolving port operations and decarbonization efforts; facilitating electrification by establishing energy storage as a grid resource, starting at strategic port locations; creation of a flexible market resource that can be used by SCL to generate revenue via arbitrage; support of planned future maritime operations that involve heavy use of hydrogen for ocean-going vessels; and future end-use applications involving natural gas pipeline hydrogen injection. Ultimately, the success of these activities is underpinned by the deployed storage capacity. Large-scale deployment of hydrogen systems will require hydrogen storage at a scale that has not been demonstrated. In addition, the ideal location for such multi-use systems is near the end user which will often necessitate deploying into urban and/or industrial areas. A detailed risk assessment using the Port as a test case is necessary to ensure the deployment of large-scale hydrogen is successful. Many technologies have been proposed for hydrogen storage; however, these technologies need to be analyzed as they apply to an actual site. The physical infrastructure and hydrogen use cases for the Port will be analyzed, and a risk assessment for compressed hydrogen, liquified hydrogen, and Liquid Organic Hydrogen Carrier (LOHC) storage will be performed. These risk assessments will be useful for understanding how each of these technologies would perform in terms of facility and public safety. The operating states of the proposed hydrogen systems at the Port will be analyzed and incorporated into the storage risk assessment. Scalability will also be analyzed to understand how future port uses would affect the overall risk assessment. Finally, using the risk assessment as a tool to inform engagement and to gain stakeholder acceptance will be explored.

08 HYDROGEN↗

Industrial Load Flexibility, the U.S. Power Grid and Ammonia

A variable renewable power grid is a new technological regime that involves real time harvesting and low-cost availability of energy resources coupled with storage to meet additional needs. Decarbonization through electrification of end uses formerly met by combustion processes will be a concurrent trend. Taken together, these two changes may make flexibility on the demand side more valuable to the grid and to industrial users. Industry accounted for 26% of US power demand in 2021. Traditionally, industrial processes for producing ammonia and other basic materials have been optimized for a system based on fossil resources, where energy can be called upon according to needs. Large capital expenditures as well as safety considerations have favored plants running at steady state at close to their maximum capacity. It is possible, however, that the renewable energy transition will offer opportunities to sectors that can operate in a more flexible manner. Innovations that make use of flexibility to enhance their business model to move forward, individuals and groups active in their development, use and regulation, together with institutions and infrastructures, can be considered as a technological innovation system (TIS). Beyond economic and technical factors on their own, the TIS is an important analysis framework for studying the development and diffusion of technologies. This work attempts to map the TIS of flexible industrial loads and their interaction with electric power in the US, with a particular focus on ammonia as a case study. We have conducted interviews with stakeholders involved in ammonia projects, working in system operators, trade groups, regulators and utilities. We assess to what extent a technological innovation system is functioning and document characteristics that allow industries to operate flexibly.

ammonia↗

PipeSight: A High-Performance Computing Platform for Pipeline Integrity Management

The Phase I feasibility study completed as part of this project has led to a number of innovative technologies being developed and has laid the foundation for a successful Phase II effort to commercialize a platform for managing the integrity of pipelines for the damage mechanisms of the new, hybrid-energy based economy. To ground the development efforts and direction of the project, an extensive market research and customer discovery effort was undertaken early in Phase I. Through this effort, a number of pipeline owners and operators were interviewed, and the following key findings were discovered about the pipeline industry: • Small pipeline operators do not have the central engineering groups necessary to perform their own independent analysis of inspection data, but instead rely on summarized tally sheets provided to them by inspection service providers. • The time it takes to go from an inspection to a completed engineering assessment, even for small segments of pipeline, can take anywhere from 30-120 days. During this delay, critical threats can (and have been known to) cause failures. • Uncertainty is often not accounted for in the assessment of pipeline integrity. The tally sheets provided by third-party service providers are almost always deterministic in nature, identifying threats that present a concern only to the current (not the future) integrity of the pipeline. • It is uncommon to apply the latest technologies to perform advanced assessments of damaged pipelines. There is a desire to use more advanced analysis capabilities to assess threats. Many pipeline operators indicated that they would often excavate a pipeline to perform an inspection and find that the damage was not as bad as they anticipated, thus using limited resources unnecessarily. Companies are not consistent in their use of inspection data to determine corrosion rates, and those that do only calculate deterministic corrosion rates. • The industry has prominently relied on time-based inspections but has recently started to transition to risk-based inspections. However, there appears to be no uniform guidance on how to do so while properly accounting for all sources of uncertainty. • Companies are not storing inspection data in a manner that allows for the ready determination of temporal trends. • Predictive maintenance principles and practices are beginning to be used by early adopters • Some pipelines are being re-purposed to transport different process fluids than they were designed for, e.g., H 2 and CO 2 rich process streams to serve the new hybrid-energy based economy, which are presenting new integrity concerns for the existing pipeline network that crisscrosses the United States. As a result of these discoveries, we were able to target the development efforts in Phase I to best serve the needs of the industry. In Phase I, we developed a way to correlate multiple large-scale scans of the pipeline to determine a probabilistic corrosion rate that accounts for all sources of error and uncertainty in the inspection process. This probabilistic corrosion rate can be used to predict the future thickness distribution of the pipe wall. We demonstrate how this analysis may be performed in an analytical fashion and has been implemented in such a manner that it can be readily distributed using GPU computing through integration of the Kokkos programming model. We also make a very novel extension of the analytical corrosion rate model to Bayesian Networks (an explainable AI technique) that can account for non-parametric distributions of corrosion rates. With the predictions made above for the probabilistic corrosion rate and corresponding future distribution of the pipe wall thickness, we can assess the integrity of the pipeline through the use of a probabilistic engineering assessment. We developed a novel screening data analysis approach that can rapidly identify ‘hotspots’ (local thin areas) where the integrity of the pipeline is a concern. Once more, we implemented this screening approach in C++ to leverage GPU computing via the Kokkos programming model. After the critical hotspots are identified, we developed a program that can automatically generate an advanced finite element model of the damaged regions. Since the number of damaged regions that require advanced analysis can number in the thousands, we integrated an open-source container-native workflow engine for orchestrating parallel jobs on the cloud. Initially, these advanced numerical models were only designed to account for loading due to internal pressure. However, in a slight pivot from the initial Phase I proposal, we developed a complete pipe stress analysis program (called Simflex) which can simulate the complete pipeline and its response to thermal expansion, pressure, thermal bowing, weight, wind, earthquake, support displacement, support friction and external forces. This pipe stress analysis program was written generically, to handle any piping system, but contains the features needed to model long pipelines (i.e., it incorporates a model for soil mechanics and can account for the nonlinear boundary conditions necessary to simulate long underground pipelines). This pipe stress analysis program can simulate any segment of the pipeline (simple or complex) under any set of conditions and loads, to determine the supplemental loads (axial forces and bending moments) at the location of damage. This enables the most accurate state of stress to be accounted for in the pipeline, which can prove critical when evaluating the integrity of a damaged region. In the process of developing the technologies to perform the integrity assessment of the pipeline, we also extended one of the industry standard approaches for performing the assessment of local thin areas that extend more in the circumferential direction than the longitudinal direction of the pipeline. This approach was presented to the API 579-1/AS ME FFS-1 steering committee in November 2021 for consideration in the next edition of the industry standard for Fitness-For-Service (expected to be released in 2023). To help pipeline operators make decisions with the results on any integrity assessment, we developed a new approach to the life-cycle management of pipelines which uses a Bayesian Decision Network. The network is designed to help pipeline operators plan and prioritize inspection activities and ultimately make smarter, more cost-effective decisions. The Bayesian approach accounts for all sources of uncertainty and carries them through to the final optimal decisions, providing a probabilistic framework for optimizing inspection intervals. The proof-of-concept networks developed in the feasibility study are complete, verified, and are focused on a subset of the pipeline. To expand this novel approach to the scale necessary for an entire network of pipelines in Phase II, we will leverage the DOE-funded Bengi solver for industrial-scale decision making with Bayesian Networks [22]. Once implemented, we will be able to provide the pipeline industry with a much-needed tool for optimal inspection planning using truly explainable artificial intelligence (XAI). To handle all of these advanced capabilities into a cloud-based platform, the architecture of the Equity Engineering Cloud (EEC) was extended to include Argo Workflows, a framework capable of distributing and managing a massive number of jobs that consume their own resources, such that thousands of serial finite element simulations can be run in parallel. As part of this substantial undertaking, we also integrated Argo Continuous Delivery (CD) into the EEC, to aid with the rapid prototyping and iterations that will be imperative to the success of the PipeSight platform’s Agile development process in Phase II. As part of the pipe stress analysis program, we also developed a custom visualizer that leverages the DOE-funded VTK visualization library. We added custom contouring capabilities and a means for interacting visually with both the inputs and outputs of the pipe stress analysis program. We also developed routines for automating the post-processing of the finite element simulations to determine if any failure criteria are met and to visualize the deformations, stresses and strains in ParaView using the exodus II file format (a subset of netCDF).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Automated electrical demand peak leveling in a manufacturing facility with short term energy storage for smart grid participation

Demand side management of energy is a vital function in the smart grid that allows for greater integration of renewable energy resources, and is facilitated with economic incentives in energy and demand pricing schedules. Manufacturing systems can take advantage of these incentives to reduce their energy costs through active energy management. This paper is a simulation analysis on the implementation of a novel algorithm that levelizes the maximum power load of an industrial bakery that operates under an on-peak demand price structure. The algorithm takes advantage of an untapped thermal energy storage resource in the facility, a chilled glycol buffer tank, to level the short intra-day power oscillations that the facility experiences. One of the key advantages of the algorithm is that it does not require precise demand forecasting or complex control algorithms, such as model predictive control. Even with substantial error in peak power estimates (5%), the algorithm is expected to result in at least a 2% peak reduction. Under ideal prediction, the algorithm reduces the on-peak facility power maximum by 7.3% of the possible 9.0% reduction the storage can provide. Further, the algorithm uses very few facility specific inputs, and can readily be adapted for any facility with short intra-day oscillatory power profiles and untapped storage capacity. The key insight of the paper is the employment of a novel algorithm to leverage untapped energy storage in manufacturing facilities to transform them into smart grid participants with no major capital investment.

24 POWER TRANSMISSION AND DISTRIBUTION↗

American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance

The purpose of this document is to evaluate the opportunity for Letterkenny Army Depot (LEAD or the Depot) to utilize biogenic methane, which may be available in shale formations under the Depot, to provide a supplemental source of natural gas that could allow the Depot to increase energy independence. Both the Director and Deputy of Public Works at the Depot are supportive in general of a methane production project, but wanted to better understand the challenges prior to embarking on such a project. This report will cover many of these issues. A similar project has been successfully developed by the U. S. Army at Ft. Knox, KY, which will be explained and referred to throughout this report as a backdrop to discussing the challenges and opportunities at LEAD, because the geologic formations and possibilities at both sites are similar. Prior to discussing the opportunity at LEAD, it is important to briefly discuss the successful methane recovery operation at Ft. Knox, because it is applicable to the projected approach for the LEAD methane system. The Ft. Knox project is an excellent example of how the U. S. Army can use an onsite renewable resource to provide a secure energy source that is not dependent on regional energy networks and foreign oil. At Ft. Knox, the U. S. Army contracted (through a utility co-op) with an energy production company to drill wells, establish a distribution infrastructure, and provide the equipment needed to prepare and compress the produced methane gas for use by base operations. The energy production company agreed to conduct the exploratory investigation at Ft. Knox with no cost to the government, as long as they could be granted a long-term contract if a reliable energy resource was established. The Depot is located, in part, over an Ordovician Age shale formation that may have the potential for producing biogenic methane, similar to the Devonian Age shale found beneath Ft. Knox. However, the Ordovician Age Shale beneath the Letterkenny Depot is not known to have any currently producing gas wells.

04 OIL SHALES AND TAR SANDS↗

Design and implementation of dynamic I/O control scheme for large scale distributed file systems

In this paper, we have analyzed the input/output (I/O) activities of Cori, which is a high-performance computing system at the National Energy Research Scientific Computing Center at Lawrence Berkeley National Laboratory. Our analysis results indicate that most users do not adjust storage configurations but rather use the default settings. In addition, owing to the interference from many applications running simultaneously, the performance varies based on the system status. To configure file systems autonomously in complex environments, we developed DCA-IO, a dynamic distributed file system configuration adjustment algorithm that utilizes the system log information to adjust storage configurations automatically. Our scheme aims to improve the application performance and avoid interference from other applications without user intervention. Moreover, DCA-IO uses the existing system logs and does not require code modifications, an additional library, or user intervention. To demonstrate the effectiveness of DCA-IO, we performed experiments using I/O kernels of real applications in both an isolated small-sized Lustre environment and Cori. Our experimental results shows that our scheme can improve the performance of HPC applications by up to 263% with the default Lustre configuration.

97 MATHEMATICS AND COMPUTING↗

INTEGRATION OF PANDA WORKLOAD MANAGEMENT SYSTEM WITH SUPERCOMPUTERS

Abstract The Large Hadron Collider (LHC), operating at the international CERN Laboratory in Geneva, Switzerland, is leading Big Data driven scientific explorations. Experiments at the LHC explore the funda- mental nature of matter and the basic forces that shape our universe, and were recently credited for the dis- covery of a Higgs boson. ATLAS, one of the largest collaborations ever assembled in the sciences, is at the forefront of research at the LHC. To address an unprecedented multi-petabyte data processing challenge, the ATLAS experiment is relying on a heterogeneous distributed computational infrastructure. The ATLAS experiment uses PanDA (Production and Data Analysis) Workload Management System for managing the workflow for all data processing on over 140 data centers. Through PanDA, ATLAS physicists see a single computing facility that enables rapid scientific breakthroughs for the experiment, even though the data cen- ters are physically scattered all over the world. While PanDA currently uses more than 250000 cores with a peak performance of 0.3+ petaFLOPS, next LHC data taking runs will require more resources than Grid computing can possibly provide. To alleviate these challenges, LHC experiments are engaged in an ambitious program to expand the current computing model to include additional resources such as the opportunistic use of supercomputers. We will describe a project aimed at integration of PanDA WMS with supercomputers in United States, Europe and Russia (in particular with Titan supercomputer at Oak Ridge Leadership Com- puting Facility (OLCF), Supercomputer at the National Research Center Kurchatov Institute , IT4 in Ostrava, and others). The current approach utilizes a modified PanDA pilot framework for job submission to the supercomputers batch queues and local data management, with light-weight MPI wrappers to run single- threaded workloads in parallel on Titan s multi-core worker nodes. This implementation was tested with a variety of Monte-Carlo workloads on several supercomputing platforms. We will present our current accom- plishments in running PanDA WMS at supercomputers and demonstrate our ability to use PanDA as a portal independent of the computing facility s infrastructure for High Energy and Nuclear Physics, as well as other data-intensive science applications, such as bioinformatics and astro-particle physics.

De, K↗

Energetic Potential for Demand Response in Detached Single Family Homes in Austin, TX

This study builds a generalized tool to quantify the maximum peak load reduction achievable with residential demand response and distributed energy resources (DERs). The tool is demonstrated by using empirical energy usage data from detached single family households within the service territory of Austin Energy - the local municipal utility in Austin, TX. The demand response optimization algorithm shifts energy usage of four controllable, high-consumption residential devices to off-peak hours: HVAC (heating, ventilation, and air conditioning) systems, electric water heaters, electric vehicles, and pool pumps. In addition, rooftop solar generation on individual residences is considered to reduce net load to the utility, and an energy storage system optimization model performing energy arbitrage further reduces peak demand. Results from the aggregate demand response and battery optimization study indicate that peak demand for the 2017 summer peak in Austin Energy could have been reduced by 26 MW or 2.9%. Here, by considering the combined effect of controllable consumer loads, solar generation, and energy storage systems, this study highlights the potential of strategic demand response and energy arbitrage to reduce peak demand at the distribution level.

14 SOLAR ENERGY↗

3-D Geologic Controls of Hydrothermal Fluid Flow at Brady Geothermal Field, Nevada using PCA

In many hydrothermal systems, fracture permeability along faults provides pathways for groundwater to transport heat from depth. Faulting generates a range of deformation styles that cross-cut heterogeneous geology, resulting in complex patterns of permeability, porosity, and hydraulic conductivity. Vertical connectivity (a through going network of permeable areas that allows advection of heat from depth to the shallow subsurface) is rare and is confined to relatively small volumes that have highly variable spatial distribution. This local compartmentalization of connectivity represents a significant challenge to understanding hydrothermal circulation and for exploring, developing, and managing hydrothermal resources. Here, we present an evaluation of the geologic characteristics that control this compartmentalization in hydrothermal systems through 3-D analysis of the Brady geothermal field in western Nevada. A published 3-D geologic map of the Brady area is used as a basis to develop structural and geological variables that are hypothesized to control or effect permeability or connectivity. The 3-D distribution of these variables is compared to the distribution of productive and non-productive fluid flow intervals along production wells and non-productive wells via principal component analysis (PCA). This comparison elucidates which geologic and structural variables are most closely associated with productive fluid flow intervals. Results indicate that production intervals at Brady are located: (1) within or near to known and stress-loaded macro-scale faults, and (2) in areas of high fault and fracture density. This submission includes the published journal article detailing this work, the published 3-D geologic map of the Brady Geothermal Area used as a basis to develop structural and geological variables that are hypothesized to control or effect permeability or connectivity, 3-D well data, along which geologic data were sampled for PCA analyses, and associated metadata file. This work was done using existing R programs.

15 GEOTHERMAL ENERGY↗

University Coalition for Fossil Fuel Energy Research

Following a nationwide open competition, the University Coalition for Fossil Energy Research (UCFER) was established in October 2015 through a cooperative agreement between Penn State and the Department of Energy (DOE) National Energy Technology Laboratory (NETL). Penn State lead UCFER with the objective of advancing basic and applied research for clean and low-carbon energy based on fossil fuels in support of the DOE’s mission. UCFER focused on research that improves the efficiency of production and use of fossil energy resources, while minimizing the environmental impacts and reducing greenhouse gas emissions. Penn State lead a team of nine universities (Massachusetts Institute of Technology, The Pennsylvania State University, Princeton University, Texas A&M University, University of Kentucky, University of Southern California, The University of Tulsa, University of Wyoming, and Virginia Polytechnic and State University) during the competition stage, adding seven more universities in 2017 (Carnegie Mellon University, Louisiana State University, The Ohio State University, University of North Dakota, University of Pittsburgh, University of Utah, and West Virginia University). This Coalition exhibited a wide geographical distribution across the U.S. bringing a wide variety of fossil energy expertise. This national university alliance was a major collaborative effort with NETL to address specific topics of R&D in NETL’s mission area, which involved one or more of NETL’s five core competencies (Geologic and Environmental Systems, Materials Engineering and Manufacturing, Energy Conversion Engineering, Systems Engineering and Analysis, and Computational Science and Engineering). The first five to six months of the project was the definitization stage. During this period, Penn State worked closely with NETL to finalize the Coalition organizational structure and By- Laws, prepare a statement of substantial involvement and a statement of project objectives, and develop operations and membership plans. A major component of this stage included preparing an execution plan to solicit research, evaluate proposals, recommend selected projects to NETL, and award projects. In addition, a plan was prepared to monitor projects, review projects, disseminate knowledge from research projects and develop an online system for Coalition research portfolio management. This included developing a website and several databases. The first of six rounds of solicitations started in mid-2016. Projects from the sixth solicitation started February 1, 2021, and ended January 31, 2023. Projects that were selected represented twelve technology lines. Approximately $16.6 million in funding was available for the six solicitations. Most of the funding was provided by DOE, Office of Fossil Energy (DOEFE) with the DOE Fuel Cells Technologies Office (DOE-FCTO) providing funding for a few projects. Coalition universities submitted 259 proposals in response to the solicitations, requesting approximately $67.0 million in funding, and forty-three projects were selected. However, one project withdrew after the principal investigator left the university. The management of the Coalition projects was a major activity by Penn State. Managing the Coalition projects consisted of monitoring the projects, reviewing the projects through annual technical review meetings, disseminating knowledge from the research projects, and developing an online system for Coalition research portfolio management. Penn State’s OMT monitored projects to ensure that all milestones (technical, schedule, budget) were met, expenditures were allowable, cost share (when applicable) were reported, and all technical reports were submitted. The OMT also posted the technical reports electronically on a secure members-only website for access and review by the Coalition members. Disseminating knowledge from the research projects was done through a website, newsletters, various meetings, conferences, journal articles, publicity/press releases, and project summaries that were prepared after each project was completed. Penn State kept NETL apprised of UCFER progress through quarterly reports (thirtyone were submitted by Penn State), verbal and written communications, yearly updates at the annual technical review meetings, and cost accrual reports. The UCFER project had a significant impacty. The UCFER program established the first national university alliance in fossil energy research with a major collaboration effort with DOE NETL that addressed specific topics in NETL’s research and development mission areas. It generated inter-university collaborations, which was another program interest. Twenty-two out of 259 proposals contained collaborations (≈8.5%) and three of forty-two funded projects involved inter-university collaborations (≈7.0%). The forty-two funded projects provided support at fourteen universities involving 269 personnel. Research was conducted by 106 faculty, 115 graduate and undergraduate students, forty-six research staff and post-doctoral scholars, and two visiting scholars. Students and post-doctoral scholars were also on-site at NETL through CRADAs. In addition, non-Coalition participants included six universities and sixteen companies and national laboratories. The non-Coalition participants were involved as subcontractors, providers of cost share, performed unpaid consultation and sample analysis, served as advisory board members, or were providers of samples and materials for testing. UCFER also produced visibility in that fifty-six refereed journal articles were published, fifty-seven conference papers and twenty-three posters were prepared, 190 presentations were given, eight patent applications were filed, two books/book chapters were written, and ten software codes were developed. Collaboration between NETL and the individual projects was a major requirement for all funded projects. This included NETL staff time to support collaboration, consultation, technical guidance, sample preparation and analysis, internships at NETL, on-site testing and equipment usage by Coalition participants at NETL, co-mentoring students, and coauthoring journal articles and conference papers. Collaboration was impacted by COVID-19 in that not all on-site activities could be performed. NETL personnel were coauthors on eight of the conference papers (fourteen percent of the conference papers that were prepared) and seventeen of the journal articles (thirty percent of the journal articles that were prepared). A website was developed for an online proposal solicitation and review process and to provide exposure to UCFER. A website analysis highlighted the large amount of member and general public interest in UCFER by interpreting access statistics from March 2016 through June 2023. Visitors to the site originated from many different organizations, businesses, and countries. The website provided a means to disseminate information to both the general public and the UCFER members and was successfully used for outreach activities. In addition, NETL required that RFP release, proposal submission, and proposal reviews all be performed online. Penn State successfully developed these capabilities in a secure section of the website, which were used throughout the UCFER project. It is recognized that each project had its technical successes. In addition, highlighted successes were compiled and summarized from the research projects. Information was requested from the PIs of completed projects. In addition, Penn State’s Operations Management Team reviewed subcontract reports to identify project successes. Examples of information requested from PIs included (not all-inclusive): new projects that have been funded as a result of UCFER funding; new commercial products; establishment of a new center; new patent; new software; best paper awards; highly-cited work; and graduate student successes. A total of forty-eight highlighted successes were reported.

01 COAL, LIGNITE, AND PEAT↗