Search NASA⌕ Search

SEARCH · Search NASA

Results for “FINALS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 739 records · Page 41

Measurement of WW and WZ production in the lepton plus heavy flavor jets final state at CDF

We present the CDF measurement of the diboson WW and WZ production cross section in a final state consistent with leptonic W decay and jets originating from heavy flavor quarks, based on the full Tevatron Run II dataset. The analysis of the di–jet invariant mass spectrum allows the observation of 3.7 sigma evidence for the combined production processes of either WW or WZ bosons. The different heavy flavor decay pattern of the W and Z bosons and the analysis of the secondary–decay vertex properties allow to independently measure the WW and WZ production cross section in a hadronic final state. The measured cross sections are consistent with the standard model predictions and correspond to signal significances of 2.9 and 2.1 sigma for WW and WZ production, respectively.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Measurement of Top Quark Polarization in $t\bar{t}$ Lepton + Jets Final States at D0

We present a measurement of top quark polarization in $t\bar{t}$ pair production in $p\bar{p}$ collisions at $\sqrt{s}=1.96$ TeV using data corresponding to 9.7 fb$^{-1}$ of integrated luminosity recorded with the D0 detector at the Fermilab Tevatron Collider. We consider final states containing a lepton and at least three jets. The polarization is measured through the distribution of lepton angles along three axes: the beam axis, the helicity axis, and the transverse axis normal to the $t\bar{t}$ production plane. This is the first measurement of top quark polarization at Tevatron using lepton+jet final states and the first measurement of the transverse polarization in $t\bar{t}$ production. The observed distributions are consistent with standard model predictions of nearly no polarization.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

EERC Final Topical Report – Findings on Subtask 3.2 – Produced Water Management Through Geologic Homogenization, Conditions, and Reuse

The Energy & Environmental Research Center (EERC) was awarded a contract by the North Dakota Industrial Commission (NDIC) Oil and Gas Research Program (NDIC No. G-051-101) to conduct a study on the recycling of water used in oil and gas operations, also known as produced water, from oil- and gas-producing regions of North Dakota as directed by Section 19 of North Dakota House Bill 1014. This final report provides a compilation of results of the study, which include regulatory, scientific, technological, and feasibility methods and considerations associated with North Dakota produced water management. The report provides a synopsis of this project’s previously submitted produced water assessment report entitled “Produced Water Management and Recycling Options in North Dakota” (Energy & Environmental Research Center, 2020), with updated values provided as appropriate. The report provides the results from the investigation of a novel produced water management strategy, referred to as geologic homogenization, conditioning, and reuse (GHCR), which aims to use a subsurface geologic formation as a natural medium for managing produced water recycling and reuse. Water management is a significant technical and economic challenge for sustainable oil and gas production, and water volumes are intrinsically linked to oil production volumes. North Dakota oil production rose to over 1.5 million barrels (MMbbl)/day in 2019, and despite a downturn in oil price in early 2020, North Dakota oil production has recovered to 1.1 MMbbl/day as of August 2021. Bakken petroleum system development between 2008 and 2020 has resulted in a nearly fourfold increase in produced water volumes to 642 MMbbl/yr in 2020 after peaking at 740 MMbbl/yr in 2019 and a fivefold increase in saltwater disposal (SWD) volumes to 565 MMbbl/yr in 2020 after a peak of 682 MMbbl/yr in 2019. Produced water and SWD volumes are forecasted to double by 2030. SWD is the primary method of produced water management used in North Dakota, with approximately 95% of the SWD volume occurring through subsurface injection into sandstones of the Dakota Group (Dakota). Localized pressurization of the Dakota resulting from SWD and projected increases in produced water volumes could impact the economics of North Dakota oil production. As a result, there is an emerging need to pursue alternative produced water management approaches, including recycling and reuse. While produced water recycling is not yet widespread, commercial operators are making strides in overcoming the technical challenges of using high salinity produced water in completion operations (Marathon Oil, 2020). As water management continues to be a key focal point in companies’ environmental, social, and governance (ESG) initiatives, focus on water management, including recycling, will likely continue to increase. Laboratory column testing, field sample collection, geologic modeling and numerical simulation, and techno-economic analysis all indicate that GHCR could feasibly be implemented as a potential water management option. Laboratory column testing and field sample collection indicate that the Inyan Kara sandstone and native formation fluid are capable of homogenizing with the Bakken produced water to a point where the fluid composition appears to stabilize. Extracting that stabilized fluid could be considered homogeneous and capable of providing individual batches of hydraulic fracturing fluid. Numerical simulation results indicate that extraction of fluids from the Inyan Kara in a GHCR implementation scenario is capable of reducing formation pressure, which would help ease localized pressurization of the Inyan Kara and extend the available capacity for nearby existing SWD wells. Economic analysis indicates that there are scenarios where GHCR implementation can be a competitive or even lower-cost option than a conventional water management approach. Site-specific conditions will dictate the economic potential of GHCR, but potentially attractive sites for GHCR implementation will be those that are located above a pressurized zone of the Inyan Kara, need six or more Bakken infill wells, and face high costs for conventional SWD and/or freshwater. Based on the regulatory review, drilling into the Inyan Kara for SWD and to harness as a source water for industrial use have precedent in North Dakota, and a workable regulatory solution for GHCR seems likely. However, restrictions in the state regarding surface storage and transport of produced fluids may limit some activities, which will affect how GHCR could ultimately be implemented. In summary, this study reveals pursuing GHCR can be a viable approach to water management in North Dakota. The GHCR concept addresses some of the challenges that hinder the more traditional approaches to recycling in the industry. Furthermore, an assessment of the current landscape of water management within the state reveals the ongoing trend of increasing volumes of produced water and SWD. Projections reveal that the volumes of produced water that need to be managed are expected to double over the next decade (Energy & Environmental Research Center, 2020). With the continued development of the Bakken and continuing driving factors related to ESG initiatives, implementing a practice such as GHCR is a feasible approach to adding recycling of produced water to industry within the state. This subtask was cofunded through the EERC–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission Oil and Gas Research Program. References Energy & Environmental Research Center, 2020, Produced water management and recycling options in North Dakota: Final Report for North Dakota Legislative Management Energy Development and Transmission Committee and North Dakota Industrial Commission. Marathon Oil, 2020, Sustainability report: https://cdn.sanity.io/files/ghcnw9z2/website/ 91744eb6ef8fbe59505a911c6b8d2e8dd9a537fa.pdf?dl (accessed November 2021).

02 PETROLEUM↗

Transient Efficiency, Flexibility, and Reliability Optimization of Coal-Fired Power Plants - Final Program Review

This program developed an advanced model-based monitoring and model-predictive control algorithms for a coal fired power plant (CFPP), and deployed these algorithms in a real-time platform to demonstrate performance benefits for transient flexibility and plant operation efficiency. More specifically, the objectives were successfully achieved through a combination of (i) developing a high-fidelity transient plant model in Apros, which was used as a high-fidelity plant simulation between $100-50\% TMCR$ where TMCR denotes the turbine maximum continuous rating, i.e., baseload, (ii) developing a very fast physics-based reduced-order model (ROM) of the plant, which ran more than $100\times$ faster than real-time, enabling its use as real-time embedded model for model-based estimation (MBE) and model predictive control (MPC) (iii) implementing a real-time MBE based on ROM using a robust unscented Kalman filter (UKF) to continuously tune the ROM to match the measurements from high-fidelity Apros plant model despite significant plant-model mismatch, and thus, obtain a Digital Twin of the plant (iv) designing and implementing a real-time MPC with dual objectives of transient plant load tracking with high ramp rates and minimizing coal consumption, i.e., improving plant efficiency in the baseload-partload operation range of $100-50\% TMCR$. Each key element above was developed and tested individually, and has been reported in corresponding Topical Reports. Finally, all the individual elements were integrated in an overall closed-loop system, that was successfully tested in desktop Simulink test harness simulations with ROM or high-fidelity model as the plant. Thereafter, the Simulink implementation was used to auto-generate C-code and deploy as real-time Docker microservice containers in Linux, and validate that they can run in real-time in the hardware-in-the loop (HIL) setup and produce the same results as in Simulink. The results of the integrated simulation tests in Simulink as well as the real-time HIL deployment are documented in this final report, showing good load tracking for load ramps at $3-4\%/min$ ramp rates, and achieving up to $5.5\%$ reduction in coal relative to baseline operation at $50\% TMCR$ load. The desktop and HIL simulations show successful performance of the overall model based estimation and control solution and achieve the key objectives of the program for flexible, efficient and reliable operation of sub-critical coal fired power plants.

20 FOSSIL-FUELED POWER PLANTS↗

A Plutonium Finishing Plant Model for the Cercla Removal Action and Decommissioning Construction Final Report

The joint policy between the U.S. Environmental Protection Agency (EPA) and the U.S. Department of Energy (DOE) for decommissioning buildings at DOE facilities documents an agreement between the agencies to perform decommissioning activities including demolition under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). The use of removal actions for decommissioning integrates EPA oversight authority, DOE lead agency responsibility, and state authority for decommissioning activities. Once removal actions have been performed under CERCLA, a construction completion report is required to document the completion of the required action. Additionally, a decommissioning report is required under DOE guidance. No direct guidance was found for documenting completion of decommissioning activities and preparing a final report that satisfies the CERCLA requirements and the DOE requirements for decommissioning. Additional guidance was needed for the documentation of construction completion under CERCLA for D and D projects undertaken under the joint policy that addresses the requirements of both agencies. A model for the construction completion report was developed to document construction completion for CERCLA D and D activities performed under the joint EPA/DOE policy at the Plutonium Finishing Plant (PFP). The model documentation report developed at PFP integrates the DOE requirements for establishing decommissioning end-points, documenting end-point completion and preparing a final decommissioning report with the CERCLA requirements to document completion of the action identified in the Action Memorandum (AM). The model includes the required information on health and safety, data management, cost and schedule and end-points completion. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Back from the Brink with Something for Everyone - The Final Executed Memorandum of Agreement for Interpretation of the East Tennessee Technology Park and the K-25 Building - 13370

When the Environmental Management (EM) Program at the Oak Ridge Office of the Department of Energy (DOE) began its major decontamination and decommissioning (D and D) program activities in the mid-1990's, it was understood that the work to demolish the gaseous diffusion process buildings at the K-25 Site, as it was then known, would be challenging. Nothing of that size and breadth had ever been done within the DOE complex and the job brought about a full menu of unique attributes: radiological contamination with enriched materials entrained in certain areas of the system, a facility that was never designed not to operate but had been shut down since 1964, and a loyal following of individuals and organizations who were committed to the physical preservation of at least some portion of the historic Manhattan Project property. DOE was able to solve and resolve the issues related to nuclear materials management, contamination control, and determining the best way to safely and efficiently deconstruct the massive building. However, for a variety of reasons, resolution of the historic preservation questions - what and how much to preserve, how to preserve it, where to preserve it, how to interpret it, how much to spend on preservation, and by and for whom preservation should occur - remained open to debate for over a decade. After a dozen years, countless meetings, phone calls, discussions and other exchanges, and four National Historic Preservation Act (NHPA) [1] Memoranda of Agreement (MOA), a final MOA [2] has been executed. The final executed MOA's measures are robust, creative, substantive, and will be effective. They include a multi-story replica of a portion of the K-25 Building, the dedication of the K-25 Building footprint for preservation purposes, an equipment building to house authentic Manhattan Project and Cold War equipment, a virtual museum, an on-site history center, a grant to preserve a historically-significant Manhattan Project-era hotel in Oak Ridge, and more. The MOA was designed to offer something for everyone. The MOA for the K- 25 Building and interpretation of the East Tennessee Technology Park (ETTP; formerly the K-25 Site) was executed by all of the signatory parties on August 7, 2012 - almost 67 years to-the-day after the 'product' of the K-25 process building became known to more than just a small group of scientists and engineers working on a secret project for the Army Corps of Engineers Manhattan District. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges with Final Status Surveys at a Large Decommissioning Site - 13417

As part of decommissioning a former nuclear fuel manufacturing site, one of the crucial final steps is to conduct Final Status Surveys (FSS) in order to demonstrate compliance with the release criteria. At this decommissioning site, the area for FSS was about 100 hectares (248 acres) and included varying terrain, wooded areas, ponds, excavations, buildings and a brook. The challenges in performing the FSS included determining location, identifying FSS units, logging gamma walkover survey data, determining sample locations, managing water in excavations, and diverting water in the brook. The approaches taken to overcome these challenges will be presented in the paper. The paper will present and discuss lessons learned that will aid others in the FSS process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Final Radiological Conditions at Areas of the Niagara Falls Storage Site Remediated under the Formerly Utilized Sites Remedial Action Program - 12184

The U.S. Department of Energy (DOE) methods and protocols allow evaluation of remediation and final site conditions to determine if remediated sites remain protective. Two case studies are presented that involve the Niagara Falls Storage Site (NFSS) and associated vicinity properties (VPs), which are being remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). These properties are a part of the former Lake Ontario Ordnance Works (LOOW). In response to stakeholders concerns about whether certain remediated NFSS VPs were putting them at risk, DOE met with stakeholders and agreed to evaluate protectiveness. Documentation in the DOE records collection adequately described assessed and final radiological conditions at the completed VPs. All FUSRAP wastes at the completed sites were cleaned up to meet DOE guidelines for unrestricted use. DOE compiled the results of the investigation in a report that was released for public comment. In conducting the review of site conditions, DOE found that stakeholders were also concerned about waste from the Separations Process Research Unit (SPRU) at the Knolls Atomic Power Laboratory (KAPL) that was handled at LOOW. DOE agreed to determine if SPRU waste remained at that needed to be remediated. DOE reviewed records of waste characterization, historical handling locations and methods, and assessment and remediation data. DOE concluded that the SPRU waste was remediated on the LOOW to levels that pose no unacceptable risk and allow unrestricted use and unlimited exposure. This work confirms the following points as tenets of an effective long-term surveillance and maintenance (LTS and M) program: - Stakeholder interaction must be open and transparent, and DOE must respond promptly to stakeholder concerns. - DOE, as the long-term custodian, must collect and preserve site records in order to demonstrate that remediated sites pose no unacceptable risk. - DOE must continue to maintain constructive relationships with the U.S. Army Corps of Engineers and state and federal regulators. After review of historical site documentation, DOE reports, and USACE radiological data, DOE concluded the following: - DOE had access to adequate documentation to evaluate site conditions at the former LOOW. This is important to confirm now, while institutional knowledge of early FUSRAP work remains available. - DOE remediated the completed VPs to conditions that are protective for unrestricted residential use. Sample and walkover gamma scan results indicate that no wastes remain that exceed cleanup criteria. - Process knowledge and field observations establish that Cs-137 is the predominant radionuclide in the KAPL waste stream. Cs-137, a strong gamma emitter, was used as an indicator for remediation of KAPL waste. Other radionuclides were present in much lower relative concentrations and were likely also removed during remediation of the VPs. - KAPL contaminants were removed during remedial activities at the former LOOW as either co-located or co-mingled with other radionuclides. - For the active VPs (VP-E, VP-E', and VP-G), results of DOE's cleanup of the accessible portions of these properties indicate that KAPL waste does not remain at concentrations greater than the DOE cleanup limit: - Inaccessible areas were not associated with historic KAPL waste handling. Therefore, it is unlikely that KAPL waste remains on the active VPs. - Because gamma activity was used by DOE during remediation/verification activities for excavation control, additional USACE cleanup of FUSRAP wastes on these properties will likely result in the remediation of any co-located residual KAPL wastes to acceptable levels or identification of KAPL waste that is not co-located. - Although USACE has not established a cleanup level for Cs-137 on the active NFSS VPs, DOE assessment and remediation data indicate that assessed Cs-137 was remediated and significant Cs-137 is unlikely to remain. Because of the low likelihood of encountering significant KAPL waste on the active NFSS VPs, additional remediation is not anticipated at these properties. - USACE assessment soil sampling results on the NFSS proper indicate that KAPL waste does not exceed the DOE cleanup level for Cs-137. USACE has not established a cleanup level for Cs-137 on NFSS proper. The USACE cleanup of FUSRAP wastes on the NFSS proper will likely result in the remediation of any co-located residual KAPL wastes or identification of KAPL waste that is not co-located. DOE is drafting a report of the investigation of KAPL waste at LOOW. The report will be released to the public for comment when the draft is complete. DOE responses to stakeholder inquiries resulted in a common understanding of site conditions and site risk. DOE expects additional interaction with stakeholders at the former LOOW as USACE completes remediation of the active VPs and the NFSS proper, and these relationships will hopefully have built trust between DOE and the stakeholders that DOE will perform its duties in an open and transparent manner that includes stakeholders as stewards for remediated FUSRAP sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TN{sup R} MW- Multi Waste Package 'All In One Solution' For Conditioning - Transport - Storage - Up To Final Disposal - 17196

For the management of radioactive waste, either during nuclear facility operation or decommissioning, one must consider a diverse array of nuclear waste forms of various types, volumes and activities. Examples are: activated metallic waste; legacy waste; sludge; resins; and orphan waste. Customers are frequently faced with the obligation of undertaking multiple, costly waste management operations. These operations activities include handling, reconditioning or material transfers between packages, as in the case when moving material from on-site storage to transportation, and then from transportation to final disposal. To address this issue, a new - highly flexible up to reversible - cask system, the TN{sup R} MW, is being developed as an 'All in One Solution'. TN{sup R} MW has a total weight of 10 metric tons and is compliant with the 2012 International Atomic Energy Agency (IAEA) regulations. It was developed to provide flexibility and designed with the capability to be adaptable to the various needs of the nuclear industry. From IP-2 and Type A containers to Type B(U) and B(U)F casks, this cask offers different options to sufficiently address the requirements of each step of the waste stream from on-site and international transport to long-term interim storage and final disposal. Licensing and manufacturing of a number of packagings in this TN{sup R} MW family are underway. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The role of Aspo Hard Rock laboratory for the Swedish nuclear fuel and waste management's research, developing and demonstration programme for a final repository of spent nuclear fuel - 15378

The Aspo Hard Rock Laboratory (HRL), located in the Simpevarp area in the municipality of Oskarshamn in Sweden, Figure 1, constitutes an important part of the Swedish Nuclear Fuel and Waste Management (SKB) work with design and construction of a deep geological repository for final disposal of spent nuclear fuel. One of the fundamental reasons behind SKB's decision to construct an underground laboratory was to create an opportunity for research, development and demonstration in a realistic and undisturbed rock environment down to repository depth. Most of the research has concerned with processes of importance for the long-term safety of a future final repository and the capability to model the processes taking place at repository depth. Demonstration addresses the performance of the engineered barriers and practical means of constructing a repository and emplacing the canisters containing spent fuel. SKB will in the coming years more focus on using the Aspo HRL for demonstrating technology for and function of important parts of the repository system before constructing and operate the spent nuclear fuel repository in Forsmark. Aspo HRL includes both a research village with office space for 100 persons and different laboratories, e.g. Chemistry and Material Science Laboratory and Bentonite Laboratory, and an underground research laboratory to a depth of 460 m. The Aspo HRL is also open for other organisations to be used for their own projects and experiments not only related to nuclear waste management research. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges in Interim and Final Storage of HLW in Germany - 19060

After the Fukushima event in 2011 Germany has decided to phase out nuclear power. Subsequently, it seemed to be politically attractive also to achieve a broad consensus with respect to final disposal of the high-active heat-generating waste after a long societal conflict lasting for decades. Germany has then decided to start a new site selection program for the determination of a site for high-active and heat-generating waste. In 2013, an overall parliamentary consensus could be achieved to agree on a new Repository Site Selection Act. This law has then been evaluated by a commission and the Repository Site Selection Act became amended. Besides, also organization and responsibilities became adapted as well as the financing system. A fund has been installed, which was financed by the utilities, to secure the availability of money to finance the whole process. In the meanwhile, the organizations for licensing of interim storage and final disposal facilities (BfE), for the operation of interim storage facilities for spent fuel, high-active waste and low and intermediate level waste (BGZ) and for site investigation, construction, operation and decommissioning of repositories for spent fuel and high-active waste as well as for low and intermediate level waste (BGE) had been founded and the site investigation process has just started. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 46: Final Closure of Unlined LLW Disposal Facilities Worldwide (R3.5)

This panel discussed the on-going and emerging issues with the design and construction of final cover system of unlined disposal facilities (e.g., material disposal areas (MDAs), subsurface disposal areas (SDAs), burial grounds, and similar historical waste trenches, pits and vaults). The discussion focused on key technical and regulatory issues as well as lessons learned from years of engineering and construction in US and non-US locations. Panelists with presentations: Closure of Unlined LLW Disposal Sites (Craig Benson); Closure of LLW Facilities (Paul Pointon); Final Closure of Unlined LLW Disposal Facilities - Lessons Learned (Kevin Foye)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Finalizing the {sup 63}Cu and {sup 65}Cu Resonance Evaluations for the ENDF/B-VIII Release

The resolved resonance region evaluation for the only two natural isotopes of copper ({sup 63}Cu and {sup 65}Cu) was carried out at the Oak Ridge National Laboratory (ORNL) in support of the US Department of Energy (DOE) Nuclear Criticality Safety Program (NCSP). The particular interest in the isotope of copper arose because it was linked with poor performance of the Zeus series of integral benchmarks from the International Criticality Safety Benchmark Evaluation Project (ICSBEP). Good agreement between the calculated and experimentally measured values for the ICSBEP benchmarks is essential to the NCSP because the ICSBEP benchmarks are used for validation purposes of criticality safety calculations. The particular set of four Zeus experiments had a highly-enriched uranium core with a thick copper-reflector resulting in a large sensitivity of the criticality of these systems to the cross section of copper in the intermediate energy range. Sobes et al. presented the effect of the newly resolved resonance region evaluations for the two isotopes of copper on the Zeus integral benchmarks, as well as 23 other benchmarks from the ICSBEP during the 2016 ANS Annual Meeting. The results presented in Ref. were calculated with the ENDF/B-VII.1 cross section libraries used for all other materials. However, it is suggested that the resolved resonance region evaluations for the isotopes of copper should not be judged only on their performance in the integral benchmark calculations especially when the ENDF/B-VII.1 cross sections are used for all of the other isotopes. Three reasons are provided for this. First and foremost, a new evaluation is an assessment of the physics of the nucleus of the particular isotope, and the goal of an application agnostic nuclear data evaluation is to improve evaluation by fitting state-of-the art R-Matrix formalism to highly precise experimental cross section measurements. The improved performance in the integral benchmarks should only come as a consequence of the improvement in the physics of the evaluation. Secondly, there is some uncertainty in the nuclear data evaluation of the cross section of all isotopes, so there could be some error in evaluating another isotope used in calculating the integral benchmark experiment. Such an error may have been having a compensating effect, in combination with the previous evaluations for the isotopes of copper. Thirdly, with the two isotopes of copper proposed for inclusion in the upcoming release of the ENDF/B-VIII library, performance of the new resonance evaluation for copper should be evaluated based on the calculation of the integral benchmarks with all of the evaluations proposed for inclusion in the ENDF/B-VIII release. These benchmarking results using the ENDF/B-VIII evaluations as they converge closer to their final form will be presented at the conference. This summary stresses the importance of the physics of the evaluation and reviews some of the steps taken in finalizing a resolved resonance region evaluation. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Final design for thermal epithermal experiments (TEX) with ZPPR plutonium/aluminium plates with polyethylene and tantalum - 13592

Lawrence Livermore National Laboratory has completed the final design for the first phase of the Thermal Epithermal experiments (TEX), which focused on critical configurations composed of plutonium/aluminum Zero Power Physics Reactor (ZPPR) plates moderated by polyethylene with and without a tantalum diluent. {sup 239}Pu and {sup 240}Pu were identified as being the number one and two nuclear data need by the nuclear criticality safety and nuclear data communities, with special emphasis placed on performance issues of the Pu cross sections in the intermediate energy region. Preliminary TEX design recommended tantalum as the first diluent to pursue for final design, as it represented a high priority data need, showed the highest sensitivity and largest contribution to uncertainty with the Pu ZPPR system, and a large number of high quality Ta plates from the ZPPR inventory in Idaho was readily available. The goals of the new critical experiments are 1) to create assemblies that span a wide range of fission energy spectra, from thermal (below 0.625 eV), through the intermediate (0.65 eV to 100 keV), and to fast energies (above 100 keV), and 2) to easily modify the assemblies to include high priority materials like tantalum. A total of ten critical configurations were designed as part of CED-2. Five TEX experiments (Experiments 1-5) were designed to establish baseline configurations with the Pu ZPPR plates covering the thermal, intermediate, and fast fission energy regimes. For all five experiments, the ZPPR plates will be arranged in layers of 24 plates (6 plates by 4 plates), resulting in approximately a 12 inch by 12 inch footprint. Multiple layers will be stacked together with varying thicknesses of interspersed polyethylene placed between the layers to fine tune the neutron spectrum of the assembly. The other five experiments (Experiments 6-10) will be similar to the five baseline experiments, except that a tantalum layer will be placed next to each plutonium plate layer, thus diluting the stack and allowing for tests of the neutron cross section for tantalum. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Measuring Muon Antineutrino Charged-Current Interactions without Mesons in the Final State, in the NOvA Near Detector

NOvA is a long-baseline neutrino experiment based at Fermilab in the US, with the primary aim of measuring neutrino and antineutrino oscillations. This will enhance our understanding of electroweak interactions by measuring the neutrino mixing angles, CP-violating phase and neutrino mass ordering. To measure these oscillations, we first need to have a deep understanding of how neutrinos and antineutrinos interact with matter. Antineutrino interaction cross sections are, at present, particularly poorly constrained, and processes such as meson exchange currents are not well understood in the antineutrino sector. This analysis will develop a cross-section measurement of muon antineutrino interactions without mesons (e.g. pions or kaons) in the final state, in the NOvA near detector. A high-statistics, high-purity sample is obtained through a cut-based selection process implementing machine learning techniques. The sample is dominated by quasi-elastic and meson exchange current interactions which are sensitive to nuclear effects such as Final-State Interactions. The cross section will be extracted as a function of the incoming neutrino energy and the kinematics of the outgoing particles. This presentation will give an overview of the analysis and discuss progress towards obtaining the cross-section measurement.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Measurement of Multi-Proton Zero Pion Final States with the NuMI Neutrino Beam at ICARUS

Evidence suggests that charge-parity (CP) symmetry, or the principle that matter and antimatter must obey the same physics, might be violated in neutrino flavor mixing. The next-generation long-baseline experiment DUNE is designed to confirm whether or not neutrinos oscillate differently from antineutrinos. The magnitude of systematic uncertainties contributing to current long-baseline oscillation measurements, if left unimproved, is enough to jeopardize DUNE's ability to measure CP violation. Neutrino cross section measurements on argon targets are an essential input for improving neutrino interaction modelling and reducing the systematic uncertainties before DUNE turns on. The ICARUS experiment at Fermilab is well suited perform such measurements due to the NuMI neutrino beam providing neutrinos at the same energy as DUNE's first oscillation maximum. This work presents a measurement of muon neutrino charged-current interactions with multiple energetic protons and zero final state mesons in ICARUS. Multi-proton topologies are sensitive to contributions from two-particle two hole effects as well as resonant pion production and subsequent absorption via final state interactions (FSI) within the argon nucleus. Single-differential cross sections are measured in lab-frame opening angles and transverse kinematic imbalance variables, characterizing the initial sate momentum sharing between correlated nucleons and strength of FSI in argon.

Smedley, John [Rochester U.] (ORCID:00000002848611↗

Measurement of Charged-current Muon Neutrino–argon Interactions Without Final-state Pions Using the MicroBooNE Detector

This thesis presents a new high-statistics measurement of flux-integrated single- and double-differential cross sections for charged-current muon neutrino interactions on argon nuclei without final-state pions. The analysis utilizes the full 1.3 $\times$ $10^{21}$ protons-on-target dataset collected by the MicroBooNE liquid argon time projection chamber between 2015 and 2020 at Fermilab's Booster Neutrino Beam. The results of this study are reported with respect to final-state muon kinematic variables and compared with predictions from commonly used neutrino event generators. In one-dimensional distributions, all generators perform reasonably well. However, in two dimensions, only a few demonstrate good agreement with the data. These findings provide valuable insight into characterizing neutrino-nucleon interactions. Such advancements are vital for future long-baseline neutrino experiments, which aim to accurately measure neutrino oscillation and investigate beyond-the-Standard-Model physics with high sensitivity.

Englezos, Panagiotis [Rutgers U., Piscataway (main↗