Search NASA⌕ Search

SEARCH · Search NASA

Results for “Distributed architecture”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 739 records · Page 41

Modular, Reconfigurable, and Rapid Response Space Systems: The Remote Sensing Advanced Technology Microsatellite

Modular, Reconfigurable, and Rapid-response (MR(sup 2)) space systems represent a paradigm shift in the way space assets of all sizes are designed, manufactured, integrated, tested, and flown. This paper will describe the MR(sup 2) paradigm in detail, and will include guidelines for its implementation. The Remote Sensing Advanced Technology microsatellite (RSAT) is a proposed flight system test-bed used for developing and implementing principles and best practices for MR(sup 2) spacecraft, and their supporting infrastructure. The initial goal of this test-bed application is to produce a lightweight (approx. 100 kg), production-minded, cost-effective, and scalable remote sensing micro-satellite capable of high performance and broad applicability. Such applications range from future distributed space systems, to sensor-webs, and rapid-response satellite systems. Architectures will be explored that strike a balance between modularity and integration while preserving the MR(sup 2) paradigm. Modularity versus integration has always been a point of contention when approaching a design: whereas one-of-a-kind missions may require close integration resulting in performance optimization, multiple and flexible application spacecraft benefit &om modularity, resulting in maximum flexibility. The process of building spacecraft rapidly (< 7 days), requires a concerted and methodical look at system integration and test processes and pitfalls. Although the concept of modularity is not new and was first developed in the 1970s by NASA's Goddard Space Flight Center (Multi-Mission Modular Spacecraft), it was never modernized and was eventually abandoned. Such concepts as the Rapid Spacecraft Development Office (RSDO) became the preferred method for acquiring satellites. Notwithstanding, over the past 30 years technology has advanced considerably, and the time is ripe to reconsider modularity in its own right, as enabler of R(sup 2), and as a key element of transformational systems. The MR2 architecture provides a competitive advantage over the old modular approach in its rapid response to market needs that are difficult to predict both from the perspectives of evolving technology, as well as mission and application requirements.

Esper, Jaime↗

NASA Tech Briefs, July 2009

Topics covered include: Dual Cryogenic Capacitive Density Sensor; Hail Monitor Sensor; Miniature Six-Axis Load Sensor for Robotic Fingertip; Improved Blackbody Temperature Sensors for a Vacuum Furnace; Wrap-Around Out-the-Window Sensor Fusion System; Wide-Range Temperature Sensors with High-Level Pulse Train Output; Terminal Descent Sensor Simulation; A Robust Mechanical Sensing System for Unmanned Sea Surface Vehicles; Additive for Low-Temperature Operation of Li-(CF)n Cells; Li/CFx Cells Optimized for Low-Temperature Operation; Number Codes Readable by Magnetic-Field-Response Recorders; Determining Locations by Use of Networks of Passive Beacons; Superconducting Hot-Electron Submillimeter-Wave Detector; Large-Aperture Membrane Active Phased-Array Antennas; Optical Injection Locking of a VCSEL in an OEO; Measuring Multiple Resistances Using Single-Point Excitation; Improved-Bandwidth Transimpedance Amplifier; Inter-Symbol Guard Time for Synchronizing Optical PPM; Novel Materials Containing Single-Wall Carbon Nanotubes Wrapped in Polymer Molecules; Light-Curing Adhesive Repair Tapes; Thin-Film Solid Oxide Fuel Cells; Zinc Alloys for the Fabrication of Semiconductor Devices; Small, Lightweight, Collapsible Glove Box; Radial Halbach Magnetic Bearings; Aerial Deployment and Inflation System for Mars Helium Balloons; Steel Primer Chamber Assemblies for Dual Initiated Pyrovalves; Voice Coil Percussive Mechanism Concept for Hammer Drill; Inherently Ducted Propfans and Bi-Props; Silicon Nanowire Growth at Chosen Positions and Orientations; Detecting Airborne Mercury by Use of Gold Nanowires; Detecting Airborne Mercury by Use of Palladium Chloride; Micro Electron MicroProbe and Sample Analyzer; Nanowire Electron Scattering Spectroscopy; Electron-Spin Filters Would Offer Spin Polarization Greater than 1; Subcritical-Water Extraction of Organics from Solid Matrices; A Model for Predicting Thermoelectric Properties of Bi2Te3; Integrated Miniature Arrays of Optical Biomolecule Detectors; A Software Rejuvenation Framework for Distributed Computing; Kurtosis Approach to Solution of a Nonlinear ICA Problem; Robust Software Architecture for Robots; R4SA for Controlling Robots; Bio-Inspired Neural Model for Learning Dynamic Models; Evolutionary Computing Methods for Spectral Retrieval; Monitoring Disasters by Use of Instrumented Robotic Aircraft; Complexity for Survival of Living Systems; Using Drained Spacecraft Propellant Tanks for Habitation; Connecting Node; and Electrolytes for Low-Temperature Operation of Li-CFx Cells.

Source record↗

Integrated Mission Simulation (IMSim): Multiphase Initialization Design with Late Joiners, Rejoiners and Federation Save & Restore

This document describes the design of the Integrated Mission Simulation (IMSim) federate multiphase initialization process. The main goal of multiphase initialization is to allow for data interdependencies during the federate initialization process. IMSim uses the High Level Architecture (HLA) IEEE 1516 [1] to provide the communication and coordination between the distributed parts of the simulation. They are implemented using the Runtime Infrastructure (RTI) from Pitch Technologies AB. This document assumes a basic understanding of IEEE 1516 HLA, and C++ programming. In addition, there are several subtle points in working with IEEE 1516 and the Pitch RTI that need to be understood, which are covered in Appendix A. Please note the C++ code samples shown in this document are for the IEEE 1516-2000 standard.

Dexter, Daniel E.↗

Localized Triple Modular Redundancy vs. Distributed Triple Modular Redundancy on a ProASIC3E Reprogrammable FPGA

Field programmable gate arrays (FPGA) are used in every space application. Currently, most space flight applications use radiation hardened (RH) FPGAs, which are very expensive. There is a desire to use cheaper, commercial off the shelf reprogrammable FPGAs, which are more susceptible to radiation effects known as single-event effects (SEE). The RH parts have SEE and total ionizing dose (TID) hardened elements pre-integrated into the part. This means that the designer does not need to implement any hardening techniques while configuring the device. The COTS parts on the other hand must be mitigated by design in order to insure any form of mitigation. The design techniques this project examines concern the use of localized triple modular redundancy (LTMR) and distributed triple modular redundancy (DTMR). LTMR triples every flip flop in the device architecture while DTMR triples everything except for the global routes (clocks, resets, and enables). The testing was performed on a ProASIC3E FPGA at the Texas A&M cyclotron facility. Two design architectures were used: shift registers and counters, both with LTMR and DTMR mitigation techniques. The test results prove that DTMR is more effective at reducing SEE than LTMR. We also determined that there was not a significant difference between the use of shift registers and counters for test purposes. More testing is required to obtain additional linear energy transfer values for each architecture and mitigation technique in order to determine the most cost-effective method of SEE mitigation.

McGuffey, Alex↗

The James Webb Space Telescope Mission: Optical Telescope Element Design, Development, and Performance

The James Webb Space Telescope (JWST) is a large, infrared space telescope that has recently started its science program which will enable breakthroughs in astrophysics and planetary science. Notably, JWST will provide the very first observations of the earliest luminous objects in the universe and start a new era of exoplanet atmospheric characterization. This transformative science is enabled by a 6.6 m telescope that is passively cooled with a 5 layer sunshield. The primary mirror is comprised of 18 controllable, low areal density hexagonal segments, that were aligned and phased relative to each other in orbit using innovative image-based wave front sensing and control algorithms. This revolutionary telescope took more than two decades to develop with a widely distributed team across engineering disciplines. We present an overview of the telescope requirements, architecture, development, superb on-orbit performance, and lessons learned. JWST successfully demonstrates a segmented aperture space telescope and establishes a path to building even larger space telescopes.

Infrared observatories↗

Integrated control system concept for high-speed aircraft

The synthesis and evaluation of flight control system architectures for future aircraft are discussed in terms of design features and the requirements for fighter aircraft. Advanced fighter configurations may feature canards, flaperons, two-dimensional vectoring nozzles, a mixing compression inlet, and an advanced turbojet engine. Survey and evaluation technology will also progress to include distributed microprocessors, VLSI and VHSIC microcircuitry, optical circuits, analytic redundancy, etc. Bottom-p and top-down architectures have been investigated to fulfill the reliability, maintainability, cost, and performance goals. A centralized architecture has been devised with line-removable units to facilitate maintainability and reduce weight. Descriptions are provided of the performance parameters and applications of optical elements, photoelastic pressure sensors, rare earth sensors, computing elements, and information transfer system.

Carlin, C. M.↗

Assessment of Crew Time for Maintenance and Repair Activities for Lunar Surface Missions

NASA is currently evaluating different methods to predict how much time crewmembers will spend conducting repair and maintenance activities on future space missions. As mission scope and spacecraft architectures change, understanding how crew repair and maintenance timelines are impacted by mission operations and technology changes is vital for future mission planning. Past work has been done using historical International Space Station (ISS) data to accurately predict crew habitation and operation timelines, resulting in the development of NASA’s Exploration Crew Time Model (ECTM). However, understanding crew maintenance and repair requirements has posed a unique challenge due to the complexity of available datasets, the probabilistic nature of sub-system failures, and the impacts of reliability growth on failure rates. This paper presents a methodology to collect and condition empirical repair and maintenance time data from available datasets, to extrapolate from that data to estimate projected maintenance and repair times for a lunar Surface Habitat (SH), and to assess how uncertainty in repair time could impact utilization time on the lunar surface. NASA ISS maintenance and crew time data are logged into two central databases: the Maintenance Data Collection (MDC) and the Operations Planning Timeline Integration System (OPTimIS). Separately, each of these two datasets capture only portions of the complete set of data required to generate an accurate assessment of crew time spent on maintenance activities at a sub-system level. To create a more useful crew time estimate for maintenance timelines, the authors developed a methodology to capture relevant data from each set and combine and utilize that data by linking crew time requirements to specific components. The authors compare the failure logs in the MDC to crew activity logs pulled from OPTimIS and then process the data to estimate required repair time for each failure and repair event. The entire maintenance activity dataset is then categorized based on the class of failed component to ensure a significant sample size for each class and accurate crew time estimates for any components lacking relevant data. This resultant component repair time data can be used in the future to generate Mean Time to Repair (MTTR) estimates and confidence intervals for each class of component based on a probabilistic distribution of documented maintenance events. These improved MTTR values can then be applied to candidate element sub-system architectures, along with component Mean Time Between Failure (MTBF) data to generate distributions for potential required system crew repair time estimates for a given mission. The authors applied these modeling methods to a case study of a crewed mission to the planned SH and produced expected corrective maintenance crew time distributions. The results produced an expected corrective maintenance crew time at over 24 hours per mission, and a maintenance crew time distribution that reflects the importance of planning for sufficient maintenance requirements each mission. Repair time distributions can then be used to develop more accurate crew schedules and to assess potential available utilization time.

Crew Time↗

Assessment of Crew Time for Maintenance and Repairs Activities for Lunar Surface Missions

NASA is currently evaluating different methods to predict how much time crewmembers will spend conducting repair and maintenance activities on future space missions. As mission scope and spacecraft architectures change, it will be necessary to understand how crew repair and maintenance timelines are impacted by mission operations and technology changes. Past work has been done using historical ISS data to accurately predict crew habitation and operation timelines, resulting in the development of NASA’s Exploration Crew Time Model (ECTM). However, understanding crew maintenance and repair requirements has posed a unique challenge due to the complexity of available datasets, the probabilistic nature of sub-system failures, and the impacts of reliability growth on failure rates. This paper presents a methodology to collect and condition empirical repair and maintenance time data from available data sets, to extrapolate from that data to estimate projected maintenance and repair times for a lunar Surface Habitat, and to assess how uncertainty in repair time could impact utilization time on the lunar surface. NASA International Space Station (ISS) maintenance and crew time data are logged into two central databases, the Maintenance Data Collection (MDC) and the Operations Planning Timeline Integration System (OPTimIS) respectively. Separately, each of these two datasets capture only portions of the complete set of data required to generate an accurate assessment of crew time spent on maintenance activities at a sub-system level. MDC provides a detailed catalog of failure events and an overview of the failure’s required maintenance and OPTimIS provides a description of crew activities and crew time durations dedicated to maintenance. To create a more useful crew time estimate for maintenance timelines, the authors developed a methodology to capture relevant data from each set and combine and utilize that data by linking crew time requirements to specific components. The authors compare the failure logs in the MDC to crew activity logs pulled from OPTimIS and then process the data to estimate required repair times for each failure event. Data is also classified by the outcome of each repair event, whether the failed component was replaced or whether it was repaired in place. The entire maintenance activity dataset is then categorized based on the class of failed component to allow for a statistically significant sample size for each class and to provide accurate crew time estimates for any components lacking relevant data. This resultant component repair time data can be used in the future to generate Mean Time To Repair (MTTR) estimates and confidence intervals for each class of component based on a probabilistic distribution of documented maintenance events. These improved MTTR values can then be applied to candidate element sub-system architectures, along with component Mean Time Between Failure (MTBF) data to generate distributions for potential required system crew repair time estimates for a given mission. Repair time distributions can then be used to develop more accurate crew schedules and to assess potential available utilization time.

Crew Time↗

A distributed version of the NASA Engine Performance Program

Distributed NEPP, a version of the NASA Engine Performance Program, uses the original NEPP code but executes it in a distributed computer environment. Multiple workstations connected by a network increase the program's speed and, more importantly, the complexity of the cases it can handle in a reasonable time. Distributed NEPP uses the public domain software package, called Parallel Virtual Machine, allowing it to execute on clusters of machines containing many different architectures. It includes the capability to link with other computers, allowing them to process NEPP jobs in parallel. This paper discusses the design issues and granularity considerations that entered into programming Distributed NEPP and presents the results of timing runs.

Cours, Jeffrey T.↗

Kepler Science Operations Center Pipeline Framework

The Kepler mission is designed to continuously monitor up to 170,000 stars at a 30 minute cadence for 3.5 years searching for Earth-size planets. The data are processed at the Science Operations Center (SOC) at NASA Ames Research Center. Because of the large volume of data and the memory and CPU-intensive nature of the analysis, significant computing hardware is required. We have developed generic pipeline framework software that is used to distribute and synchronize the processing across a cluster of CPUs and to manage the resulting products. The framework is written in Java and is therefore platform-independent, and scales from a single, standalone workstation (for development and research on small data sets) to a full cluster of homogeneous or heterogeneous hardware with minimal configuration changes. A plug-in architecture provides customized control of the unit of work without the need to modify the framework itself. Distributed transaction services provide for atomic storage of pipeline products for a unit of work across a relational database and the custom Kepler DB. Generic parameter management and data accountability services are provided to record the parameter values, software versions, and other meta-data used for each pipeline execution. A graphical console allows for the configuration, execution, and monitoring of pipelines. An alert and metrics subsystem is used to monitor the health and performance of the pipeline. The framework was developed for the Kepler project based on Kepler requirements, but the framework itself is generic and could be used for a variety of applications where these features are needed.

Klaus, Todd C.↗

Memory Network For Distributed Data Processors

Universal Memory Network (UMN) is modular, digital data-communication system enabling computers with differing bus architectures to share 32-bit-wide data between locations up to 3 km apart with less than one millisecond of latency. Makes it possible to design sophisticated real-time and near-real-time data-processing systems without data-transfer "bottlenecks". This enterprise network permits transmission of volume of data equivalent to an encyclopedia each second. Facilities benefiting from Universal Memory Network include telemetry stations, simulation facilities, power-plants, and large laboratories or any facility sharing very large volumes of data. Main hub of UMN is reflection center including smaller hubs called Shared Memory Interfaces.

Bolen, David↗

Fault Management Architectures and the Challenges of Providing Software Assurance

The satellite systems Fault Management (FM) is focused on safety, the preservation of assets, and maintaining the desired functionality of the system. How FM is implemented varies among missions. Common to most is system complexity due to a need to establish a multi-dimensional structure across hardware, software and operations. This structure is necessary to identify and respond to system faults, mitigate technical risks and ensure operational continuity. These architecture, implementation and software assurance efforts increase with mission complexity. Because FM is a systems engineering discipline with a distributed implementation, providing efficient and effective verification and validation (VV) is challenging. A breakout session at the 2012 NASA Independent Verification Validation (IVV) Annual Workshop titled VV of Fault Management: Challenges and Successes exposed these issues in terms of VV for a representative set of architectures. NASA's IVV is funded by NASA's Software Assurance Research Program (SARP) in partnership with NASA's Jet Propulsion Laboratory (JPL) to extend the work performed at the Workshop session. NASA IVV will extract FM architectures across the IVV portfolio and evaluate the data set for robustness, assess visibility for validation and test, and define software assurance methods that could be applied to the various architectures and designs. This work focuses efforts on FM architectures from critical and complex projects within NASA. The identification of particular FM architectures, visibility, and associated VVIVV techniques provides a data set that can enable higher assurance that a satellite system will adequately detect and respond to adverse conditions. Ultimately, results from this activity will be incorporated into the NASA Fault Management Handbook providing dissemination across NASA, other agencies and the satellite community. This paper discusses the approach taken to perform the evaluations and preliminary findings from the research including identification of FM architectures, visibility observations, and methods utilized for VVIVV.

Fault Management↗

Optical technology for spacecraft antennas

The issues involved in the design and implementation of high-speed fiberoptic distribution networks for spacecraft antennas are examined. The phased array antennas and antenna remoting are considered. The system requirements for these two generic system types are summarized, and their architectures are described. Optical beamforming of phased arrays is discussed, including beam control at the T/R module level, optical beam control on the fiber optic distribution network, and optical beamforming in free space.

Herczfeld, P. R.↗

Reference architecture for space data systems

This paper introduces the Reference Architecture for Space Data Systems (RASDS)that is being developed by CCSDS. RASDS uses five views to describe architectures of space data systems. These views are derived from the viewpoints of the Reference Model of Open Distributed Processing (RM-ODP), but they are slightly modified from the RM-ODP viewpoints so that they can better represent the concerns of space data systems.

CCSDS space communication reference architecture s↗

Fault Management Architectures and the Challenges of Providing Software Assurance

Fault Management (FM) is focused on safety, the preservation of assets, and maintaining the desired functionality of the system. How FM is implemented varies among missions. Common to most missions is system complexity due to a need to establish a multi-dimensional structure across hardware, software and spacecraft operations. FM is necessary to identify and respond to system faults, mitigate technical risks and ensure operational continuity. Generally, FM architecture, implementation, and software assurance efforts increase with mission complexity. Because FM is a systems engineering discipline with a distributed implementation, providing efficient and effective verification and validation (V&V) is challenging. A breakout session at the 2012 NASA Independent Verification & Validation (IV&V) Annual Workshop titled "V&V of Fault Management: Challenges and Successes" exposed this issue in terms of V&V for a representative set of architectures. NASA's Software Assurance Research Program (SARP) has provided funds to NASA IV&V to extend the work performed at the Workshop session in partnership with NASA's Jet Propulsion Laboratory (JPL). NASA IV&V will extract FM architectures across the IV&V portfolio and evaluate the data set, assess visibility for validation and test, and define software assurance methods that could be applied to the various architectures and designs. This SARP initiative focuses efforts on FM architectures from critical and complex projects within NASA. The identification of particular FM architectures and associated V&V/IV&V techniques provides a data set that can enable improved assurance that a system will adequately detect and respond to adverse conditions. Ultimately, results from this activity will be incorporated into the NASA Fault Management Handbook providing dissemination across NASA, other agencies and the space community. This paper discusses the approach taken to perform the evaluations and preliminary findings from the research.

Fault Management↗

Human factors in space station architecture 1: Space station program implications for human factors research

The space station program is based on a set of premises on mission requirements and the operational capabilities of the space shuttle. These premises will influence the human behavioral factors and conditions on board the space station. These include: launch in the STS Orbiter payload bay, orbital characteristics, power supply, microgravity environment, autonomy from the ground, crew make-up and organization, distributed command control, safety, and logistics resupply. The most immediate design impacts of these premises will be upon the architectural organization and internal environment of the space station.

Cohen, M. M.↗

Advances in Distributed Operations and Mission Activity Planning for Mars Surface Exploration

A centralized mission activity planning system for any long-term mission, such as the Mars Exploration Rover Mission (MER), is completely infeasible due to budget and geographic constraints. A distributed operations system is key to addressing these constraints; therefore, future system and software engineers must focus on the problem of how to provide a secure, reliable, and distributed mission activity planning system. We will explain how Maestro, the next generation mission activity planning system, with its heavy emphasis on portability and distributed operations has been able to meet these design challenges. MER has been an excellent proving ground for Maestro's new approach to distributed operations. The backend that has been developed for Maestro could benefit many future missions by reducing the cost of centralized operations system architecture.

Mars Exploration Rover (MER)↗

Random and block copolymerization in metal oxide gel synthesis from metalorganic compounds

The introduction and development of the block copolymerization concept in metal oxide gel synthesis will in the future generate a new class of glass/microcrystalline materials. By the year 2004, better scientific understanding of the chemical principles controlling the distribution of network formers or modifiers in silicate gels will permit the synthesis of architecturally well-defined block polymers with unique high-performance behavior.

Mukherjee, S. P.↗