Search NASA⌕ Search

SEARCH · Search NASA

Results for “test support”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 739 records · Page 41

Cryogenic Nitrogen Thermosyphon Developed and Characterized

A two-phase nitrogen thermosyphon was developed at the NASA Glenn Research Center to efficiently integrate a cryocooler into an insulated liquid-nitrogen-filled tank as part of an advanced development zero-boiloff (ZBO) ground test. NASA Marshall Space Flight Center's (MSFC) Advanced Space Transportation Program supported this test to improve the performance of in-space propulsion system concepts. Recent studies (ref. 1) have shown significant mass reductions and other advantages when incorporating active cooling in a ZBO configuration, enabling consideration of high-performing cryogenic propellants for long-duration applications in space. Active cooling was integrated via a thermosyphon, made of copper, 42 in. (1070 mm) long with an inner diameter of 0.436 in. (11 mm). It was charged with nitrogen to 225 psia at 300 K, which provided a fill ratio of 15 percent. The temperatures and heat flows through the thermosyphon were monitored during the startup phase of the ZBO test, and steady-state tests were conducted over a range of increasing and decreasing heat flows. The results also were compared with the initial design calculations and with results for a similar thermosyphon. They show that the thermal resistance of the thermosyphon was one-half of that expected--0.2 K/W at a heat flow of 8.0 W. The design calculations also showed that this resistance can be made relatively constant over a wider range of heat flows by making the ratio of evaporator area to condenser area 3:1. The better-than-expected results will translate into reduced integration loss for the ZBO concept.

Plachta, David W.↗

Testing to Transition the J-2X from Paper to Hardware

The J-2X Upper Stage Engine (USE) will be the first new human-rated upper stage engine since the Apollo program of the 1960s. It is designed to carry the Ares I and Ares V into orbit and send the Ares V to the Moon as part of NASA's Constellation Program. This paper will provide an overview of progress on the design, testing, and manufacturing of this new engine in 2009 and 2010. The J-2X embodies the program goals of basing the design on proven technology and experience and seeking commonality between the Ares vehicles as a way to minimize risk, shorten development times, and live within current budget constraints. It is based on the proven J-2 engine used on the Saturn IB and Saturn V launch vehicles. The prime contractor for the J-2X is Pratt & Whitney Rocketdyne (PWR), which is under a design, development, test, and engineering (DDT&E) contract covering the period from June 2006 through September 2014. For Ares I, the J-2X will provide engine start at approximately 190,000 feet, operate roughly 500 seconds, and shut down. For Ares V, the J-2X will start at roughly 190,000 feet to place the Earth departure stage (EDS) in orbit, shut down and loiter for up to five days, re-start on command and operate for roughly 300 seconds at its secondary power level to perform trans lunar injection (TLI), followed by final engine shutdown. The J-2X development effort focuses on four key areas: early risk mitigation, design risk mitigation, component and subassembly testing, and engine system testing. Following that plan, the J-2X successfully completed its critical design review (CDR) in 2008, and it has made significant progress in 2009 and 2010 in moving from the drawing board to the machine shop and test stand. Post-CDR manufacturing is well under way, including PWR in-house and vendor hardware. In addition, a wide range of component and sub-component tests have been completed, and more component tests are planned. Testing includes heritage powerpack, turbopump inducer water flow, turbine air flow, turbopump seal testing, main injector and gas generator, injector testing, augmented spark igniter testing, nozzle side loads cold flow testing, nozzle extension film cooling flow testing, control system testing with hardware in the loop, and nozzle extension emissivity coating tests. In parallel with hardware manufacturing, work is progressing on the new A-3 test stand to support full duration altitude testing. The Stennis A-2 test stand is scheduled to be turned over to the Constellation Program in September 2010 to be modified for J-2X testing also. As the structural steel was rising on the A-3 stand, work was under way in the nearby E complex on the chemical steam generator and subscale diffuser concepts to be used to evacuate the A-3 test cell and simulate altitude conditions.

Byrd, Tom↗

Space Station Freedom ECLSS: A step toward autonomous regenerative life support systems

The Environmental Control and Life Support System (ECLSS) is a Freedom Station distributed system with inherent applicability to extensive automation primarily due to its comparatively long control system latencies. These allow longer contemplation times in which to form a more intelligent control strategy and to prevent and diagnose faults. The regenerative nature of the Space Station Freedom ECLSS will contribute closed loop complexities never before encountered in life support systems. A study to determine ECLSS automation approaches has been completed. The ECLSS baseline software and system processes could be augmented with more advanced fault management and regenerative control systems for a more autonomous evolutionary system, as well as serving as a firm foundation for future regenerative life support systems. Emerging advanced software technology and tools can be successfully applied to fault management, but a fully automated life support system will require research and development of regenerative control systems and models. The baseline Environmental Control and Life Support System utilizes ground tests in development of batch chemical and microbial control processes. Long duration regenerative life support systems will require more active chemical and microbial feedback control systems which, in turn, will require advancements in regenerative life support models and tools. These models can be verified using ground and on orbit life support test and operational data, and used in the engineering analysis of proposed intelligent instrumentation feedback and flexible process control technologies for future autonomous regenerative life support systems, including the evolutionary Space Station Freedom ECLSS.

Dewberry, Brandon S.↗

Usability of Operational Performance Support Tools - Findings from Sea Test II

Sea Test II, aka NASA Extreme Environment Mission Operations 17(NEEMO 17) took place in the Florida Aquarius undersea habitat. This confined underwater environment provides a excellent analog for space habitation providing similarities to space habitation such as hostile environment, difficult logistics, autonomous operations, and remote communications. This study collected subjective feedback on the usability of two performance support tools during the Sea Test II mission, Sept 10‐14, 2013; Google Glass and iPAD. The two main objectives: - Assess the overall functionality and usability of each performance support tool in a mission analog environment. - Assess the advantages and disadvantages of each tool when performing operational procedures and Just‐In‐Time‐Training (JITT).

Byrne, Vicky↗

Propelling Exploration to the Moon and Beyond

As the Constellation Program enters its fourth year, the Ares Projects have made substantial progress toward sending human explorers beyond Earth orbit. The Ares I crew launch vehicle, which will take six astronauts or cargo to the International Space Station or four astronauts to rendezvous with Ares V for missions to the Moon, is the first human-rated vehicle NASA has developed in over 30 years. Since the Exploration Systems Architecture Study in 2005, the Ares Projects have completed a successful system requirements review, system definition review, and preliminary design review for the Ares I crew launch vehicle. The Ares I elements are well into development, beginning with the Shuttle-derived, five-segment solid rocket motor that will provide first-stage propulsion. The first stage team has poured its first production simulation article motor and will be pouring and firing the first five-segment development motor in 2009. Large-scale tooling has been installed and tested to produce propellant tanks for the liquid-fuel upper stage at Marshall Space Flight Center (MSFC) in Alabama. The initial upper stage units and main propulsion test article will be manufactured and tested at MSFC before transferring to Michoud Assembly Facility in Louisiana. The upper stage engine team has completed powerpack testing using Apollo J-2 heritage hardware and begun construction of a new altitude test stand at Stennis Space Center in Mississippi. The flight and integrated testing group has designed and built hardware for the Ares I-X test flight scheduled for 2009, as well as begun refurbishing existing infrastructure to support ground testing. Additionally, a base configuration has been selected for the Ares V cargo launch vehicle, which will send the Altair lunar lander and Orion to the Moon. Today, the Ares Projects are well on the way to building America s next generation of exploration-capable launch vehicles.

Cook, Stephen A.↗

Hybrid Wing Body Shielding Studies Using an Ultrasonic Configurable Fan Artificial Noise Source Generating Simple Modes

An Ultrasonic Configurable Fan Artificial Noise Source (UCFANS) was designed, built, and tested in support of the Langley Research Center s 14- by 22-Foot wind tunnel test of the Hybrid Wing Body (HWB) full three-dimensional 5.8 percent scale model. The UCFANS is a 5.8 percent rapid prototype scale model of a high-bypass turbofan engine that can generate the tonal signature of candidate engines using artificial sources (no flow). The purpose of the test was to provide an estimate of the acoustic shielding benefits possible from mounting the engine on the upper surface of an HWB aircraft and to provide a database for shielding code validation. A range of frequencies, and a parametric study of modes were generated from exhaust and inlet nacelle configurations. Radiated acoustic data were acquired from a traversing linear array of 13 microphones, spanning 36 in. Two planes perpendicular to the axis of the nacelle (in its 0 orientation) and three planes parallel were acquired from the array sweep. In each plane the linear array traversed five sweeps, for a total span of 160 in. acquired. The resolution of the sweep is variable, so that points closer to the model are taken at a higher resolution. Contour plots of Sound Pressure Level, and integrated Power Levels are presented in this paper; as well as the in-duct modal structure.

Sutliff, Daniel, L.↗

Space Shuttle Orbiter ECLSS.

The Orbiter Environmental Control and Life Support System (ECLSS) provides the functions of atmosphere revitalization, crew life support, active thermal conditioning, and airlock support for EVA and docking activities. The ECLSS must satisfy the requirements of orbital missions with four to ten crewmembers and mission duration of a few hours to 30 days and the requirements associated with an atmospheric horizontal flight test program and ferry flight missions. The ECLSS development plan utilizes an ECLSS ground test article and thermal/vacuum testing to support the first horizontal flight test at the end of 1976. The ground testing and horizontal flight test program certify the Orbiter ECLSS for the first orbital flight in early 1978.

Stoll, O. T.↗

How Much Testing is Needed to Manage Supportability Risks for Beyond-LEO Missions?

Supportability will be a significantly greater driver of cost and risk for future deep-space crewed missions than it has been in the past. Spares requirements and maintenance risk mitigation in particular present an unprecedented challenge for missions beyond Low Earth Orbit (LEO), since, for the first time in human spaceflight history, crews will be weeks or months away from resupply or a safe return to Earth in the event of an abort. Under these conditions, failure rates are a critical parameter that must be well-understood in order to manage logistics and risk effectively. However, failure rates cannot be measured directly, and can only be estimated based on past experience and test results. Previous research has shown that International Space Station (ISS) operational experience has provided significant benefits to future missions by reducing uncertainty and improving accuracy in failure rate estimates, resulting in significant reductions in mass and risk for beyond-LEO missions. This paper updates and expands on that research and quantifies the potential value of continued testing for future mission supportability. Frequentist and Bayesian models for evaluating, validating, and updating failure rate estimates are described, and are combined with supportability models to examine potential impacts of additional operating experience for future missions in terms of logistics mass reduction. The implications of these results for technology development, system design, and program planning are discussed along with lessons learned and recommendations for future system development. In the end, there is no simple answer to the question of how much testing is required, but the models described in this paper provide a way to evaluate the potential impacts of testing in order to inform test planning.

Andrew C Owens↗

Adaptive Recovery Model: Designing Systems for Testing Tracing and Vaccination to Support COVID-19 Recovery Planning.

This report documents a new approach to designing disease control policies that allocate scarce testing, contact tracing, and vaccination resources to better control community transmission of COVID19 or similar diseases. The Adaptive Recovery Model (ARM) combines a deterministic compartmental disease model with a stochastic network disease propagation model to enable us to simulate COVID-19 community spread through the lens of two complementary modeling motifs. ARM contact networks are derived from cell-phone location data that have been anonymized and interpreted as individual arrivals to specic public locations. Modeling disease spread over these networks allows us to identify locations within communities conducive to rapid disease spread. ARM applies this model- and data-derived abstractions of community transmission to evaluate the effectiveness of disease control measures including targeted social distancing, contact tracing, testing and vaccination. The architecture of ARM provides a unique capacity to help decision makers understand how best to deploy scarce testing, tracing and vaccination resources to minimize disease-spread potential in a community. This document details the novel mathematical formulations underlying ARM, presents a dynamical stability analysis of the deterministic model components, a sensitivity analysis of control parameters and network structure, and summarizes a process for deriving contact networks from cell-phone location data. An example use case steps through applying ARM to evaluate three targeted social distancing policies using Bernalillo County, New Mexico as an exemplar test locale. This step-by-step analysis demonstrates how ARM can be used to measure the relative performance of competing public health policies. Initial scenario tests of ARM shows that ARMs design focus on resource utilization rather than simple incidence prediction can provide decision makers with additional quantitative guidance for managing ongoing public health emergencies and planning future responses.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Load Test of Alum-a-Lift Serial No. 33053261

An Alum-A-Lift A800CSPD-60 (Lift) was procured to support mechanical testing of programmatic equipment. This testing will take place within the Bldg. 131 Hi Bay. The design of the Lift procured for the purposes at LLNL was a modification of a machine that had previously been engineered and sold by Alum-a-Lift, see Fig. 1. The modification was to shorten the boom from a 56 in. length to a 28 in. length. The modified design is illustrated in Fig. 2. The Lift was fabricated and shipped to LLNL, received ~ June 2022. Upon arrival, it was successfully evaluated for “no-load” performance capability. Upon inspection of the documentation provided by Alum-a-Lift, it was noted that the load test was performed to qualify the machine for a lifting capacity of 200 lb. The LLNL requirement was that the capacity of the machine be 400 lb. Conversations with the vendor, Alum-A-Lift, followed this discovery. Rather than send the machine back to the vendor for load testing, discussions concurred that LLNL would load test the machine and Alum-A-Lift would provide the relevant load test placard to be placed on the machine subsequent to the successful load test. This MESN provides documentation of the load test to qualify the Alum-a-Lift to its’ rated capacity of 400 lb.

42 ENGINEERING↗

Lunar orbital mass spectrometer experiment

The design, development, manufacture, test and calibration of five lunar orbital mass spectrometers with the four associated ground support equipment test sets are discussed. A mass spectrometer was installed in the Apollo 15 and one in the Apollo 16 Scientific Instrument Module within the Service Module. The Apollo 15 mass spectrometer was operated with collection of 38 hours of mass spectra data during lunar orbit and 50 hours of data were collected during transearth coast. The Apollo 16 mass spectrometer was operated with collection of 76 hours of mass spectra data during lunar orbit. However, the Apollo 16 mass spectrometer was ejected into lunar orbit upon malfunction of spacecraft boom system just prior to transearth insection and no transearth coast data was possible.

Lord, W. P.↗

Surface color perception under two illuminants: the second illuminant reduces color constancy

This study investigates color perception in a scene with two different illuminants. The two illuminants, in opposite corners, simultaneously shine on a (simulated) scene with an opaque dividing wall, which controls how much of the scene is illuminated by each source. In the first experiment, the height of the dividing wall was varied. This changed the amount of each illuminant reaching objects on the opposite side of the wall. Results showed that the degree of color constancy decreased when a region on one side of the wall had cues to both illuminants, suggesting that cues from the second illuminant are detrimental to color constancy. In a later experiment, color constancy was found to improve when the specular highlight cues from the second illuminant were altered to be consistent with the first illuminant. This corroborates the influence of specular highlights in surface color perception, and suggests that the reduced color constancy in the first experiment is due to the inconsistent, though physically correct, cues from the two illuminants.

Contrast Sensitivity/physiology↗

Reefing of Quarter Spherical Ribbon Parachutes Used in the Ares I First Stage Deceleration System

This paper introduces the parachutes that have been drop tested in support of the Ares I first stage deceleration system development. The results of the tests show that the reefing ratios for these quarter spherical ribbon parachutes provide the same reefed drag area as historical conical ribbon parachutes. Two sources are investigated for properly normalizing the parachutes relative to their suspension line length, and one is found to be superior.

Schmidt, Jason R.↗

Hybrid Wing Body Shielding Studies Using an Ultrasonic Configurable Fan Artificial Noise Source Generating Typical Turbofan Modes

An Ultrasonic Configurable Fan Artificial Noise Source (UCFANS) was designed, built, and tested in support of the NASA Langley Research Center's 14- by 22-ft wind tunnel test of the Hybrid Wing Body (HWB) full 3-D 5.8 percent scale model. The UCFANS is a 5.8 percent rapid prototype scale model of a high-bypass turbofan engine that can generate the tonal signature of proposed engines using artificial sources (no flow). The purpose of the test was to provide an estimate of the acoustic shielding benefits possible from mounting the engine on the upper surface of an HWB aircraft using the projected signature of the engine currently proposed for the HWB. The modal structures at the rating points were generated from inlet and exhaust nacelle configurations--a flat plate model was used as the shielding surface and vertical control surfaces with correct plan form shapes were also tested to determine their additional impact on shielding. Radiated acoustic data were acquired from a traversing linear array of 13 microphones, spanning 36 in. Two planes perpendicular, and two planes parallel, to the axis of the nacelle were acquired from the array sweep. In each plane the linear array traversed four sweeps, for a total span of 168 in. acquired. The resolution of the sweep is variable, so that points closer to the model are taken at a higher resolution. Contour plots of Sound Pressure Levels, and integrated Power Levels, from nacelle alone and shielded configurations are presented in this paper; as well as the in-duct mode power levels

Sutliff, Daniel l.↗

CPAS Preflight Drop Test Analysis Process

Throughout the Capsule Parachute Assembly System (CPAS) drop test program, the CPAS Analysis Team has developed a simulation and analysis process to support drop test planning and execution. This process includes multiple phases focused on developing test simulations and communicating results to all groups involved in the drop test. CPAS Engineering Development Unit (EDU) series drop test planning begins with the development of a basic operational concept for each test. Trajectory simulation tools include the Flight Analysis and Simulation Tool (FAST) for single bodies, and the Automatic Dynamic Analysis of Mechanical Systems (ADAMS) simulation for the mated vehicle. Results are communicated to the team at the Test Configuration Review (TCR) and Test Readiness Review (TRR), as well as at Analysis Integrated Product Team (IPT) meetings in earlier and intermediate phases of the pre-test planning. The ability to plan and communicate efficiently with rapidly changing objectives and tight schedule constraints is a necessity for safe and successful drop tests.

Englert, Megan E.↗

Wind Tunnel Investigation of the Supersonic Stage Separation Aerodynamics of a Generic 0.0175-Scale Bimese Two-Stage-to-Orbit Reusable Launch Vehicle Configuration

A wind tunnel investigation was conducted of the supersonic stage separation aerodynamics of a generic two-stage-to-orbit bimese wingbody configuration in the NASA Langley Research Center Unitary Plan Wind Tunnel. Proximity and isolated model testing was conducted at Mach numbers of 2.3, 3.0, and 4.5 and a unit Reynolds number of 2.0 million per foot using 0.0175-scale models of the Langley Glide-Back Booster concept designated as the orbiter and booster in belly-to-belly and back-to-belly configurations. Longitudinal forces and moments were obtained on both models and surface static pressure measurements were obtained on the orbiter model at 328 relative proximity locations and at relative angles of attack of 0 degrees and 5 degrees. The test results supported a larger effort to develop and validate experimental and computational tools applicable to the design and simulation of stage separation and abort procedures for reusable launch vehicles composed of multiple bodies, including winged bodies. An initial proof-of-concept experiment featuring low-cost uninstrumented models was conducted to verify an emerging automated model control system and new support system hardware, and to identify potential model and support system blockage and unsteady aerodynamics/model dynamics prior to committing to higher-fidelity instrumented models. This investigation led to upgrades in the facility stage separation hardware, calibration and testing techniques and capabilities, and data analysis and documentation methodologies that have been extended to the more recent NASA Constellation and Space Launch System crew and cargo launch vehicle programs. A virtual diagnostics interface methodology was used to facilitate the design of the stage separation support hardware, to position the models in the test section, and to define the experimental test space. Advances in the facility automated model positioning system established a foundation for the development of a continuous-sweep data acquisition technique that is responsible for significant productivity improvements to the current NASA Space Launch System test program. The automated model positioning capability was leveraged to conduct a companion statistically-designed stage separation experiment requiring randomization of the relative proximity positions of the orbiter and booster models. The respective zones of influence and interference effects of the orbiter and booster were identified from three-dimensional scatter plots, contour and influence maps, and two-dimensional plotting methods. The highly-nonlinear, shock-dominated aerodynamic characteristics of the orbiter and booster in the Unitary Plan Wind Tunnel exhibited good agreement with independent test data obtained in a NASA Marshall Space Flight Center wind tunnel and with computational fluid dynamics predictions using a compressible, three-dimensional flow solver and an inviscid, unstructured Cartesian method.

Erickson, Gary E.↗

Overview of RS-25 Adaptation Hot-Fire Test Series for SLS, Status and Lessons Learned

This paper discusses the engine system design, hot-fire test history and analyses for the RS-25 Adaptation Engine test series, a major hot-fire test series supporting the Space Launch System (SLS) program. The RS-25 is an evolution of the Space Shuttle Main Engine (SSME). Since the SLS mission profile and engine operating conditions differ from that experienced by the SSME, a test program was needed to verify that SLS-unique requirements could be met by the adapted legacy engines. A series of 18 tests, including one engine acceptance test, was conducted from January 2015 to October 2017, to directly support Exploration Mission-1 (EM-1), the first flight of SLS. These tests were the first hot-firings of legacy SSME hardware since 2009. Major findings are described along with top level overview of the engine system.

Vetcha, Naveen↗