Search NASA⌕ Search

SEARCH · Search NASA

Results for “Timeline”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 739 records · Page 41

Simulated EVA operation of a remote connector assembly test report

The features of a connector concept with respect to timelines and ease of connection by EVA (extravehicular activity), in various mating orientations were evaluated. The connector tests were conducted by thee EVA astronaut test subjects. Each of four test conditions (baseline, off angle, overhead, and with visual obstruction) were run three times by each of the test subjects. Time data were taken on each test run. Visual and voice communications with the subjects were recorded. The tests demonstrated that EVA personnel can perform connection tasks in relatively short times (generally one minute) and the connector configuration was a reasonable design base for such tasks. The in-situ communications and post-test comments indicated that the connector was generally acceptable but requires improvement to its manual interface features.

Lefever, A.↗

Thermal integration of Spacelab experiments

The method of thermally integrating the experiments for Spacelab is discussed. The scientific payload consists of a combination of European and United States sponsored experiments located in the module as well as on a single Spacelab pallet. The thermal integration must result in accomodating the individual experiment requirements as well as ensuring that the total payload is within the Spacelab Environmental Control System (ECS) resource capability. An integrated thermal/ECS analysis of the module and pallet is performed in concert with the mission timeline to ensure that the agreed upon experiment requirements are accommodated and to ensure the total payload is within the Spacelab ECS resources.

Patterson, W. C.↗

First Spacelab flight - A status report of the joint ESA/NASA mission

A general overview of the first Spacelab flight is presented and a table is given listing the payload composition. An accommodation study is presented with emphasis on the configuration, mass status, timeline, and experiment interface specifications. Also considered are flight and ground operations, safety factors, and payload specialists training for the first flight.

Craft, H. G., Jr.↗

Shuttle orbiter TPS flight repair kit development

The design and application of a TPS repair kit is presented. The repair kit is designed for on orbit use by a crew member working in the manned maneuvering unit (MMU). The kit includes the necessary equipment and materials to accomplish the repair tasks which include the following: HRSI emittance coating repair, damaged tile repair, missing tile repair, and multiple tile repair. Two types of repair materials required to do the small area repair and the large area repair are described. The materials area cure in place, silicone base ablator for small damaged areas and precured ablator tile for repair of larger damaged areas is examined. The cure in place ablator is also used as an adhesive to bond the precured tiles in place. An applicator for the cure in place ablator, designed to contain a two-part silicon compound, mix the two components at correct ratio, and dispense the materials at rates compatible with mission timelines established for the EVA is described.

Source record↗

Space construction and utility distribution

Technology advancement to effect an orderly development program leading to construction of space platforms was defined, in a program that utilized a viable platform and service module concept with concise OSS/OAST mission and payload models. Consideration was given to concepts for alternate platform servicing of the payloads described in the model. Using the baseline configuration, issues pertinent to platform development as well as orbit emplacement and operation and on orbit construction methodology were analyzed. These analyses provided the following data: (1) payload definitions and installation options; (2) identified structural and subsystems options; (3) developed integrated platform system concepts; and (4) identified technology deficiencies and recommended technology development timelines.

Bloom, K. A.↗

Capillary acquisition devices for high-performance vehicles: Executive summary

Technology areas critical to the development of cryogenic capillary devices were studied. Passive cooling of capillary devices was investigated with an analytical and experimental study of wicking flow. Capillary device refilling with settled fluid was studied using an analytical and experimental program that resulted in successful correlation of a versatile computer program with test data. The program was used to predict Centaur D-1S LO2 and LH2 start basket refilling. Comparisons were made between the baseline Centaur D-1S propellant feed system and feed system alternatives including systems using capillary devices. The preferred concepts from the Centaur D-1S study were examined for APOTV and POTV vehicles for delivery and round trip transfer of payloads between LEO and GEO. Mission profiles were determined to provide propellant usage timelines and the payload partials were defined.

Blatt, M. H.↗

NASA TLA workload analysis support. Volume 1: Detailed task scenarios for general aviation and metering and spacing studies

The techniques required to produce and validate six detailed task timeline scenarios for crew workload studies are described. Specific emphasis is given to: general aviation single pilot instrument flight rules operations in a high density traffic area; fixed path metering and spacing operations; and comparative workload operation between the forward and aft-flight decks of the NASA terminal control vehicle. The validation efforts also provide a cursory examination of the resultant demand workload based on the operating procedures depicted in the detailed task scenarios.

Sundstrom, J. L.↗

Supporting research and technology for automotive Stirling engine development

The technology advancement topics described are a part of the supporting research and technology (SRT) program conducted to support the major Stirling engine development program. This support focuses on developing alternatives or backups to the engine development in critical areas. These areas are materials, seals control, combustors and system analysis. Specific objectives and planned milestone schedules for future activities as now envisioned are described. These planned SRT activities are related to the timeline of the engine development program that they must support.

Tomazic, W. A.↗

STS-1 operational flight profile. Volume 5: Descent, cycle 3

The trajectory data presented are to be used for orbiter systems and subsystems evalation, flight and mission control center software verification, flight techniques and timeline development, crew training, and evaluation of operational mission suitability. The entry profile is very similar to cycle 2, however, elevon and body flap temperature margins have increased and the elevon schedule was changed. The terminal area energy management (TAEM) profile was completely reshaped to conform with new angle of attack constraints and left hand turn around the heading alignment cylinder. Also, the entry/TAEM interface was adjusted to minimize guidance induced angle of attack transients across the interface. The approach and landing phase was reshaped for a 20 deg glideslope and reduced velocity at touchdown. The definition of the runway threshold was standardized for all landing sites. This results in a shift at Edwards Air Force Base in aim points and touchdown relative to the threshold of 1000 feet. The rollout remains essentially unchanged with the exception of the speedbrake, which is now deployed to 50 percent at touchdown.

Moore, R.↗

Retrieval techniques: LVLH and inertially stabilized payloads

Procedures and techniques are discussed for retrieving payloads that are inertially or local vertical/local horizontal (LVLH) stabilized. Selection of the retrieval profile to be used depends on several factors: (1) control authority of the payload, (2) payload sensitivity to primary reaction control system (PRCS) plumes, (3) whether the payload is inertially or LVLH stabilized, (4) location of the grapple fixture, and (5) orbiter propellant consumption. The general retrieval profiles recommended are a V-bar approach for payloads that are LVLH or gravity-gradient stabilized, and the V-bar approach with one or two phase flyaround for inertially stabilized payloads. Once the general type of profile has been selected, the detailed retrieval profile and timeline should consider the various guidelines, groundrules, and constraints associated with a particular payload or flight. Reaction control system (RCS) propellant requirements for the recommended profiles range from 200 to 1500 pounds, depending on such factors as braking techniques, flyaround maneuvers (if necessary), and stationkeeping operations. The time required to perform a retrieval (starting from 1000 feet) varies from 20 to 130 minutes, depending on the complexity of the profile. The goals of this project are to develop a profile which ensures mission success; to make the retrieval profiles simple; and to keep the pilot workload to a minimum by making use of the automatic features of the orbiter flight software whenever possible.

Yglesias, J. A.↗

Environmental control and life support system: Analysis of STS-1

The capability of the orbiter environmental control and life support system (ECLSS) to support vehicle cooling requirements in the event of cabin pressure reduction to 9 psia was evaluated, using the Orbiter versions of the shuttle environmental consumbles usage requirement evaluation (SECURE) program, and using heat load input data developed by the spacecraft electrical power simulator (SEPS) program. The SECURE model used in the analysis, the timeline and ECLSS configuration used in formulating the analysis, and the results of the analysis are presented. The conclusion which may be drawn drom these results. is summarized. There are no significant thermal problems with the proposed mission. There are, however, several procedures which could be optimized for better performance: setting the cabin HX air bypass and the interchanger water bypass to the zero flow position is of questionable efficacy; the cabin air pressure monitoring procedure should be re-evaluated; and the degree of equipment power down specified for this analysis and no problems were noted.

Steines, G.↗

Space Shuttle Orbiter - Countdown

The status of Orbiter launch planning is reviewed, with consideration given to major structure elements, subsystem and component development, readiness for launch, and follow-on Orbiters. It is noted that timelines in the completion of each increment of development of the first Orbital Flight Vehicle become increasingly crucial as the scheduled launch date approaches. Concurrent with the testing and finalization of this vehicle's software and hardware construction are the preliminary developmental stages of future Shuttle Orbiters.

Cohen, A.↗

NOSS flight segment concept study

An 11 ft wide by 26.5 ft long flat structure weighing almost 14,469 pounds evolved during a low level, inhouse conceptual design study for a national oceanic satellite system spacecraft that would stow directly in the space shuttle. Following STS launch to a 300 Km mission orbit inclination, transfer will be effected to a 800 Km Sun synchronous circular orbit. The instrument completement includes 2 altimeters, 1 scatterometer, 1 large antenna multichannel microwave radiometer, and a coastal zone scanner. The spacecraft, its instruments, and interfaces with STS and TDRSS are described. The mission timeline, potential problem areas, system drivers, and recommended study areas are discussed. Drawings and system block diagrams are included.

Source record↗

Forest resource information system

Remote sensing technology providing St. Regis with an independent operational system and having LANDSAT data as a significant and viable contributor was documented and transferred. Primary emphasis was placed on documenting developmental LARSYS (LARSYSDV) software modules. Timelines and a short description of the software documentation process is given.

Mroczynski, R. P.↗

Satellite Power Systems (SPS) concept definition study (Exhibit D). Volume 4: Operations analyses

Using a coplanar, end-mounted antenna as a baseline, various configuration trades were performed to select a preferred solid state concept. The increase in efficiency that could be realized by use of multi bandgap solar cells, either with klystron or solid state antenna was evaluated. Satellite configurations were developed to exploit the sandwich antenna concept wherein solar cells are located on one side of the antenna panel and solid state dc/RF converters on the other side. These concepts entailed various primary and secondary reflector arrangements for directing solar energy to the solar cell side of the antenna with higher concentration ratios than used on the coplanar configurations. Operations analysis included development of a satellite construction scenario, a concept for the SCB, a top-level satellite construction operation, construction operation, construction timelines and crew sizes, mass flows to orbit, and a satellite maintenance scenario. The list of materials required for satellite construction was updated to identify significant differences relevant to the solid state satellite concept. Means of decommissioning satellites at the end of their design life were studied.

Hanley, G. M.↗

Satellite services system analysis study. Volume 1, part 2: Executive summary

The early mission model was developed through a survey of the potential user market. Service functions were defined and a group of design reference missions were selected which represented needs for each of the service functions. Servicing concepts were developed through mission analysis and STS timeline constraint analysis. The hardware needs for accomplishing the service functions were identified with emphasis being placed on applying equipment in the current NASA inventory and that in advanced stages of planning. A more comprehensive service model was developed based on the NASA and DoD mission models segregated by mission class. The number of service events of each class were estimated based on average revisit and service assumptions. Service Kits were defined as collections of equipment applicable to performing one or more service functions. Preliminary design was carrid out on a selected set of hardware needed for early service missions. The organization and costing of the satellie service systems were addressed.

Source record↗

Life sciences passive GN2 freezer thermal performance test

Thermal performance tests that were conducted on the life sciences passive GN2 freezer project are summarized as well as the improvements to the freezers to improve the thermal performance of the containers. Procedures were developed, based upon these tests, to initially charge the freezers with LN2 and verify that the freezer performance is adequate for the mission duration. Improvements were made to the corvac sample tube to limit the amount of breakage due to thermal expansion of the liquid during freezing. A method of verifying the freezer vacuum insulative integrity was defined as well as a procedure for refurbishment of the internal vacuum level. Freezer modifications were made to ease the reevacuation of the containers. The orientation of the freezer in a 1-G environment, after being charged, had to remain in a vertical position. The LN2 boiloff rate increased significantly in a horizontal position. This resulted in a stowage definition in the spacecraft prior to launch. Functional testing, using the SL-1 mission timeline showed that the freezer will maintain samples in the frozen state for the duration of the mission.

Belshaw, G. W.↗

SPS construction perspective. Summary

Projections concerning the general construction requirements for a solar power satellite (SPS) are summarized. It is recognized that the ability to construct an SPS must be developed through an evolutionary process. This process would begin with shuttle operations and when construction timelines exceed the shuttle capability, small manned bases in low Earth orbit (LEO) would be used. The influence of construction methods on design, assembly bases, and crew considerations are addressed.

Benson, H.↗