Search NASA⌕ Search

SEARCH · Search NASA

Results for “Nuclear waste management program*”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

Lessons Learned from the First Year of Property Remediation - 20475

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste (LLRW) in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL) on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI compliantly, on time and within budget is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The larger of the two PHAI scopes of work - the Port Hope Project - involves the cleanup of approximately 1.2 million cubic metres of historic LLRW from 18 major sites in Port Hope, the construction of an engineered aboveground mound where the waste will be safely contained and the long-term maintenance and monitoring of the facility. Construction of the waste water treatment plant, the first three of four cells in the mound and supporting infrastructure is complete, with construction of the fourth cell in progress. In 2017 with the movement of on-site waste at this facility began and is now complete. Waste excavation and transportation from off-site locations within the community began in 2018; the cleanup of four temporary storage sites is now complete and remediation at several other major sites is underway. The Port Hope Project also includes a survey of the interior and exterior investigation of approximately 4,800 properties, primarily residential, in the urban area of Port Hope for the presence or absence of historic LLRW. The current projection is that approximately 1,250 privately owned residential and commercial properties known as Small-Scale Sites (SSS) will be identified as having waste exceeding the PHAI clean-up criteria. This paper will outline some of the challenges and lessons learned from the first year of SSS remediation including contractual, data and design issues; interaction with and managing expectations of stakeholders; weather, site and structure conditions as well as municipal permitting, resourcing, transportation and remediation verification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced reprocessing developments in Europe contribution of European projects ACSEPT and ACTINET-I3

Nuclear energy has more than ever to demonstrate that it can contribute safely and on a sustainable way to answer the international increase in energy needs. Actually, in addition to an increased safety of the reactors themselves, its acceptance is still closely associated to our capability to reduce the lifetime of the nuclear waste, to manage them safely and to propose options for a better use of the natural resources. Spent fuel reprocessing can help to reach these objectives. But this cannot be achieved only by optimizing industrial processes through engineering studies. It is of a primary importance to increase our fundamental knowledge in actinide sciences in order to build the future of nuclear energy on reliable and scientifically-founded results, and therefore meet the needs of the future fuel cycles in terms of fabrication and performance of fuels, reprocessing and waste management. At the European level, both the collaborative project ACSEPT and the Integrated Infrastructure Initiative ACTINET-I3 work together to improve our knowledge in actinides chemistry and therefore develop advanced separation processes. These tools are complementary and work in close connection on some specific issues such as the understanding of the selectivity of extracting organic ligands. By offering trans-national access to the main nuclear research facility in Europe, ACTINET-I3 aims at increasing the knowledge in actinide sciences by gathering all the expertise available in European nuclear research institutes or university and giving them the opportunity to come and work in hot-labs (ITU, Atalante...) or beamlines (ESFR, ANKA, PSI) ACSEPT is focused on the development of advanced separation processes, both aqueous and pyrochemical. Head-end steps, fuel re-fabrication, solvent treatment, waste management are also taken into account. In aqueous process development, the SANEX and innovative SANEX flowsheets demonstration were successfully achieved. Chemical systems were selected for GANEX and a hot-test under finalization thanks to an important collaboration between European teams. In pyrometallurgy, studies on actinide back-extraction from aluminium and exhaustive electrolysis allowed the validation of two flowsheets developed from more then 10 years in Europe. In addition, efforts were made to increase collaborations, mutualize and homogenise procedures and share good practices. A training and education program including seminars, workshops, brainstorming meeting but also student exchanges and support to post-doctorate fellowships was a key point for maintaining and increasing a high expertise level in actinide separation sciences in Europe. The second ACSEPT International workshop, organised as a specific session of the next Atalante 2012 International Conference, will conclude the ACSEPT project. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A WM Facility for the Processing of Radioactive Materials Arising from the Decommissioning Activities of the Belgian Nuclear Power Plant of Doel - 16042

Doel Nuclear Power Plant is located in the northern part of Belgium in the harbour of Antwerp on the Scheldt River. On this 80-hectare site Electrabel, the Belgian utility, operates four PWRs with a total generation capacity of 2911 MWe. Those nuclear power units were commissioned in 1975 (Doel 1 and 2 - twin units), in 1982 (Doel 3) and in 1985 (Doel 4). In light of the Belgian governments decision to definitively shutdown the oldest units of the site (Doel 1 and 2 - 433 MWe each) in 2015 at the end of their 40-year design lifetime, Electrabel launched a D and D program in partnership with Tractebel Engineering in July 2012. During the D and D preparation phase prior to the final shutdown, studies performed by Tractebel Engineering showed the added benefit of a purpose-built Waste Management Facility (WMF) specifically equipped to process contaminated and activated components generated by the in-situ dismantling activities. The WMF is a key infrastructure contributing to a large extent to the Waste Minimization Policy within the global D and D program. The present paper aims at presenting its strategic, logistic, infra-structural, and design principles. At the end of 2014, the Belgian government and Electrabel entered into discussions to envisage a 10-year lifetime extension of Doel 1 and 2 units. Therefore, Electrabel decided to put the D and D program on hold. Nevertheless, the preparatory studies for the future D and D activities on Doel site are set on solid assumptions and pave the way towards a safe, cost-effective and waste minimizing decommissioning process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Air Shipment of Highly Enriched Uranium Spent Nuclear Fuel from Romania

Romania safely air shipped 23.7 kilograms of Russian origin highly enriched uranium (HEU) spent nuclear fuel from the VVR S research reactor at Magurele, Romania, to the Russian Federation in June 2009. This was the world’s first air shipment of spent nuclear fuel transported in a Type B(U) cask under existing international laws without special exceptions for the air transport licenses. This shipment was coordinated by the Russian Research Reactor Fuel Return Program (RRRFR), part of the U.S. Department of Energy Global Threat Reduction Initiative (GTRI), in cooperation with the Romania National Commission for Nuclear Activities Control (CNCAN), the Horia Hulubei National Institute of Physics and Nuclear Engineering (IFIN-HH), and the Russian Federation State Corporation Rosatom. The shipment was transported by truck to and from the respective commercial airports in Romania and the Russian Federation and stored at a secure nuclear facility in Russia where it will be converted into low enriched uranium. With this shipment, Romania became the 3rd country under the RRRFR program and the 14th country under the GTRI program to remove all HEU. This paper describes the work, equipment, and approvals that were required to complete this spent fuel air shipment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Benefits of a Biological Monitoring Program for Assessing Remediation Performance and Long-Term Stewardship - 12272

The Biological Monitoring and Abatement Program (BMAP) is a long-running program that was designed to evaluate biological conditions and trends in waters downstream of Department of Energy (DOE) facilities in Oak Ridge, Tennessee. BMAP monitoring has focused on aquatic pathways from sources to biota, which is consistent with the sites' clean water regulatory focus and the overall cleanup strategy which divided remediation areas into watershed administrative units. Specific programmatic goals include evaluating operational and legacy impacts to nearby streams and the effectiveness of implemented remediation strategies at the sites. The program is characterized by consistent, long-term sampling and analysis methods in a multidisciplinary and quantitative framework. Quantitative sampling has shown conclusively that at most Oak Ridge stream sites, fish and aquatic macro-invertebrate communities have improved considerably since the 1980s. Monitoring of mercury and PCBs in fish has shown that remedial and abatement actions have also improved stream conditions, although in some cases biological monitoring suggests further actions are needed. Follow-up investigations have been implemented by BMAP to identify sources or causes, consistent with an adaptive management approach. Biological monitoring results to date have not only been used to assess regulatory compliance, but have provided additional benefits in helping address other components of the DOE's mission, including facility operations, natural resource, and scientific goals. As a result the program has become a key measure of long-term trends in environmental conditions and of high value to the Oak Ridge environmental management community, regulators, and the public. Some of the BMAP lessons learned may be of value in the design, implementation, and application of other long-term monitoring and stewardship programs, and assist environmental managers in the assessment and prediction of the effectiveness of remedial actions and pollution abatement. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improving the Safety Culture by Strengthening Leadership Skills - 16563

As a primary contractor for the U.S. Department of Energy (DOE), CH2M HILL Plateau Remediation Company (CH2M) is managing a team of approximately 1,400 employees at the Hanford Site in Southeast Washington. The work on this 10-year, $5.7 billion contract ranges from design and construction to decommissioning and cleanup. In 2013, CH2M began the second half of its contract and expanded its leadership development program to focus on succession planning and strengthening the leadership skills of its employees. The goal is to create and sustain qualified leaders to lead the Hanford cleanup mission today and into the future. CH2M launched the Leadership Impact Initiative, a training program modeled from best practices used at other CH2M projects, including the Idaho Cleanup Project. Based on the results of a CH2M HILL Plateau Remediation Company site-wide safety culture survey, the company developed an improvement strategy focused on leadership development with emphasis on the front-line leadership. The strategy stresses core leadership principles and skill development to help managers more effectively engage the workforce. The two-day workshop gives employees the opportunity to build leadership on the job in an audience of their peers. CH2M expanded the workshops to include employees from all levels of the organization, including bargaining unit employees. The workshops are reinforced at quarterly all-manager meetings, communications among team members and regular sharing of lessons learned and experiences in the field. The Leadership Impact Initiative advances CH2M's vision of quality leadership and project delivery anchored by health and safety performance excellence. Since 2013, CH2M hosted more than 25 Leadership Impact Initiative workshops, reaching approximately 500 participants. Meanwhile, the company achieved the best safety record since the start of its contract, and results from its 2015 safety culture survey show improvements in the safety climate. A DOE assessment of the CH2M worker health and safety culture for the Voluntary Protection Program (VPP) found the workshop was a contributing factor to the contractor achieving VPP Star and VPP Star of Excellence Status. This paper summarizes the strategy behind the leadership development program, the outcomes and its relevance for other companies, particularly those on DOE Environmental Management decommissioning projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance Demonstration Program Plan for Nondestructive Assay of Boxed Wastes for the TRU Waste Characterization Program

Each testing and analytical facility performing waste characterization activities for the Waste Isolation Pilot Plant (WIPP) participates in the Performance Demonstration Program (PDP) to comply with the Transuranic Waste Acceptance Criteria for the Waste Isolation Pilot Plant (WAC) (DOE/WIPP-02-3122) and the Quality Assurance Program Document (QAPD) (CBFO-94-1012). The PDP serves as a quality control check for data generated in the characterization of waste destined for WIPP. Single-blind audit samples are prepared and distributed to each of the facilities participating in the PDP. Different PDPs evaluate the analyses of simulated headspace gases (HSGs), constituents of the Resource Conservation and Recovery Act (RCRA), and transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Salt Waste Processing Facility Project (SWPF) project management improvements: Working under a cost cap contract - 15523

The Salt Waste Processing Facility (SWPF), located at the Savannah River Site (SRS) in Aiken, South Carolina, is a multi-billion dollar LRW processing facility that represents the keystone for the U.S. Department of Energy (DOE)-EM clean-up mission at SRS. In June 2013, DOE and Parsons agreed to Contract Modification 0116 that definitized the remaining work to achieve Construction Complete with a target schedule and a cost cap contract structure. The SWPF project is currently 85 percent complete with construction, and approximately 10 percent complete with commissioning. To date there have been numerous lessons learned with regard to contract and project management, procurement, construction, safety and quality assurance approaches (both good practices and mistakes). These lessons learned are considered to be of significant value in improving the state of major project execution within the DOE-EM clean-up program as well as to the wider DOE complex. An overview of the current SWPF project status is provided, along with challenges associated with operating under a cost cap environment within a cost-plus contract structure. Key lessons learned will be discussed including contract management, baseline development and acceptance under DOE O 413.3, Program and Project Management for the Acquisition of Capital Assets requirements, cost and schedule control, change management and risk strategies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Contaminant Transport Parameters for the Groundwater Flow and Contaminant Transport Model of Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nye County, Nevada, Revision 1

This document presents a summary and framework of available transport data and other information directly relevant to the development of the groundwater transport model for Central and Western Pahute Mesa (PM) corrective action units (CAU). This model is referred to as the “PM CAU transport model” in this document. Central and Western PM are two areas of the Nevada National Security Site (NNSS) that historically were used for underground nuclear testing. These nuclear tests resulted in groundwater contamination in the vicinity of the underground test areas. As a result, the U.S. Department of Energy (DOE), Environmental Management (EM) Nevada Program is currently conducting a corrective action investigation (CAI) of the PM underground test areas. This work is a part of the Underground Test Area (UGTA) Activity in accordance with the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2016 Los Alamos National Laboratory Hazardous Waste Minimization Report

Waste minimization and pollution prevention are goals within the operating procedures of Los Alamos National Security, LLC (LANS). The US Department of Energy (DOE), inclusive of the National Nuclear Security Administration (NNSA) and the Office of Environmental Management, and LANS are required to submit an annual hazardous waste minimization report to the New Mexico Environment Department (NMED) in accordance with the Los Alamos National Laboratory (LANL or the Laboratory) Hazardous Waste Facility Permit. The report was prepared pursuant to the requirements of Section 2.9 of the LANL Hazardous Waste Facility Permit. This report describes the hazardous waste minimization program, which is a component of the overall Pollution Prevention (P2) Program, administered by the Environmental Stewardship Group (EPC-ES). This report also supports the waste minimization and P2 goals of the Associate Directorate of Environmental Management (ADEM) organizations that are responsible for implementing remediation activities and describes its programs to incorporate waste reduction practices into remediation activities and procedures. This report includes data for all waste shipped offsite from LANL during fiscal year (FY) 2016 (October 1, 2015 – September 30, 2016). LANS was active during FY2016 in waste minimization and P2 efforts. Multiple projects were funded that specifically related to reduction of hazardous waste. In FY2016, there was no hazardous, mixed-transuranic (MTRU), or mixed low-level (MLLW) remediation waste shipped offsite from the Laboratory. More non-remediation hazardous waste and MLLW was shipped offsite from the Laboratory in FY2016 compared to FY2015. Non-remediation MTRU waste was not shipped offsite during FY2016. These accomplishments and analysis of the waste streams are discussed in much more detail within this report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

GAIN Fuel Safety Research Workshop

The Gateway for Accelerated Innovation in Nuclear (GAIN) Fuel Safety Research Workshop was held in Idaho Falls, Idaho, at the Idaho National Laboratory (INL) meeting center in the Energy Innovation Laboratory (EIL). The purpose of the workshop was to gather fuel safety research needs from the broad range of industrial nuclear technology users and developers. The needs will be analyzed relative to the national laboratory capabilities to help inform program planning and funding. The workshop provided a forum to learn about transient testing from a research and regulatory perspective and tour participation of the Transient Reactor Test Facility (TREAT), Advanced Test Reactor (ATR), and Materials and Fuels Complex (MFC).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste management technology development and demonstration programs at Brookhaven National Laboratory

Two thermoplastic processes for improved treatment of radioactive, hazardous, and mixed wastes were developed from bench scale through technology demonstration: polyethylene encapsulation and modified sulfur cement encapsulation. The steps required to bring technologies from the research and development stage through full scale implementation are described. Both systems result in durable waste forms that meet current Nuclear Regulatory Commission and Environmental Protection Agency regulatory criteria and provide significant improvements over conventional solidification systems such as hydraulic cement. For example, the polyethylene process can encapsulate up to 70 wt pct. nitrate salt, compared with a maximum of about 20 wt pct. for the best hydraulic cement formulation. Modified sulfur cement waste forms containing as much as 43 wt pct. incinerator fly ash were formulated, whereas the maximum quantity of this waste in hydraulic cement is 16 wt pct.

Kalb, Paul D.↗

Nuclear Safety [Vol. 36, No. 1, January-June 1995]

Nuclear Safety is a journal that covers significant issues in the field of nuclear safety. Its primary scope is safety in the design, construction, operation, and decommissioning of nuclear power reactors worldwide and the research and analysis activities that promote this goal, but it also encompasses the safety aspects of the entire nuclear fuel cycle, including fuel fabrication, spent-fuel processing and handling, and nuclear waste disposal, the handling of fissionable materials and radioisotopes, and the environmental effects of all these activities. Table of Contents for this issue follows. THE CHORNOBYL ACCIDENT: 1 The Chornobyl Accident Revisited, Part II: The State of the Nuclear Fuel Located Within the Chornobyl Sarcophagus, A A. Borovoi and A. R. Sich; GENERAL SAFETY CONSIDERATIONS: 33 Nuclear Power Safety in Central and Eastern Europe, R. Wilson; 46 Safety of Nuclear Power Reactors in the Former Eastern European Countries, S. Chakraborty; 53 Technical Note: On the Definition of Common-Cause Failures, H. Paula; ACCIDENT ANALYSIS: 58 Modeling and Analysis of Core-Debris Recriticality During Hypothetical Severe Accidents in the Advanced Neutron Source Reactor, S.-H. Kim, V. Georgevich, D. B. Simpson, C. O. Slater, and R. P. Taleyarkhan; 68 Ignitability of Hydrogen/Oxygen/Diluent Mixtures in the Presence of Hot Surfaces, R. K. Kumar and G. W. Koroll; 94 Coupled RELAP5 and CONTAIN Accident Analysis Using PVM, K. A. Smith, A. J. Baratta, and G. E. Robinson; CONTROL AND INSTRUMENTATION: 109 Application of Fuzzy Logic in Nuclear Reactor Control Part I: An Assessment of State-of-the-Art, A. S. Heger, N. K. Alang-Rashid, and M. Jamshidi; DESIGN FEATURES: 122 Twenty-Third DOE/NRC Nuclear Air-Cleaning and Treatment Conference, R. R. Bellamy, J. J. Hayes, and M. W. First; ENVIRONMENTAL EFFECTS: 135 Atmospheric Dispersion and the Radiological Consequences of Normal Airborne Effluents from a Nuclear Power Plant, D. Fang, C. Z. Sun, and L. Yang; 142 Calculation of Distribution Coefficients for Radionuclides in Soils and Sediments, I. Puigdomenech and U. Bergstrom: OPERATING EXPERIENCES: 155 Reactor Shutdown Experience, Compiled by J. W. Cletcher; U.S. NUCLEAR REGULATORY COMMISSION INFORMATION AND ANALYSES: 158 Operating Experience Feedback Report—Reliability of Safety-Related Steam Turbine-Driven Standby Pumps Used in U.S. Commercial Nuclear Power Plants, J. R. Boardman; 166 Turbine Building Hazards, H. L Ornstein; RECENT DEVELOPMENTS: 169 Reports, Standards, and Safety Guides, D. S. Queener; 175 Proposed Rule Changes as of Dec. 31,1994; ANNOUNCEMENTS: 32 Harvard School of Public Health In-Place Filter Testing Workshop; 134 International Conference on Advances in the Operational Safety of Nuclear Power Plants; 193 30th Tennessee Industries Week; 193 DOE Technical Standards Program 1995 Workshop; 194 Multiphase Flow Experiments and Instrumentation; 180 The Authors; 185 Indexes to Nuclear Safety, Volumes 34 and 35.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Repository performance confirmation.

Repository performance confirmation links the technical bases of repository science and societal acceptance. This paper explores the myriad aspects of what has been labeled performance confirmation in U.S. programs, which involves monitoring as a collection of distinct activities combining technical and social significance in radioactive waste management. This paper is divided into four parts: (1) A distinction is drawn between performance confirmation monitoring and other testing and monitoring objectives; (2) A case study illustrates confirmation activities integrated within a long-term testing and monitoring strategy for Yucca Mountain; (3) A case study reviews compliance monitoring developed and implemented for the Waste Isolation Pilot Plant; and (4) An approach for developing, evaluating and implementing the next generation of performance confirmation monitoring is presented. International interest in repository monitoring is exhibited by the European Commission Seventh Framework Programme 'Monitoring Developments for Safe Repository Operation and Staged Closure' (MoDeRn) Project. The MoDeRn partners are considering the role of monitoring in a phased approach to the geological disposal of radioactive waste. As repository plans advance in different countries, the need to consider monitoring strategies within a controlled framework has become more apparent. The MoDeRn project pulls together technical and societal experts to assimilate a common understanding of a process that could be followed to develop a monitoring program. A fundamental consideration is the differentiation of confirmation monitoring from the many other testing and monitoring activities. Recently, the license application for Yucca Mountain provided a case study including a technical process for meeting regulatory requirements to confirm repository performance as well as considerations related to the preservation of retrievability. The performance confirmation plan developed as part of the Yucca Mountain license application identified a broad suite of monitoring activities. A revision of the plan was expected to winnow the number of activities down to a manageable size. As a result, an objective process for the next stage of performance confirmation planning was developed as an integral part of an overarching long-term testing and monitoring strategy. The Waste Isolation Pilot Plant compliance monitoring program at once reflects its importance to stakeholders while demonstrating adequate understanding of relevant monitoring parameters. The compliance criteria were stated by regulation and are currently monitored as part of the regulatory rule for disposal. At the outset, the screening practice and parameter selection were not predicated on a direct or indirect correlation to system performance metrics, as was the case for Yucca Mountain. Later on, correlation to performance was established, and the Waste Isolation Pilot Plant continues to monitor ten parameters originally identified in the compliance certification documentation. The monitoring program has proven to be effective for the technical intentions and societal or public assurance. The experience with performance confirmation in the license application process for Yucca Mountain helped identify an objective, quantitative methodology for this purpose. Revision of the existing plan would be based on findings of the total system performance assessment. Identification and prioritization of confirmation activities would then derive from performance metrics associated with performance assessment. Given the understanding of repository performance confirmation, as reviewed in this paper, it is evident that the performance confirmation program for the Yucca Mountain project could be readily re-engaged if licensing activities resumed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Under-tank Inspection with Ultrasonic Volumetric Non-destructive Examination Technology - 18470

The U.S. Department of Energy (DOE) and the Hanford Site Tank Operations Contractor Washington River Protection Solutions, LLC (WRPS) are sponsoring a non-destructive evaluation (NDE) technology development program to identify and mature volumetric (non-visual) NDE technology that will enable the examination of Hanford double-shell tank (DST) bottoms. NDE technology for Hanford under-tank examination will be made possible through technology maturation that includes adaptation of NDE sensor technology to overcome access challenges presented by tank risers and refractory pad air-slots, followed by integration with robotic delivery systems, and ultimately qualification and deployment of the inspection systems. The stages of technology maturation and the testing and evaluation required to support the process are organized under three program phases: Phase I - NDE Capability Testing: Identify and down-select NDE technologies based on flaw detection and characterization abilities only; Phase 2 - NDE Delivery System Testing: Mature promising NDE technologies to adapt transducer hardware and robotic delivery system to address access challenges; Phase 3 - Full-scale Demonstration of Integrated NDE System: Demonstrate adapted NDE technologies in a cold test platform to challenge flaw detection and navigation abilities. Phase I of the program, which was initiated and completed in FY2017, focused on completing the following five key activities: 1. Identifying a broad cross section of potentially applicable NDE volumetric inspection technologies for under-tank examination. 2. Down-selecting the broad set of NDE technologies to a set of strong candidates based on initial flaw detection performance and potential to be adapted/matured to overcome primary tank access challenges posed by access risers and/or refractory pad air-slots. 3. Evaluating the flaw detection performance of the candidate sensors through testing. 4. Using the test results to baseline sensor performance against the flaw detection requirements established for high-level waste tanks. 5. Assessing the trade-offs and vulnerabilities of the candidate sensors that would negatively impact sensor performance reliability or complicate tank inspection operations. The completion of the first three key activities satisfied the first two Phase I test objectives, which were to complete Technology Screening and Sensor Effectiveness Testing. Completion of the fourth key activity satisfied the final test objective of Phase I, which was to determine the extent to which the sensors can satisfy high-level waste tank flaw detection requirements. Sensor flaw detection performance testing yielded several suitable sensor technology options, although each has specific risks or challenges that would need to be accepted or overcome. Thus, the fifth key activity was performed to evaluate sensor risks and challenges for consideration with flaw detection performance. The Phase I evaluation outcomes will be used to support the Phase I programmatic objective, which is to identify one or more NDE sensor technologies for adaptation and maturation for the DST environment. Selection of one or more sensors will mark the culmination of Phase I of the NDE Technology Development Program and allow progression to Phase II.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integration of Environmental Compliance at the Savannah River Site - 13024

The Savannah River Site (SRS) is a large federal installation hosting diverse missions and multiple organizations with competing regulatory needs. Accordingly, there was a need to integrate environmental compliance strategies to ensure the consistent flow of information between Department of Energy-Savannah River (DOE-SR), the regulatory agencies and other interested parties. In order to meet this objective, DOE and major SRS contractors and tenants have committed to a strategy of collaboratively working together to ensure that a consistent, integrated, and fully coordinated approach to environmental compliance and regulator relationships is maintained. DOE-SR and Savannah River Nuclear Solutions, LLC, the SRS management and operations contractor, have established an environmental compliance integration process that provides for the consistent flow down of requirements to projects, facilities, SRS contractors, and subcontractors as well as the upward flow of information to assist in the early identification and resolution of environmental regulatory issues and enhancement of compliance opportunities. In addition, this process strongly fosters teamwork to collaboratively resolve complex regulatory challenges, promote pollution prevention and waste minimization opportunities to advance site missions in a manner that balances near-term actions with the long-term site vision, while being protective of human health and the environment. Communication tools are being utilized, some with enhancements, to ensure appropriate information is communicated to all levels with environmental responsibility at SRS. SRS internal regulatory integration is accomplished through a variety of informational exchange forums (e.g., Challenges, Opportunities and Resolution (COR) Team, DOE's Joint Site Regulatory Integration Team, and the Senior Environmental Managers Council (SEMC)). SRS communications and problem-solving with the regulatory agencies have been enhanced through formation of an interagency 'SRS Regulatory Integration Team (SRIT)'. The SRIT is a partnership comprised of representatives from DOE-SR (with contractor support), EPA Region 4 and the South Carolina Department of Health and Environmental Control (SCDHEC) and is chartered to develop a consensus understanding of SRS regulatory issues and activities. These forums and a formal environmental compliance integration process improve timely cross-functional decision making, problem solving, information sharing, and issue resolution. The SRS internal process has been formally documented in an Environmental Regulatory Integration Program Description, which is linked to the SRS Environmental Policy and agreed upon by all major contractors, subcontractors and tenants. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing Inventories of Heavy Actinides

The Department of Energy (DOE) has stored a limited inventory of heavy actinides contained in irradiated targets, some partially processed, at the Savannah River Site (SRS) and Oak Ridge National Laboratory (ORNL). The 'heavy actinides' of interest include plutonium, americium, and curium isotopes; specifically 242Pu and 244Pu, 243Am, and 244/246/248Cm. No alternate supplies of these heavy actinides and no other capabilities for producing them are currently available. Some of these heavy actinide materials are important for use as feedstock for producing heavy isotopes and elements needed for research and commercial application. The rare isotope 244Pu is valuable for research, environmental safeguards, and nuclear forensics. Because the production of these heavy actinides was made possible only by the enormous investment of time and money associated with defense production efforts, the remaining inventories of these rare nuclear materials are an important part of the legacy of the Nuclear Weapons Program. Significant unique heavy actinide inventories reside in irradiated Mark-18A and Mark-42 targets at SRS and ORNL, with no plans to separate and store the isotopes for future use. Although the costs of preserving these heavy actinide materials would be considerable, for all practical purposes they are irreplaceable. The effort required to reproduce these heavy actinides today would likely cost billions of dollars and encompass a series of irradiation and chemical separation cycles for at least 50 years; thus, reproduction is virtually impossible. DOE has a limited window of opportunity to recover and preserve these heavy actinides before they are disposed of as waste. A path forward is presented to recover and manage these irreplaceable National Asset materials for future use in research, nuclear forensics, and other potential applications.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The role of international collaboration in the United States geologic disposal research program

Abstract. More than a decade ago, the United States disposal program discontinued all research activities focused on the unsaturated fractured tuff formation at Yucca Mountain as the geologic disposal site for spent fuel and high-level radioactive waste. A new research and development (R&D) program was initiated to provide a sound technical basis for alternative disposal options across clay, crystalline, and salt rocks. The goals of this broad program were (and still are) to (1) increase confidence in the robustness of generic disposal concepts, (2) develop the science and engineering tools needed to support disposal concept implementation, and (3) conduct R&D on the direct disposal of existing dual-purpose (storage and transportation) canisters. Recognizing the benefits of international collaboration toward the common goal of safely and efficiently managing the back end of the nuclear fuel cycle, the program emphasized international cooperation as an effective strategy for sharing information and knowledge. In a multi-laboratory effort coordinated by Lawrence Berkeley National Laboratory, the United States Department of Energy (DOE) program established formal and informal cooperation partnerships with several international initiatives and institutions and developed a number of collaborative R&D activities in important research areas, such as engineered barrier integrity, near-field perturbations, radionuclide transport, performance assessment, and methods for characterization and monitoring of engineered and natural barriers. This presentation gives an overview of these R&D activities, with a specific focus on activities that improve our current understanding of the coupled thermal–hydrological–mechanical–chemical (THMC) processes occurring in engineered and natural barriers. We start with a brief review of selected international collaboration initiatives and then describe a few specific collaboration projects. We focus specifically on such studies that use experimental data sets provided by international research cooperation for joint modeling work to increase confidence in performance-relevant predictions of coupled processes. Overall, the focus on international collaboration has allowed deep engagement of US researchers with the international waste management R&D community in terms of best practices, new scientific advances, state-of-the-art simulation tools, new monitoring and performance confirmation approaches, and lessons learned. The joint R&D with international researchers, worldwide sharing of knowledge and experience, and access to relevant data and experiments from a variety of host rocks have helped our researchers to significantly improve their understanding of the current technical basis for disposal in a range of potential host rock environments. International collaboration also provides ample opportunity for training and educating junior staff that are well suited to move the United States disposal research program forward into the next decades, a promising avenue for developing a next-generation workforce of disposal scientists.

Birkholzer, Jens T.↗