Search NASA⌕ Search

SEARCH · Search NASA

Results for “Ground Operational Support System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 739 records · Page 41

Operational Modal Analysis of the Space Launch System Mobile Launcher on the Crawler Transporter ISVV-010 Rollout

NASA is developing an expendable heavy lift launch vehicle capability, the Space Launch System, to support lunar and deep space exploration. To support this capability, an updated ground infrastructure is required including modifying an existing Mobile Launcher system. The Mobile Launcher is a very large heavy beam/truss steel structure designed to support the Space Launch System during its buildup and integration in the Vehicle Assembly Building, transportation between the Vehicle Assembly Building and launch pad 39B by the Crawler Transporter, and provides the launch platform at the launch pad. As part of the Verification and Validation of the Mobile Launcher and Crawler Transporter, two rollouts of the Mobile Launcher transported by the Crawler Transporter, Integrated System Verification and Validation (ISVV) 005 and 010, have been performed to demonstrate the Crawler Transporter’s ability to transport the Mobile Launcher. ISVV-005 occurred in September 2018 and ISVV-010 occurred in late June 2019. ISVV-005 and ISVV-010 also provided the opportunity to gather data that can be used identify the Mobile Launcher on the Crawler Transporter rollout modal characteristics and refine the estimates of the Artemis I integrated launch vehicle rollout forcing functions. While the rollout environment has historically produced relatively small launch vehicle structural loads for the Saturn/Apollo and Space Shuttle programs in comparison to launch and ascent loads, these relatively small structural loads are inputs to structural fatigue analyses. The same holds true for the Space Launch System. Because the rollout forces acting on the Mobile Launcher and the Crawler Transporter are not directly measurable, Operational Modal Analysis techniques, instead of traditional Experimental Modal Analysis techniques, provide an empirical means to identify the Mobile Launcher on the Crawler Transporter rollout modal characteristics. The ISVV-010 rollout modal characteristics provide important supplemental modal information, which along with the Mobile Launcher modal test that was performed in June 2019 immediately prior to ISVV-010 rollout, combine to reduce uncertainty in the test correlated Mobile Launcher on the Crawler Transporter finite element model. A well test correlated finite element model will play a key role in the Building Block approach the Space Launch System program has implemented as part of its certification process for the Artemis I flight and in refining the Artemis I rollout forcing functions. At the time of the ISVV-005 rollout in September 2018, the Mobile Launcher was still undergoing construction, and therefore its modal characteristics are not directly comparable to those of the Mobile Launcher during the June 2019 Mobile Launcher modal test and subsequent ISVV-010 rollout. Hence the ISVV-005 rollout modal characteristics will not be looked at in this paper. This paper will briefly describe the Mobile Launcher and Crawler Transporter physical characteristics, ISVV-010 rollout data collection, the challenges in implementing Operational Modal Analysis techniques due in part to the Crawler Transporter harmonics, and how these challenges were overcome to obtain the ISVV-010 Mobile Launcher on the Crawler Transporter rollout modal characteristics.

Apollo↗

Operational Modal Analysis of the Space Launch System Mobile Launcher on the Crawler Transporter ISVV-010 Rollout

NASA is developing an expendable heavy lift launch vehicle capability, the Space Launch System, to support lunar and deep space exploration. To support this capability, an updated ground infrastructure is required including modifying an existing Mobile Launcher system. The Mobile Launcher is a very large heavy beam/truss steel structure designed to support the Space Launch System during its buildup and integration in the Vehicle Assembly Building, transportation between the Vehicle Assembly Building and launch pad 39B by the Crawler Transporter, and provides the launch platform at the launch pad. As part of the Verification and Validation of the Mobile Launcher and Crawler Transporter, two rollouts of the Mobile Launcher transported by the Crawler Transporter, Integrated System Verification and Validation (ISVV) 005 and 010, have been performed to demonstrate the Crawler Transporter’s ability to transport the Mobile Launcher. ISVV-005 occurred in September 2018 and ISVV-010 occurred in late June 2019. ISVV-005 and ISVV-010 also provided the opportunity to gather data that can be used identify the Mobile Launcher on the Crawler Transporter rollout modal characteristics and refine the estimates of the Artemis I integrated launch vehicle rollout forcing functions. While the rollout environment has historically produced relatively small launch vehicle structural loads for the Saturn/Apollo and Space Shuttle programs in comparison to launch and ascent loads, these relatively small structural loads are inputs to structural fatigue analyses. The same holds true for the Space Launch System. Because the rollout forces acting on the Mobile Launcher and the Crawler Transporter are not directly measurable, Operational Modal Analysis techniques, instead of traditional Experimental Modal Analysis techniques, provide an empirical means to identify the Mobile Launcher on the Crawler Transporter rollout modal characteristics. The ISVV-010 rollout modal characteristics provide important supplemental modal information, which along with the Mobile Launcher modal test that was performed in June 2019 immediately prior to ISVV-010 rollout, combine to reduce uncertainty in the test correlated Mobile Launcher on the Crawler Transporter finite element model. A well test correlated finite element model will play a key role in the Building Block approach the Space Launch System program has implemented as part of its certification process for the Artemis I flight and in refining the Artemis I rollout forcing functions. At the time of the ISVV-005 rollout in September 2018, the Mobile Launcher was still undergoing construction, and therefore its modal characteristics are not directly comparable to those of the Mobile Launcher during the June 2019 Mobile Launcher modal test and subsequent ISVV-010 rollout. Hence the ISVV-005 rollout modal characteristics will not be looked at in this paper. This paper will briefly describe the Mobile Launcher and Crawler Transporter physical characteristics, ISVV-010 rollout data collection, the challenges in implementing Operational Modal Analysis techniques due in part to the Crawler Transporter harmonics, and how these challenges were overcome to obtain the ISVV-010 Mobile Launcher on the Crawler Transporter rollout modal characteristics.

Apollo↗

Internet Access to Spacecraft

The Operating Missions as Nodes on the Internet (OMNI) project at NASA's Goddard Space flight Center (GSFC), is demonstrating the use of standard Internet protocols for spacecraft communication systems. This year, demonstrations of Internet access to a flying spacecraft have been performed with the UoSAT-12 spacecraft owned and operated by Surrey Satellite Technology Ltd. (SSTL). Previously, demonstrations were performed using a ground satellite simulator and NASA's Tracking and Data Relay Satellite System (TDRSS). These activities are part of NASA's Space Operations Management Office (SOMO) Technology Program, The work is focused on defining the communication architecture for future NASA missions to support both NASA's "faster, better, cheaper" concept and to enable new types of collaborative science. The use of standard Internet communication technology for spacecraft simplifies design, supports initial integration and test across an IP based network, and enables direct communication between scientists and instruments as well as between different spacecraft, The most recent demonstrations consisted of uploading an Internet Protocol (IP) software stack to the UoSAT- 12 spacecraft, simple modifications to the SSTL ground station, and a series of tests to measure performance of various Internet applications. The spacecraft was reconfigured on orbit at very low cost. The total period between concept and the first tests was only 3 months. The tests included basic network connectivity (PING), automated clock synchronization (NTP), and reliable file transfers (FTP). Future tests are planned to include additional protocols such as Mobile IP, e-mail, and virtual private networks (VPN) to enable automated, operational spacecraft communication networks. The work performed and results of the initial phase of tests are summarized in this paper. This work is funded and directed by NASA/GSFC with technical leadership by CSC in arrangement with SSTL, and Vytek Wireless.

Rash, James↗

Assembly and Integration Status of a High Fidelity Ground Test Bed for the Water Processor Assembly

The Water Recovery System (WRS) is a critical component of life support aboard the International Space Station (ISS) and will play an essential role in future missions beyond Low Earth Orbit (LEO). Its primary functional units – the Urine Processor Assembly (UPA), Brine Processor Assembly (BPA), and Water Processor Assembly (WPA) – must be evaluated for extended operation, dormancy resilience, material obsolescence, and reliability under exploration-driven constraints. Ground testing is vital for developing these technologies and generating statistically relevant reliability assessments, which requires extended runtime under integrated, Flight-like conditions. Currently, no high-fidelity, fully integrated WPA ground test bed exists to support these objectives. To address this gap, NASA is developing a WPA test bed at Marshall Space Flight Center (MSFC) that combines downgraded ISS flight hardware with functionally flight-like components in a cost-effective configuration while maintaining priority hardware investigations. This paper describes the current status of hardware assembly and integration, outlines key challenges such as simulating microgravity effects and mitigating obsolescence, and presents future test objectives including software development, reliability assessments, dormancy studies, and exploration-oriented upgrades.

Mary-Elizabeth Davis↗

Assembly and Integration Status of a High Fidelity Ground Test Bed for the Water Processor Assembly

The Water Recovery System (WRS) is a critical component of life support aboard the International Space Station (ISS) and will play an essential role in future missions beyond Low Earth Orbit (LEO). Its primary functional units – the Urine Processor Assembly (UPA), Brine Processor Assembly (BPA), and Water Processor Assembly (WPA) – must be evaluated for extended operation, dormancy resilience, material obsolescence, and reliability under exploration-driven constraints. Ground testing is vital for developing these technologies and generating statistically relevant reliability assessments, which requires extended runtime under integrated, Flight-like conditions. Currently, no high-fidelity, fully integrated WPA ground test bed exists to support these objectives. To address this gap, NASA is developing a WPA test bed at Marshall Space Flight Center (MSFC) that combines downgraded ISS flight hardware with functionally flight-like components in a cost-effective configuration while maintaining priority hardware investigations. This paper describes the current status of hardware assembly and integration, outlines key challenges such as simulating microgravity effects and mitigating obsolescence, and presents future test objectives including software development, reliability assessments, dormancy studies, and exploration-oriented upgrades.

Water Processor Assembly↗

Maiden Voyage of the Rodent Habitat on ISS: Opportunities for Investigating Molecular Mechanisms and Biomedical Consequences of Long Duration Spaceflight

Research using rodents is an essential tool for advancing biomedical research on Earth and in space. The National Research Counsel’s Decadal survey (1) emphasized the importance of expanding NASAs life sciences research to perform long duration, rodent experiments on the International Space Station (ISS). To accomplish this objective, flight hardware, operations, and science capabilities were developed at NASA ARC to support both commercial and government-sponsored research. In preparation for the maiden voyage of the Rodent Habitat hardware and operations system (Rodent Research-1), and in close consultation with a Science Working Group comprised of veterinarians and experienced spaceflight investigators, we modified existing Animal Enclosure Module hardware, developed new hardware, operations, and science activities, and performed a series of ground-based verification tests. Preflight, ground based hardware tests included a simulation of SpaceX Dragon launch conditions (vibration and hypergravity) using the Transporter, and also two long-term biocompatibility tests (32 and 92 days) using the Habitat developed for long term housing on the ISS. The launch simulation test showed that adult mice housed in Transporter hardware adapted well, even if launch simulation was followed by a period of simulated weightlessness (via hind limb unloading). The biocompatibility tests demonstrated that the Habitat successfully supported animal health and also provided a useful video imaging system that enables frequent monitoring of animal health and behavior by veterinary and scientific experts on the ground, independent of ISS crew intervention. At the conclusion of all tests, mice were deemed healthy and suitable for conducting biological research. Additional preflight analyses of tissues preserved by freezing or fixation for gene expression analyses revealed that spleen and liver tissues recovered under conditions that simulated on-orbit activities yielded high quality RNA (RIN values 8-10) and liver enzyme activities and protein content (e.g. catalase). In addition, new methods were developed to optimize future science return by dissecting tissues post-euthanasia and storage. Various tissues were harvested from either intact or partially dissected, frozen carcasses after storage for ~2-6 months; most of the tissues (brain, heart, kidney, eye, adrenal glands and skeletal muscle) were of high RNA quality for science return, whereas some tissues (small intestine, bone marrow and bones) were not. These data demonstrated the protocols developed for future flight experiments supported science return despite delayed preservation post-euthanasia or prolonged storage, and furthermore, that high-quality RNA samples from many different tissues can be recovered by dissection following prolonged storage of the tissue in situ at -80˚C. The first flight experiments carrying 20 mice were launched on Sept 21, 2014 in an unmanned Dragon Capsule, SpaceX4; Rodent Research-1 is dedicated to achieving both NASA validation and CASIS science objectives. Ground based control groups (housed in flight hardware or standard cages) were maintained in environmental chambers at Kennedy Space Center. Crewmembers previously trained in animal handling transferred mice from the Transporter into Habitats under simultaneous veterinary supervision by video streaming and were deemed healthy. Health and behavior of all mice on the ISS was monitored by video feed on a daily basis. The 10 mice for validation (16wk old, female C57Bl6/J) ambulated freely and actively throughout the Habitat, relying heavily on their forelimbs for locomotion. The first on-orbit dissections of mice were performed successfully on Oct 12 and 13, 2014, and the validation mice will reside on ISS for up to 30 days. In conclusion, new capability for long duration rodent research is under development, including in-flight sample collection (which avoids the complication of reentry); results obtained to date will be described. This new Rodent Research system enables achievement of both basic science and translational research objectives to advance human exploration of space.

maiden voyage↗

Operation Evaluation of the VEGGIE Food Production System in the Habitat Demonstration Unit

The 2010 Desert Research and Technology Studies (DRATS) of the VEGGIE Food Production System in the Habitat Demonstration Unit (HDU) Pressurized Excursion Module (PEM) was the first operational evaluation of salad crop production technology in a NASA analog test. A systematic evaluation of rooting media and nutrient delivery systems were evaluated for three lettuce cultivars that have shown promise as candidates for a surface based food production system. The VEGGIE nutrient delivery system worked well, was able to be maintained by multiple operators with a minimum of training, and supported excellent lettuce growth for the duration of the test. A Hazard Analysis and Critical Control Point (HACCP) evaluation was performed using ProSantm as sanitation agent prior to consumption was approved, and the crew was allowed to consume the lettuce grown using the VEGGIE light cap and gravity based nutrient delivery system at the completion of the 14-day DRAT field test. The DRAT field test validated the crew operations; Growth of all lettuce cultivars was excellent. The operational DRAT field testing in the HDU identified light quality issues related to morphology and pigment development that will need to be addressed through additional testing. Feedback from the crew, ground support personnel, and human factors leads was uniformly positive on the psychological value of having the crop production system in the excursion module. A number of areas have been identified for future work, to minimize the "footprint" of the Food Production system through creative use of unused wall and floor space in the unit.

Stutte, Gary W.↗

Operational Evaluation of VEGGIE Food Production System in the Habitat Demonstration Unit

The 2010 Desert Research and Technology Studies (DRATS) of the VEGGIE Food Production System in the Habitat Demonstration Unit (HDU) Pressurized Excursion Module (PEM) was the first operational evaluation of salad crop production technology in a NASA analog test. A systematic evaluation of rooting media and nutrient delivery systems were evaluated for three lettuce cultivars that have shown promise as candidates for a surface based food production system. The VEGGIE nutrient delivery system worked well, was able to be maintained by multiple operators with a minimum of training, and supported excellent lettuce growth for the duration of the test. A Hazard Analysis and Critical Control Point (HACCP) evaluation was performed using ProSan(tm) as sanitation agent prior to consumption was approved, and the crew was allowed to consume the lettuce grown using the VEGGIE light cap and gravity based nutrient delivery system at the completion of the 14-day DRAT field test. The DRAT field test validated the crew operations; Growth of all lettuce cultivars was excellent. The operational DRAT field testing in the HDU identified light quality issues related to morphology and pigment development that will need to be addressed through additional testing. Feedback from the crew, ground support personnel, and human factors leads was uniformly positive on the psychological value of having the crop production system in the excursion module. A number of areas have been identified for future work, to minimize the "footprint" of the Food Production system through creative use of unused wall and floor space in the unit.

Stutte, Gary W.↗

Introduction to Space Station Freedom

NASA field centers and contractors are organized to develop 'work packages' for Space Station Freedom. Marshall Space Flight Center and Boeing are building the U.S. laboratory and habitation modules, nodes, and environmental control and life support system; Johnson Space Center and McDonnell Douglas are responsible for truss structure, data management, propulsion systems, thermal control, and communications and guidance; Lewis Research Center and Rocketdyne are developing the power system. The Canadian Space Agency (CSA) is contributing a Mobile Servicing Center, Special Dextrous Manipulator, and Mobile Servicing Center Maintenance Depot. The National Space Development Agency of Japan (NASDA) is contributing a Japanese Experiment Module (JEM), which includes a pressurized module, logistics module, and exposed experiment facility. The European Space Agency (ESA) is contributing the Columbus laboratory module. NASA ground facilities, now in various stages of development to support Space Station Freedom, include: Marshall Space Flight Center's Payload Operations Integration Center and Payload Training Complex (Alabama), Johnson Space Center's Space Station Control Center and Space Station Training Facility (Texas), Lewis Research Center's Power System Facility (Ohio), and Kennedy Space Center's Space Station Processing Facility (Florida). Budget appropriations impact the development of the Space Station. In Fiscal Year 1988, Congress appropriated only half of the funds that NASA requested for the space station program ($393 million vs. $767 million). In FY 89, NASA sought $967 million for the program, and Congress appropriated $900 million. NASA's FY 90 request was $2.05 billion compared to an appropriation of $1.75 billion; the FY 91 request was $2.45 billion, and the appropriation was $1.9 billion. After NASA restructured the Space Station Freedom program in response to directions from Congress, the agency's full budget request of $2.029 billion for Space Station Freedom in FY 92 was appropriated. For FY 93, NASA is seeking $2.25 billion for the program; the planned budget for FY 94 is $2.5 billion. Further alterations to the hardware configuration for Freedom would be a serious setback; NASA intends 'to stick with the current baseline' and continue planning for utilization.

Kohrs, Richard↗

The LANDSAT/global positioning system project

A GPSPAC/LANDSAT-D Interface (GLI) Ground Support System was built to validate the performance and to calibrate the accuracy of the experimental navigation package, GPSPAC, flown on the LANDSAT-4 and 5 spacecraft. Although the GLI system operated successfully to give the orbit information needed to validate the GPSPAC, it also detected two anomalies: one is characteristic of the GLI system and the other is characteristic of the pre-operational phase of GPS. Several methods were applied to resolve or reduce the anomalies. This paper presents a description of the problems, the methods applied to resolve or reduce them, and the results.

Wood, Terri↗

Space station Simulation Computer System (SCS) study for NASA/MSFC. Volume 1: Overview and summary

NASA's Space Station Freedom Program (SSFP) planning efforts have identified a need for a payload training simulator system to serve as both a training facility and as a demonstrator to validate operational concepts. The envisioned Marshall Space Flight Center (MSFC) Payload Training Complex (PTC) required to meet this need will train the space station payload scientists, station scientists, and ground controllers to operate the wide variety of experiments that will be onboard the Space Station Freedom. The Simulation Computer System (SCS) is the computer hardware, software, and workstations that will support the Payload Training Complex at MSFC. The purpose of this SCS study is to investigate issues related to the SCS, alternative requirements, simulator approaches, and state-of-the-art technologies to develop candidate concepts and designs. This study was performed August 1988 to October 1989. Thus, the results are based on the SSFP August 1989 baseline, i.e., pre-Langley configuration/budget review (C/BR) baseline. Some terms, e.g., combined trainer, are being redefined. An overview of the study activities and a summary of study results are given here.

Source record↗

Space Station Simulation Computer System (SCS) study for NASA/MSFC. Volume 2: Baseline architecture report

NASA's Space Station Freedom Program (SSFP) planning efforts have identified a need for a payload training simulator system to serve as both a training facility and as a demonstrator to validate operational concepts. The envisioned MSFC Payload Training Complex (PTC) required to meet this need will train the Space Station payload scientists, station scientists, and ground controllers to operate the wide variety of experiments that will be onboard the Space Station Freedom. The Simulation Computer System (SCS) is the computer hardware, software, and workstations that will support the Payload Training Complex at MSFC. The purpose of this SCS Study is to investigate issues related to the SCS, alternative requirements, simulator approaches, and state-of-the-art technologies to develop candidate concepts and designs.

Source record↗

Logistics Operations Management Center: Maintenance Support Baseline (LOMC-MSB)

The Logistics Operations Management Center Maintenance Support Baseline is defined. A historical record of systems, applied to and deleted from, designs in support of future management and/or technical analysis is provided. All Flight elements, Ground Support Equipment, Facility Systems and Equipment and Test Support Equipment for which LOMC has responsibilities at Kennedy Space Center and other locations are listed. International Space Station Alpha Program documentation is supplemented. The responsibility of the Space Station Launch Site Support Office is established.

Kurrus, R.↗

The Gateway as a Building Block for Space Exploration and Development

The Gateway, which will be a small, human-tended space station in orbit around the Moon, is an example of the building block approach to space exploration and development. The National Aeronautics and Space Administration (NASA) leads the Gateway Program and serves as the integrator of the spaceflight capabilities and contributions of U.S. commercial partners and international partners. Gateway is a cornerstone of deep space human exploration, one critical element of the strategies and architectures that will enable human exploration of the solar system. This paper will outline: 1) The concept of operations and describe how Gateway is a multipurpose space station, supporting lunar surface missions, cis-lunar research, and as a proving ground for human missions to Mars; 2) Gateway’s international partnerships as an expansion of the partnerships of the “second generation of space programmes,” namely the International Space Station (ISS); and 3) Future commercial, scientific, and technology demonstration opportunities that this infrastructure building block provides. Lastly, the strategies and architectures for future space exploration and development must include thoughtful approaches to the management and business operations of government space programs. This includes planning for limited outyear growth in budgets, partnership and acquisition strategies, pursuing public-private partnerships and the use of firm-fixed price contracts, enabling vendor-to-vendor relationships, the use of multilateral interoperability standards, and incorporating key lessons learned from prior governmental Programs. This paper will discuss the strategies and approaches undertaken when establishing the Gateway Program at the NASA Johnson Space Center in 2019 and the current operational status of this new, lean, and efficient Program.

Gateway↗

Developmental Flight Instrumentation: Review of Space Shuttle, Ares I-X, and Artemis I

Ascent vehicles in the developmental stages of the program are instrumented with Developmental Flight Instrumentation (DFI) sensors. These sensors establish a link between a vehicle and engineers on the ground to communicate conditions experienced during the ascent. These data are then compared to pre-flight predictions used in the design process. The aerodynamic, acoustic, thermal, and structural data are either telemetered to ground stations during the ascent or stored on the vehicle for post-flight recovery and archived at the Huntsville Operations Support Center (HOSC). Following NASA's Artemis I Space Launch System (SLS) launch on November 16, 2020, data from three separate programs are available at the HOSC: Space Shuttle Program (Space Transport System (STS)), Constellation Program (Ares I-X), and Artemis Program (SLS). Availability of these data presents a unique opportunity to examine DFI data from three distinct vehicles and analyze the broad impact of the DFI data on the understanding of transonic aerodynamics. Classical spectrogram and Empirical Mode Decomposition techniques were used to present data in aerodynamically analogous regions on each vehicle. On the SLS and Ares I-X, a region downstream of the Launch Abort System motors was chosen. Comparing SLS and the STS, a region downstream of booster Froward Attach Hardware was selected as analogous flow region. Some other regions of interest were also identified. Although similarities in flow features on three vehicles were identified, some challenges in the comparison were also encountered, especially due to poor temporal and spatial resolution of Shuttle measurements.

Space Shuttle↗

Developmental Flight Instrumentation: Review of Space Shuttle, Ares I-X, and Artemis I

Ascent vehicles in the developmental stages of the program are instrumented with Developmental Flight Instrumentation (DFI) sensors. These sensors establish a link between a vehicle and engineers on the ground to communicate conditions experienced during the ascent. These data are then compared to pre-flight predictions used in the design process. The aerodynamic, acoustic, thermal, and structural data are either telemetered to ground stations during the ascent or stored on the vehicle for post-flight recovery and archived at the Huntsville Operations Support Center (HOSC). Following NASA's Artemis I Space Launch System (SLS) launch on November 16, 2020, data from three separate programs are available at the HOSC: Space Shuttle Program (Space Transport System (STS)), Constellation Program (Ares I-X), and Artemis Program (SLS). Availability of these data presents a unique opportunity to examine DFI data from three distinct vehicles and analyze the broad impact of the DFI data on the understanding of transonic aerodynamics. Classical spectrogram and Empirical Mode Decomposition techniques were used to present data in aerodynamically analogous regions on each vehicle. On the SLS and Ares I-X, a region downstream of the Launch Abort System motors was chosen. Comparing SLS and the STS, a region downstream of booster Froward Attach Hardware was selected as analogous flow region. Some other regions of interest were also identified. Although similarities in flow features on three vehicles were identified, some challenges in the comparison were also encountered, especially due to poor temporal and spatial resolution of Shuttle measurements.

Space Shuttle↗

Enabling a Larger Deep Space Mission Suite: A Deep Space Network Queuing Antenna for Demand Access

The advent of deep space small spacecraft, as exemplified by the Mars Cubesat One (MarCO), Lunar Trailblazer, Janus, the Escape and Plasma Acceleration and Dynamics Explorers (EscaPADE), and the thirteen Artemis 1 missions, opens the possibility that a much larger number of deep space spacecraft may be launched over the next 10 years and beyond. While scientifically exciting, the prospect of a (much) larger mission suite raises significant challenges for the current approach to ground stations and mission operations. We have been investigating an integrated approach for ground stations and missions operations to enable new modes of operation while maintaining the capabilities of the current operational techniques. This integrated approach is built around three core capabilities: (1) A queuing antenna that enables monitoring the status of a much larger number of spacecraft, and allows spacecraft to transmit requests for telemetry with NASA’s Deep Space Network (DSN); (2) a flexible scheduling system that expands the current DSN scheduling services to enable allocating time on DSN antennas in near real-time; and (3) a cloud-based ground data system that can be spun up and down according to how tracks are assigned by the flexible scheduling system. We shall show that an 18 meter DSN queuing antenna equipped with cyrogenic receivers would enable use of the DSN Demand Access Service for small spacecraft throughout the inner Solar System, thus providing service to a large mission suite. We first discuss the architecture of the queuing antenna and its supporting systems, including, for instance, the service required to generate the schedule for the queueing antenna (which dictates how it slews to monitor multiple spacecraft in a day of operations). Next, we describe the signaling scheme used to encode a request, which is inherited from the already operational DSN Beacon Tone Service, and describe two alternative ways to detect the incoming tone at the ground station, one based on maximum likelihood estimation (MLE), and another one based on Fast-Fourier Transfer (FFT) processing. We then use these results to estimate the maximum range at which a request can be reliably detected as a function of the spacecraft and ground station communication capabilities. Finally, the last part of this part of this paper briefly describes the prototyping effort undertaken at Morehead State University (MSU) and JPL to demonstrate the viability of this new DSN demand access. In particular, we describe the suite of tests conducted using MSU’s 21 meter ground station to validate its use a queuing antenna.

Mattle, Emily↗

Thermal Modeling and Correlation of the Space Environments Complex Vacuum Chamber and Cryoshroud

From Presentation: Formerly known as the Space Power Facility (SPF) Located at Plum Brook Station in Sandusky, OH -- Houses large-scale test facilities including the Space Simulation Vacuum Chamber -- Largest vacuum chamber in the world -- 100 ft diameter, 122 ft tall -- Cryoshroud operates between -250 °F and +140 °F -- To be used for Orion EM-1 thermal vacuum test -- Thermal Desktop model of vacuum chamber, cryoshroud, mechanical ground support equipment (MGSE) including fluid model of GN2 -- Primary uses: Predict MGSE temperatures; Predict heat load on GN2 system -- Includes 96 TD Temperature Measures that represent test thermocouples -- Steady state correlation with 3 tests: 2 hot; 1 cold -- Two ISTs performed with no MGSE inside the cryoshroud: Insulated test: operated at 170 °F for 37 hours; Uninsulated test: operated at 170 °F for 14 days -- Only cryoshroud thermocouples were installed

Thermal modeling↗