Search NASA⌕ Search

SEARCH · Search NASA

Results for “Well Plugging”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

738 records · Page 41

Voltron Compatible Whole Building Root-Fault Detection and Diagnosis

Buildings consume more than 40% of primary energy in the U.S. Malfunctioning sensors, components, and control systems, as well as degrading components in Heating, Ventilating and Air-conditioning (HVAC) and lighting systems are main reasons for energy waste and unsatisfactory indoor environment. Field studies have shown that an energy saving of 5-30% of total building energy consumption and improved indoor air quality can be achieved by simply applying automated fault detection and diagnosis (AFDD), followed by corrections even if these are not done in real time. Extensive research has been made on the development of component level AFDD tools in the past two decades. However, in recent years, the development of method for a whole building level AFDD has received much attention. Here, a whole building fault refers to a fault happening in one subsystem but impact on more than one subsystems, or has a significant impact on building performances, such as building’s energy consumption. Existing component level AFDD tools could fail to detect or give false alarm for faults that trigger abnormalities in multiple subsystems. Isolating such whole building faults, which have impacts on multiple subsystems, is also challenging by simply using component based AFDD solutions. On the other hand, it might be more cost-effective for medium- or small-sized commercial buildings that have subsystems (e.g. primary cooling subsystem, air loop subsystem, heating subsystem, lighting subsystem, etc.) to install one whole building level AFDD tool, rather than many component level AFDD tools, to focus on significant faults. The focus of this project is firstly to provide training opportunities in building AFDD research area for undergraduate students and to develop a workforce pipeline in building sciences. The objective of the proposed research activities is to develop cost-effective and scalable AFDD solutions for whole building level faults. The developed AFDD solution is VOLTTRONTM compatible to further increase its plug-n-play capacity and the market penetration. VOLTTRONTM is an open-source innovative distributed control and sensing software platform developed by the Pacific Northwest National Laboratory. A VOLTTRONTM compatible AFDD tool brings the benefits such as low-cost deployment, and better building to grid integration, etc. The performance of the developed whole building AFDD tools is evaluated using data collected from a mixed-use medium-sized university campus building. Another significant goal of this project is to engage undergraduate students in research activities and expose them to building control and AFDD fields. A demonstration building – Nesbitt Hall at Drexel University is identified for this study. This demonstration building has a typical HVAC system configuration, which includes a water-cooled chiller system, three variable air volume (VAV) air handling unit (AHU) systems, and a hydronic heating system. Faults, that are expected to have a whole building level impact, are artificially implemented in this demonstration building for three different seasons. Building data have been collected in this project, which include fault free building automation system (BAS) data and BAS data that contain system behaviors caused by artificially implemented and naturally occurred faults. These collected data are used to evaluate the developed whole building AFDD tools. A data-driven method, which includes a weather and schedule-based pattern matching (WPM) method and Feature based Principal Component Analysis (FPCA) method, is developed for whole building level fault detection. Parameter sensitivity tests, including snapshot window size, data sample searching pool size, etc., are implemented to evaluate the impacts of various WPM-FPCA parameters. A data-driven and expert knowledge/rule-based method using Bayesian Network (BN) and WPM is developed for whole building level fault diagnosis. The developed WPM-BN method, which includes a two-layer BN structure model and BN parameters, are either learned from baseline data or developed from expert knowledge. The developed whole building AFDD tools are evaluated using BAS data collected from the demonstration building. Using the evaluation data set, the WPM-FPCA fault detection method is evaluated under two different Principle Component (PC) retention rates, i.e., 0.65 retention rate and 0.95 retention rate. It is observed that when using 0.65 PC retention rate, the WPM-FPCA fault detection method achieves a 79% fault detection rate (this rate reaches to 85% when including the six make-up fault test cases discussed in the next bullet), while when using 0.95 PC retention rate, the WPM-FPCA fault detection method achieves 100% fault detection rate (this rate remains to be 100% when including the six make-up fault test cases). Under both PC retention rates, the WPM-FPCA fault detection method demonstrates 0% false alarm rates. Using the evaluation data set, the developed WPM-BN fault diagnosis method has successfully diagnosed thirteen (13) faults out of the fourteen (14) fault test cases. The one mis-diagnosed case exhibits fewer fault symptoms in different subsystems, when compared with other fault test cases. Overall speaking, the developed whole building AFDD solutions demonstrate satisfactory fault detection/diagnosis accuracy with very low false alarm rate. Lastly, a survey and market study has been performed to understand the existing AFDD market, including its gaps and needs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The pre-conceptual design of the nuclear island of ASTRID

The CEA is involved in a substantial effort on the ASTRID (Advanced Sodium Technological Reactor for Industrial Demonstration) pre-conceptual design in cooperation with EDF, as experienced Sodium-cooled Fast Reactor (SFR) operator, AREVA, as experienced SFR Nuclear Island engineering company and components designer, ALSTOM POWER as energy conversion system designer and COMEX NUCLEAIRE as mechanical systems designer. The CEA is looking for other partnerships, in France and abroad. The ASTRID preliminary design is based on a sodium-cooled pool reactor of 1500 MWth generating about 600 MWe, which is required to guarantee the representativeness of the reactor core and the main components with regard to future commercial reactors. ASTRID lifetime target is 60 years. Two Energy Conversion Systems are studied in parallel until the end of 2012: Rankine steam cycle or Brayton gas based energy conversion cycle. ASTRID design is guided by the following major objectives: improved safety, simplification of structures, improved In Service Inspection and Repair (ISIR), improved manufacturing conditions for cost reduction and increased quality, reduction of risks related to sodium fires and water/sodium reaction, and improved robustness against external hazards. The core is supported by a diagrid, which lay on a strong back to transfer the weight to the main vessel. AREVA is involved in a substantial effort in order to improve the core support structure in particular regarding the ISIR and the connection to primary pump. In the preliminary design, the primary system is formed by the main vessel and the upper closure comprising the reactor roof, two rotating plugs - used for fuel handling - and the components plugs located in the roof penetrations. The Above Core Structure deflects the sodium flow in the hot pool and provides support to core instrumentation and guidance of the control rod drive mechanisms. The number of the major components in the main vessel, primary pumps, Intermediate Heat Exchangers, and Decay Heat Exchangers are now under consideration. Under normal conditions, power release is achieved using the steam/water plant (in case of Rankine steam cycle) or the gas plant (in case of Brayton gas cycle). The diverse design and operating modes of Decay Heat Removal systems provide protection against common cause failures. A Decay Heat Removal system through the reactor vault is in particular studied with the objective to complement Direct Reactor Cooling systems. At this stage of the studies, the secondary system comprises four independent sodium loops (two and three sodium loops configurations are also investigated). Each loop includes one mechanical pump (or a large capacity Annular Linear Induction Electromagnetic Pump), and three modular Steam Generator Units characterized by once through straight tube units with a ferritic tube bundle; nevertheless, helical coil steam generator with tubes made of Alloy 800, and inverted type steam generator with a ferritic tube bundle are also investigated. The limited power of each modular Steam Generator Unit allows the whole secondary loop to withstand a large water/sodium reaction consecutive to the postulated simultaneous rupture of all the heat exchange tubes of one module. The arrangement of the components is based on the 'Regain' concept, in which the secondary pump is situated at a low level in the circuit; conventional arrangement, as SUPERPHENIX type, is a back-up option. Alternative arrangements based on gas cycles are also studied together with Na-gas heat exchanger design. This paper presents a status of the ASTRID pre-conceptual design. The most promising options are highlighted as well as less risky and back-up options. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Future Cost Benefits Analysis for Electrified Vehicles from Advances Due to U.S. Department of Energy Targets

The U.S. Department of Energy’s Vehicle Technologies Office (DOE-VTO) supports research and development (R&D), as well as deployment of efficient and sustainable transportation technologies, that will improve energy efficiency and fuel economy and enable America to use less petroleum. To accelerate the creation and adoption of new technologies, DOE-VTO has developed specific targets for a wide range of powertrain technologies (e.g., engine, battery, electric machine, lightweighting, etc.). This paper quantifies the impact of VTO R&D on vehicle energy consumption and cost compared to expected historical improvements across vehicle classes, powertrains, component technologies and timeframes. We have implemented a large scale simulation process to develop and simulate tens of thousands of vehicles on U.S. standard driving cycles using Autonomie, a vehicle simulation tool developed by Argonne National Laboratory. Results demonstrate significant additional reductions in both cost and energy consumption due to the existence of VTO R&D targets compared to predicted historical trends. It is observed that, over time, the fuel consumption of different electrified vehicles is expected to decrease by 40–50% and a reduction of 45–55% for vehicle manufacturing costs owing to significant improvements through various VTO R&D targets.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

BLENDING STUDY FOR SRR SALT DISPOSITION INTEGRATION: TANK 50H SCALE-MODELING AND COMPUTER-MODELING FOR BLENDING PUMP DESIGN, PHASE 2

The Salt Disposition Integration (SDI) portfolio of projects provides the infrastructure within existing Liquid Waste facilities to support the startup and long term operation of the Salt Waste Processing Facility (SWPF). Within SDI, the Blend and Feed Project will equip existing waste tanks in the Tank Farms to serve as Blend Tanks where 300,000-800,000 gallons of salt solution will be blended in 1.3 million gallon tanks and qualified for use as feedstock for SWPF. Blending requires the miscible salt solutions from potentially multiple source tanks per batch to be well mixed without disturbing settled sludge solids that may be present in a Blend Tank. Disturbing solids may be problematic both from a feed quality perspective as well as from a process safety perspective where hydrogen release from the sludge is a potential flammability concern. To develop the necessary technical basis for the design and operation of blending equipment, Savannah River National Laboratory (SRNL) completed scaled blending and transfer pump tests and computational fluid dynamics (CFD) modeling. A 94 inch diameter pilot-scale blending tank, including tank internals such as the blending pump, transfer pump, removable cooling coils, and center column, were used in this research. The test tank represents a 1/10.85 scaled version of an 85 foot diameter, Type IIIA, nuclear waste tank that may be typical of Blend Tanks used in SDI. Specifically, Tank 50 was selected as the tank to be modeled per the SRR, Project Engineering Manager. SRNL blending tests investigated various fixed position, non-rotating, dual nozzle pump designs, including a blending pump model provided by the blend pump vendor, Curtiss Wright (CW). Primary research goals were to assess blending times and to evaluate incipient sludge disturbance for waste tanks. Incipient sludge disturbance was defined by SRR and SRNL as minor blending of settled sludge from the tank bottom into suspension due to blending pump operation, where the sludge level was shown to remain constant. To experimentally model the sludge layer, a very thin, pourable, sludge simulant was conservatively used for all testing. To experimentally model the liquid, supernate layer above the sludge in waste tanks, two salt solution simulants were used, which provided a bounding range of supernate properties. One solution was water (H{sub 2}O + NaOH), and the other was an inhibited, more viscous salt solution. The research performed and data obtained significantly advances the understanding of fluid mechanics, mixing theory and CFD modeling for nuclear waste tanks by benchmarking CFD results to actual experimental data. This research significantly bridges the gap between previous CFD models and actual field experiences in real waste tanks. A finding of the 2009, DOE, Slurry Retrieval, Pipeline Transport and Plugging, and Mixing Workshop was that CFD models were inadequate to assess blending processes in nuclear waste tanks. One recommendation from that Workshop was that a validation, or bench marking program be performed for CFD modeling versus experiment. This research provided experimental data to validate and correct CFD models as they apply to mixing and blending in nuclear waste tanks. Extensive SDI research was a significant step toward bench marking and applying CFD modeling. This research showed that CFD models not only agreed with experiment, but demonstrated that the large variance in actual experimental data accounts for misunderstood discrepancies between CFD models and experiments. Having documented this finding, SRNL was able to provide correction factors to be used with CFD models to statistically bound full scale CFD results. Through the use of pilot scale tests performed for both types of pumps and available engineering literature, SRNL demonstrated how to effectively apply CFD results to salt batch mixing in full scale waste tanks. In other words, CFD models were in error prior to development of experimental correction factors determined during this research, which provided a technique to use CFD models for salt batch mixing and transfer pump operations. This major scientific advance in mixing technology resulted in multi-million dollar cost savings to SRR. New techniques were developed for both experiment and analysis to complete this research. Supporting this success, research findings are summarized in the Conclusions section of this report, and technical recommendations for design and operation are included in this section of the report.

08 HYDROGEN↗

Proton Exchange Membrane (PEM) Water Electrolysis: Cell-Level Considerations for Gigawatt-Scale Deployment

Hydrogen produced with no greenhouse gas emissions is termed “green hydrogen” and will be essential to reaching decarbonization targets set forth by nearly every country as per the Paris Agreement. Proton exchange membrane water electrolyzers (PEMWEs) are expected to contribute substantially to the green hydrogen market. However, PEMWE market penetration is insignificant, accounting for less than a gigawatt of global capacity. Achieving substantive decarbonization via green hydrogen will require PEMWEs to reach capacities of hundreds of gigawatts by 2030. This paper serves as an overarching roadmap for cell-level improvements necessary for gigawatt-scale PEMWE deployment, with insights from three well-established hydrogen technology companies included. Analyses will be presented for economies of scale, renewable energy prices, government policies, accelerated stress tests, and component-specific improvements.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Analyzing The Impacts of the Biogas-to-Electricity Purchase Incentives on Electric Vehicle Deployment with the MA3T Vehicle Choice Model

This analysis represents the biogas-to-electricity pathway under the Renewable Fuel Standard (RFS) as a point of purchase incentive and tests the impact of this incentive on EV deployment using a vehicle consumer choice model. The credit value generated under this policy was calculated in a number of scenarios based on electricity use of each power train choice on a yearly basis over the 15 year vehicle lifetime, accounting for the average electric vehicle miles travelled and vehicle efficiency, competition for biogas-derived electricity among electric vehicles (EVs), the RIN equivalence value and the time value of money. The credit value calculation in each of these scenarios is offered upfront as a point of purchase incentive for EVs using the Market Acceptance of Advanced Automotive Technologies (MA3T) vehicle choice model, which tracks sales, fleet size and energy use over time. The majority of the scenarios use a proposed RIN equivalence value, which increases the credit value as a way to explore the analysis space. Additional model runs show the relative impact of the equivalence value on EV deployment. The MA3T model output shows that a consumer incentive accelerates the deployment of EVs for all scenarios relative to the baseline (no policy) case. In the scenario modeled to represent the current biogas-to-electricity generation capacity (15 TWh/year) with a 5.24kWh/RIN equivalence value, the policy leads to an additional 1.4 million plug-in hybrid electric vehicles (PHEVs) and 3.5 million battery electric vehicles (BEVs) in 2025 beyond the no-policy case of 1.3 million PHEVs and 2.1 million BEVs when the full value of the credit is passed on to the consumer. In 2030, this increases to 2.4 million PHEVs and 7.3 million BEVs beyond the baseline. This larger impact on BEVs relative to PHEVs is due in part to the larger credit that BEVs receive in the model based on the greater percentage of electric vehicle miles traveled by BEVs relative to PHEVs. In this scenario 2025 also represents the last year in which biogas-derived electricity is able to fully supply the transportation electricity demand in the model. After 2025, the credit value declines on a per vehicle basis. At the same time a larger fraction of the credit may shift towards biogas producers in order to incent additional biogas production. The expanded 41 TWh/year biogas availability scenarios represent an increase beyond today s generation capacity and allow greater eRIN generation. With a 5.24kWh/RIN equivalence value, when all of the credit is directed towards reducing vehicle purchase prices, the 41 TWh/year biogas scenario results in 4.1 million additional PHEVs and 12.2 million additional BEVs on the road in 2030 beyond the baseline of 2.5 million PHEVs and 6.1 million BEVs. Under this expanded biogas capacity, biogas-derived electricity generation is able to fully supply electricity for a fleet of over 21 million EVs (15.6 million BEVs and 5.8 million PHEVs) on a yearly basis. In addition to assessing the full value credit scenarios described above, multiple scenarios were analyzed to determine the impact if only a fraction of the credit value was passed on to the consumer. In all of these cases, the EV deployment was scaled back as the fraction of the credit that was passed on to the consumer was reduced. These scenarios can be used to estimate the impact if the credit value is reduced in other ways as well, as demonstrated by the scenarios where the current (22.6 kWh/RIN) equivalence value was used. The EV deployment that results from an equivalence value of 22.6 kWh/RIN equivalence value is roughly equivalent to the EV deployment observed in the 25% case using the 5.24 kWh/RIN equivalence value. A higher equivalence value means that a smaller number of credits, and therefore value, is created for each kWh, and therefore the impact on EV deployment is reduced. This analysis shows several of the drivers that will impact eRIN generation and credit value, and tests the impact of an eRIN point of purchase incentive on EV deployment. This additional incentive can accelerate the deployment of EVs when it is used to reduce vehicle purchase prices. However, the ultimate impact of this policy, as modeled here, will be determined by future RIN prices, the extent to which eRIN credit value can be passed on to the consumer as a point of purchase incentive and the equivalence value.

09 BIOMASS FUELS↗

Remediation of Mercury-Contaminated Storm Sewer Sediments from the West End Mercury Area at the Y-12 National Security Complex in Oak Ridge, Tennessee - 12061

The Y-12 National Security Complex in Oak Ridge, TN has faced an ongoing challenge from mercury entrapped in soils beneath and adjacent to buildings, storm sewers, and process pipelines. Previous actions to reduce the quantity and/or mobilization of mercury-contaminated media have included plugging of building floor drains, cleaning of sediment and sludge from sumps, manholes, drain lines, and storm sewers, lining/relining of storm sewers and replacement of a portion of the storm sewer trunk line, re-routing and removal of process piping, and installation of the Central Mercury Treatment System to capture and treat contaminated sump water. Despite the success of these actions, mercury flux in the storm sewer out-falls that discharge to Upper East Fork Poplar Creek (UEFPC) continues to pose a threat to long-term water quality. A video camera survey of the storm sewer network revealed several sections of storm sewer that had large cracks, separations, swells, and accumulations of sediment/sludge and debris. The selected remedy was to clean and line the sections of storm sewer pipe that were determined to be primary contributors to the mercury flux in the storm sewer out-falls. The project, referred to as the West End Mercury Area (WEMA) Storm Sewer Remediation Project, included cleaning sediment and debris from over 2,460 meters of storm sewer pipe followed by the installation of nearly 366 meters of cure-in-place pipe (CIPP) liner. One of the greatest challenges to the success of this project was the high cost of disposal associated with the mercury-contaminated sludge and wastewater generated from the storm sewer cleaning process. A contractor designed and operated an on-site wastewater pre-treatment system that successfully reduced mercury levels in 191 cubic meters of sludge to levels that allowed it to be disposed at Nevada Nuclear Security Site (NNSS) disposal cell as a non-hazardous, low-level waste. The system was also effective at pre-treating over 1,514,000 liters of wastewater to levels that met the waste acceptance criteria for the on-site West End [wastewater] Treatment Facility (WETF). This paper describes the storm sewer cleaning and lining process and the methods used to process the mercury-contaminated sludge and wastewater, as well as several 'lessons learned' that would be relevant to any future projects involving storm sewer cleaning and debris remediation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Conversion of METL Diagnostic Flowmeters to Permanent Magnet Based Electromagnetic Flowmeters

The Mechanisms Engineering Test Loop (METL) uses three flowmeters to monitor sodium circulation through the main loop, the Cold Trap leg, and the Plugging Meter leg. When constructed, the Cold Trap flowmeter (CTFM) and Plugging Meter flowmeter (PMFM) were equipped with permanent magnets and Hall Sensors. By October of 2019, during normal operations, both the CTFM and PMFM failed, producing either erroneous or zero signals. Repairs to the flowmeters were attempted in January of 2020 but failed to resolve the issues. Therefore, starting in March of 2021, a plan was developed to convert the installed flowmeters to more robust permanent magnet based electromagnetic flowmeters (EMFMs). The Cold Trap EMFM (CT EMFM) and Plugging Meter EMFM (PM EMFM) were fully installed by August of 2021. Initial testing and commissioning were completed in November of 2021. Finally, the first calibration runs were finished in March of 2022. This report discusses the design, conversion, and calibration of the as-built CTFM and PMFM to robust permanent magnet based EMFMs. During the design phase, theoretical models were used to estimate the signal output and required magnet sizes. Then, the CTFM and PMFM were disassembled and converted to EMFMs. After commissioning, the CT EMFM and PM EMFM were calibrated using a ‘Time Transfer Procedure’ carried out with METL Expansion Vessels and Test Vessel Two. The accuracy of the calibration was estimated through an uncertainty analysis. Finally, the report describes some lessons learned for future flowmeter conversions and follow-up work. In total, both METL EMFM’s met the desired performance targets. Testing data showed that the METL EMFMs provide a output signal of roughly 2 mV at 1 GPM and 250 °C. During calibration, flowrates between 0.7 GPM and 2.4 GPM were achieved. In this flow range, calibration coefficients of 0.485 and 0.935 were measured as with errors ranging from 15-5% and 16-5% for the CT EMFM and PM EMFM, respectively. Above 1.5 GPM, the error was assumed to be about 5% for both METL EMFMs. Several points will be considered for future follow-up work on the METL EMFM’s. First, the signal noise issues in the PM EMFM will be addressed. It is likely the source of the noise is due to some stray EMF from a heater. Secondly, the NdFeB magnets will be replaced with a grade that has a Curie temperature above 80 °C. For example, a few grades of NeFeB magnets have Curie temperatures which exceed 150 °C and some SmCo magnets have Curie temperatures as high as 500 °C. Third, more calibration runs will be completed in the range of 0.5-2.5 GPM. This will further improve the accuracy of the calibration coefficient. Fourth, calibration runs will be completed up to 5 GPM. This requires a larger pressure relief valve to be installed on the Expansion Vessel and Test Vessel 2, as well as a revised calibration procedure. Lastly, calibration runs will be completed to account for cold spots in the system, which reduced the inlet temperature of the METL EMFMs. Overall, these points will improve the calibration coefficients derived in this work and also improve the performance of the METL EMFMs.

42 ENGINEERING↗

Using Electric Vehicles to Meet Balancing Requirements Associated with Wind Power

Many states are deploying renewable generation sources at a significant rate to meet renewable portfolio standards. As part of this drive to meet renewable generation levels, significant additions of wind generation are planned. Due to the highly variable nature of wind generation, significant energy imbalances on the power system can be created and need to be handled. This report examines the impact on the Northwest Power Pool (NWPP) region for a 2019 expected wind scenario. One method for mitigating these imbalances is to utilize plug-in hybrid electric vehicles (PHEVs) or battery electric vehicles (BEVs) as assets to the grid. PHEVs and BEVs have the potential to meet this demand through both charging and discharging strategies. This report explores the usage of two different charging schemes: V2GHalf and V2GFull. In V2GHalf, PHEV/BEV charging is varied to absorb the additional imbalance from the wind generation, but never feeds power back into the grid. This scenario is highly desirable to automotive manufacturers, who harbor great concerns about battery warranty if vehicle-to-grid discharging is allowed. The second strategy, V2GFull, varies not only the charging of the vehicle battery, but also can vary the discharging of the battery back into the power grid. This scenario is currently less desirable to automotive manufacturers, but provides an additional resource benefit to PHEV/BEVs in meeting the additional imbalance imposed by wind. Key findings in the report relate to the PHEV/BEV population required to meet the additional imbalance when comparing V2GHalf to V2GFull populations, and when comparing home-only-charging and work-and-home-charging scenarios. Utilizing V2GFull strategies over V2GHalf resulted in a nearly 33% reduction in the number of vehicles required. This reduction indicates fewer vehicles are needed to meet the unhandled energy, but they would utilize discharging of the vehicle battery into the grid. This practice currently results in the voiding of automotive manufacturer's battery warranty, and is not feasible for many customers. The second key finding is the change in the required population when PHEV/BEV charging is available at both home and work. Allowing 10% of the vehicle population access to work charging resulted in nearly 80% of the grid benefit. Home-only charging requires, at best, 94% of the current NWPP light duty vehicle fleet to be a PHEV or BEV. With the introduction of full work charging availability, only 8% of the NWPP light duty vehicle fleet is required. Work charging has primarily been associated with mitigating range anxiety in new electric vehicle owners, but these studies indicate they have significant potential for improving grid reliability. The V2GHalf and V2GFull charging strategies of the report utilize grid frequency as an indication of the imbalance requirements. The introduction of public charging stations, as well as the potential for PHEV/BEVs to be used as a resource for renewable generation integration, creates conditions for additional products into the ancillary services market. In the United Kingdom, such a capability would be bid as a frequency product in the ancillary services market. Such a market could create the need for larger, third-party aggregators or services to manage the use of electric vehicles as a grid resource. Ultimately, customer adoption, usage patterns and habits, and feedback from the power and automotive industries will drive the need.

17 WIND ENERGY↗

A Study Of Geological Disposal Facility (GDF) Ageing Phenomena In Bentonite - 17605

Since the 1950's, the UK's nuclear activity in energy, defence and medicine has led to the accumulation of a large amount of higher activity radioactive waste (HAW). Most of nuclear waste arises in a wide variety of physical and chemical forms with different radioisotopes and loadings. Due to complexity in HAW, it is imperative that there be a rigorous management system that ensures population and environmental safety over extended periods. The concept of Deep Geological Disposal of waste in a stable geological formation is, nowadays, an internationally accepted solution as the surest and the most viable long term method for management. Any future Geological Disposal Facility (GDF) will comprise, among other artificial and natural engineered barriers, a barrier immediately around the waste containers compounded by a sealing material. The long-term stability of a GDF will be determined by the design and construction of the engineered barriers, and the mechanical, hydraulic and geochemical interactions that may happen between the different engineered components as a result of combined processes such as the heat produced by radioactive decay and the ion water composition of the surrounding host rock. Bentonite clay has been selected as the most promising buffer and backfill material in many disposal programmes because of its swelling capacity, low permeability, plasticity and cation exchange capacity. In the nuclear scope, bentonite testing at different scale-lengths (laboratory and field scale) has been performed and implemented in order to examine the thermo-hydro-mechanical (THM) and thermo-hydro-geochemical (THG) processes that may happen in the engineered barriers and geological settings associated with a GDF. Two major European field scale tests have been performed to better understand bentonite performance and behaviour immediately after HAW emplacements. The Full-Scale Engineered Barriers Experiment (FEBEX) at the Grimsel Test Sit (Switzerland) and the Alternative Buffer Material (ABM) Project at the Aespoe Hard Rock Laboratory (Sweden). The Febex Experiment was a pilot project designed for 'field research' of HAW repository hosted in crystalline rock where surrogate HAW canisters were placed horizontally in drifts, surrounded by compacted blocks of bentonite, sealed by a concrete plug and maintaining a constant canister surface temperature of 100 deg. C. After five years of operation, a partial dismantling was carried out in 2002. Heater processes occurring in the surrounding bentonite. The dismantling of the heater no. 2 (after 18 years of operation) started in late 2014 and is planned to be finished at the end of 2016 (termed FEBEX-DP). The FEBEX Project utilised bentonite from the Cortijo de Archidona deposit (Almeria, Spain). This 'Febex' bentonite is sourced from calcium-magnesium montmorillonite with good properties in relation to swelling capacity, permeability, adsorption capacity, and thermal conductivity. The ABM Project is a large-scale programme that has been running since 2006. The programme is designed to study a suite of possible buffer materials and correlate the physical and chemical properties of eleven different types of bentonites to their fundamental mineralogical properties. The ABM test consists in three 'packages' containing a central heater tube surrounded by different pre-compacted bentonite blocks and instrumentation. Each 'package' was installed in separate boreholes. The target temperature for the surface of the heated tubes in contact with the bentonite was 130 deg. C. Both FEBEX and ABM test the bentonite was saturated with water percolating from surrounding host rock (FEBEX and ABM) and also via artificial supply systems (ABM), being the water itself acting as a long term corrosion agent. For both experiments and emerging interest is in the interaction of bentonite with metallic components, under geological disposal conditions are not considered to be thermodynamically stable and hence arising corrosion products could interact with the buffer. These interactions depend on various factors such as the redox potential, temperature, pH, solute concentration and buffer material characteristics. During the operational phases of the FEBEX and ABM and after its 'closure' a significant volume of air was found to be retained in the bentonite. Under these conditions a period of initial aerobic corrosion by the air in the bentonite barrier would have occurred followed by establishment of anaerobic corrosion would be the dominant process ongoing. The anaerobic corrosion began when the bentonite became water saturated. Under these conditions, the water acted as the major oxidant. The present project focuses on the characterization of samples arising from the FEBEX and ABM Projects as well as performing additional independent experiments designed to complement these prior studies. Characterization will focus mainly on corrosion related alteration combined with thermal effects. Through detailed sample characterization, the intention is to achieve a greater knowledge regarding the changes to the bentonite under the experimental conditions to which it was exposed, and plausible alterations in its THM and THG properties occurring during the experiment due to blended effects of temperature,water content, engineering structural components and solutes are also to be measured. The fulfilment of a large-scale 'in-situ' test is intricate, time-consuming and with an abundance of external variables that are not always well controlled. For this reason, the University of Bristol is performing a series of well constrained time-resolved laboratory tests which bentonite is being subjected to different possible scenarios that may happen whilst in a HAW repository. In virtue of this experiment, the UoB aims to understand the illitisation and cementation process and their effects on bentonite safety properties. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hydrogeologic Modeling at the Sylvania Corning FUSRAP Site - 13419

A comparative groundwater hydrogeologic modeling analysis is presented herein to simulate potential contaminant migration pathways in a sole source aquifer in Nassau County, Long Island, New York. The source of contamination is related to historical operations at the Sylvania Corning Plant ('Site'), a 9.49- acre facility located at 70, 100 and 140 Cantiague Rock Road, Town of Oyster Bay in the westernmost portion of Hicksville, Long Island. The Site had historically been utilized as a nuclear materials manufacturing facility (e.g., cores, slug, and fuel elements) for reactors used in both research and electric power generation in early 1950's until late 1960's. The Site is contaminated with various volatile organic and inorganic compounds, as well as radionuclides. The major contaminants of concern at the Site are tetrachloroethene (PCE), trichloroethene (TCE), nickel, uranium, and thorium. These compounds are present in soil and groundwater underlying the Site and have migrated off-site. The Site is currently being investigated as part of the Formerly Utilized Sites Remedial Action Program (FUSRAP). The main objective of the current study is to simulate the complex hydrogeologic features in the region, such as numerous current and historic production well fields; large, localized recharge basins; and, multiple aquifers, and to assess potential contaminant migration pathways originating from the Site. For this purpose, the focus of attention was given to the underlying Magothy formation, which has been impacted by the contaminants of concern. This aquifer provides more than 90% of potable water supply in the region. Nassau and Suffolk Counties jointly developed a three-dimensional regional groundwater flow model to help understand the factors affecting groundwater flow regime in the region, to determine adequate water supply for public consumption, to investigate salt water intrusion in localized areas, to evaluate the impacts of regional pumping activity, and to better understand the contaminant transport and fate mechanisms through the underlying aquifers. This regional model, developed for the N.Y. State Department of Environmental Conservation (NYSDEC) by Camp Dresser and McKee (CDM), uses the finite element model DYNFLOW developed by CDM, Cambridge, Massachusetts. The coarseness of the regional model, however, could not adequately capture the hydrogeologic heterogeneity of the aquifer. Specifically, the regional model did not adequately capture the interbedded nature of the Magothy aquifer and, as such, simulated particles tended to track down-gradient from the Site in relatively straight lines while the movement of groundwater in such a heterogeneous aquifer is expected to proceed along a more tortuous path. This paper presents a qualitative comparison of site-specific groundwater flow modeling results with results obtained from the regional model. In order to assess the potential contaminant migration pathways, a particle tracking method was employed. Available site-specific and regional hydraulic conductivity data measured in-situ with respect to depth and location were incorporated into the T-PROG module in GMS model to define statistical variation to better represent the actual stratigraphy and layer heterogeneity. The groundwater flow characteristics in the Magothy aquifer were simulated with the stochastic hydraulic conductivity variation as opposed to constant values as employed in the regional model. Contaminant sources and their exact locations have been fully delineated at the Site during the Remedial Investigation (RI) phase of the project. Contaminant migration pathways originating from these source locations at the Site are qualitatively traced within the sole source aquifer utilizing particles introduced at source locations. Contaminant transport mechanism modeled in the current study is based on pure advection (i.e., plug flow) and mechanical dispersion while molecular diffusion effects are neglected due to relatively high groundwater velocities encountered in the aquifer. In addition, fate of contaminants is ignored hereby to simulate the worst-case scenario, which considers the contaminants of concern as tracer-like compounds for modeling purposes. The results of the modeling analysis are qualitatively compared with the County's regional model, and patterns of contaminant migration in the region are presented. (authors)

54 ENVIRONMENTAL SCIENCES↗

Hamilton: Flexible, Open Source $10 Wireless Sensor System for Energy Efficient Building Operation

Sensors for improving building performance are rapidly populating the market, driven in part by the drive to reduce greenhouse gas emissions resulting from energy production as well as improve the interior environment for healthy and more productive spaces. UC Berkeley has led wireless sensor development over the past 25 years (e.g., Telos mote), with the Hamilton (named after Alexander Hamilton on the US $10 bill) as the most recent. The Hamilton sensor was designed as a low-cost high-performance sensor that is modular and interoperable. The objective of the Hamilton project was to create, evaluate and establish the technological foundations for secure and easy to deploy building energy efficiency applications utilizing pervasive, low-cost wireless sensors integrated with traditional Building Management Systems (BMS), consumer-sector building components, and powerful data analytics. The project included iterative hardware design, incorporating a high-performance database (BTrDb, http://btrdb.io/), creating and iterating the development of secure data middleware (BOSSwave, WAVE/WAVEMQ), working with and pushing the development of an open-source tiny operating system RiotOS, and implementing and improving protocols such as Thread/OpenThread and TCP/IP. The hardware benefited from careful design to drive down the cost; the design included a System-on-a-Chip (SoC), chip antenna, single crystal and five passive components. Careful design of the operating system created a low-power design to enable a long life with small batteries. The hardware included several sensors: temperature, radiant temperature, relative humidity, magnetometer, accelerometer, and light, with an optional occupancy (Passive InfraRed) sensor. The project was the basis of several applications, both internal to the research team and other researchers and professionals at other institutions. Several applications used the sensor hardware as the basis for other complex devices. Other applications used the sensors to improve building performance through interoperating with the building Heating Ventilation and Air-Conditioning (HVAC) system, such as using occupancy and/or distributed temperature sensing to reduce HVAC zone energy while still providing thermal comfort and to reduce peak loads in small commercial buildings. We demonstrated cloud-based energy analytics, implemented a schedule and a Model Predictive Controller in a small commercial building to optimize HVAC energy, occupancy and electricity price. Initial integration of these technological innovations was performed through the creation of execution containers containing the WAVE agent and various driver, proxy, or building system function logic. The research added to the understanding of efficient sensor hardware, secure middleware, time-series data management (high performance database), efficient communication protocols, and interoperating with applications and building systems. The project showed the technical effectiveness and economic feasibility of creating a low-cost, modular, and easy-to-deploy sensor. Through conversations with multiple end users, the research team discovered that many customers wanted data management and services in addition to the sensors. HamiltonIOT developed packages of sensors, border router, and data services to provide a seamless “plug-and-play” sensor deployment. Some customers were willing to pay for higher quality sensors (such as light); some customers wanted a robust enclosure (waterproof).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Deep Borehole Disposal Research in the United States - 17427

The U.S. Department of Energy (DOE) Office of Nuclear Energy (NE) manages a research and development (R and D) program for the disposal of spent nuclear fuel and high-level radioactive waste in the United States. Deep boreholes are being evaluated for disposal of some smaller DOE-managed waste as an alternative to disposal in a mined geologic repository. The deep borehole disposal concept consists of drilling borehole(s) to a total depth of about 5,000 m (16,400 ft - or greater than three miles) into crystalline basement rock, placing waste packages in the lower emplacement zone portion of the borehole, and sealing and plugging the upper portion of the borehole. The required bottom-hole diameter of the borehole(s) depends on the waste package configuration for the reference concept, but ranges from 22 to 43 cm (8.5 to 17 inches). Additional research and development is desired in several important areas for further consideration of deep borehole disposal of radioactive waste. A Deep Borehole Field Test (DBFT) will be conducted by DOE to further assess the viability of deep borehole disposal as an alternative for the disposal of smaller DOE-managed waste forms. The DBFT will be used to evaluate three main areas: 1) evaluation of the capability for drilling and construction of deep, large-diameter boreholes; 2) downhole scientific analyses to assess hydrogeochemical conditions that control waste stability and containment; and 3) engineering activities to assess the viability and safety of waste package emplacement and retrieval in deep boreholes. The DBFT will include first drilling a characterization borehole, followed by an optional field test borehole, to a total depth of about 5,000 m (16,400 feet) into crystalline basement rock in a geologically stable continental location. The initial smaller diameter characterization borehole will be drilled and completed to facilitate downhole scientific testing and analysis. If site conditions are found to be suitable, DOE intends to drill a larger-diameter field test borehole to evaluate emplacement activities using surrogate waste packages. The surrogate waste packages will not contain any radioactive waste, nor will any radioactive waste be used in these tests. One of the advantages of deep borehole disposal is that it would give DOE the flexibility to consider options for disposal of smaller waste forms. Deep borehole disposal also potentially offers earlier disposal of some wastes than might be possible in a mined repository, and could reduce costs associated with projected treatments of some wastes. In order to accomplish the DBFT, DOE will require the support of multiple national laboratories, along with a site contractor to acquire a suitable test site and to manage the site and the required testing activities. DOE issued a competitive solicitation via a request for proposal (RFP) in July, 2015, which requested proposals to provide a test site and site management services. The contract was awarded in January, 2016, to a team led by Battelle Memorial Institute which included a proposed test site in Pierce County, North Dakota. After efforts to acquire both the initial test site in North Dakota and an alternative proposed site in Spink County, South Dakota were unsuccessful, activities were suspended. The experiences in Pierce County, ND and Spink County, SD highlighted the importance of public engagement and support for the DBFT, and that relevant levels of government and other public stakeholders should be involved from the beginning. Using the lessons learned in North and South Dakota, DOE issued a new RFP on August 22, 2016 which emphasized local, state, and tribal (if applicable) government engagement, as well as public and other stakeholder involvement ahead of proposal submittals and throughout the contract execution phases. The new RFP allowed for multiple initial awards and multiple phases of contract execution. In December, 2016, DOE announced the selection of four companies - AECOM, ENERCON, RE/SPEC, and TerranearPMC - to begin exploring the possibility of conducting a DBFT under the terms of the new RFP. Ultimately, only one site will be chosen for the field test. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Efficient Single Frequency Ho:YLF Laser for IPDA Lidar Applications

A highly efficient, versatile, single frequency 2-micron pulsed laser can be used in a pulsed Differential Absorption Lidar (DIAL) / Integrated Path Differential Absorption (IPDA) instrument to make precise, high-resolution measurements to investigate sources and sinks of CO2. For a direct detection IPDA lidar, the desired 2 m Ho:YLF laser should generate 30-40 mJ pulses at the repetition rate of 100 to 200 Hz, with short pulse length (<100 ns) and better than 2% wall plug efficiency. A Tm fiber laser in-band pumped Ho:YLF laser has been developed to meet this technical challenge. This Ho:YLF laser is designed in a four mirror ring resonator with bow tie configuration, which helps to obtain high beam quality. It is end-pumped by a 40 W linearly polarized Tm fiber laser at 1.94μm. The resonator length is 1.10 meters with output coupler reflectivity at 45%. The laser crystal size is 3 x 3 x 60 mm (w, h, l) with a doping concentration of 0.5% Holmium. The laser beam and pump beam are mode-matched in the active medium. Thus, the pump and laser beams have the same confocal parameters. Mode-matching is also helpful for operating the laser in a single transverse mode. The laser beam waist is slightly less than 0.5 mm at the center of the laser crystal. Based on quasi-four level modeling, pump absorption and saturation depend on laser intensity. Laser amplification and saturation also depend on the pump intensity in the crystal. The laser is injection seeded to obtain the single frequency required by an IPDA lidar measurement. The seed beam is entered into the resonator through an output coupler. The laser is mounted on a water cooled optical bench for stable and reliable operation. The size of the optical bench is 22.16 x 9.20 x 1.25 inches. It is stiffened so that the laser can be operated in any orientation of the optical bench. This packaged Ho:YLF laser is designed for either mobile trailer or airborne platform operation. The engineering prototype Ho:YLF laser has been fully characterized to demonstrate laser performance. Figure 1 shows the laser output power as a function of pump power at different pulse repetition rates from 100 Hz to 333 Hz. The threshold of the laser is less than 14 W. The slope efficiencies are 28%, 40%, 41% and 43% for pulse repetition rates of 100, 200, 250 and 333 Hz, respectively. Maximum power increases with the pulse repetition rate. Output power of 4.2 W, 6 W, 6.7 W, and 7.7 W is achieved for pulse repetition rates of 100, 200, 250 and 333Hz, respectively. This represents the optical conversion efficiency of 16.7%, 22.4%, 23.7%, and 26.5% at these various pulse repletion rates. It is the most efficient and compact Ho:YLF laser demonstrated in the high pulse energy (>20mJ) and moderate pulse repetition rate (100's Hz) operation range. As shown in Figure 1, the maximum pulse energy at 100 Hz is 42 mJ. This is limited due to optical damage. The laser stability is characterized and found to be very stable. A relative pulse energy standard deviation of 2% was measured. The beam quality of the Ho:YLF was measured by a Spiricon infrared laser beam camera. Figure 2 shows the beam profile image of the laser. Both the X-profile of the beam (horizontal direction) and the Y-profile of the beam (vertical direction) are well fitted by a Gaussian profile. The qualitative beam quality measurement shows excellent beam quality in both axis. The M-square value for the laser beam is measured at 1.06 and 1.09 for the x and y axis respectively.-

Yu, J.↗

Enigma Version 12

Enigma Version 12 software combines model building, animation, and engineering visualization into one concise software package. Enigma employs a versatile user interface to allow average users access to even the most complex pieces of the application. Using Enigma eliminates the need to buy and learn several software packages to create an engineering visualization. Models can be created and/or modified within Enigma down to the polygon level. Textures and materials can be applied for additional realism. Within Enigma, these models can be combined to create systems of models that have a hierarchical relationship to one another, such as a robotic arm. Then these systems can be animated within the program or controlled by an external application programming interface (API). In addition, Enigma provides the ability to use plug-ins. Plugins allow the user to create custom code for a specific application and access the Enigma model and system data, but still use the Enigma drawing functionality. CAD files can be imported into Enigma and combined to create systems of computer graphics models that can be manipulated with constraints. An API is available so that an engineer can write a simulation and drive the computer graphics models with no knowledge of computer graphics. An animation editor allows an engineer to set up sequences of animations generated by simulations or by conceptual trajectories in order to record these to highquality media for presentation. Enigma Version 12 Lyndon B. Johnson Space Center, Houston, Texas 28 NASA Tech Briefs, September 2013 Planetary Protection Bioburden Analysis Program NASA's Jet Propulsion Laboratory, Pasadena, California This program is a Microsoft Access program that performed statistical analysis of the colony counts from assays performed on the Mars Science Laboratory (MSL) spacecraft to determine the bioburden density, 3-sigma biodensity, and the total bioburdens required for the MSL prelaunch reports. It also contains numerous tools that report the data in various ways to simplify the reports required. The program performs all the calculations directly in the MS Access program. Prior to this development, the data was exported to large Excel files that had to be cut and pasted to provide the desired results. The program contains a main menu and a number of submenus. Analyses can be performed by using either all the assays, or only the accountable assays that will be used in the final analysis. There are three options on the first menu: either calculate using (1) the old MER (Mars Exploration Rover) statistics, (2) the MSL statistics for all the assays, or This software implements penetration limit equations for common micrometeoroid and orbital debris (MMOD) shield configurations, windows, and thermal protection systems. Allowable MMOD risk is formulated in terms of the probability of penetration (PNP) of the spacecraft pressure hull. For calculating the risk, spacecraft geometry models, mission profiles, debris environment models, and penetration limit equations for installed shielding configurations are required. Risk assessment software such as NASA's BUMPERII is used to calculate mission PNP; however, they are unsuitable for use in shield design and preliminary analysis studies. The software defines a single equation for the design and performance evaluation of common MMOD shielding configurations, windows, and thermal protection systems, along with a description of their validity range and guidelines for their application. Recommendations are based on preliminary reviews of fundamental assumptions, and accuracy in predicting experimental impact test results. The software is programmed in Visual Basic for Applications for installation as a simple add-in for Microsoft Excel. The user is directed to a graphical user interface (GUI) that requires user inputs and provides solutions directly in Microsoft Excel workbooks. This work was done by Shannon Ryan of the USRA Lunar and Planetary Institute for Johnson Space Center. Further information is contained in a TSP (see page 1). MSC- 24582-1 Micrometeoroid and Orbital Debris (MMOD) Shield Ballistic Limit Analysis Program Lyndon B. Johnson Space Center, Houston, Texas Commercially, because it is so generic, Enigma can be used for almost any project that requires engineering visualization, model building, or animation. Models in Enigma can be exported to many other formats for use in other applications as well. Educationally, Enigma is being used to allow university students to visualize robotic algorithms in a simulation mode before using them with actual hardware.

Shores, David↗

The Future Looks Bright for Teraflop Computing

Wouldn’t it be great to have a teraflop of computing power sitting in your lab, desktop workstation, or remote instrument server? Talk about simplifying workflows, eliminating competition for HPC resources, and allowing more scientists and technicians to get more work done! Well, the computer industry is marketing that capability now in the form of high-end video cards – and for a bargain price – with more and better technology on the market horizon. As the industry evolves to become more oriented toward multi-core and multi-threaded hardware; video card manufacturers are attempting to transition from a niche to multi-purpose market. One of the products currently getting attention is the Nvidia Tesla family of products based on the Tesla GPGPU (general purpose graphics processing unit). This card contains 128 processor computing core engines advertised as having the ability to deliver an aggregate 518 billion single-precision floating operations per second (518 Gflop), which is being introduced at a $1499 MSRP price-point. Nvidia also offers other commodity graphics cards, such as the GeForce 8800, which appear on paper to have roughly the same performance for roughly half the price – although with half the memory (768M vs the Tesla 1.5 GB). This highlights how the Tesla GPGPUs are essentially redesigned graphics cards (with no video capability, increased memory, and clock changes) that fit into PCI-Express slots in your motherboard. If you believe Nvidia’s claims, two Tesla cards will - for the right applications - turn your lab workstation into a teraflop capable supercomputer. Double-precision versions are projected for a late 2007 introduction with expected 2008 delivery. The Nvidia Tesla GPGPU is one step forward in the many-core revolution that is happening in the computer industry. Instead of making two or four processing cores available to the user, many-core processors offer tens or hundreds of processing cores. Many-core processors promise to provide very high performance-per-dollar and performance-per-watt for many computational workloads. Intel is working on their version of many-core processors but delivery dates appear to be several years in the future. Last year Intel made a large splash with their proof-of-concept teraflop 80-core chip, which they announced might be available sometime in 2011. Intel is also working on something similar to the Nvidia Tesla – codename Larrabee – which will perform in the teraflop range and has a release date of sometime around 2009 or 2010. Larrabee is supposed to have 16 – 24 cores and several nice features. Bottom line: A teraflop lab computer is feasible today as the programmable Nvidia GeForce 8 and Quadro family of graphics cards are available now, Tesla cards will be shipping, and exciting many-core architectures are on the horizon from a number of vendors. Definitely, the potential for parallel processing systems is huge, and GPGPUs certainly provide parallel processing, but are there enough applications out there to take them mainstream and make it more appealing to businesses other than just research firms? Only time will tell as more applications are developed to utilize this computational capability. Right now, programming is required. Recently Google purchased PeakStream, a firm that engaged in abstracting the task of running multiple threads to software with specific GPGPU applicability. However, Google is a visionary software company. Instrument vendors and much of the software industry are still in the early stages of the transition to multi-threaded many-core data processing. Applications that exploit the full potential of parallel processing systems, and GPGPUs in particular, really don’t exist in today’s market. The development of Matlab plug-ins is a very positive sign for the future of GPGPUs and is indicative of Nvidia’s sense of where the market is headed.

99 GENERAL AND MISCELLANEOUS↗

Batteries (2021 Annual Progress Report)

This document summarizes the progress of VTO battery R&D projects supported during the fiscal year 2021 (FY 2021). In FY 2021, the DOE VTO battery R&D funding was approximately $\$$115 million. Its R&D focus was on the development of high-energy batteries for EVs as well as very high-power devices for hybrid vehicles. The electrochemical energy storage roadmap (which can be found at the EERE Roadmap web page2) describes ongoing and planned efforts to develop electrochemical storage technologies for EVs. To advance battery technology, which can in turn improve market penetration of PEVs, the program investigates various battery chemistries to overcome specific technical barriers, e.g., battery cost, performance, life (both the calendar life and the cycle life), its tolerance to abusive conditions, and its recyclability/sustainability. VTO R&D has had considerable success, lowering the cost of EV battery packs to $\$$185/kWh in 2019 (representing more than 80% reduction since 2008) yet even further cost reduction is necessary for EVs to achieve head-to-head cost competitiveness with ICEs (without Federal subsidies). In addition, today’s batteries also need improvements in such areas as their ability to accept charging at a high rate, referred to as extreme fast charging (XFC) (15 minute charge) – to provide a “refueling” convenience similar to ICEs, and the ability to operate adequately at low temperatures. Research into “next-gen lithium-ion” batteries which would provide such functionalities is one of the R&D focus areas. VTO is funding research on both “next gen” chemistries (which employ an alloy anode and/or a high voltage cathode) and beyond lithium-ion (BLI) chemistries (which can, for example, employ a lithium metal anode).

25 ENERGY STORAGE↗

Degradation of Poly- and Perfluoroalkyl Substances (PFAS) in Water via High Power, Energy-Efficient Electron Beam Accelerator

The goal of the 2-year workplan was to see if electron beam (EB) could be used to break down a sub-set of the larger chemical family of per and polyfluoroalkylated substances (PFAS) in an energy efficient and economical manner when compared to conventional water treatment technologies. Year one (Y1) work focused on sample EB treatment work in the Fermi National Accelerator Laboratory’s (FNALs) Accelerator Applications Demonstration and Development (A2D2) EB accelerator. While there are reportedly thousands of types of PFAS, for the point of most of the work herein, a small subset was examined, typically perfluorooctane sulfonate (PFOS) and perfluorooctanoate (PFOA). PFOA and PFOS are two of the most well studied PFAS and are studied for baseline evaluations and are considered most useful. The work from Y1 provided information about the optimal operating parameters and additives to use when treating PFOS and PFOA via EB. The data were then used to see where in a water treatment system an EB accelerator would be best suited to treat PFAS. A conventional water treatment technology, GAC, was then compared to e-beam treatment technology with respect to energy and costs for treatment. In year two (Y2), several conventional e-beam accelerator designs, and FNAL’s developmental compact SRF accelerator design, were evaluated for their suitability in PFAS treatment, from an energy efficiency and cost standpoint. Several EB parameters were evaluated and optimized for the removal of PFOA and PFOS from water at normal pressure and temperature, measured as total PFAS removal. Under the optimized test conditions both PFOA showed complete destruction to inorganic fluoride, and PFOS to inorganic fluoride and sulfate, with mass balance. The effect on PFAS removal relative to solution pH, total EB dose, EB dose rate, dissolved oxygen concentration (DO), temperature, and initial PFAS concentration were evaluated. In general, PFOA was easier to destroy than PFOS. Degradation products, typically observed under less-than-optimal EB conditions, provided insight to degradation mechanisms. Products were identified to rule out possible deleterious biproduct formation. The water radiolysis radical reaction kinetics with PFOS and PFOA were not dependent on the initial concentration over 5-orders of magnitude from 2 μg/L to 20 mg/L. This is thought to be because there was an overabundance of the reactive water radiolysis radicals relative to PFAS molecules and largely attributed to aqueous electrons. The reaction rates appeared to be diffusion limited. Testing at higher concentrations (100-200 mg/L) showed a decrease in removal efficiency, suggesting alternative kinetics, possibly second order rates, at higher concentrations. In all, we successfully defined a set of optimal EB parameters to treat PFOA and PFOS at concentrations of 20 mg/L in water with destruction efficiencies near 100%. We further tested the optimized EB parameters with other types of PFAS, including shorter and longer fluorocarbon chain homologs of PFOA and PFOS, and PFAS with alternative functional groups such as sulfonamides. Based on our results EB can be optimized as an effective destructive technology for removing PFAS from water. The conditions optimized for PFOA and PFOS were less effective with ultra-short fluorocarbon compounds like TFMS, PFES, PFPS and PFBS, and likely require re-optimization of parameters to them. In all, it was determined that from a cost and energy efficiency standpoint, EB would be best applied to waste streams with relatively high concentrations of PFOS and PFOA and is not as cost effective as GAC treatment for removing low concentrations of PFAS from water. Higher concentrations of PFAS can be found in the wastewater of conventional treatment processes such as RO and IE and therefore EB may be used to supplement such treatment technologies. Some real-world IE regeneration wash water and RO reject water containing higher concentrations of PFAS and obtained from pilot scale industrial wastewater treatment system at a fluorochemical manufacturing facility, showed that EB could remove PFAS from such types of wastewaters. The IE regenerant wash water appeared to be the most efficient of the two types of wastewaters tested. However, some further optimization of the EB parameters for the specific PFAS types present in those wastewaters may be required. Also, the effects of co-present TOC and mineral salts should be considered during such optimization efforts. From the experimental Y1 results it was seen that the aqueous electron drives degradation of the PFAS. In a hypothetical water treatment skid using EB for PFAS destruction the parameters of the system should be optimized to promote aqueous electron production. Before EB treatment, the PFAS should be preconcentrated when possible, the pH should be raised to pH 10 or higher to enhance aqueous electron production, and the water should be nitrogen purged to remove dissolved oxygen to minimize aqueous electron scavenging. An excel spreadsheet was created that calculates optimal conditions based on inlet PFAS concentration and desired outlet concentration, by optimizing the accelerator power, dose rate, water treatment rate, pH and dissolved oxygen levels to reach the desired endpoint. Given this information on accelerator operating conditions five different EB accelerator systems were compared. One EB system was a continuous-wave, linear superconducting accelerator being designed at Fermilab. Three other EB systems (IMPELA at 5% and 25% duty factor and the ILU-14) were normal conducting pulsed linear accelerators. The fifth system was an IBA Rhodotron which is a normal conducting, circular, continuous-wave accelerator. The accelerator efficiency (% of the incoming power that is used in water treatment) was the dominating factor in accelerator choice. The radio frequency (RF) power supply and the accelerator design (superconducting versus warm technology) drive the accelerator efficiency. The IBA Rhodotron was seen to be the most energy efficient commercially available technology with a wall-plug (total) power efficiency of 43% at 400 kW. The Fermilab design, with a prototype for a different application currently being fabricated, was the most energy efficient at 55% when driven by a Klystron RF power supply and as high as 77% when powered by a magnetron. As the Fermilab design was the most energy efficient by approximately 10-30%, further design work was done on the accelerator and beam delivery system specific to the destruction of PFAS in water. The Fermilab design is unique from industrial accelerators in that is superconducting. Superconducting technology allows for the acceleration of electrons without losses. The accelerator must be cooled to below the point where it is superconducting and is operated around 4 degrees Kelvin. The bulk of the design work for the accelerator is on making the accelerator as energy efficient as possible so that it does not require liquid helium and can be cooled with conduction cooling via cryocoolers. Final design work resulted in an EB accelerator that would operate at minimally 200 kW and 10 MeV. Prototype construction would cost $\$ $7.8 million dollars when driven by a Klystron power supply. A second version of the same accelerator would cost $\$ $5.5 million dollars when driven by a magnetron that is still under development. The commercially available 300 kW IBA Rhodotron cost was estimated at approximately $\$ $9 million. While it is hard to directly compare, an operational GAC system used by 3M for groundwater treatment capital cost (2022 dollars) was estimated to cost $\$ $3.3 million. While the capital expense of the EB accelerator systems was higher than GAC, the accelerator EB treatment would result in destruction of the PFAS and not just sequestration of PFAS to form a new waste stream that requires further treatment or disposal. The operating cost to destroy the PFAS via 400 kw EB system was less than $\$ $1000/kg of PFAS destroyed when treating at a 20 mg/L PFAS concentration, compared to GAC with operating costs that calculated at $\$ $27,530 per kg of PFAS sequestered when treating 100 μg/L PFOA and PFOS combined concentration.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗