Search NASA⌕ Search

SEARCH · Search NASA

Results for “LOGISTICS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

Explosives for Lunar Seismic Profiling Experiment (LSPE)

Explosive charges of various sizes were investigated for use in lunar seismic studies. Program logistics, and the specifications for procurement of bulk explosives are described. The differential analysis, thermal properties, and detonation velocity measurements on HNS/Teflon 7C 90/10 are reported along with the field tests of the hardware. It is concluded that nearly all large explosive charges crack after fabrication, from aging or thermal shock. The cracks do not affect the safety, or reliability of the explosives.

Source record↗

Study of an evolutionary interim earth orbit program

An evolutionary, gradual, and step-wise spacecraft systems technology development from those used on the Apollos and Skylab 1 to that required for the space station was considered. The four mission spacecraft were dry workshop versions of the Saturn 4-B stage, and each individually configured, outfitted and launched by INT-21 vehicles. These spacecraft were evaluated for crews of three, six and nine men and for mission lifetimes of one year. Two versions of the Apollo CSM, a three man and a four man crew, were considered as the logistic vehicle. The solar cell electrical power system of the first mission evolves into a light weight panel system supplemented by an operating isotope-Brayton system on the later missions. The open life support system of the first mission evolves to a system which recovers both water and oxygen on the last mission. The data handling, communications, radiation shielding, micrometeoroid protection, and orbit keeping systems were determined. The program costs were estimated and, excluding operational costs, the cost for each mission would average about $2 billion of which one-sixth would be for development, one-fourth for experiments, and the balance for vehicle acquisition.

Anderson, J. L.↗

Study of solid rocket motor for space shuttle booster, volume 2, book 3, appendix A

A systems requirements analysis for the solid propellant rocket engine to be used with the space shuttle was conducted. The systems analysis was developed to define the physical and functional requirements for the systems and subsystems. The operations analysis was performed to identify the requirements of the various launch operations, mission operations, ground operations, and logistic and flight support concepts.

Source record↗

Geosynchronous platform definition study. Volume 3: Geosynchronous mission characteristics

The objectives of the study were to examine the nature of currently planned and new evolutionary geosynchronous programs, to analyze alternative ways of conducting missions, to establish concepts for new systems to support geosynchronous programs in an effective and economical manner, and to define the logistic support to carry out these programs. In order to meet these objectives, it was necessary to define and examine general geosynchronous mission characteristics and the potentially applicable electromagnetic spectrum characteristics. An organized compilation of these data is given with emphasis on the development and use of the data. Fundamental geosynchronous orbit time histories, mission profile characteristics, and delivery system characteristics are presented. In addition, electromagnetic spectrum utilization is discussed in terms of the usable frequency spectrum, the spectrum potentially available considering established frequency allocations, and the technology status as it affects the ability to operate within specific frequency bands.

Source record↗

Geosynchronous platform definition study. Volume 6: Geosynchronous program evaluation and recommendations

The programmatic analyses conducted to achieve the objectives of the study are presented. The characteristics are examined of alternate geosynchronous programs based on servicing concepts, geosynchronous platform configurations, and equipment definitions which have evolved during the study. The logistics support necessary to carry out programs using these systems is defined considering alternate approaches for on-orbit servicing. The costs of the resultant programs are then determined and the alternate program approaches compared. Conventional programs with expendable satellites are also defined to the extent necessary to permit comparison with on-orbit serviced platform programs.

Myers, H. L.↗

Utilizing ERTS-1 imagery for tectonic analysis through study of the Bighorn Mountains region

The author has identified the following significant results. Comparisons of imagery of three seasons, late summer-fall, winter, and spring indicate that for this region fall imagery is the best for overall geologic analysis. Winter scenes with light to moderate snow cover provide excellent topographic detail owing to snow enhancement, lower sun angle, and clarity of the atmosphere. Spring imagery has considerable reduction of tonal contrast owing to the low reflecting heavy green grass cover which subdues lithologic effects; heavy snow cover in the uplands masks topography. Mapping of geologic formations is impractical in most cases. Separation into tonal units can provide some general clues on structure. A given tonal unit can include parts of several geologic formations and different stratigraphic units can have the same tonal signature. Drainage patterns and anomalies provide the most consistent clues for detecting folds, monoclines, and homoclines. Vegetation only locally reflects lithology and structure. False color infrared 9 x 9 transparencies are the most valuable single imagery. Where these can be supplemented by U-2 color infrared for more detailed work, a tremendous amount of information is available. Adequately field checking such a large area just in one scene is the major logistic problem even in a fairly well known region.

Hoppin, R. A.↗

Study 2.6 operations analysis mission characterization

An analysis of the current operations concepts of NASA and DoD is presented to determine if alternatives exist which may improve the utilization of resources. The final product is intended to show how sensitive these ground rules and design approaches are relative to the total cost of doing business. The results are comparative in nature, and assess one concept against another as opposed to establishing an absolute cost value for program requirements. An assessment of the mission characteristics is explained to clarify the intent, scope, and direction of this effort to improve the understanding of what is to be accomplished. The characterization of missions is oriented toward grouping missions which may offer potential economic benefits by reducing overall program costs. Program costs include design, development, testing, and engineering, recurring unit costs for logistic vehicles, payload costs. and direct operating costs.

Wolfe, R. R.↗

Air Cargo Marketing Development

The factors involved in developing a market for air cargo services are discussed. A comparison is made between the passenger traffic problems and those of cargo traffic. Emphasis is placed on distribution analyses which isolates total distribution cost, including logistical costs such as transportation, inventory, materials handling, packaging, and processing. Specific examples of methods for reducing air cargo costs are presented.

Kersey, J. W.↗

Photography of a lithium vapor trail during the daytime.

Barium and lithium vapors were released from sounding rockets in the thermosphere and observed from aboard a jet aircraft at an altitude of 40,000 ft. The purpose of the releases was to demonstrate the feasibility of an all-weather technique for observing chemical releases and to evaluate methods of observing daytime releases. The selected flight plan of the aircraft allowed a series of observations of the trail from two different straight line paths. Data were recorded photographically. The reduction in sky brightness at the 40,000-ft altitude as compared to the ground allows the use of a filter with a 10-A bandwidth for trail photography in the daytime. These photographs verified the calculation of the usable angular field of the narrow-band filters. Photographs of a 45-min-old trail of lithium vapor were obtained up to 20 min after sunrise at the aircraft. It is concluded that now vapor trail observations may be made during the daytime without regard to weather and logistic restrictions.

Bedinger, J. F.↗

The Launch Processing System for Space Shuttle.

In order to reduce costs and accelerate vehicle turnaround, a single automated system will be developed to support shuttle launch site operations, replacing a multiplicity of systems used in previous programs. The Launch Processing System will provide real-time control, data analysis, and information display for the checkout, servicing, launch, landing, and refurbishment of the launch vehicles, payloads, and all ground support systems. It will also provide real-time and historical data retrieval for management and sustaining engineering (test records and procedures, logistics, configuration control, scheduling, etc.).

Springer, D. A.↗

Redundancy management of inertial systems.

The paper reviews developments in failure detection and isolation techniques applicable to gimballed and strapdown systems. It examines basic redundancy management goals of improved reliability, performance and logistic costs, and explores mechanizations available for both input and output data handling. The meaning of redundant system reliability in terms of available coverage, system MTBF, and mission time is presented and the practical hardware performance limitations of failure detection and isolation techniques are explored. Simulation results are presented illustrating implementation coverages attainable considering IMU performance models and mission detection threshold requirements. The implications of a complete GN&C redundancy management method on inertial techniques are also explored.

Mckern, R. A.↗

Sortie laboratory, phase B technical summary

The design and operational requirements which evolved from Sortie Lab (SL) analysis are summarized. A source of requirements for systems is given along with experimental support for the SL, baseline. Basic design data covered include: configuration definition, mission analysis, experimental integration, safety, and logistics. A technical summary outlines characteristics which reflect the influence of the growth in SL capability and the results of the mission and operational analysis. Each of the selected areas is described in terms of objectives, equipment, operational concept, and support requirements.

Source record↗

Crew interface specifications development functions, phase 3A

The findings and data products developed during the crew interface specification study for inflight maintenance and stowage functions are presented. Guidelines are provided for improving the present progress of defining, controlling, and managing the flight crew requirements. The following data products were developed: (1) description of inflight maintenance management process, (2) specifications for inflight maintenance management requirements, and (3) suggested inflight maintenance data processing reports for logistics management.

Carl, J. G.↗

Operations analysis, study 2.6. Volume 2: Analysis results

Results are presented of the assessment of the space transportation system as it applies to future space program planning. Comparisons are given between space servicing and ground refurbishment of payloads. Mission characterization, logistic vehicle options, and payload design options are also discussed.

Wolfe, R. R.↗

Substructure analysis techniques and automation

A basic automated substructure analysis capability for NASTRAN is presented which eliminates most of the logistical data handling and generation chores that are currently associated with the method. Rigid formats are proposed which will accomplish this using three new modules, all of which can be added to level 16 with a relatively small effort.

Hennrich, C. W.↗

Radio astronomy Explorer-B in-flight mission control system development effort

A description is given of the development for the Mission Analysis Evaluation and Space Trajectory Operations (MAESTRO) program to be used for the in-flight decision making process during the translunar and lunar orbit adjustment phases of the flight of the Radio Astronomy Explorer-B. THe program serves two functions: performance and evaluation of preflight mission analysis, and in-flight support for the midcourse and lunar insertion command decisions that must be made by the flight director. The topics discussed include: analysis of program and midcourse guidance capabilities; methods for on-line control; printed displays of the MAESTRO program; and in-flight operational logistics and testing.

Lutsky, D. A.↗

Applications of remote sensing data to the Alaskan environment

The ERTS program provides a means to overcome the formidable logistic and economic costs of preparing environmental surveys of the vast and relatively unexplored regions of Alaska. There is an excellent potential in satellite remote sensing to benefit Federal, state, local, and private agencies, by providing a new synoptic data base which is necessary for the preparation of the needed surveys and the search for solutions to environmental management problems. One approach in coupling satellite data to Alaskan problems is a major program initiated by the University of Alaska and funded by NASA's Goddard Space Flight Center. This included 12 projects whose aims were to study the feasibility of applying ERTS data to the disciplines of ecology, agriculture, hydrology, wildlife management, oceanography, geology, glaciology, volcanology, and archaeology.

Belon, A. E.↗

Supply support of NASA tracking networks

The extent which supply support for Jet Propulsion Laboratory's Deep Space Network and Goddard Space Flight Center's Space Flight Tracking and Data Network should be consolidated is considered along with the Identification of opportunities for improvements in each of the supply systems without regard to consolidation. There is a considerable amount of commonality between the items in the stock catalogs at the two network depots, 58% for federal stock number items and 30% overall. The workload at the DSIF Supply Depot (DSD) is small (less than 20%) compared to the Network Logistics Depot (NLD). A number of important benefits in supply support would result from a consolidation of DSD into NLD. LMI found that a consolidation as is, without any changes in inventory management techniques, would reduce annual operating costs by from $208,000 to $358,000. However, if the consolidation were coupled with a change to use of economic order quantities, the annual operating cost reduction would range from $930,000 to $1,078,000.

Source record↗