Search NASA⌕ Search

SEARCH · Search NASA

Results for “resource planning optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 739 records · Page 41

Launch Complex 34, SWMU CC054 2023 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring and Phase Two Expansion Construction Completion Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 14 operations and performance monitoring of the hydraulic containment (HC) Interim Measure (IM), details associated with construction and implementation of the HS 6 AS system expansion (Phase Two), and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. The timeframe for activities documented in this PMR extends from April 1, 2023 to March 31, 2024. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the shallow and deep DSZ and surrounding dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to recharacterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS and install additional recovery wells in Layer 7 to more adequately capture residual contaminant mass. The operational period for Year 14 of the HCS was from April 1, 2023 to March 31, 2024. Operational runtime for the system was 94 percent during Year 14, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2024, a total of 344,849,634 cumulative gallons of groundwater containing 94,656 pounds of chlorinated volatile organic compounds (CVOCs) have been removed by the HCS. During the reporting period covered under this report, the HCS recovered 31,176,393 gallons and approximately 6,319 pounds of CVOC mass. Total combined influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 25,000 µg/L (March 2024). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in January 2024 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2022. Full vertical profile sampling was completed at each DPT from 8 to 98 feet below land surface (bls), at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 28 to 98 feet bls. An overall decreasing trend of TCE concentrations was observed in DPT samples during this reporting period, which is a reduction from the previous event (December 2022) and the peak event in December 2021, where TCE percentages appeared to increase in all depth zones because several recovery wells were turned off during the AS pilot study in the DSZ. The maximum TCE concentration in January 2024 was 1,600,000 µg/L in the 53 feet bls depth interval at DPT594 (previous maximum result in 2022 was 1,800,000 µg/L in the 48 feet bls depth interval at DPT599). This maximum concentration in the 53 feet bls depth interval is in the deep capture zone. During the January 2024 DPT event, the largest portion of TCE mass was observed in the 48 feet bls interval above/within Layer 4. This trend remains consistent with previous years and appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, annual groundwater samples were collected from 11 deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2023 to verify vertical and horizontal delineation. Three of the wells were also sampled biweekly to evaluate operations of recovery well RW21D (screened 86 to 106 feet bls), which was installed in January 2023. Of the Layer 7/8 monitoring sampled only annually, results were non-detect or less than groundwater cleanup target levels GCTLs in December 2023, with the exception of one well, IW45D2, which had a cis-1,2-dichloroethene (cDCE), detection greater than the GCTL. Of the three wells sampled biweekly during the operational period, the well located closest to Layer 7 recovery well RW21D (IW44D2, screened 105 to 115 feet bls) had concentrations of TCE, cDCE and vinyl chloride (VC) greater than GCTLs throughout the operational period, but displayed a decreasing trend since the peak concentrations in September 2023. The maximum TCE concentration during this operational period was 190,000 µg/L at IW44D2 in September 2023, but reduced to 700 µg/L in March 2024, indicating the HCS is still effectively removing mass from the source area. Expansion of the HCS and addition of new recovery wells is ongoing and will continue to be evaluated as the groundwater recovery scheme is optimized. Details of the expansion and optimization will be provided in a future PMR. The HS 6 AS IM was initiated in 2018 with 160 AS wells and expanded in 2019 with another 140 AS wells. An additional expansion of the HS 6 AS IM was completed during the reporting period covered under this report and details of the construction implementation and startup of the expansion are detailed in Section III of this report. The new expansion, referred to as Phase Two, was implemented between August 17, 2022 and August 28, 2023, and included the installation of 190 air sparge wells to treat an additional 11.2 acres. The original configuration (referred to as Phase One) operated until Phase Two came online, then all but 52 AS wells were turned off so the components could be moved and utilized in the Phase Two area. The 52 AS wells that remain on are in a barrier configuration preventing contaminated groundwater from impacting the treated area. The HS 6 AS system (both Phase One and Two) operated normally during the reporting period covered under this report. Semi-annual performance monitoring of the Phase One configuration was conducted in April and November 2023, consistent with previous years. For the Phase Two configuration, 21 new monitoring wells were installed and sampled quarterly, with a baseline event in July 2023, and quarterly events in November 2023 and February 2024 summarized in this report. Semi-annual monitoring results collected in April and October 2023 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and VC) have decreased to less than GCTLs in nearly all wells and not impacting the surface water drainage canal, indicating the HS 6 IM continues to meet objectives. The baseline and quarterly sampling for the Phase Two configuration indicate generally decreasing concentrations in wells within and around the perimeter of the treatment area. At least two more quarters of monitoring will be conducted and once those results are evaluated a reduced the sampling frequency may be considered. Overall, the tasks associated with Year 14 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with recommendations included in the previous 2022 LC34 (Year 13) PMR. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

groundwater remediation↗

GridWise Transactive Energy Framework (V.1.1)

Over the past two decades, the use of demand response and other flexible distributed resources for electricity market efficiency and grid reliability has grown dramatically. Federal and state policy objectives point to an important role for customers’ loads, generation, and storage in the management of an increasingly unpredictable power system. As we consider the need to substantially scale the use of flexible distributed energy resources, growing attention has been devoted to the need to address not only the economics of the electricity grid, but also the control system implications, to address grid reliability. This has led to a focus on an area of activity called “Transactive Energy.” Transactive energy (TE) refers to the use of a combination of economic and control techniques to improve grid reliability and efficiency. These techniques may also be used to optimize operations within a customer’s facility. The U.S. Department of Energy has supported the GridWise ® Architecture Council (“the Council”) in developing a conceptual framework for developing architectures and designing solutions related to TE. The goal of this effort is to encourage and facilitate collaboration among the many stakeholders involved in the transformation of the power system and thereby advance the practical implementation of TE.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Sensor enabled data-driven predictive analytics for modeling and control with high penetration of DERs in distribution systems

The electric power grid is undergoing a tremendous transformation due to the increasing penetration of renewable energy resources beginning with wind and more recently with the distributed energy resources (DERs) such as solar and battery storage. DERs have dramatically changed the role of the distribution systems in the overall power grid, and they are expected to contribute a significant portion of power generation in the future. If current trends for DERs continue, system operation and control will need to change dramatically for improved grid reliability and resiliency. As renewable resources increase in penetration, new and challenging operational, planning, and design problems are expected to emerge. Some of the key challenges that arise in the planning and operation of the future grid are: 1) Quantifying the impact of high DER penetration in distribution systems on bulk grid behavior over multiple time scales. 2) Identifying whether a particular DER configuration/settings have a large impact on the overall grid behavior. These challenges can be addressed in an offline manner using detailed T&D grid models and they can also be addressed in an online manner using sensor measurements. In particular, the advancement and planned growth in sensor technology in power grid over various voltage levels provide us with a unique opportunity to tackle these challenges from a data analytic perspective without needing detailed T&D grid models. A few questions that naturally arise when addressing the challenges from DERs using sensor data are: 1) How can we use limited sensor measurements to monitor & control voltage stability and small signal stability of the bulk system? 2) How can we ensure that the developed data analytic methods are robust to data availability and quality issues? 3) How can we compute the developed analytics in a scalable manner using streaming measurements? In this project, we addressed the aforementioned challenges arising from DERs and answered the questions raised above on how to effectively use the sensor measurements to enhance the reliability and performance of the electric grid. Thus, the overarching goal of this project is to develop effective reduced/representative system models from data that make the computational complexity sufficiently manageable so as to be useful to simulate, analyze, and even control complex non-linear power systems dynamics with large penetrations of DERs. In order to achieve the objective, the project team established a four-fold technical approach 1) Formulated a combined transmission-distribution co-simulation framework for data generation and validation, 2) Derived reduced/representative models of power systems based on data-driven methods for efficient computation and appropriate representation of system behavior, 3) Developed data driven characterization of power system behavior based on transfer operator theory, machine learning and optimization for model estimation, 4) Incorporated a scalable data management and processing architecture using distributed Kafka streaming applications that coordinate input data streams to the developed data analytics. The key accomplishments of the project are: 1) Development of a scalable multi-timescale T&D co-simulation framework (both for steady state and for dynamic co-simulation) using commercial solvers (PSSE and GridLAB-D). The steady-state T&D co-simulation interface is shared with our industry partner (PJM). 2) A structured reduced order dynamic model of distribution systems that can represent partial motor stalling along with a systematic procedure to derive the model parameters. 3) A PMU based online method to monitor, localize and mitigate fault-induced delayed voltage recovery using DER reactive support and load control in distribution systems. 4) Development of linear operator based robust methodologies for dynamic state estimation, uncertainty quantification, system identification and trajectory prediction for power system dynamics. 5) An adaptive damping control for utilizing wind energy resources to provide oscillation damping and system stability. 6) Implementation of Kafka-based framework for efficient processing of streaming data using Linux-based local virtual environment.

DER integration↗

Stochastic Continuous-time Flexibility Scheduling and Pricing in Wholesale Electricity Markets

Large-scale integration of intermittent renewable energy sources (RES) is calling for additional flexibility resources as well as more advanced modeling and optimization techniques to account for the increasing uncertainty and variability in power systems operation. As the RES integration gains momentum, the magnitude and frequency of their variations increase, which may trigger ramping scarcity events in real-time power systems operation. This necessitates revisiting the present definition of power systems flexibility and reserve services to reflect their robustness and adequacy towards sub-interval variations of the load and RES, as well as adjusting the operation models to accommodate the new reserve services. This project took a fundamental approach and aimed at developing continuous-time scheduling and pricing model that accurately models the continuous-time variations of load and RES and efficiently deploys the ramping capability of flexible resources to compensate the sources of variability and uncertainty in the market. In this regard, this project pursued the following goals: Developing stochastic multi-fidelity continuous-time optimization models for scheduling of energy storage (ES) systems and flexible loads in wholesale energy markets; Developing the theory and practices of continuous-time locational marginal pricing for valuating energy storage systems and flexible loads in wholesale energy markets; Developing function space solution approach to convert the proposed stochastic multi-fidelity continuous-time optimization models into tractable mixed-integer linear optimization models; and Defining flexibility reserve as a new type of reserve in markets that would enable ultimate participation of energy storage devices in provision of services to compensate the variability and uncertainty of RES in electricity markets. This project successfully completed all five major tasks defined in the SOPO, and produced 8 high-impact journal papers, 6 conference papers, 3 published U.S. patents, and one web-based software for continuous-time operation optimization of power systems. The application of the proposed flexibility reserve and the stochastic multi-fidelity continuous-time operation scheduling models would modify the forward commitment and schedule of generating units, ES devices and flexible loads, and would line up the resources in such a way that the composition of available resources is better prepared to respond to the sub-hourly variations of the load and renewable resources in real-time operation. Therefore, this project paves the way to sustainable, reliable, and economic integration of renewable energy resources in power system, supporting the progress towards reaching the national targets on energy independence. Even if the proposed models offers a radically different point of view as compared to existing models, it does not alter fundamentally the architecture of power systems operations, nor the complexity of the scheduling problem, so the integration of this project in power systems is extremely practical.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Dynamic Multi-Sensor Multi-Mission Optimal Planning Tool

Remote sensing systems have firmly established a role in providing immense value to commercial industry, scientific exploration, and national security. Continued maturation of sensing technology has reduced the cost of deploying highly-capable sensors while at the same time increased reliance on the information these sensors can provide. The demand for time on these sensors is unlikely to diminish. Coordination of next-generation sensor systems, larger constellations of satellites, unmanned aerial vehicles, ground telescopes, etc. is prohibitively complex for existing heuristics-based scheduling techniques. The project was a two-year collaboration spanning multiple Sandia centers and included a partnership with Texas A&M University. We have developed algorithms and software for collection scheduling, remote sensor field-of-view pointing models, and bandwidth-constrained prioritization of sensor data. Our approach followed best practices from the operations research and computational geometry communities. These models provide several advantages over state of the art techniques. In particular, our approach is more flexible compared to heuristics that tightly couple models and solution techniques. First, our mixed-integer linear models afford a rigorous analysis so that sensor planners can quantitatively describe a schedule relative to the best possible. Optimal or near-optimal schedules can be produced with commercial solvers in operational run-times. These models can be modified and extended to incorporate different scheduling and resource constraints and objective function definitions. Further, we have extended these models to proactively schedule sensors under weather and ad hoc collection uncertainty. This approach stands in contrast to existing deterministic schedulers which assume a single future weather or ad hoc collection scenario. The field-of-view pointing algorithm produces a mosaic with the fewest number of images required to fully cover a region of interest. The bandwidth-constrained algorithms find the highest priority information that can be transmitted. All of these are based on mixed-integer linear programs so that, in the future, collection scheduling, field-of-view, and bandwidth prioritization can be combined into a single problem. Experiments conducted using the developed models, commercial solvers, and benchmark datasets have demonstrated that proactively scheduling against uncertainty regularly and significantly outperforms deterministic schedulers.

47 OTHER INSTRUMENTATION↗

Simulating Impacts of Extreme Events on Grids with High Penetrations of Wind Power Resources

As extreme weather events become more frequent and intense, the demand for connecting grid operation and infrastructure planning with extreme event models will increase as well. We present a methodology for creating damage contingencies and scenarios for electric transmission grids during a hurricane strike. Included is an example case study: Hurricane Dolly damaging a synthetic 2000 bus test system during its landing in Southern Texas. Using WIND Toolkit meteorological data in conjunction with fragility curves for various electric grid elements, we generate stochastic damage scenarios that can be used for short- and long-term planning problems including emergency asset management. We perform statistical analysis of damages and quantify topological effects on example synthetic grid. Also, we investigate loss-of-load events during two-day economic dispatch experiment. Finally, we point out various shortcomings of our method and suggest how it can be improved.

data-driven forecasting↗

Simulating Impacts of Extreme Events on Grids with High Penetrations of Wind Power Resources: Preprint

As extreme weather events become more frequent and intense, the demand for connecting grid operation and infrastructure planning with extreme event models will increase as well. We present a methodology for creating damage contingencies and scenarios for electric transmission grids during a hurricane strike. Included is an example case study: Hurricane Dolly damaging a synthetic 2000 bus test system during its landing in Southern Texas. Using WIND Toolkit meteorological data in conjunction with fragility curves for various electric grid elements, we generate stochastic damage scenarios that can be used for short- and long-term planning problems including emergency asset management. We perform statistical analysis of damages and quantify topological effects on example synthetic grid. Also, we investigate loss-of-load events during two-day economic dispatch experiment. Finally, we point out various shortcomings of our method and suggest how it can be improved.

contingencies↗

A modeling framework for optimal energy management of a residential building

Residential buildings are currently equipped with energy production facilities, e.g., solar rooftops and batteries, which in conjunction with smart meters, can function as smart energy hubs coordinating the loads and the resources in an optimal manner. This paper presents a mathematical model for the optimal energy management of a residential building and proposes a centralized energy management system (CEMS) framework for off-grid operation. The model of each component of the hub is integrated within the CEMS. The optimal decisions are determined in real-time by considering these models with realistic parameter settings and customer preferences. Model predictive control (MPC) is used to adapt the optimal decisions on a receding horizon to account for the deviations in the system inputs. Simulation results are presented to demonstrate the feasibility and effectiveness of the proposed CEMS framework. Results show that the proposed CEMS can reduce the energy cost and energy consumption of the customers by approximately 17% and 8%, respectively, over a day. In conclusion, using the proposed CEMS, the total charging cycles of the ESS were reduced by more than 50% in a day.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cognitive Functioning in Space Exploration Missions: A Human Requirement

Solving cognitive issues in the exploration missions will require implementing results from both Human Behavior and Performance, and Space Human Factors Engineering. Operational and research cognitive requirements need to reflect a coordinated management approach with appropriate oversight and guidance from NASA headquarters. First, this paper will discuss one proposed management method that would combine the resources of Space Medicine and Space Human Factors Engineering at JSC, other NASA agencies, the National Space Biomedical Research Institute, Wyle Labs, and other academic or industrial partners. The proposed management is based on a Human Centered Design that advocates full acceptance of the human as a system equal to other systems. Like other systems, the human is a system with many subsystems, each of which has strengths and limitations. Second, this paper will suggest ways to inform exploration policy about what is needed for optimal cognitive functioning of the astronaut crew, as well as requirements to ensure necessary assessment and intervention strategies for the human system if human limitations are reached. Assessment strategies will include clinical evaluation and fitness-to-perform evaluations. Clinical intervention tools and procedures will be available to the astronaut and space flight physician. Cognitive performance will be supported through systematic function allocation, task design, training, and scheduling. Human factors requirements and guidelines will lead to well-designed information displays and retrieval systems that reduce crew time and errors. Means of capturing process, design, and operational requirements to ensure crew performance will be discussed. Third, this paper will describe the current plan of action, and future challenges to be resolved before a lunar or Mars expedition. The presentation will include a proposed management plan for research, involvement of various organizations, and a timetable of deliverables.

Fiedler, Edan↗

Interim Report of the Astronomy Spacelab Payloads Study: Ultraviolet and Optical Astronomy - Volume 2

The Space Shuttle will comprise NASA's primary transportation system into near-earth orbit during the 1980s. The Shuttle will provide the astronomical community with a major new capability to send a wide variety of instrumentation into orbit, to utilize it there under manned or automatic control for periods from seven to thirty days, and to return it to the ground. To this end the European Space Research Organization (ESRO) is developing Spacelab, an array of interchangeable components -pressurized manned modules, unpressurized pallets and related support systems - to be mounted in the Shuttle payload bay. Spacelab will offer important opportunities to carry out astronomical research with instruments optimized for specific objectives. With a high flight frequency and with the ability to modify or interchange telescopes and instruments between flights, one will not need to make rigid long-term commitments to specific and compromised telescope/instrument/ detector combinations as is the case for automated satellites. Observational techniques demanding the physical return of data and equipment - in particular the use of photographic film, instruments requiring tight calibration controls, cryogens, high-risk detectors and degradeable optical coatings -will open research areas not readily addressed by automated satellites. Although Shuttle flight duration will be limited to periods from seven to thirty days, substantial data can be obtained with a single instrument on short missions, if targets are carefully selected and prioritized, and a large number of instruments can be accommodated on a single flight. Important astronomical data are regularly obtained on sounding rocket flights of five minutes duration. Spacelab will provide far longer observing periods for large and small telescopes, with resources greatly exceeding those of sounding rockets, while retaining much of the sounding rocket philosophy in terms of instrument flexibility, simplicity, reliability assurance and development costs. The Ultraviolet and Optical Astronomy Program on Spacelab is being planned to provide optical astronomers with relatively simple and regular access to the extended wavelength coverage, the superior image quality and the darkness of the night sky available above the earth's atmosphere. In a rapidly evolving science one cannot predict what problems will be timely in the 1980s. Extrapolating from the current epoch, however, one can envision a continuing interest in such areas as the structure, composition and phenomenology of planetary surfaces and atmospheres; the composition and physical nature of the interstellar medium; the composition, structure and life history of stars, especially those in advanced stages of evolution; the stellar population of other galaxies; such enigmatic phenomena as X-ray binary black holes, pulsars, active galactic nuclei and quasars; large scale interactions between galaxies and the nature of the intergalactic medium; precise calibration of the Hubble law for the expansion of the universe; the average density of the universe; and the existence of extraterrestrial life.

Source record↗

TEAL Output Visualization

Tool for Economic Analysis (TEAL) is an open-source economics calculation package written and maintained by Idaho National Laboratory (INL). As a plugin of the Risk Analysis Virtual ENvironment (RAVEN), TEAL provides economics analysis models to RAVEN workflow users. In addition, TEAL is used in other RAVEN plugins such as LOGOS and the Holistic Energy Resource Optimization Network (HERON) to complement other analyses with economic calculations. This report documents the efforts in developing the capability of TEAL output visualization for users to better understand and investigate TEAL simulation results. In the past, outputs (e.g., various cash flows) were generated and printed to screen. According to the need and purpose for visualization, users can select various bar charts and donut charts to visualize the cash flows including inflows, outflows, and net cash flows in each year or in a selected time range, in addition to observing data stored in comma-separated value files (CSVs). The visualization capability is flexible and user-friendly by introducing several user-defined parameters, for instance, the start and the end project year of interest and the type of colors to be assigned to the cash flows.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Mid-Atlantic Offshore Wind Interconnection and Transmission (MAOWIT)

This project has carried out a detailed analysis to evaluate the pros and cons of offshore transmission, a possible method to decrease balance-of-system costs and permitting time identified in the DOE Office Wind Strategic Plan (DOE, 2011). It also addresses questions regarding the adequacy of existing transmission infrastructure and the ability of existing generating resources to provide the necessary Ancillary Services (A/S) support (spinning and contingency reserves) in the ISO territory. This project has completed the tasks identified in the proposal: 1. Evaluation of the offshore wind resource off PJM, then examination of offshore wind penetrations consistent with U.S. Department of Energy’s (DOE) targets and with their assumed resource size (DOE, 2011). 2. Comparison of piecemeal radial connections to the Independent System Operator (ISO) with connections via a high-voltage direct current (HVDC) offshore network similar to a team partner. 3. High-resolution examination of power fluctuations at each node due to wind energy variability 4. Analysis of wind power production profiles over the Eastern offshore region of the regional ISO to assess the effectiveness of long-distance, North- South transmission for leveling offshore wind energy output 5. Analysis of how the third and fourth items affect the need for ISO grid upgrades, congestion management, and demand for Ancillary Services (A/S) 6. Analysis of actual historic 36-hr and 24-hr forecasts to solve the unit commitment problem and determine the optimal mix of generators given the need to respond to both wind variability and wind forecasting uncertainties.

17 WIND ENERGY↗

Coastal High-resolution Observations and Remote Sensing of Ecosystems (C-HORSE)

Coastal benthic marine ecosystems, such as coral reefs, seagrass beds, and kelp forests are highly productive as well as ecologically and commercially important resources. These systems are vulnerable to degraded water quality due to coastal development, terrestrial run-off, and harmful algal blooms. Measurements of these features are important for understanding linkages with land-based sources of pollution and impacts to coastal ecosystems. Challenges for accurate remote sensing of coastal benthic (shallow water) ecosystems and water quality are complicated by atmospheric scattering/absorption (approximately 80+% of the signal), sun glint from the sea surface, and water column scattering (e.g., turbidity). Further, sensor challenges related to signal to noise (SNR) over optically dark targets as well as insufficient radiometric calibration thwart the value of coastal remotely-sensed data. Atmospheric correction of satellite and airborne remotely-sensed radiance data is crucial for deriving accurate water-leaving radiance in coastal waters. C-HORSE seeks to optimize coastal remote sensing measurements by using a novel airborne instrument suite that will bridge calibration, validation, and research capabilities of bio-optical measurements from the sea to the high altitude remote sensing platform. The primary goal of C-HORSE is to facilitate enhanced optical observations of coastal ecosystems using state of the art portable microradiometers with 19 targeted spectral channels and flight planning to optimize measurements further supporting current and future remote sensing missions.

Coasts↗

Net Zero Energy Model for Wastewater Treatment Plants

The primary objective of this study is to achieve net-zero energy (NZE) wastewater treatment plants (WWTPs) by utilizing energy efficiency opportunities (EEO), combined heat and power (CHP) systems, and other renewable energy (RE) sources, e.g., solar, water, and wind powers. Herein, this study discusses an innovative energy solution for WWTPs in the United States, and one of the WWTPs with a flow capacity of 1.5 million gallons per day (MGD) was selected as a case study. An optimization tool, Hybrid Optimization of Multiple Energy Resources (HOMER) software, is used in this study to find the best energy system configuration to run the system. An energy audit for one WWTP was conducted in early 2020 and the report is used to do this study. The proposed EEOs were able to reduce WWTP energy consumption by about 11%. The excess anaerobic digester gas was utilized in a CHP system to cover about 42% of the facility’s consumption. Also, 3% of the utility energy consumption can be claimed by microturbines in the aeration tanks. Another two renewable energy systems, solar photovoltaic (PV) with 29% and water turbines with 15%, contribute to covering 100% of the WWTP energy consumption and achieving an NZE WWTP.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Multidisciplinary Design Optimization and Analysis of an Open Rotor Stage: Part 1

Successful design of open rotor propulsors requires effective analysis across multiple disciplines, including aerodynamics, acoustics, and structures. A viable design must not only be efficient but must also produce an acceptable level of noise and meet all static and dynamic structural requirements. For design and optimization, this is especially challenging because running high fidelity analyses is resource-intensive, and optimizing a design may require many thousands of cases to be analyzed. For this reason, the NASA team has applied design methodology that utilizes low-cost aerodynamic methods, machine learning models, and high-fidelity analyses when necessary. This includes standard two-dimensional methods such as throughflow analysis and quasi-3D blade-to-blade CFD, as well as some newly developed methods. Optimization using 3D CFD is necessary to maximize performance, and this is considered as well. All optimizations are carried out subject to structural constraints evaluated using finite element analysis. Doing this accurately requires a robust trunnion design, capable of pitching the blade between cruise and takeoff conditions while maintaining acceptable factor of safety. Hot to cold analysis must also be applied in order to correctly determine the as-manufactured shape. For acoustics, the unsteady pressures on the blade surfaces must be predicted, and this can be done either through full-annulus unsteady CFD or through a nonlinear harmonic method (NLH). NLH can run much faster, allowing some acoustic considerations to be made earlier in the design process. The design process is ongoing, and this presentation will review the current status and planned next steps. This part of the talk will focus on aerodynamic performance and be followed by a talk on structures and acoustics.

Design↗

Quantitative Metrics for Grid Resilience Evaluation and Optimization

Power system resilience has become a critical topic in recent years because of the increasing trend of extreme events and the growing integration of intermittent renewable energy sources. To enhance grid resilience against high-impact, low-frequency events, two questions should be answered: how to quantify the resilience of a given grid and how to incorporate the quantification into power system planning, operation, and restoration. Here this paper develops a new set of quantitative metrics with clear physical interpretation to comprehensively evaluate power system resilience. Using microgrids as an example, an event-based corrective scheduling (ECS) model and an online model predictive control (OMPC) model are developed to integrate the proposed quantitative resilience metrics into power system optimization models for resilience enhancement. The ECS model employs extreme event data to investigate the optimal restoration solution and to help microgrid operators prepare to respond to similar events. The OMPC model provides online decision-making support for operators to handle ongoing outages in the most resilient fashion. The effectiveness and superiority of the proposed quantitative resilience metrics and the resilience enhancement models are demonstrated through simulations and comparative studies on an IEEE test feeder and a real distribution feeder in Southern California.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Zero Export Feeder Through Transactive Markets

This project is aimed at creating a transactive energy market to address the challenges faced by utility providers when increasing distributed energy resource (DER) adoption in their service area. One major challenge is mitigating export back to the grid during times of excess production. The transactive energy market operates at the distribution level and balances the supply and demand on the feeder, thus maintaining a zero-energy export at the primary feeder head. The market participants in this case are the residential customers on the feeder, who bid into the market. Building controls are then optimized based on the settled price. Market performance was demonstrated in this study by simulating different levels of DER penetration on a selected Pepco feeder. The feeder successfully achieved a zero export while providing cost-effective electricity to the participants, demonstrating that this market design can enable high DER penetration on existing feeders.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Applications of data mining technology to enhance O and M: automatic planning of electrical isolation with deep learning - 255

Data mining technology is now readily available, thanks to high powered, low cost computing resource and useful coding tools. We study several applications of data mining to enhance operation and maintenance (O and M), such as abnormality prediction, efficiency diagnosis, document traceability, image recognition, etc. In field support, we try automatic planning of electrical isolation with deep learning. Currently, a skilled engineer plans electrical isolation procedure with hundreds of the circuit diagrams and the related documents, taking man-hours. If this task becomes automatic, it is very efficient. The automatic planning has two issues. One is much calculation time of electrical circuit simulator, searching billions of electrical conducting paths. The other is interpretation of human fuzzy information, such as ease of work. Deep learning is helpful to resolve them. We performed a model case study of the electrical isolation. We applied a deep neural network (DNN) for dropping in the calculation time. We trained the circuit diagrams and the responses of the circuit simulator to the DNN, constructing an efficient path search algorithm in the DNN. The calculation time of the DNN was shorter by a factor of 32 for the model case, compared with that of the electrical circuit simulator. We applied a deep Q-network (DQN) for the interpretation of fuzzy information. The DQN optimized isolation procedure from the viewpoint of the work load with the equipment layout, related doses, and values of wet bulb globe temperature (WBGT) to prevent heatstroke. (authors)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗