Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operational Risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

Phosphate and Fluoride Processing Options for Hanford Sludge

The Direct Feed High-Level Waste (DFHLW) strategy represents an alternative flowsheet to bypass the Hanford Waste Treatment and Immobilization Plant (WTP) Pretreatment Facility. Key processing functions previously captured during baseline pretreatment operations include leaching and washing prior to solids concentration and should be considered in the new DFHLW flowsheet to maximize waste feed loading, minimize high-level waste (HLW) volume, and mitigate corrosion challenges associated with vitrification of high phosphate and fluoride concentrations. The effectiveness and efficiency of sludge washing can have a substantial impact on DST space and mission duration. Two target species that benefit significantly from washing are phosphate and fluoride. Commonly present in many high-level wastes at Hanford, phosphate and fluoride are found predominately in the form of salt precipitates and can have adverse and detrimental effects on glass waste loading. Additionally, fluoride produces melter off-gas that creates corrosion risks in the off-gas system piping. Determining the solubilities of fluoride and phosphate salts, as well as the dissolution kinetics under potential HLW processing conditions will help to mitigate future operational risks and mature flowsheet technical bases.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Methods to Automate Assessing the Outage Risk and Technical Specification Compliance for Planned Work and Current Plant Conditions. Light Water Reactor Sustainability Program report

This research effort is a part of the Light Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by the Department of Energy. The LWRS Program is performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long term, safe, and economical operation of current nuclear power plants (NPPs). The LWRS Program serves to help the United States (U.S.) nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of these NPPs and the extension of their current operating licenses. The Outage Risk Management Improvement Pilot Project seeks to improve the management of nuclear power plant outages. This is done through the development of tools to assist in evaluating pending activities against requirements to detect undesired interactions. Significant efforts are expended to manage the nuclear risk of an outage. The utilities conduct pre outage risk assessments, based on a very detailed review of the outage schedule, to identify where combinations of outage work and out of service equipment would result in degraded conditions with respect to nuclear safety or regulatory compliance. Probabilistic risk assessment studies are conducted to quantify incremental core damage frequency as a result of the outage activities and system unavailability. These studies are usually presented to site and fleet management, the site plant operational review committee, and the NPP’s independent Nuclear Safety Review Board for concurrence that the outage is planned safely and that reasonable measures have been taken to reduce the added risk of conducting the outage. During the outage, the plant configuration is monitored continuously to ensure that it conforms to the approved safety plan. Deviations must be assessed and approved by management committees and, in some cases, the plant operational review committee. In virtually all outage meetings and job briefings, the current nuclear safety status of the plant is communicated, including information on the specific equipment necessary to meet the requirements of the nuclear safety plan. In addition, the operations and outage organizations implement several layers of physical and administrative barriers to prevent unintended interaction with the systems and equipment credited for nuclear safety. In spite of all these efforts, nuclear safety challenges still occur too frequently during outages. While some of these are due to failures of equipment credited for safety, the majority occur because of human error. These typically involve some form of interaction between work activities and plant configuration changes. Some of them are very subtle and are extremely challenging to detect in advance. Nevertheless, they are not acceptable and represent clear opportunities to improve nuclear safety during outages. This particular report will provide a demonstration of the capabilities in the development of a predictive software platform for improving configuration control and accessing the plant risks associated with outage work protocols and illustrate how the software assists in strategies to minimize these interactions. In addition to maintaining nuclear safety, there are numerous administrative requirements that must be complied with during an outage. This report will discuss the use of logic modelling to monitor planned work against technical specification requirements for given plant conditions and to integrate these requirements with shutdown risk models, clearance order requirements and other plant condition requirements.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Populating the Hydrogen Component Reliability Database (HYCRED) with Incident Data from Hydrogen Dispensing

Safety, risk, and reliability issues are vital to ensure the continuous and profitable operation of hydrogen technologies. Quantitative risk assessment (QRA) has been used to enable the safe deployment of engineering systems, especially hydrogen fueling stations. However, QRA studies require reliability data which are essential to collect to make the studies as realistic and relevant as possible. These data are currently lacking and data from other industries, such as oil and gas, are used in hydrogen system QRAs. This may lead to inaccurate results since hydrogen fueling stations have differences in physical properties, system design, and operational parameters when compared to other fueling stations, thus necessitating new data sources are necessary to capture the effects of these differences. To address this gap, we developed a structure for a hydrogen component reliability database, (HyCReD) [1], which could be used to generate reliability data to be used in QRA studies. In this paper, we demonstrate populating the HyCReD database with information extracted from new narrative reports on hydrogen fueling station incidents, specifically focused on the dispensing processes. We analyze five new events and demonstrate the feasibility of populating the database and types of meaningful insights that can be obtained at this stage.

component reliability↗

Risk-Informed Analysis for an Enhanced Resilient PWR with ATF, FLEX, and Passive Cooling

This report documents the activities performed by Idaho National Laboratory (INL) during the fiscal year (FY) 2019 for the DOE Light Water Reactor Sustainability (LWRS) Program, Risk-Informed System Analysis (RISA) Pathway, Enhanced Resilient Plant (ERP) Systems research. The purpose of the RISA Pathway research and development is to support plant owner-operator decisions with the aim to improve the economics, reliability, and maintain the high levels of safety of current nuclear power plants over periods of extended plant operations. The concept of ERP refers to the combinations of Accident Tolerant Fuel (ATF), optimal use of Diverse and Flexible Coping Strategy (FLEX), enhancements to plant components and systems, and the incorporation of augmented or new passive cooling systems, as well as improved fuel cycle efficiency. The objective of the ERP research effort is to use the RISA methods and toolkit in industry applications, including methods development and early demonstration of technologies, in order to enhance existing reactors safety features (both active and passive) and to substantially reduce operating costs through risk-informed approaches to plant design modifications to the plant and their characterization. The FY 2019 efforts documented in this report is an extension of those conducted in FY 2018. The same analysis process, risk analysis approaches, and analysis tools as in FY 2018 are used for near-term ATF cladding [i.e., Iron-Chromium-Aluminum (FeCrAl) cladding and Chromium (Cr) coated cladding] designs under the postulated loss of feedwater (LOFW) and steam generator tube rupture (SGTR) accident scenarios. In addition, FLEX analysis was presented for an overview of FLEX equipment and strategies implemented in nuclear industry after Fukushima accident. A FLEX model was developed and incorporated into the generic SAPHIRE model to assess the risk impact from FLEX. FLEX HRA analysis was performed which suggested an approach to HRA with FLEX strategies. Passive cooling system analysis includes an overview of the DNC system, the RELAP5-3D simulations of the DNC system in selected SBO scenarios, and the evaluation of the DNC system risk impact using the generic PRA model.

99 GENERAL AND MISCELLANEOUS↗

Risk-Informed ATF and FLEX Analysis for an Enhanced Resilient BWR Under Design-Basis and Beyond-Design-Basis Accidents

This report documents the activities performed by the Idaho National Laboratory (INL) during fiscal year (FY) 2020 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk-Informed System Analysis (RISA) Pathway, Enhanced Resilient Plant (ERP) Systems research. The purpose of the RISA Pathway research and development is to support plant owner-operator decisions with the aim to improve the economics, reliability, and maintain the high levels of safety of current nuclear power plants over periods of extended plant operations. The concept of ERP refers to the combinations of accident-tolerant fuel (ATF), optimal use of diverse and flexible coping strategy (FLEX), enhancements to plant components and systems, and the incorporation of augmented or new passive cooling systems, as well as improved fuel cycle efficiency. The objective of the ERP research effort is to use the RISA methods and toolkit in industry applications, including methods development and early demonstration of technologies, in order to enhance existing reactors’ safety features (both active and passive) and to substantially reduce operating costs through risk-informed approaches to plant design modifications to the plant and their characterization. One main focus of the FY 2020 efforts documented in this report was to extend the analyses conducted in FYs 2018 and 2019 for a pressurized water reactor (PWR) to a boiling water reactor (BWR). The same analysis process, risk analysis approaches, and analysis tools as in the previous work for PWR were used for a generic BWR with near-term ATF cladding (i.e., Iron-Chromium-Aluminum [FeCrAl] cladding and Chromium [Cr]-coated cladding) designs under the postulated station blackout (SBO) and medium loss-of-coolant (MLOCA) accident scenarios. In addition, a FLEX model was developed and incorporated into a generic BWR probabilistic risk assessment (PRA) model using the INL-developed software tool, Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE), to assess the risk impact from FLEX. The other main focus of the FY 2020 efforts was to advance analysis methods, including developing dynamic approach for FLEX human reliability analysis (HRA) using the INL-developed software tool, Event Modeling Risk Assessment using Linked Diagrams (EMRALD), as well as developing a multicriterion benefit evaluation (MCBE) method for evaluating costs and benefits of safety enhancements in nuclear power plants (NPPs). As a case study, the MCBE method was applied to evaluate the costs and benefits brought by FLEX implementation.

99 GENERAL AND MISCELLANEOUS↗

Risk-Informed Analysis for Enhanced Resilient Nuclear Power Plant with Initiatives including ATF, FLEX, and Advanced Battery Technology

This report documents the activities performed by the Idaho National Laboratory (INL) during fiscal year (FY) 2021 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk-Informed Systems Analysis (RISA) Pathway, Enhanced Resilient Plant (ERP) Systems research. The purpose of the RISA Pathway research and development is to support plant owner-operator decisions with the aim to improve the economics, reliability, and maintain the high levels of safety of current nuclear power plants over periods of extended plant operations. The concept of ERP refers to the combinations of accident-tolerant fuel (ATF), optimal use of diverse and flexible coping strategy (FLEX), enhancements to plant components and systems, the incorporation of augmented or new passive cooling systems, the advanced battery technology with extended capacity, as well as improved fuel cycle efficiency. The objective of the ERP research effort is to use the RISA methods and toolkit in industry applications, including methods development and early demonstration of technologies, in order to enhance existing reactors? safety features and to substantially reduce operating costs through risk-informed approaches to plant design modifications to the plant and their characterization. The ERP R&D efforts in FY 2021 are focused on three industry initiatives, including accident-tolerant fuel (ATF), optimal use of diverse and flexible coping strategy (FLEX), and advanced battery technology with extended capacity.

99 GENERAL AND MISCELLANEOUS↗

Navigation Strategy for the Mars 2001 Lander Mission

The Mars Surveyor Program (MSP) is an ongoing series of missions designed to robotically study, map and search for signs of life on the planet Mars. The MSP 2001 project will advance the effort by sending an orbiter, a lander and a rover to the red planet in the 2001 opportunity. Each vehicle will carry a science payload that will Investigate the Martian environment on both a global and on a local scale. Although this mission will not directly search for signs of life, or cache samples to be returned to Earth, it will demonstrate certain enabling technologies that will be utilized by the future Mars Sample Return missions. One technology that is needed for the Sample Return mission is the capability to place a vehicle on the surface within several kilometers of the targeted landing site. The MSP'01 Lander will take the first major step towards this type of precision landing at Mars. Significant reduction of the landed footprint will be achieved through two technology advances. The first, and most dramatic, is hypersonic aeromaneuvering; the second is improved approach navigation. As a result, the guided entry will produce in a footprint that is only tens of kilometers, which is an order of magnitude improvement over the Pathfinder and Mars Polar Lander ballistic entries. This reduction will significantly enhance scientific return by enabling the potential selection of otherwise unreachable landing sites with unique geologic interest and public appeal. A landed footprint reduction from hundreds to tens of kilometers is also a milestone on the path towards human exploration of Mars, where the desire is to place multiple vehicles within several hundred meters of the planned landing site. Hypersonic aeromaneuvering is an extension of the atmospheric flight goals of the previous landed missions, Pathfinder and Mars Polar Lander (MPL), that utilizes aerodynamic lift and an autonomous guidance algorithm while in the upper atmosphere. The onboard guidance algorithm will control the direction of the lift vector, via bank angle modulation, to keep the vehicle on the desired trajectory. While numerous autonomous guidance algorithms have been developed for use during hypersonic flight at Earth, this will be the first flight of an autonomously directed lifting entry vehicle at Mars. However, without sufficient control and knowledge of the atmospheric entry conditions, the guidance algorithm will not perform effectively. The goal of the interplanetary navigation strategy is to deliver the spacecraft to the desired entry condition with sufficient accuracy and knowledge to enable satisfactory guidance algorithm performance. Specifically, the entry flight path angle must not exceed 0.27 deg. to a 3 sigma confidence level. Entry errors will contribute directly to the size of the landed footprint and the most significant component is entry flight path angle. The size of the entry corridor is limited on the shallow side by integrated heating constraints, and on the steep side by deceleration (g-load) and terminal descent propellant. In order to meet this tight constraint it is necessary to place a targeting maneuver seven hours prior to the time of entry. At this time the trajectory knowledge will be quite accurate, and the effects of maneuver execution errors will be small. The drawback is that entry accuracy is dependent on the success of this final late maneuver. Because propulsive maneuvers are critical events, it is desirable to minimize their occurrence and provide the flight team with as much response time as possible in the event of a spacecraft fault. A mission critical maneuver at Entry - 7 hours does not provide much fault tolerance, and it is desirable to provide a strategy that minimizes reliance on this maneuver. This paper will focus on the Improvements in interplanetary navigation that will decrease entry errors and will reduce the landed footprint, even in the absence of aeromaneuvering. The easiest to take advantage of are Improvements In the knowledge of the Mars ephemeris and gravity field due to the MGS and MSP'98 missions. Improvements In data collection and reduction techniques such as "precislon ranging' and near-simultaneous tracking will also be utilized. In addition to precise trajectory control, a robust strategy for communications and flight operations must also be demonstrated. The result Is a navigation and communications strategy on approach that utilizes optimal maneuver placement to take advantage of trajectory knowledge, minimizes risk for the flight operations team, is responsive to spacecraft hardware limitations, and achieves the entry corridor. The MSP2001 mission Is managed at JPL under the auspices of the Mars Exploration Directorate. The spacecraft flight elements are built and managed by Lockheed-Martin Astronautics in Denver, Colorado.

Mase, Robert A.↗

Characterization of Radiation Fields in Biological Shields of Nuclear Power Plants for Assessing Concrete Degradationa

Life extensions of nuclear power plants to 60 and potentially 80 years of operation have renewed interest in long-term material degradation. One material being considered is concrete, with a particular focus on radiation-induced effects. Based on the projected neutron fluence values (E > 0.1 MeV) in the concrete biological shields of the US pressurized water reactor fleet and the available data on radiation effects on concrete, some decrease in mechanical properties of concrete cannot be ruled out during extended operation beyond 60 years. An expansion of the irradiated concrete database and a reliable determination of relevant neutron fluence energy cutoff value are necessary to ensure reliable risk assessment for extended operation of nuclear power plants.

concrete↗

JSC Orbital Debris Website Description

Purpose: The website provides information about the NASA Orbital Debris Program Office at JSC, which is the lead NASA center for orbital debris research. It is recognized world-wide for its leadership in addressing orbital debris issues. The NASA Orbital Debris Program Office has taken the international lead in conducting measurements of the environment and in developing the technical consensus for adopting mitigation measures to protect users of the orbital environment. Work at the center continues with developing an improved understanding of the orbital debris environment and measures that can be taken to control its growth. Major Contents: Orbital Debris research is divided into the following five broad efforts. Each area of research contains specific information as follows: 1) Modeling - NASA scientists continue to develop and upgrade orbital debris models to describe and characterize the current and future debris environment. Evolutionary and engineering models are described in detail. Downloadable items include a document in PDF format and executable software. 2) Measurements - Measurements of near-Earth orbital debris are accomplished by conducting ground-based and space-based observations of the orbital debris environment. The data from these sources provide validation of the environment models and identify the presence of new sources. Radar, optical and surface examinations are described. External links to related topics are provided. 3) Protection - Orbital debris protection involves conducting hypervelocity impact measurements to assess the risk presented by orbital debris to operating spacecraft and developing new materials and new designs to provide better protection from the environment with less weight penalty. The data from this work provides the link between the environment defined by the models and the risk presented by that environment to operating spacecraft and provides recommendations on design and operations procedures to reduce the risk as required. These data also help in the analysis and interpretation of impact features on returned spacecraft surfaces. 4) Mitigation - Controlling the growth of the orbital debris population is a high priority for NASA, the United States, and the major space-faring nations of the world to preserve near-Earth space for future generations. Mitigation measures can take the form of curtailing or preventing the creation of new debris, designing satellites to withstand impacts by small debris, and implementing operational procedures ranging from utilizing orbital regimes with less debris, adopting specific spacecraft attitudes, and even maneuvering to avoid collisions with debris. Downloadable items include several documents in PDF format and executable software.and 5) Reentry - Because of the increasing number of objects in space, NASA has adopted guidelines and assessment procedures to reduce the number of non-operational spacecraft and spent rocket upper stages orbiting the Earth. One method of postmission disposal is to allow reentry of these spacecraft, either from orbital decay (uncontrolled entry) or with a controlled entry. Orbital decay may be achieved by firing engines to lower the perigee altitude so that atmospheric drag will eventually cause the spacecraft to enter. However, the surviving debris impact footprint cannot be guaranteed to avoid inhabited landmasses. Controlled entry normally occurs by using a larger amount of propellant with a larger propulsion system to drive the spacecraft to enter the atmosphere at a steeper flight path angle. It will then enter at a more precise latitude, longitude, and footprint in a nearly uninhabited impact region, generally located in the ocean.

Johnson, Nicholas L.↗

Virtual refrigerant charge sensing algorithm for residential CO₂ heat pumps

Natural refrigerants are increasingly adopted in next-generation heat pump systems, among which CO₂ heat pumps have attracted significant attention. However, due to their high operating pressures, the leakage risk is higher, resulting in undercharge conditions and degraded heat pump performance. Thus, developing an accurate refrigerant charge level detection technique is necessary to guarantee safe and efficient operation. Although virtual refrigerant charge (VRC) level calculation algorithms for CO₂ heat pumps exist, they typically rely on empirically selected features without a systematic selection framework, leading to multicollinearity and potential overfitting, which limit their prediction accuracy and generalizability. To address these issues, this study proposes a VRC algorithm framework with a systematic feature selection method that identifies physically meaningful and statistically significant features, and is applied using a residential CO₂ heat pump as a case study. The method is extended from previous work on conventional refrigerants to account for charge behavior in CO₂ gas coolers. The selected features include gas cooler outlet density, evaporator pressure, and superheat temperature. The results demonstrate that the proposed feature selection method significantly improves prediction accuracy compared to existing VRC approaches. A relatively small training dataset (∼30 samples) is sufficient for feature identification and model development. The developed algorithm achieves less than 3% prediction error under both undercharge and overcharge conditions, representing reductions of 46.7% and 35.3% compared to two recent reference VRC algorithms for transcritical CO₂ heat pumps reported in the literature. The proposed algorithm and feature selection method enhance leakage detection capability, facilitate the deployment of CO₂ heat pump systems, and contribute to reduced energy waste and maintenance costs.

Guo, Fangzhou [Lawrence Berkeley National Laborato↗

Gateway Program Safety and Mission Assurance Integration - the Future of Safe Deep Space Human Exploration

As a foundational element of the National Aeronautics and Space Administration (NASA) Artemis Campaign, the Gateway is an incrementally built cislunar spacecraft that will serve as a platform for deep space human exploration, science, and technology demonstration. The Gateway will be a unifying catalyst for international partners around the world to establish sustained deep space scientific investigations, lunar surface access, and missions to Mars. As human exploration moves farther away from Earth, spacecraft designs must prioritize and optimize mass and volume allocations, while minimizing human and spacecraft risk. To accomplish this objective, the Gateway Program Safety and Mission Assurance functions develop, implement, and ensure compliance with requirements, in concert with the accurate characterization and transparent communication of residual hazard risks, for integrated safety, reliability and maintainability and quality assurance. Safety and Mission Assurance was a key contributor during Gateway program pre-formulation and formulation activities where safety and reliability analysis was embedded in the Gateway Systems Engineering and Integration team. During these early program stages, a preliminary Gateway Integrated Hazard Analysis and Preliminary Gateway Probabilistic Risk Assessment assisted in Gateway architectural and operational definition as part of a risk-informed design process. As the deep space architecture has matured, the integrated Safety and Mission Assurance analyses have matured, new safety review processes have been developed, and requirements have been refined to ensure compliance with integrated safety and mission assurance objectives. The Gateway Program is currently concluding the preliminary design review informed milestone, where the primary objectives included: - Ensured completeness and consistency of the preliminary design, including the meeting of all requirements within appropriate margins and acceptable risk posture. - Identification of any major issues moving forward to the Critical Design phase. At this milestone, Safety and Mission Assurance provided numerous products, including Gateway Top Risks and Risk Mitigation Plans, updated integrated hazard analyses, updated probabilistic risk assessment, Crew Survival Analysis Report, and updated Safety and Mission Assurance Requirements and Plans. These products provide a many-faceted perspective on the inherent risk and available mitigations involved in flying the current proposed vehicle design and anticipated stack configurations. In addition, Safety and Mission Assurance identified top technical, process and workforce concerns to be addressed as the program progresses toward the critical design phase. This paper will detail the evolution of the Gateway Program Safety and Mission Assurance integration functions, provide its current status and lessons learned for future human spaceflight programs. Throughout this paper the key tenets of the Gateway Program Safety and Mission Assurance will be discussed: - Application of a risk-informed approach to identify and mitigate areas of highest risk. - Leverage of valuable processes and lessons learned from earlier spaceflight programs. - Development of Safety and Mission Assurance products to inform design risk trades. - Utilization of common Safety and Mission Assurance practices to identify safety risks for multiple perspectives: top-down, bottom-up, and across lines of integration. - Approval of safety hazards at the appropriate level of authority, keeping most deliberation closest to design expertise and elevating risks of greatest concern for program-level consideration. - Championing of Safety and Mission Assurance processes and forums to foster a pervasive safety culture that is transparent, inclusive, and collaborative between all partners. These tenets have allowed the Gateway Safety and Mission Assurance function to play a key role in optimized vehicle design evolution, and early identification and mitigation of Gateway program and Artemis mission risk.

Helen Vaccaro↗

Research and Development on the Storage Ring Vacuum System for the APS Upgrade Project

A number of research and development activities are underway at Argonne National Laboratory to build confidence in the designs for the storage ring vacuum system required for the Advanced Photon Source Up-grade project (APS-U) [1]. The predominant technical risks are: excessive residual gas pressures during operation; insufficient beam position monitor stability; excessive beam impedance; excessive heating by induced electrical surface currents; and insufficient operational reliability. Present efforts to mitigate these risks include: building and evaluating mockup assemblies; performing mechanical testing of chamber weld joints; developing computational tools; investigating design alternatives; and performing electrical bench measurements. Status of these activities and some of what has been learned to date will be shared.

APS-U, APS UPGRADE PROJECT, STORAGE RING VACUUM SY↗

EC Transmission Line Risk Identification and Mitigation Analysis

The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements); (2) Underperformance of prototype, first unit, or production components during testing; (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Exploring the effects of policy on stakeholder adoption and deployment of agrivoltaics: A case study of Massachusetts

Further deployment of agrivoltaics is likely to require a better understanding of how policies and agreements can shape the outcomes of solar siting on farmland. This study evaluates the Massachusetts agrivoltaics policy in terms of its implications on deployment and stakeholder experiences in adoption. We present findings from interviews with 26 state policymakers, Extension agents, representatives of non-governmental organizations, farm owners and operators, and solar developers. Our findings demonstrate how the policy has mixed effects on deployment processes and outcomes—in some instances, the policy enables deployment by formalizing cross-sector collaboration, increasing farm owner and operator participation in development, and facilitating novel business models. In other instances, the policy constrains deployment by prescribing operational requirements, creating liability risk, and developing dependency on empirical data to inform eligibility decisions. Interviewees explained how these mixed policy effects create both benefits and burdens for adopters, particularly farm owners and operators. These insights indicate the value of cross-sector collaboration during all phases of agrivoltaic policy implementation and project development; the importance of coordination across policy, research, and commercial activities; and the significant role of regulators and policy design in deployment. The evidence presented in this paper can inform decision making for emerging agrivoltaic policies and markets, both in the United States and internationally.

14 SOLAR ENERGY↗

An assessment of flexibility reserves in stochastic modeling at multiple timescales

Due to recent technological achievements, stochastic optimization, which inherently captures the uncertainty of intermittent resources, is being used to capture the variability and uncertainty of wind and solar resources. However, due to persistent computational limitations, it is not practical to consider all possible variable generation scenarios. As a result, a reduced number of most likely scenarios is usually considered. While this helps reduce the computational burden, it also leaves the system operator vulnerable to some risk. In order to address this issue, this paper aims at providing insight into using an explicit reserve requirement in a stochastic modeling framework in order to provide system operators with greater confidence in stochastic dispatch solutions. This is accomplished by simulating a modified version of the IEEE 118 bus system in a fully stochastic, multi-timescale framework with flexibility reserve requirements. Results show that utilizing a stochastic flexibility reserve requirement within the stochastic modeling framework offers the most reliability benefit.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Plan to Verify and Validate Multi-Hazard Risk-Informed Margin Management Methods and Tools

This report describes the development plan for verification and validation (V&V) of multihazard risk informed margin management (RIMM) methods and tools. The plan will include using new INL developed tool sets coupled with the new multi-partner External Hazards Experimental Group (EHEG) coordinated by the Idaho National Laboratory (INL) within the Risk-Informed Safety Margin Characterization (RISMC) technical pathway of the Light Water Reactor Sustainability Program. The RISMC pathway is developing a suite of new tools and methods for advanced evaluation of facility risk. The RISMC toolkit, includes tools and methods focused on evaluation of risk from external hazards (e.g, seismic and flooding events), which have been shown to be dominant risk contributors in probabilistic risk assessments performed for operating nuclear power plants (NPPs). The external events activity (EEA) within the RISMC pathway is tasked with developing tools and methods focused on evaluation of multi-hazard external risk (e.g, seismic and flooding events). The EHEG will provide technical expertise and experimental large-scale testing data needed for development and validation of tools and methods in the RISMC toolkit for external hazard safety evaluations. The EEA within RISMC has two key elements: (1) an organizational and research framework provided by INL and (2) a coordinated group of university and national laboratory partners with the complementary expertise and experimental capabilities needed to conduct large-scale external hazard-focused experiments. This cooperative group will allow INL to leverage a range of existing capabilities to meet the unique needs of RISMC tool and method development. In addition, the capabilities of the EHEG could be used to address needs of other national laboratories. Currently, there is limited data available for development and validation of the tools and methods being developed in the RISMC Toolkit. The EHEG is being developed to obtain high quality, large-scale experimental data validation of RISMC tools and methods in a timely and cost-effective way. The group of universities and national laboratories that will eventually form the EHEG (which is ultimately expected to include both the initial participants and other universities and national laboratories that have been identified) have the expertise and experimental capabilities needed to both obtain and compile existing data archives and perform additional seismic and flooding experiments. The data developed by EHEG will be stored in databases within RISMC. These databases will be used to validate the advanced external hazard tools and methods. The numerical tools under development in RISMC are used to evaluate the impacts that external hazards have on nuclear power plants. These analysis tools will be used to advanced current risk calculation processes and reduce uncertainty in these calculations. To have confidence in the predictive capability of these numerical tools it is important to verify and validate them. To verify and validate numerical tools the user must understand what physics is being used to represent the problem (i.e. constitutive models used to represent the soil and structure), the numerical solver approach used (i.e. finite element), what data already exists that could be used to validate the tools, and what data is needed for validation.

31274↗

Simulation and Flight Test Environments for the TASAR Traffic Aware Planner

The Traffic Aware Planner (TAP) software is a flight deck decision support tool that enhances the flight crew’s ability to make flight-optimizing route change requests while airborne. The software provides conflict-free, optimized trajectory suggestions during en route flight to produce time- and fuel-savings compared to the current trajectory. The TAP software requires evaluation in an operational environment with real pilot users to validate projected benefits. To this end, a set of developmental test environments have been developed to mature the software and mitigate technical risk prior to entering operational evaluation. The unique attributes of each test environment were leveraged to provide a range of purpose- and case-dependent TAP software tests. This paper describes the elements of a testing environment, discusses several environments of varying fidelity used to test the TAP software, and provides a review of two case studies highlighting the vital role testing played in the TAP software development process.

Barney, Terique L.↗

On the Moral Hazard of Autonomy

This paper describes the concept of moral hazard as applied to technologies that incorporate automation and autonomy. Moral hazard is said to exist when a party to a transaction feels more comfortable taking undue risks because another party will bear the costs if things go badly. As opposed to regular physical hazards, a moral hazard comes from within a person. In this paper, we reveal two categories of moral hazards related to autonomy. The first category of moral hazard occurs when the owner of the autonomy introduces an autonomous system without accepting the full responsibility for improper operation thereby shifting the risks from one party to another party. This category of moral hazard is similar to moral hazards experienced in other industries and can often be addressed through appropriate policy and establishing liability for irresponsible behavior. The issue becomes more complicated in cases where the operator of the autonomy may not have a full understanding of the system behavior. In the second category of moral hazard, risks are shifted from people to autonomy. In this category, the humans in proximity to the autonomous system begin to trust its behavior. Their behavior may change in that they may believe they are more insulated from harm and subsequently exhibit more risky behavior towards increasingly autonomous technologies. Mitigating this type of moral hazard may require the autonomy to possess certain design features to discourage this type of harmful human behavior so that humans do not suffer needlessly in their interactions with autonomous systems by placing inappropriate trust where that trust is neither warranted nor deserved.

Cybernetics↗