Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling Service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 739 records · Page 41

Mars Science Laboratory Drill

The Drill for the Mars Science Laboratory mission is a rotary-percussive sample acquisition device with an emphasis on toughness and robustness to handle the harsh environment on Mars. The unique challenges associated with autonomous drilling from a mobile robot are addressed. A highly compressed development schedule dictated a modular design architecture that satisfies the functional and load requirements while allowing independent development and testing of the Drill subassemblies. The Drill consists of four actuated mechanisms: a spindle that rotates the bit, a chuck that releases and engages bits, a novel voice-coil-based percussion mechanism that hammers the bit, and a linear translation mechanism. The Drill has three passive mechanisms: a replaceable bit assembly that acquires and collects sample, a contact sensor / stabilizer mechanism, and, lastly a flex harness service loop. This paper describes the various mechanisms that makeup the Drill and discusses the solutions to their unique design and development challenges.

Okon, Avi B.↗

ZAM Modeling Study to Support the Tank Closure Cesium Removal (TCCR) 1A Unit

Currently at the Savannah River Site (SRS), the Tank Closure Cesium Removal (TCCR) is an “at-tank” process designed to remove cesium from aqueous tank waste. Cesium will be removed by ion exchange using the engineered IONSIV® R9120 form of Crystalline Silicotitanate (CST) media. The current TCCR design has two columns online in a lead-lag configuration to optimize media usage and achieve the target decontamination. Once the lead column is saturated with cesium, it will be removed from service, the lag column will rotate into the lead position, and a new column with fresh ion-exchange media will be placed into the lag position. The TCCR process for cesium removal from Tank 10H is detailed in X-SOW-H- 00002. Demonstration of the system began in early calendar year 2019 with two batches of salt solution generated by dissolving saltcake in Tank 10H, followed by processing of these batches through the TCCR system. A third TCCR Tank 10H dissolved saltcake batch is scheduled for processing soon. Upon completion of the demonstration with Tank 10H dissolved saltcake, Tank 9H salt solution will be transferred to Tank 10H and subsequently processed through the TCCR unit with new CST media (referred to as R9120-B 30x60) added to new IX columns. The TCCR processing campaign of Tank 9H salt solution is referred to as TCCR-1A .

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and Characterization of the Engineering Model of the Spectrometer Onboard LuSEE-Night

The Lunar Surface Electromagnetics Explorer - Night, LuSEE-Night, is a low-frequency radio astronomy experiment that will explore the cosmic Dark Ages signal on the radio quiet farside of the Moon. The LuSEE-Night carries a radio frequency spectrometer consisting of a set of antennas, analog and digital processing electronics, and will be launched by NASA's Commercial Lunar Payload Services in 2025. The spectrometer is designed to observe the spectrum of the radio sky in the 0.5−50MHz band. The engineering model (EM) of the four-channel spectrometer has been developed. The EM has been characterized for linearity, gain, noise, and their temperature dependence, confirming that the EM meets all the requirements for LuSEE-Night. Three mitigation techniques have been implemented and verified to suppress self-induced electromagnetic interference (EMI). The flight model of the spectrometer is currently being developed and is scheduled to be shipped to the integration site in early 2024

47 OTHER INSTRUMENTATION↗

Consort Suborbital Rocket Series: Starfire I on Launch Rail

The enclosed report provides information on the sixth flight of the Consort suborbital rocket series. Consort 6 is currently scheduled for launch on February 19, 1993, with lift off at 11:00 a.m., Mountain Time. It will carry seven materials and biotechnology experiments, two accelerometer systems, a controller and battery packs in a module nearly 12 feet tall and weighing approximately 1,004 pounds. Consort 6 will reach an apogee of approximately 200 miles providing about 7 minutes of microgravity time. The entire mission, from launch to touchdown, is expected to last approximately 15 minutes. The Consort series is part of a unique suborbital rocket launch services program conducted by the Office of Advanced Concepts and Technology (OACT) in conjunction with its Centers for the Commercial Development of Space (CCDS). This service is managed through the Consortium for Materials Development in Space (CMDS), a CCDS based University of Alabama in Huntsville (UAH). This suborbital rocket program provides CCDS investigators with a microgravity environment to achieve commercial development objectives, or to test developmental hardware or techniques in preparation for orbital flights or additional follow-on work. Rocket and launch services for Consort 6, including use of the Starfire 1 launch vehicle, are provided by EER Systems Corporation. Integration of the payload into Starfire 1 will be handled by McDonnell Douglas Space Systems Company.

Source record↗

Lunar Reconnaissance Orbiter (LRO) Rapid Thermal Design Development

The Lunar Reconnaissance Orbiter (LRO) project had a rapid development schedule starting with project conception in spring of 2004, instrument and launch vehicle selection late in 2005 and then launch in early 2009. The lunar thermal environment is one of the harshest in our solar system with the heavy infrared loading of the moon due to low albedo, lack of lunar atmosphere, and low effective regolith conduction. This set of constraints required a thermal design which maximized performance (minimized radiator area and cold control heater power) and minimized thermal hardware build at the orbiter level (blanketing, and heater service). The orbiter design located most of the avionics on an isothermalized heat pipe panel called the IsoThermal Panel (ITP). The ITP was coupled by dual bore heat pipes to an Optical Solar Reflector (OSR) covered heat pipe radiator. By coupling all of the avionics to one system, the hardware was simplified. The seven instruments were mainly heritage instruments which resulted in their desired radiators being located by their heritage design. This minimized instrument redesigns and therefore allowed them to be delivered earlier, though it resulted in a more complex orbiter level blanket and heater service design. Three of the instruments were mounted on a tight pointing M55J optical bench that needed to be covered in heaters to maintain pointing. Two were mounted to spacecraft controlled radiators. One was mounted to the ITP Dual Bores. The last was mounted directly to the bus structure on the moon facing panel. The propulsion system utilized four-20 pound insertion thrusters and eight-5 pound attitude control thrusters (ACS) in addition to 1000 kg of fuel in two large tanks. The propulsion system had a heater cylinder and a heated mounting deck for the insertion thrusters which coupled most of the propulsion design together simplifying the heater design. The High Gain Antenna System (HGAS) and Solar Array System (SAS) used dual axis actuator gimbal systems. HGAS required additional boom heaters to cool the approximately 10 W of RF losses thru the rotary joints and wave guides from the 40 W Ka system. By design this module needed a fair amount of heater, blanketing, and radiator complexity. The SAS system required a separate cable wrap radiator to help cool the Solar Array harness which dissipated 30 W thru the actuators and cable wraps. This module also was complex.

Baker, Charles↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗

Channel access schemes and fiber optic configurations for integrated-services local area networks

Local Area Networks are in common use for data communications and have enjoyed great success. Recently, there is a growing interest in using a single network to support many applications in addition to traditional data traffic. These additional applications introduce new requirements in terms of volume of traffic and real-time delivery of data which are not met by existing networks. To satisfy these requirements, a high-bandwidth tranmission medium, such as fiber optics, and a distributed channel access scheme for the efficient sharing of the bandwidth among the various applications are needed. As far as the throughput-delay requirements of the various application are concerned, a network structure along with a distributed channel access are proposed which incorporate appropriate scheduling policies for the transmission of outstanding messages on the network. A dynamic scheduling policy was devised which outperforms all existing policies in terms of minimizing the expected cost per message. A broadcast mechanism was devised for the efficient dissemination of all relevant information. Fiber optic technology is considered for the high-bandwidth transmisison medium.

Nassehi, M. Mehdi↗

Lessons learned from the CSIS

A discussion is presented of the Centralized Storm Information System (CSIS), a joint effort by several organizations including NASA and the National Weather Service, which has been developed to aid the forecaster in evaluating weather data. The CSIS was developed to provide a handling, analyzing, intercomparison, and display system for real-time data from all available sources. The CSIS hardware and software, the impact of the CSIS, and the initial experience gained following the implementation of the CSIS are examined. Several general insights learned from this interactive processing system are examined in detail, including the benefits of an evolutionary bottom up rather than top down design approach, the crucial nature of scheduler function to any real time system, the recognition that meteorological interactive terminals requirements are different from image processing terminals requirements, and the knowledge that forecasters generate a large peak load on computer resources.

Mosher, F. R.↗

Replacement of Melter 2 at the Defense Waste Processing Facility (DWPF) - 18608

The original DWPF melter was replaced in 2002 with an identical unit, and radioactive operation of Melter 2 commenced in 2003. After nearly 14 years of service, a lower electrode failure of Melter 2 occurred in February 2017 which required its removal and replacement with Melter 3. The scope of the replacement outage involves several significant evolutions: - Shutdown of Melter 2 and placement into a safe state; - Remote external and internal inspection of Melter 2 to chronicle its condition prior to removal; - Disassembly and removal of Melter 2 from the process cell; - Placement of Melter 2 into a storage box and transport to a storage vault; - Preparation and initial testing of Melter 3 prior to transport to the DWPF; - Transport to the DWPF and installation of Melter 3 in the process cell; - Final startup testing and initiation of radioactive operation. Upon determination that repair of Melter 2 was not feasible, DWPF created an outage team to integrate schedules and resources needed to execute melter replacement as well as including maintenance scope for facility work that can only be performed when the melter is de-energized. The execution of this scope required integration with other mission critical outage activities already in progress, and planned to start, including initial facility tie-in scope for the new Salt Waste Processing Facility (SWPF). This unplanned addition of the melter replacement scope to the existing outage scope resulted in the longest facility outage period since the initiation of radioactive operations at the DWPF in 1996. Successful completion of this scope across all Liquid Waste facilities would require balance - for schedules, resources, priority, funding, etc. To overcome the significant challenges created by this additional scope, a WAR Room was established to ensure adequate integration and coordination of critical resources, and daily progress. The execution of this scope has required the integration of nearly two dozen work groups across multiple facilities at Savannah River Site (SRS), in addition to support from nearly a dozen vendors. The melter replacement outage was executed with a high degree of disciplined operation to ensure the facility was ready to resume glass pouring operation in time to support restart of the Liquid Waste program at the Savannah River Site (SRS). This paper will provide a brief overview of Melter 2 operational history. The execution of the removal and replacement operations will be described with a specific focus on lessons learned and opportunities where the outage execution diverged from the original Melter 1 replacement outage. It is expected to be of interest to vitrification facilities, as well as facilities, which require remote maintenance and replacement of large process equipment. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Space Network Control Conference on Resource Allocation Concepts and Approaches

The results are presented of the Space Network Control (SNC) Conference. In the late 1990s, when the Advanced Tracking and Data Relay Satellite System is operational, Space Network communication services will be supported and controlled by the SNC. The goals of the conference were to survey existing resource allocation concepts and approaches, to identify solutions applicable to the Space Network, and to identify avenues of study in support of the SNC development. The conference was divided into three sessions: (1) Concepts for Space Network Allocation; (2) SNC and User Payload Operations Control Center (POCC) Human-Computer Interface Concepts; and (3) Resource Allocation Tools, Technology, and Algorithms. Key recommendations addressed approaches to achieving higher levels of automation in the scheduling process.

Moe, Karen L.↗

Group Task Force on Satellite Rescue and Repair

The Group Task Force was chartered by the Administrator of NASA to recommend 'a policy outlining the criteria, the design standards, and the pricing model to guide NASA in assessing the responsibilities for government and nongovernment Satellite Rescue and Repair Missions.' Criteria for accepting such missions, risks, and benefits to all sectors of our economy involved in satellite services, adequacy of planning and training, and the impact on NASA's primary mission were reviewed. The Group began by asking a more fundamental question; is satellite rescue and repair a logical element of NASA's mission? Factors considered were: (1) the probability of rescue or repair opportunities arising; (2) the economic justification for such attempts; (3) the benefits to NASA, both from such ad hoc learning experiences in space operations and the impact on the public perception of NASA; (4) the effect of such unanticipated missions on NASA's scheduled activities; (5) any potential effect on NASA's technical capability to work in space; and (6) any potential effect on U.S. economic competitiveness.

Source record↗

Work Breakdown Structure (WBS) Handbook

The purpose of this document is to provide program/project teams necessary instruction and guidance in the best practices for Work Breakdown Structure (WBS) and WBS dictionary development and use for project implementation and management control. This handbook can be used for all types of NASA projects and work activities including research, development, construction, test and evaluation, and operations. The products of these work efforts may be hardware, software, data, or service elements (alone or in combination). The aim of this document is to assist project teams in the development of effective work breakdown structures that provide a framework of common reference for all project elements. The WBS and WBS dictionary are effective management processes for planning, organizing, and administering NASA programs and projects. The guidance contained in this document is applicable to both in-house, NASA-led effort and contracted effort. It assists management teams from both entities in fulfilling necessary responsibilities for successful accomplishment of project cost, schedule, and technical goals. Benefits resulting from the use of an effective WBS include, but are not limited to: providing a basis for assigned project responsibilities, providing a basis for project schedule development, simplifying a project by dividing the total work scope into manageable units, and providing a common reference for all project communication.

Source record↗

NASA Work Breakdown Structure (WBS) Handbook

The purpose of this document is to provide program/project teams necessary instruction and guidance in the best practices for Work Breakdown Structure (WBS) and WBS dictionary development and use for project implementation and management control. This handbook can be used for all types of NASA projects and work activities including research, development, construction, test and evaluation, and operations. The products of these work efforts may be hardware, software, data, or service elements (alone or in combination). The aim of this document is to assist project teams in the development of effective work breakdown structures that provide a framework of common reference for all project elements. The WBS and WBS dictionary are effective management processes for planning, organizing, and administering NASA programs and projects. The guidance contained in this document is applicable to both in-house, NASA-led effort and contracted effort. It assists management teams from both entities in fulfilling necessary responsibilities for successful accomplishment of project cost, schedule, and technical goals. Benefits resulting from the use of an effective WBS include, but are not limited to: providing a basis for assigned project responsibilities, providing a basis for project schedule and budget development, simplifying a project by dividing the total work scope into manageable units, and providing a common reference for all project communication.

Planning↗

NASA Work Breakdown Structure (WBS) Handbook

The purpose of this document is to provide program/project teams necessary instruction and guidance in the best practices for WBS and WBS dictionary development and use for project implementation and management control. This handbook can be used for all types of NASA projects and work activities including research, development, construction, test and evaluation, and operations. The products of these work efforts may be hardware, software, data, or service elements (alone or in combination). The aim of this document is to assist project teams in the development of effective work breakdown structures that provide a framework of common reference for all project elements. The WBS and WBS dictionary are effective management processes for planning, organizing, and administering NASA programs and projects. The guidance contained in this document is applicable to both in-house, NASA-led effort and contracted effort. It assists management teams from both entities in fulfilling necessary responsibilities for successful accomplishment of project cost, schedule, and technical goals. Benefits resulting from the use of an effective WBS include, but are not limited to: providing a basis for assigned project responsibilities, providing a basis for project schedule and budget development, simplifying a project by dividing the total work scope into manageable units, and providing a common reference for all project communication.

Christopher Lewis Sadler↗

Grid site availability evaluation and monitoring at CMS

The Compact Muon Solenoid (CMS) experiment at the Large Hadron Collider (LHC) uses distributed grid computing to store, process, and analyse the vast quantity of scientific data recorded every year. The computing resources are grouped into sites and organized in a tiered structure. Each site provides computing and storage to the CMS computing grid. Over a hundred sites worldwide contribute with resources from hundred to well over ten thousand computing cores and storage from tens of TBytes to tens of PBytes. In such a large computing setup scheduled and unscheduled outages occur continually and are not allowed to significantly impact data handling, processing, and analysis. Unscheduled capacity and performance reductions need to be detected promptly and corrected. CMS developed a sophisticated site evaluation and monitoring system for Run 1 of the LHC based on tools of the Worldwide LHC Computing Grid. For Run 2 of the LHC the site evaluation and monitoring system is being overhauled to enable faster detection/reaction to failures and a more dynamic handling of computing resources. Furthermore, enhancements to better distinguish site from central service issues and to make evaluations more transparent and informative to site support staff are planned.

43 PARTICLE ACCELERATORS↗

Space Telescope design status and operations

The Space Telescope design concept is described in the context of the basic mission objectives. The orbiting telescope is designed to have 10 times better resolution, to see 50 times fainter stars and to have a much broader spectral range than the best existing ground observatories. The project is on schedule for launch in early 1985. Hardware assembly and test has started on the optical system, and the primary and secondary mirrors have been polished and coated. The five scientific instruments are beginning hardware assembly. The last major design review for the spacecraft has been completed, and good progress has been accomplished with the implementation of the pointing control system. The mission operations ground system has been defined and is under development. Control center design is complete and the science institute is under construction. The Space Telescope is designed to be serviceable in orbit and will be capable of return to the ground for refurbishment.

Speer, F. A.↗

Life Cycle Testing of Viscoelastic Material for Hubble Space Telescope Solar Array 3 Damper

During the March 2002 Servicing Mission by Space Shuttle (STS 109), the Hubble Space Telescope (HST) was refurbished with two new solar arrays that now provide all of its power. These arrays were built with viscoelastic/titanium dampers, integral to the supporting masts, which reduce the interaction of the wing bending modes with the Telescope. Damping of over 3% of critical was achieved. To assess the damper s ability to maintain nominal performance over the 10-year on-orbit design goal, material specimens were subjected to an accelerated life test. The test matrix consisted of scheduled events to expose the specimens to pre-determined combinations of temperatures, frequencies, displacement levels, and numbers of cycles. These exposure events were designed to replicate the life environment of the damper from fabrication through testing to launch and life on-orbit. To determine whether material degradation occurred during the exposure sequence, material performance was evaluated before and after the accelerated aging with complex stiffness measurements. Based on comparison of pre- and post-life-cycle measurements, the material is expected to maintain nominal performance through end of life on-orbit. Recent telemetry from the Telescope indicates that the dampers are performing nominally.

Maly, Joseph R.↗

Ares First Stage "Systemology" - Combining Advanced Systems Engineering and Planning Tools to Assure Mission Success

Ares is an integral part of NASA s Constellation architecture that will provide crew and cargo access to the International Space Station as well as low earth orbit support for lunar missions. Ares replaces the Space Shuttle in the post 2010 time frame. Ares I is an in-line, two-stage rocket topped by the Orion Crew Exploration Vehicle, its service module, and a launch abort system. The Ares I first stage is a single, five-segment reusable solid rocket booster derived from the Space Shuttle Program's reusable solid rocket motor. The Ares second or upper stage is propelled by a J-2X main engine fueled with liquid oxygen and liquid hydrogen. This paper describes the advanced systems engineering and planning tools being utilized for the design, test, and qualification of the Ares I first stage element. Included are descriptions of the current first stage design, the milestone schedule requirements, and the marriage of systems engineering, detailed planning efforts, and roadmapping employed to achieve these goals.

Seiler, James↗