Search NASA⌕ Search

SEARCH · Search NASA

Results for “Fire Simulation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

728 records · Page 41

Electrically‐Driven Metal‐Insulator Transitions Emerging from Localizing Current Density and Temperature

Negative differential resistance (NDR) is a key electronic response enabling two‐terminal artificial neurons that can be achieved through different physical phenomena, including phase‐homogeneous current density and temperature (electro‐thermal) localizations and spatially‐localized metal‐insulator phase transitions (MITs). These two effects have been observed to occur sequentially in select electrically‐biased transition metal oxides. However, it is unknown why and under what conditions localizing behaviors precede MITs, particularly as a function of device length scale. To this end, the interplay between phase‐homogeneous electro‐thermal localizations and MITs is investigated in a 3D multiphysics simulation of a lateral thin film device, using the material properties of the prototype MIT material VO 2 . These findings demonstrate that the MIT is nucleated through dynamically localizing current density and temperature. A critical device width (≈0.7 µm in this study) is identified, below which both the electrically‐induced electro‐thermal and phase inhomogeneities cease to appear. It is demonstrated that the formation of spatial inhomogeneities directly relates to device dimensions, and demonstrate the decoupling of NDR from the MIT through device scaling relationships. These results provide insight into the material phenomena underlying the material's electrical responses, clarifying conditions under which spatial inhomogeneities form in electrically‐biased MIT materials.

artificial neuron↗

Distributed fiber sensing systems for 3D combustion temperature field monitoring in coal-fired boilers using optically generated acoustic waves (Final Report)

In this project, we have developed and tested three kinds of fiber optic sensing systems for real time monitoring of temperature variations within an industrial scale boiler furnace. The fiber optic sensing systems target spatial and temporal distributions of high temperature profiles in a boiler furnace in fossil power plants. The reconstructed temperature profile will provide critical input for the control mechanisms to optimize the combustion process. This temperature profile will address the essential problem for fossil power plants in achieving higher efficiency and fewer pollutant emissions. Acoustic pyrometer systems have been used to reconstruct temperature field of power plant boilers based on measuring TOF (times-of-flight) of sound waves along some straight paths in a 2D cross-section of the boiler. In this project, optically generated acoustic signals from a fiber optic sensing system have replaced the acoustic signals generated from an electrical transducer. A 3D reconstruction algorithm replaced the previous 2D model. In this project, three kinds of fiber optic sensing systems have been developed and tested. They are fiber optic sensing system I, fiber optic sensing system II (Distributed Sensing System I) and fiber optic sensing system III (Distributed Sensing System II). For fiber optic sensing system I, the fiber optic ultrasound generator acts as a signal generator. A microphone, hydrophone or other electronic devices serve as a signal receiver. In this system, there are one generator and one receiver. Distance test, water temperature test, air temperature test, air temperature reconstruction, and GE ISBF pilot test were performed by Fiber optic sensing system I. The fiber optic sensing system I successfully detected temperature in all these tests. We got 2D temperature reconstruction results by using the fiber optic sensing system I and it matched the reference data. The fiber optic sensing system I successfully survived in GE ISBF boiler environment (480 °F). For fiber optic sensing system II (Distributed Sensing System I), it is an all optical ultrasound system. The fiber optic ultrasound generator acts as a signal generator. Fiber Bragg Grating (FBG) and Fabry-Perot (FP) sensor act as a signal receiver. In this system, there is one generator and one receiver. Aluminum plate temperature test, furnace high temperature test, and GE ISBF pilot test were performed by the fiber optic sensing system II. Fiber optic sensing system II successfully detected the temperature in all these tests. The fiber optic sensing system II successfully survived at up to 700 °C furnace environment and 320 °C GE ISBF boiler environment. For fiber optic sensing system III (Distributed Sensing System II), it is also an all optical ultrasound system. The fiber optic ultrasound generator acts as a signal generator. Multiple FP fiber sensors act as signal receivers. In this system, there is one generator and three receivers. Three GE ISBF pilot tests were performed by fiber optic sensing system III. The fiber optic sensing system III survived in the cold flow tests in GE’s ISBF pilot test facility. However, we didn’t get high temperature data by using this system since the nanosecond laser issues. During the period of the project, test trials, data simulation and algorithm optimization was performed successfully. For real time temperature field construction, the sampling rate must be fast enough to capture the field variations. The technology of Code-division multiple access (CDMA) is well studied which could allow parallel multiplexing, even if signals overlap in time or frequencies. Moreover, it has been known that extending the length of signal significantly improves SNR. For acoustic signals, these multiplexing techniques have also been widely used, mainly for sonar and acoustic communications. The CDMA modulation technique has been proposed and studied to guarantee high network throughput, low channel access delay and low energy consumption. We have studied the temperature field reconstruction using Gaussian Radial Basis Functions (GRBF)-based approximation approach. Reconstruction of 3D temperature field using Neural Networks with measured TOF and known propagation paths is feasible. 2D and 3D temperature field reconstruction simulation results are achieved. The milestone status is shown in Table 1. We finished milestone 1-8 and milestone 10. For milestone 9, we did three pilot tests by using the fiber optic sensing system III (Distributed Sensing System II) at GE Power. However, due to the failure of the ns laser, we did not get the temperature results. We conducted some additional tasks that were not originally proposed: 1) We fabricated a fiber optic sensing system I and did a pilot test based on this system. 2) In the proposal, we proposed two pilot tests at GE Power. In reality, we finished at least seven pilot tests at GE Power. GE Power has made a lot of efforts for supporting the pilot tests. 3) We got a simulation results based on CDMA. In summary, most of the tasks have been accomplished. The outcome of this project removed a few barriers that hinder the achievement of the final product of the distributed sensing systems. With the successful accomplishment of this project, a prototype of the fiber optic sensing system can be fabricated to attract more interests from companies and other funding agencies.

47 OTHER INSTRUMENTATION↗

High-Temperature Ceramic-Carbonate Dual-Phase Membrane Reactor for Pre-combustion Carbon Dioxide Capture (Final Scientific/Technical Report)

Arizona State University, in collaboration with University of South Carolina, worked on a project aimed at development of a new high temperature, high pressure CO 2 perm-selective membrane reactor for water-gas-shift reaction (WGS) with simulated gasifier syngas to produce a high concentration H 2 stream with CO 2 capture. The membrane reactor is made of a CO 2 semi-permeable ceramic-carbonate dual-phase (CCDP) membrane with high CO 2 perm-selectivity/permeance and thermal/mechanical stability for application in WGS reaction. The objectives of this project were to (1) synthesize the chemically/thermally stable tubular CCDP membranes with CO 2 permeance and selectivity (with respect to H 2 , CO or H 2 O) larger than 6.5×10-7 mol/m2·s·Pa and 500, respectively; (2) establish CCDP membrane reactor setup and study high pressure CO 2 permeation and WGS reaction with CO 2 capture using the setup; and (3) identify conditions for WGS in the CCDP membrane reactor that produce CO 2 and H 2 streams with purity of >99% and >90% respectively at CO conversion >95% and overall carbon capture >90%. The work in this project included both membrane development and membrane reactor process study. The membrane development efforts were focused on investigating a H 2 S resistant and highly oxygen-ionic conducting metal oxide material and membrane for CO 2 separation, fabrication of tubular samaria-doped-ceria/molten-carbonate CCDP membrane with high mechanical strength, and experimental and modeling study of high-pressure CO 2 permeation of the CCDP membranes. Mathematical models were developed to describe WGS in the CCDP membrane reactor without a catalyst or packed with a commercial high temperature WGS catalyst. Experiments on WGS in the CCDP membrane reactor with the commercial WGS catalyst, guided by the model analysis, were performed to identify optimum conditions for achieving the CO conversion, carbon capture, and the purity of the H 2 and CO 2 streams mentioned above. At 30 atm feed pressure, 750°C operation temperature, space velocity of 250 h-1, and with steam sweep, a single-stage CCDP membrane reactor with average CO 2 permeation flux of 0.5 cm3(STP)/min.cm2 can achieve CO 2 conversion of 95% and overall carbon capture of 94%, and produce CO 2 and H 2 streams with dry-based purity of >99% and 92% respectively. The project also included process design and techno-economic analysis (TEA) for a CCDP membrane reactor process for WGS reaction with CO 2 capture for a 550 MW coal-fired IGCC power plant, and its comparison with the conventional fixed-bed reactor system for WGS with follow-up CO 2 capture by an amine absorption process. The target performance for the reactor for WGS with CO 2 capture includes CO conversion >95%, hydrogen stream purity >90%, CO 2 stream purity >95%, and total carbon capture >90%. The CCDP membrane developed in this project can achieve the performance target, without subsequent CO 2 capture process at the optimum conditions identified in this project. The outcome of the process design and TEA analysis shows that the membrane reactor for WGS with in-situ CO 2 capture has an operating cost about 40% lower than that for the conventional fixed-bed reactor with a separate amine absorption process for CO 2 capture. However, the capital cost of the membrane reactor process is about twice that of the conventional process because of the higher cost of the CCDP membrane. Modeling analysis shows that a membrane reactor using a CCDP membrane with higher CO 2 permeance (about three times the current value) can deliver the targeted performance for WGS reaction with CO 2 capture at a much higher space velocity and lower membrane surface area to catalyst volume ratio, leading to a smaller catalyst amount and/or membrane area and hence significantly reduced membrane reactor capital costs.

20 FOSSIL-FUELED POWER PLANTS↗

Probing the Effects of NO x and SO x Impurities on Oxy-Fuel Combustion in Supercritical CO 2 : Shock Tube Experiments and Chemical Kinetic Modeling

The direct-fired supercritical carbon dioxide cycles are one of the most promising power generation methods in terms of their efficiency and environmental friendliness. Two important challenges in implementing these cycles are the high pressure (300 bar) and high CO 2 dilution (>80%) in the combustor. The design and development of supercritical oxy-combustors for natural gas require accurate reaction kinetic models to predict the combustion outcomes. The presence of a small amount of impurities in natural gas and other feed streams to oxy-combustors makes these predictions even more complex. During oxy-combustion, trace amounts of nitrogen present in the oxidizer is converted to NO x and gets into the combustion chamber along with the recirculated CO 2 . Similarly, natural gas can contain a trace amount of ammonia and sulfurous impurities that get converted to NO x and SO x and get back into the combustion chamber with recirculated CO 2 . In this work, a reaction model is developed for predicting the effect of impurities such as NO x and SO x on supercritical methane combustion. The base mechanism used in this work is GRI Mech 3.0. H 2 S combustion chemistry is obtained from Bongartz et al. while NOx chemistry is from Konnov. The reaction model is then optimized for a pressure range of 30–300 bar using high-pressure shock tube data from the literature. It is then validated with data obtained from the literature for methane combustion, H 2 S oxidation, and NO x effects on ignition delay. The effect of impurities on CH 4 combustion up to 16 atm is validated using NO x -doped methane studies obtained from the literature. In order to validate the model for high-pressure conditions, experiments are conducted at the UCF shock tube facility using natural gas identical mixtures with N 2 O as an impurity at ~100 bar. Current results show that there is a significant change in ignition delay with the presence of impurities. A comparison is made with experimental data using the developed model and predictions are found to be in good agreement. The model developed was used to study the effect of impurities on CO formation from sCO 2 combustors. It was found that NO x helps in reducing CO formation while the presence of H 2 S results in the formation of more CO. The reaction mechanism developed herein can also be used as a base mechanism to develop reduced mechanisms for use in CFD simulations.

Energy & Fuels↗

Autonomous Aerial Power Plant Inspection in GPS-denied Environments

Inspection of coal-fired power plants is frequently dangerous, includes difficult places to reach, and can turn expensive due to the downtimes and cost of inspection crew. Robotic systems have shown capabilities to address some of these issues, but most of the current robotic inspection technology in power plants is designed for specific components. Conversely, recent advances in machine vision have empowered aerial platforms for long-range, remotely-controlled, GPS-based inspections of industrial plants. This capability has led to wide spread utilization of aerial robots (commonly termed Drones, UVS or UAS) platforms for inspection in less challenging environments where both collision avoidance, and GPS reception are not significant issues. The challenge in adapting airborne technology for power plant inspection lies in internal structures and the complex network of piping, and distribution systems, which impose significant risks for collision and can hinder the reception and transmission of GPS signals. The current state of the art in aerial inspection technology within the energy sector is controlled via radio control, and utilizes GPS-based navigation, for inspection of large-scale plants such as offshore platforms and wind turbine parks. Nevertheless, close-range and autonomous inspection in the GPS-denied environments of power plants has not yet been achieved, as it requires precise guidance and navigation with real-time situational awareness and obstacle avoidance capabilities. This endeavor introduced the use of rotary wing flying robots, due to their station keeping and vertical take-off capabilities for power plant components inspection. To enable close quarter inspection two methods were used. One method uses the 3D CAD (Three-dimensional Computer-Aided Design) model of the asset to inspect to generate the UAV’s inspection path. To acquire, analyze and process the 3D model, first, the STL file is produced to obtain surface points and vectors normal to the surface. Later, by introducing other variables such as wall offset and a controlled trajectory between each outline and each subsequent layer, the flight path is generated. The proposed framework will generate a path that will pass as close as desired from the surface and navigate in intricate environments. A second method, use advanced manufacturing techniques such as CNC (Computer Numerical Control) and additive manufacturing. Once the inspection flight path is obtained, vision-based navigation systems are employed to have the UAV autonomously tracking the provided trajectory. Finally, Artificial Intelligence-enabled developments are in charge of detecting cracks and corrosion in structural components of power plants. The proposed methods are validated in simulations, laboratory and industrial setups, where it is shown that the developed systems acting together enable close-quarter autonomous aerial inspection and mapping in power plant assets. The system can be further improved by adding more sensors to navigate in different GPS-denied environments, with non-homogeneous lighting conditions, dust and in general situations where vision-based systems may fail.

01 COAL, LIGNITE, AND PEAT↗

Nebraska Integrated Carbon Capture and Storage Pre-Feasibility Study

In collaboration with the Nebraska Public Power District (NPPD), the Energy & Environmental Research Center (EERC) has conducted a pre-feasibility study for a commercial-scale carbon dioxide (CO 2 ) geologic storage complex in western Nebraska integrated with potential CO 2 capture at Gerald Gentleman Station (GGS). GGS is the largest coal-fired electricity-generating station in Nebraska, emitting 8.5 million metric tons (Mt) of CO 2 annually, and is located near the town of Sutherland. This pre-feasibility (Phase 1) project has been executed as part of the U.S. Department of Energy (DOE) CarbonSAFE program, a multiphase initiative to support the deployment of large-scale carbon capture and storage (CCS) projects. Each CarbonSAFE project is required to demonstrate the potential to capture and store at least 50 million tonnes (Mt) of CO 2 over a 25-year operational period. The EERC and NPPD established a coordination team to identify challenges to a potential Nebraska CCS project, comprising local stakeholder organizations, which met twice in Lincoln and via several Webinars, providing feedback and guidance throughout the pre-feasibility study. The EERC also secured the technical support of Schlumberger Carbon Services and Computer Modelling Group Ltd. (CMG). The project comprised four technical themes, all using published information sources. Regional and stakeholder analysis, including identification of sensitive environmental areas, potential resource conflicts, and strategies for public outreach. A review of geographic and socioeconomic characteristics, in combination with geologic characterization in the subbasinal analysis described below, identified an area to the southwest and within a 75-mile radius of GGS as the most prospective for development of a storage site. This area largely avoided lands with protected status such as wetlands. A public outreach plan has also been developed for implementation in any further phases of CCS assessment in western Nebraska, for example a CarbonSAFE Phase 2 feasibility study. Scenario analysis, addressing economic and regulatory factors. GGS is the only single major source of CO 2 emissions capable of satisfying the CarbonSAFE 50-Mt scale requirement within the study region. Chemical absorption using amines was identified as the most viable technology for postcombustion CO 2 capture at GGS. The total cost of a CCS project at GGS was estimated to be between $67/tonne CO 2 for capture and auxiliary boiler to minimize parasitic load and $70/tonne CO 2 avoided cost, using the Carnegie-Mellon University Integrated Environmental Control Model (IECM). The total avoided cost included the capture facility and parasitic load, a flue gas desulfurization plant required for the use of amine solvent technology, transport via pipeline, and dedicated storage infrastructure. Nebraska has no legislation in place to address typical CCS-specific issues, for example pore space ownership for storage. Long-term liability, therefore, falls under the U.S. Environmental Protection Agency Underground Injection Control (UIC) Class 6 program regulations. Subbasinal analysis, addressing the potential for a dedicated subsurface “container” to store the required 50-Mt quantity of CO 2 . Modeling and simulation studies identified an area to the southwest of GGS with the potential for storage of 50 Mt CO 2 in the Cloverly Formation, comprising sandstones with interbedded and intermingled shales. The area of review (AOR) that would be required for monitoring under a Class VI operating permit was estimated to be as high as 400–700 square miles, due to uncertain pressure effects. The viability of this storage option is subject to significant uncertainty due to the relatively limited amount of existing characterization data available to the pre-feasibility study; for example, dynamic simulation indicated that the proposed storage rate might require as little as two or as many as 14 injection wells. A key uncertainty is the relative proportion and distribution of sandstone and shale within the Cloverly Formation. A preliminary, semiquantitative risk assessment also suggested uncertainty over storage capacity and injectivity constitute the most significant project risks at this pre-feasibility stage. No assessed risks were considered to rule out the possibility of a project moving to deployment. National Risk Assessment Partnership (NRAP) validation, using software tools developed by the National Energy Technology Laboratory (NETL) to assess risks associated with the potential 50-Mt CO 2 storage complex. NRAP tools were used to assess hypothetical leakage scenarios. Results broadly supported the conclusion of the semiquantitative risk analysis – for example, even worst-case analysis of theoretical leakage scenarios found limited migration rates and impacts. In summary, the work undertaken in this Phase 1 pre-feasibility study has shown that western Nebraska has potential to host a commercial-scale CCS project, including a dedicated storage “container” for 50 Mt of CO 2 . However, the following key challenges would need to be overcome: The business case for deploying CCS projects is uncertain; recently announced federal tax credits and sales of CO 2 for enhanced oil recovery may not cover the full costs of a CCS project at GGS, as estimated by this pre-feasibility study. The potential 50-Mt CO 2 dedicated storage container defined in this pre-feasibility study should be regarded as having a relatively low level of readiness to support a CCS project. Public outreach would be a vital element in western Nebraska, where sensitivities around such environmental issues as water resource protection and pipeline construction would need to be carefully addressed.

54 ENVIRONMENTAL SCIENCES↗

Evaluating a Historical Airborne Release Test with Modern Modeling Methods

Safety analysts throughout the U.S. Department of Energy (DOE) complex rely on the data provided in the DOE Handbook, DOE-HDBK-3010, to determine source terms that may be incorporated into the document safety analyses. Most often, analysts simply take the bounding values due to time constraints or simply to bound calculations. This is a safe approach that helps avoid regulatory critique; however, it may not provide results that are meaningful or relevant to the conditions being evaluated. The derivation of the data, such as airborne release fractions (ARFs) and respirable fractions (RFs) in the Handbook often depend on very limited table-top and bench/laboratory experiments, as well as engineering judgment which may not be well substantiated, and may not be representative of the actual situation. One historical dataset included a test where a solid contaminant was sprinkled over a liquid gasoline pool and set on fire (also referred to as Mishima and Schwendiman's test later in this paper). The airborne release was measured over the duration of the burn, but then collected separately for a time after the burning was completed. It can be assumed that the collected contaminant in the latter period corresponds to re-suspended particles, whereas the earlier period collected contaminant includes a combination of directly released as well as early released re-suspended particles. This scenario was recently modeled using SIERRA/Fuego as part of a parametric sensitivity study, however there were some shortcomings of the analysis methods. First, the code at the time lacked a multi-component particle evaporation model, which is necessary to capture the particle size effect of liquid/solid particles that can dynamically evaporate the liquid component. Second, a particle sticking and resuspension model did not exist at the time of the study. Recent model implementation now permits the study be repeated with the improved physical models. In the earlier work, four potential mechanisms were considered to potentially contribute to the release of the particles. These were: 1. Evaporation Induced Entrainment (EIE); 2. Surface Agitation by Wind; 3. Surface Agitation by Boiling; 4. Residue Entrainment (Resuspension). The sensitivity study evaluated mechanism 1 and 3 in the above list. Parameters varied were selected to be a reflection of a practical range of test conditions. The varied parameters included the boiling duration, fuel height, injected mass, particle size, turbulence intensity, and initial particle height. The boiling duration was the most significant parameter. The most significant mechanism was no.3, Surface Agitation by Boiling. This paper reports the implementation of the new multi-component evaporation model and its effect on the findings from the previous effort. The Mishima and Schwendiman test was re-modeled with the new evaporation model, and the results of the re-evaluation are presented. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Materials for Advanced Ultra-Supercritical (A-USC) Steam Turbines --- A-USC Component Demonstration

The U.S. Advanced Ultra-Supercritical (A-USC) Consortium was formed in 2001 as a government/industry program, sponsored by the U.S. Department of Energy (DOE) and the Ohio Coal Development Office (OCDO) and cost shared by industrial and not-for-profit partners. The purpose of the consortium was to advance the state of the art for power generation by evaluating and developing materials that allow the use of advanced steam cycles in coal-based power plants. These advanced cycles, with steam temperatures up to 1400°F (760°C), can increase the efficiency of coal-fired boilers from an average of 35% (current U.S. fleet) to more than 45% higher heating value (HHV) (>49% lower heating value [LHV]). The increase in a plant’s efficiency is limited unless new materials able to withstand these higher operating temperatures and pressures are identified and approved for use. The A-USC Consortium identified these needed materials during earlier phases of the program. It developed the welding and joining techniques along with manufacturing processes for casting and wrought products made from these new high-nickel alloys. It subjected these materials to extensive laboratory and steam loop testing. It then obtained ASME code approval for their use in U.S. boiler systems. The program’s successes leave this last remaining activity (ComTest Phase 2) that the U.S. utility industry has recommended to be accomplished prior to commercialization. The focus of the activity is the evaluation and demonstration of commercial readiness for “full scale” components to be made from these nickel-based alloy materials and provided by a U.S. domestic supply chain that is new to working with these alloys. According to studies completed by the Electric Power Research Institute (EPRI), the cost of an A-USC plant is approximately 20% higher than a non-A-USC plant because of its use of nickel-based alloys needed for the high temperature operating conditions. However, CO 2 reductions of approximately 30% from the current fleet average provide a strong incentive for its consideration. The actual costs and perceived value for CO 2 abatement will determine whether new or retrofitted plants are undertaken, although decisions to build A-USC plants in India would indicate its economic feasibility while also being part of a global carbon emissions strategy. The work by the A-USC Consortium, prior to the start of the ComTest project, has included lab scale and pilot scale materials testing, both in air and oxy-combustion. This testing has included air-cooled and steam-cooled “loops” that were installed into existing operating utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion caused by the constituents in the coal ash. The A-USC Consortium also gained ASME Code approval of the Inconel 740 material, has cast and extruded the largest high nickel precipitation hardened alloys, and developed unique welding techniques to avoid problems identified by the competing European program. However, as valuable as these material test loops and accomplishments have been for obtaining information, their scale is below that required to minimize the risk associated for a U.S. utility to build a multibillion-dollar A-USC power plant. To reduce the final identified risk barrier to full-scale commercialization of these advanced materials and systems, the A-USC Consortium (guided by a utility industry advisory committee) has identified the key areas of the technology they desire to see as being capable of full-scale manufacturing and/or fabrication from an identified, capable U.S. domestic supplier base. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as Inconel 740H or Haynes 282 alloys. Pathways to supply these components for ComTest have been identified, as well as any further development that would be required. The Phase 2 effort used Phase 1 findings for designing these key full-scale components for A-USC boilers and turbines to include large castings; extrusions, forgings, fabrication of water walls and steam loops with headers from advanced materials, raw material (such as pipe extrusion billets) are at the commercial readiness level to permit advancement to a demonstration project. The Phase 2 work scope was addressed by a diverse team, including government, industry, and not-for-profit partners. The work scope under Phase 2 addressed fabrication of components identified as being outside of the proven capabilities of the existing supply chain, including the following: Steam turbine rotor forging and Haynes 282 nozzle carrier casting Superheater and reheater header and tube assemblies Large-diameter pipe extrusions and forgings Test valve articles to support ASME Code approval. In addition, key fabrication steps were completed, including boiler weld overlays and simulated field repairs. Throughout, extensive inspection and quality assurance testing of the components were performed. The team worked to advance ASME Code approval for key components and processes. Although much of the focus of ComTest Phase 2 was the high-temperature nickel-based alloy materials, a broader range of materials were incorporated, which would be representative of the materials used in full-scale A-USC power plant applications and have cross-cutting applicability on other high-temperature power generation options, such as advanced nuclear, supercritical CO 2 cycles, and central solar receivers. This report that has been submitted is organized in the following manner: Section 1 contains an Executive Summary. Section 2 discusses the ComTest project background and organization. Section 3 discusses project management and reporting. Section 4 discusses the procurement of nickel-based alloy and other A-USC materials and components. Section 5 discusses the fabrication of procurement of nickel-based alloy and other A-USC materials and components. Section 6 discusses the fabrication of cast nickel-based A-USC steam turbine components. Section 7 discusses the fabrication of forged nickel-based A-USC steam turbine piping and steam pipe components. Section 8 discusses the qualification of pressure relieve valves (PRVs) for A-USC power plants. Section 9 discusses proposed plans for future evaluation of A-USC components. Section 10 contains the summary and conclusion.

01 COAL, LIGNITE, AND PEAT↗