U.S. Virgin Islands Wind Resources Update 2014
This report summarized the data collected from two 60-meter (m) meteorological towers (met masts or met towers) and three sonic detection and ranging (SODAR) units on St. Thomas and St. Croix in 2012 and 2013. These results are an update to the previous feasibility study; the collected data are critical to the successful development of a wind project at either site (Lantz et al. 2012). The wind maps for the territory were updated based on these improved data. The National Renewable Energy Laboratory (NREL) conducted measurements from met towers and SODAR units for several locations in the U.S. Virgin Islands (USVI). Both met masts were deployed for more than a year and produced high-quality data (standard industry practice in the wind industry). The Longford (St. Croix) and Bovoni (St. Thomas) sites are estimated to have long-term corrected wind speeds that exceed 7 meters per second (m/s), which may produce financially viable wind projects for both sites. The levelized cost of energy for both sites was estimated at $\$$0.08–$\$$0.14 per kilowatt-hour for typical utility-scale wind turbine with the uncertainty in the estimate driven by uncertainty in the installed capital costs of the proposed wind farms. These estimates assume that the wind production tax credit is not reinstated, but that accelerated depreciation is in place.