Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operational Concepts”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 739 records · Page 41

Orbit Determination Accuracy Analysis of the Magnetospheric Multiscale Mission During Perigee Raise

The Goddard Space Flight Center (GSFC) Flight Dynamics Facility (FDF) will provide orbit determination and prediction support for the Magnetospheric Multiscale (MMS) mission during the missions commissioning period. The spacecraft will launch into a highly elliptical Earth orbit in 2015. Starting approximately four days after launch, a series of five large perigee-raising maneuvers will be executed near apogee on a nearly every-other-orbit cadence. This perigee-raise operations concept requires a high-accuracy estimate of the orbital state within one orbit following the maneuver for performance evaluation and a high-accuracy orbit prediction to correctly plan and execute the next maneuver in the sequence. During early mission design, a linear covariance analysis method was used to study orbit determination and prediction accuracy for this perigee-raising campaign. This paper provides a higher fidelity Monte Carlo analysis using the operational COTS extended Kalman filter implementation that was performed to validate the linear covariance analysis estimates and to better characterize orbit determination performance for actively maneuvering spacecraft in a highly elliptical orbit. The study finds that the COTS extended Kalman filter tool converges on accurate definitive orbit solutions quickly, but prediction accuracy through orbits with very low altitude perigees is degraded by the unpredictability of atmospheric density variation.

Determination↗

Orbit Determination Accuracy Analysis of the Magnetospheric Multiscale Mission During Perigee Raise

The Goddard Space Flight Center (GSFC) Flight Dynamics Facility (FDF) will provide orbit determination and prediction support for the Magnetospheric Multiscale (MMS) mission during the mission's commissioning period. The spacecraft will launch into a highly elliptical Earth orbit in 2015. Starting approximately four days after launch, a series of five large perigee-raising maneuvers will be executed near apogee on a nearly every-other-orbit cadence. This perigee-raise operations concept requires a high-accuracy estimate of the orbital state within one orbit following the maneuver for performance evaluation and a high-accuracy orbit prediction to correctly plan and execute the next maneuver in the sequence. During early mission design, a linear covariance analysis method was used to study orbit determination and prediction accuracy for this perigee-raising campaign. This paper provides a higher fidelity Monte Carlo analysis using the operational COTS extended Kalman filter implementation that was performed to validate the linear covariance analysis estimates and to better characterize orbit determination performance for actively maneuvering spacecraft in a highly elliptical orbit. The study finds that the COTS extended Kalman filter tool converges on accurate definitive orbit solutions quickly, but prediction accuracy through orbits with very low altitude perigees is degraded by the unpredictability of atmospheric density variation.

Multiscale↗

NASA X-34 Technology in Motion

The X-34 technology development program is a joint industry/government project to develop, test, and operate a small, fully-reusable hypersonic flight vehicle. The objective is to demonstrate key technologies and operating concepts applicable to future reusable launch vehicles. Integrated in the vehicle are various systems to assure successful completion of mission objectives, including the Main Propulsion System (MPS). NASA-Marshall Space Flight Center (MSFC) is responsible for developing the X-34's MPS including the design and complete build package for the propulsion system components. The X-34 will be powered by the Fastrac Engine, which is currently in design and development at NASA-MSFC. Fastrac is a single-stage main engine, which burns a mixture of liquid oxygen (LOX) and kerosene(RP-1). The interface between the MPS and Fastrac engine are critical for proper system operation and technologies applicable to future reusable launch vehicles. Deneb's IGRIP software package with the Dynamic analysis option provided a key tool for conducting studies critical to this interface as well as a mechanism to drive the design of the LOX and RP-1 feedlines. Kinematic models were created for the Fastrac Engine and the feedlines for various design concepts. Based on the kinematic simulation within Envision, design and joint limits were verified and system interference controlled. It was also critical to the program to evaluate the effect of dynamic loads visually, providing a verification tool for dynamic analysis and in some cases uncovering areas that had not been considered. Deneb's software put the X-34 technology in motion and has been a key factor in facilitating the strenuous design schedule.

Beech, Geoffrey↗

Biotechnology System Facility: Risk Mitigation on Mir

NASA is working with its international partners to develop space vehicles and facilities that will give researchers the opportunity to conduct scientific investigations in space. As part of this activity, NASA's Biotechnology Cell Science Program (BCSP) at the Johnson Space Center (JSC) is developing a world-class biotechnology laboratory facility for the International Space Station (ISS). This report describes the BCSP, including the role of the BTS. We identify the purpose and objectives of the BTS and a detailed description of BTS facility design and operational concept, BTS facility and experiment-specific hardware, and scientific investigations conducted in the facility. We identify the objectives, methods, and results of risk mitigation investigations of the effects of microgravity and cosmic radiation on the BTS data acquisition and control system. These results may apply to many other space experiments that use commercial, terrestrial-based data acquisition technology. Another focal point is a description of the end-to-end process of integrating and operating biotechnology experiments on a variety of space vehicles. The identification of lessons learned that can be applied to future biotechnology experiments is an overall theme of the report. We include a brief summary of the science results, but this is not the focus of the report. The report provides some discussion on the successful 130-day tissue engineering experiment performed in BTS on Mir and describes a seminal gene array investigation that identified a set of unique genes that are activated in space.

Gonda, Steve R., III↗

Mars Small-Spacecraft Human Exploration Resource Prospector with Aero-braking (SHERPA): Demonstrating an End-to-End Mission to Phobos Distant Retrograde Orbit

This paper summarizes an end-to-end mission design concept exploring the feasibility of using small satellites together with aero-capture technology to achieve Mars orbit insertion, and subsequent injection into a Phobos-stabilized (or distant retrograde) orbit. The science and mission objectives are to carry out a survey of the mineralogy and morphology of Phobos, to answer basic questions concerning its origin and formation, to test the cohesiveness of Phobos regolith, and to search for potential landing sites for future human or robotic spacecraft. The Mars Small-Spacecraft Human Exploration Resource Prospector with Aero-braking (SHERPA) spacecraft is based on a combination flight-tested prototype vehicle and instruments, and first principle sizing of consumables. The resulting system is fitted with an inflatable aerodynamic decelerator to effect aero-capture into a Mars elliptical orbit, on its way to achieving Phobos orbit. A computational fluid dynamics tool is used to analyze the flow-field and identify potential hot spots during aerodynamic flight. This work advocates for the use of small satellites to test out technologies and operational concepts used in sustained human exploration of Mars, and to carry out scientific exploration of the Mars system. Consistent with a systems engineering approach, this work combines elements of the NASA Human Exploration and Operations Mission Directorate, the Space Technology Mission Directorate, and the Science Mission Directorate, and proposes a scenario for science acquisition, technology verification, trajectory validation, and in-situ resource exploration. We believe these type of missions are essential forerunners to human crewed missions to Mars.

Mission Design↗

NASA GRC UAS Project: Communications Modeling and Simulation Status

The integration of Unmanned Aircraft Systems (UAS) in the National Airspace represents new operational concepts required in civil aviation. These new concepts are evolving as the nation moves toward the Next Generation Air Transportation System (NextGen) under the leadership of the Joint Planning and Development Office (JPDO), and through ongoing work by the Federal Aviation Administration (FAA). The desire and ability to fly UAS in the National Air Space (NAS) in the near term has increased dramatically, and this multi-agency effort to develop and implement a national plan to successfully address the challenges of UAS access to the NAS in a safe and timely manner is well underway. As part of the effort to integrate UAS in the National Airspace, NASA Glenn Research Center is currently involved with providing research into Communications systems and Communication system operations in order to assist with developing requirements for this implementation. In order to provide data and information regarding communication systems performance that will be necessary, NASA GRC is tasked with developing and executing plans for simulations of candidate future UAS command and control communications, in line with architectures and communications technologies being developed and/or proposed by NASA and relevant aviation organizations (in particular, RTCA SC-203). The simulations and related analyses will provide insight into the ability of proposed communications technologies and system architectures to enable safe operation of UAS, meeting UAS in the NAS project goals (including performance requirements, scalability, and interoperability), and ultimately leading to a determination of the ability of NextGen communication systems to accommodate UAS. This presentation, compiled by the NASA GRC team, will provide a view of the overall planned simulation effort and objectives, a description of the simulation concept and status of the design and development that has occurred to date.

Kubat, Greg↗

Problem Definition and Solution Concept for En Route Constrained Airspace Problems

NASA's AATT Program is investigating potential ground-based decision support tool (DST) development for en route controllers and managers. NASA's previous work in en route DST development has focused on Transition airspace, where aircraft are impacted by constraints associated with the transition of aircraft from en route to terminal airspace. This paper investigates the problems associated with aircraft in non-transitional en route airspace, termed Constrained Airspace. A literature search was performed to catalog previously identified constrained airspace problems. The results of this search were investigated with industry representatives to validate these problems were significant in constrained airspace. Three general problem areas were identified. The first problem area involves negative impacts caused by a loss of airspace (e.g., activation of Special Use Airspace (SUA), weather cell formation, and overloaded sectors). The second problem area is the lack of identifying and taking advantage of gained airspace (e.g., SUA deactivation, weather dissipation, and sector loading reductions). The third problem area is unforeseen negative impacts caused by the acceptance of user routing requests (e.g., a route change into an area of congestion that negated the users intended benefit). Based upon the problems identified, an operational concept was developed for a DST to help handle these problems efficiently. The goal is to strategically identify constrained airspace problems and to provide functionality to support ARTCC TMUs in resolving the identified impacts. The capability lends itself well to TMU and Airline Operations Center (AOC) collaboration.

Green, Steven↗

International Space Station (ISS) Payload Autonomous Operations Past, Present and Future

Draper Laboratorys Timeliner is a scripting and automation system that runs onboard computers in the International Space Station (ISS). Timeliner is fully integrated with ISS and can be used to automate ISS operations tasks. Some of the most challenging aspects of operating a payload in low earth orbit are communication delays, ground equipment failures, and human errors. How does a Payload Developer (PD) know their equipment is operating nominally and collecting science in the most efficient way possible or even powered at any given time? During a ground Loss of Signal (LOS) data outage, PDs have no insight into their experiments state, and benefit greatly from Timeliner scripts executing on ISS to perform telemetry monitoring and commanding operations. This paper will discuss current software designs, and new operational uses for Timeliner. Existing Timeliner capabilities discussed will include: autonomous EXPRESS Rack activation and deactivation; autonomous science data downlinks; Minus Eighty Degree Freezer (MELFI) Dewar autonomous safing; JAXA and ESA module autonomous payload facility safing; as well as many others. New operational concepts discussed will include allowing Timeliner on the payload computer to issue core commands (Thermal, Power, Fire Detection), creation of new ground tools that will monitor the current status of Payload Racks as well as all the messaging from autonomous scripts executing, decreasing approval time for Timeliner bundles, and opening up the Payload MDM Enhanced Processor Integrated Communications Card (EPIC) interface. The EPIC interface could provide a new crew interface for PL Timeliner execution. The new interface could operate on either a Payload Computer System (PCS) or a Station Support Computer (SSC) that is plugged into either the Payload LAN or the Operations LAN which will make communicating to the PL MDM more flexible and greatly increase band width for communication.

Space Mission Automation↗

Deployment of a Full-Scope Commercial Nuclear Power Plant Control Room Simulator at the Idaho National Laboratory

The INL operates the HSSL to conduct research in the design and evaluation of advanced reactor control rooms, integration of intelligent support systems to assist operators, development and assessment of advanced human performance models, and visualizations to assess advanced operational concepts across various infrastructures. This advanced facility consists of a reconfigurable simulator and a virtual reality capability (known as the Computer-Aided Virtual Environment (CAVE)) (Figure 2). It supports human factors research, including human-in-the-loop performance, HSI, and analog and digital hybrid control displays. It can be applied to the development and evaluation of control systems and displays for complex systems such as existing and advanced NPP control rooms, command and control systems, and advance emergency operations centers. The HSSL incorporates a reconfigurable control room simulator, which is currently housed in the Center for Advanced Energy Studies (CAES), a joint venture of the DOE and the Idaho University System. The simulator is a platform- and plant-neutral environment intended for full-scope and part-task testing of operator performance in various control room configurations. The simulator is not limited to a particular plant or even simulator architecture. It can support engineering simulator platforms from multiple vendors using digital interfaces. Due to its ability to be reconfigured, it is possible to switch the HSI - not just to digital panels but also to different control modalities such as those using greater plant automation or intelligent alarm filtering. The simulator currently includes three operator workstations, each capable of driving up to eight 30-inch monitors. The size and number of monitors varies depending on the particular front-end simulator deployed for a simulator study. These operator workstations would typically be used for the shift supervisor or senior reactor operator, reactor operator, and assistant reactor operator in current US NPPs. In addition to the three workstations, information can be shared between the workstations and further displayed on a large-screen overview display or a panel mimic. An 82-inch high-definition display is commonly used for the overview display.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Study 2.6 operations analysis mission characterization

An analysis of the current operations concepts of NASA and DoD is presented to determine if alternatives exist which may improve the utilization of resources. The final product is intended to show how sensitive these ground rules and design approaches are relative to the total cost of doing business. The results are comparative in nature, and assess one concept against another as opposed to establishing an absolute cost value for program requirements. An assessment of the mission characteristics is explained to clarify the intent, scope, and direction of this effort to improve the understanding of what is to be accomplished. The characterization of missions is oriented toward grouping missions which may offer potential economic benefits by reducing overall program costs. Program costs include design, development, testing, and engineering, recurring unit costs for logistic vehicles, payload costs. and direct operating costs.

Wolfe, R. R.↗

Airspace Technology Demonstration 3 (ATD-3): Multi-Flight Common Route (MFCR) Technology Transfer Document Summary Version 1.0

This summary document and accompanying technology artifacts satisfy the second of three Research Transition Products (RTPs) defined in the ATD-3 Applied Traffic Flow Management (ATFM) Research Transition Team (RTT) Plan. This transfer consists of NASA's Multi-Flight Common Route (MFCR) research for efficient route corrections for en-route weather avoidance. The MFCR concept builds on the experience of the legacy Dynamic Weather Routes (DWR) and focuses on a better balance of potential savings with ATC acceptability, common route corrections options for multiple flights on similar routings, and better use of existing and/or modern automation for communication and coordination of route change options. All of these capabilities are expected to improve system performance significantly in terms of actual delay-reducing clearances issued to flights compared to that of the DWR tool and operating concept.

tech transfer↗

A manned maneuvering unit proximity operations planning and flight guidance display and control system

This task concerns the design, development, testing, and evaluation of a new proximity operations planning and flight guidance display and control system for manned space operations. A forecast, derivative manned maneuvering unit (MMU) was identified as a candidate for the application of a color, highway-in-the-sky display format for the presentation of flight guidance information. A silicon graphics 4D/20-based simulation is being developed to design and test display formats and operations concepts. The simulation includes the following: (1) real-time color graphics generation to provide realistic, dynamic flight guidance displays and control characteristics; (2) real-time graphics generation of spacecraft trajectories; (3) MMU flight dynamics and control characteristics; (4) control algorithms for rotational and translational hand controllers; (5) orbital mechanics effects for rendezvous and chase spacecraft; (6) inclusion of appropriate navigation aids; and (7) measurement of subject performance. The flight planning system under development provides for: (1) selection of appropriate operational modes, including minimum cost, optimum cost, minimum time, and specified ETA; (2) automatic calculation of rendezvous trajectories, en route times, and fuel requirements; (3) and provisions for manual override. Man/machine function allocations in planning and en route flight segments are being evaluated. Planning and en route data are presented on one screen composed of two windows: (1) a map display presenting a view perpendicular to the orbital plane, depicting flight planning trajectory and time data attitude display presenting attitude and course data for use en route; and (2) an attitude display presenting local vertical-local horizontal attitude data superimposed on a highway-in-the-sky or flight channel representation of the flight planned course. Both display formats are presented while the MMU is en route. In addition to these displays, several original display elements are being developed, including a 3DOF flight detector for attitude commanding, a different flight detector for translation commands, and a pictorial representation of velocity deviations.

Gershzohn, Gary R.↗

A surface systems architecture for an evolutionary lunar base

The NASA Office of Exploration has completed a Systems Engineering and Integration effort to define a point design for an evolving lunar base that supports substantial science, exploration, and resource production objectives. This study addressed systems level design; element requirements and conceptual designs; assessments of precursor and technology needs, and operations concepts. The central base is assumed to be located equatorially on the lunar nearside north of the crater Moltke in Mare Tranquillitatis. The study considers an aggressive case with three main phases. The initial Man-Tended Phase establishes basic enabling facilities that include a modular habitat that periodically houses a crew of four. During the Experimental Phase the base becomes permanently manned with the construction of a larger habitat that provides augmented workshop and laboratory volumes and housing for crew. The Operational Phase expands base capabilities to a substantially mature level while reducing reliance on earth.

Roberts, Barney B.↗

Galileo mission planning for Low Gain Antenna based operations

The Galileo mission operations concept is undergoing substantial redesign, necessitated by the deployment failure of the High Gain Antenna, while the spacecraft is on its way to Jupiter. The new design applies state-of-the-art technology and processes to increase the telemetry rate available through the Low Gain Antenna and to increase the information density of the telemetry. This paper describes the mission planning process being developed as part of this redesign. Principal topics include a brief description of the new mission concept and anticipated science return (these have been covered more extensively in earlier papers), identification of key drivers on the mission planning process, a description of the process and its implementation schedule, a discussion of the application of automated mission planning tool to the process, and a status report on mission planning work to date. Galileo enhancements include extensive reprogramming of on-board computers and substantial hard ware and software upgrades for the Deep Space Network (DSN). The principal mode of operation will be onboard recording of science data followed by extended playback periods. A variety of techniques will be used to compress and edit the data both before recording and during playback. A highly-compressed real-time science data stream will also be important. The telemetry rate will be increased using advanced coding techniques and advanced receivers. Galileo mission planning for orbital operations now involves partitioning of several scarce resources. Particularly difficult are division of the telemetry among the many users (eleven instruments, radio science, engineering monitoring, and navigation) and allocation of space on the tape recorder at each of the ten satellite encounters. The planning process is complicated by uncertainty in forecast performance of the DSN modifications and the non-deterministic nature of the new data compression schemes. Key mission planning steps include quantifying resource or capabilities to be allocated, prioritizing science observations and estimating resource needs for each, working inter-and intra-orbit trades of these resources among the Project elements, and planning real-time science activity. The first major mission planning activity, a high level, orbit-by-orbit allocation of resources among science objectives, has already been completed; and results are illustrated in the paper. To make efficient use of limited resources, Galileo mission planning will rely on automated mission planning tools capable of dealing with interactions among time-varying downlink capability, real-time science and engineering data transmission, and playback of recorded data. A new generic mission planning tool is being adapted for this purpose.

Gershman, R.↗

Second Annual Transformative Vertical Flight Concepts Workshop: Enabling New Flight Concepts Through Novel Propulsion and Energy Architectures

On August 3rd and 4th, 2015, a workshop was held at the NASA Ames Research Center, located at the Moffett Federal Airfield in California to explore the aviation communities interest in Transformative Vertical Flight (TVF) Concepts. The Workshop was sponsored by the AHS International (AHS), the American Institute of Aeronautics and Astronautics (AIAA), the National Aeronautics and Space Administration (NASA), and hosted by the NASA Aeronautics Research Institute (NARI). This second annual workshop built on the success and enthusiasm generated by the first TVF Workshop held in Washington, DC in August of 2014. The previous Workshop identified the existence of a multi-disciplinary community interested in this topic and established a consensus among the participants that opportunities to establish further collaborations in this area are warranted. The desire to conduct a series of annual workshops augmented by online virtual technical seminars to strengthen the TVF community and continue planning for advocacy and collaboration was a direct outcome of the first Workshop. The second Workshop organizers focused on four desired action-oriented outcomes. The first was to establish and document common stakeholder needs and areas of potential collaborations. This includes advocacy strategies to encourage the future success of unconventional vertiport capable flight concept solutions that are enabled by emerging technologies. The second was to assemble a community that can collaborate on new conceptual design and analysis tools to permit novel configuration paths with far greater multi-disciplinary coupling (i.e., aero-propulsive-control) to be investigated. The third was to establish a community to develop and deploy regulatory guidelines. This community would have the potential to initiate formation of an American Society for Testing and Materials (ASTM) F44 Committee Subgroup for the development of consensus-based certification standards for General Aviation scale vertiport capable flight systems. These standards need to accommodate novel fixed wing concepts that do not fit within the existing Federal Aviation Administration (FAA) rotorcraft certification framework (Code of Federal Regulations, Title 14, Chapter I, Subchapter C, Part 27). The fourth desired outcome was to launch an information campaign to ensure key U.S. Government agencies understand the potential benefits and industry interest in establishing new vertiport capable flight markets. This record of the Workshop proceedings documents Workshop activities and products including summaries of the video recorded technical presentations, overviews of three breakout sessions (Missions Operational Concepts, Prioritized Technical Challenges, Regulatory Roadmap), and a preliminary draft roadmap framework for TVF.

V/STOL↗

Active Neutron Interrogation as a Method for Verification of the Absence of Special Nuclear Material in Arms Control Dismantlement

The next step in arms control reductions will deal with both strategic and non-strategic weapons, presenting new and hard challenges for verification. One verification approach that might be used in support of these reductions is the concept of deferred verification, which forgoes inspections at sensitive nuclear sites and relies on an inspection regime having access to the open segment of a State's nuclear sector, in "monitored transfer zones." A component of this approach is the anticipated need for an instrument suite capable of detecting well-shielded highly-enriched uranium or plutonium where it isn't supposed to be. This specific need was recently identified by the United Nations Institute for Disarmament Research in an enabling operating concept they call "contain and dispose." At the foundation of this approach is the idea that items declared as "not nuclear" are, by definition, not treaty limited and are thus "fair-game" for inspection and questioning. Active Neutron Interrogation (ANI), using beta-delayed neutron emissions as the signature for special nuclear material (SNM) detection, is a promising method to address this challenge. The method is quick, has high sensitivity and high specificity for detecting shielded SNM, is robust against changing background radiation environments, is robust against the presence of unknown shielding, and avoids the use of gamma-ray spectrometry which may introduce complications due to the potential release of sensitive information. This paper will present recent research activities exploring technical aspects of using ANI as a FAIRGAME verification method and discuss future prospects and research needs

46 - INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AN↗

Preliminary Report on Mission Design and Operations for Critical Events

Mission-critical events are defined in the Jet Propulsion Laboratory s Flight Project Practices as those sequences of events which must succeed in order to attain mission goals. These are dependent on the particular operational concept and design reference mission, and are especially important when committing to irreversible events. Critical events include main engine cutoff (MECO) after launch; engine cutoff or parachute deployment on entry, descent, and landing (EDL); orbital insertion; separation of payload from vehicle or separation of booster segments; maintenance of pointing accuracy for power and communication; and deployment of solar arrays and communication antennas. The purpose of this paper is to report on the current practices in handling mission-critical events in design and operations at major NASA spaceflight centers. The scope of this report includes NASA Johnson Space Center (JSC), NASA Goddard Space Flight Center (GSFC), and NASA Jet Propulsion Laboratory (JPL), with staff at each center consulted on their current practices, processes, and procedures.

Hayden, Sandra C.↗

Development of Intent Information Changes to Revised Minimum Aviation System Performance Standards for Automatic Dependent Surveillance Broadcast (RTCA/DO-242A)

RTCA Special Committee 186 has recently adopted a series of changes to the original Minimum Aviation System Performance Standards (MASPS) for Automatic Dependent Surveillance Broadcast (ADS-B). The new document will be published as DO-242A. Major changes to the MASPS include a significant restructuring and expansion of the intent parameters for future ADS-B systems. ADS-B provides a means for aircraft to exchange information about their intended trajectories with each other and with ground systems. NASA and Boeing have played significant roles in recommending these changes and providing supporting analysis. The intent changes are anticipated to provide substantial benefits to several programs and operational concepts under development by the two organizations. Major changes include the addition of Target State reports and the replacement of Trajectory Change Point reports with Trajectory Change reports. These changes have been designed to better reflect the capabilities of existing and future aircraft avionics, while providing benefits to current and proposed applications. DO-242A implements intent information elements that can be supported by current avionics systems and data buses. Provisions are made for future incorporation of other intent elements, as needed to meet operational requirements. This document summarizes the reasons for the DO-242A intent changes and provides a detailed overview of current and future intended ADS-B MASPS changes related to aircraft intent.

Barhydt, Richard↗