Search NASA⌕ Search

SEARCH · Search NASA

Results for “PRESSURE VESSEL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

Quick-Actuating Closure And Handling System

Quick-actuating closure and handling system developed for containers, particularly for high-pressure vessels or shells entered frequently. Features simplicity in design and operation, saving of time, monitoring of leakage, and safety. Another significant feature, use of conical surfaces to engage effectively shear blocks in locked position to provide necessary preload and to transmit internal-pressure load directly to pressure vessel. Designed to impart proper radial movement to shear blocks, based on space available for longitudinal travel of screwjacks. Adaptable to many applications; used for such containers as autoclaves, vacuum chambers, and wide variety of specialized vessels requiring frequent entry and closure.

White, Dorsey E.↗

NASA Handbook for Nickel-Hydrogen Batteries

Nickel-hydrogen (NiH2) batteries are finding more applications in the aerospace energy storage. Since 1983, NiH2 batteries have become the primary energy storage system used for Geosynchronous-Orbit (GEO) Satellites. The first NASA application for NiH2 batteries was the Low Earth Orbit (LEO) Hubble Space Telescope Satellite launched in 1990. The handbook was prepared as a reference book to aid in the application of this technology. That is, to aid in the cell and battery design, procurement, testing, and handling of NiH2 batteries. The design of individual pressure vessel NiH2 cells is covered in Chapter l. LEO and GEO applications and their requirements are discussed in Chapter 2. The design of NiH2 batteries for both GEO and LEO applications is discussed in Chapter 3. Advanced design concepts such as the common pressure vessel and bipolar NiH2 batteries are described in Chapter 4. Performance data are presented in Chapter 5. Storage and handling of the NiH2 cells and batteries are discussed in Chapter 6. Standard test procedures are presented in Chapter 7. Cell and battery procurements are discussed in Chapter 8. Finally, safety procedures are discussed in Chapter 9.

Dunlop, James D.↗

Effect of heat input on the microstructure, residual stresses and corrosion resistance of 304L austenitic stainless steel weldments

Austenitic stainless steels are widely used in high performance pressure vessels, nuclear, chemical, process and medical industry due to their very good corrosion resistance and superior mechanical properties. However, austenitic stainless steels are prone to sensitization when subjected to higher temperatures (673 K to 1173 K) during the manufacturing process (e.g. welding) and/or certain applications (e.g. pressure vessels). During sensitization, chromium in the matrix precipitates out as carbides and intermetallic compounds (sigma, chi and Laves phases) decreasing the corrosion resistance and mechanical properties. In the present investigation, 304L austenitic stainless steel was subjected to different heat inputs by shielded metal arc welding process using a standard 308L electrode. The microstructural developments were characterized by using optical microscopy and electron backscattered diffraction, while the residual stresses were measured by X-ray diffraction using the sin{sup 2}ψ method. It was observed that even at the highest heat input, shielded metal arc welding process does not result in significant precipitation of carbides or intermetallic phases. The ferrite content and grain size increased with increase in heat input. The grain size variation in the fusion zone/heat affected zone was not effectively captured by optical microscopy. This study shows that electron backscattered diffraction is necessary to bring out changes in the grain size quantitatively in the fusion zone/heat affected zone as it can consider twin boundaries as a part of grain in the calculation of grain size. The residual stresses were compressive in nature for the lowest heat input, while they were tensile at the highest heat input near the weld bead. The significant feature of the welded region and the base metal was the presence of a very strong texture. The texture in the heat affected zone was almost random. - Highlights: • Effect of heat input on microstructure, residual stresses and corrosion is studied. • HAZ and width of dendrite in the welded region increase with heat input. • Residual stresses are tensile near the welded region after the highest heat input. • Welded region has the highest pit density after highest heat input. • Dendrites and δ-ferrite were highly oriented in the welded region.

36 MATERIALS SCIENCE↗

TRACE Analysis of Loss of Flow for the APR1400

The APR1400 is a pressurized water reactor (PWR). The APR1400 nuclear steam supply system consists of a reactor pressure vessel (RPV), which contains the reactor core, and two primary reactor coolant system loops connected in parallel to the RPV. Each coolant loop consists of a hot leg (HL), a u-tube steam generator (SG), two reactor coolant pumps (RCPs) and two cold legs (CLs). A pressurizer is connected to the hot leg on one of the coolant loops. During normal operation, the RCPs circulate high pressure water through the reactor core to remove the heat. The heated water exits the RPV and passes through the hot legs into the steam generator tubes. Heat is transferred through the walls of the steam generator tubes into a lower pressure secondary coolant system. Cooled primary system water from the steam generators is returned through the RCPs and cold legs to the RPV. The RCPs operate at constant speed; the primary coolant system is designed to provide a prescribed rate of coolant flow through the reactor core. The APR1400 SG secondary coolant system pressure is controlled through modulation of valves in the steam lines to maintain a prescribed turbine inlet pressure. The SG secondary coolant inventory is controlled by using a feedwater control system to maintain a prescribed liquid level in the steam generator downcomer. This water inventory level is sufficient to cover the outer surfaces of the steam generator tubes while preventing overfill that would cause liquid to pass from the steam generators through the steam lines into the turbine system. In the current work, the Nuclear Regulatory Commission's reactor systems analysis code, TRACE?2 was used to perform an analysis of a loss of flow anticipated operational occurrence (AOO). The loss of flow is initiated by a loss of off-site power (LOOP), resulting in a trip of the RCPs. The regulatory purpose of the current work is to confirm safety analyses documented in the APR1400 Design Control Document (DCD)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Acoustic Emission Methods for the Health Evaluation of Integrated Pressure Components

At the request of the Pressure Systems Senior Discipline Expert, to overcome the access and detectable flaw size limitations of other nondestructive evaluation (NDE) methods for integrated components, a technique akin to seismology was advanced to perceive the earliest signs of cracking in titanium components before they escalate into serious issues. In this project we achieved a landmark in Acoustic Emission (AE) testing with the first NASA Probability of Detection (POD) study. This is an important first step to the certification of the AE method for flight components and was based on the testing of notched panels. By working closely with industry allies and employing approved methods from the boiler and pressure vessel sector, we not only met but surpassed all POD benchmarks with our test and acceptance criteria. In experiments involving solution heat-treated and aged 6Al-4V-Ti alloy tested with broadband sensors, we recorded a 96% success rate, with zero false positives reported. Our research shows that in some cases, AE testing can locate smaller cracks than other NDE methods. An industry tool for scaling results to full pressure vessels is highlighted. However, before applying our findings to NASA components, tests to validate the transfer functions are advised.

acoustic↗

Refueling water storage tank (RWST) with tailored passive emergency core cooling (ECC) flow

A nuclear reactor comprises a pressure vessel containing a nuclear reactor core. A reactor core cooling system comprises a standpipe including a plurality of orifices in fluid communication with a refueling water storage tank (RWST) to drain water from the RWST into the standpipe, and an injection line configured to drain water from the standpipe to the pressure vessel. In some embodiments the standpipe is disposed in the RWST, while in other embodiments the standpipe is disposed outside of the RWST and cross-connection pipes connect the plurality of orifices with the RWST. The reactor core cooling system may further comprise a valve configured to control flow through one orifice of the plurality of orifices in fluid communication with the RWST based on water level in the standpipe. The valve may comprise a float valve having its float disposed in the standpipe.

Watson, Ronald C.↗

Sensitivity study of PWR upper vessel flow and phenomena using RELAP5-3D

During normal pressurized water reactor (PWR) operation, water enters the reactor pressure vessel (RPV) from the cold leg and exits through the hot leg. While most of this water flows through the downcomer and reactor core, a number of other flow paths exist, including the core baffle/bypass and the upper plenum spray. The upper plenum sprays normally account for a small fraction (less than 10%) of the total inlet flow, and provide cooling to the upper vessel dome and instrumentation/control rod channels. In the event of a loss-of-coolant accident (LOCA), especially one with core blockage, this alternative flow path may play a key role in maintaining core coolability. Because of the possible safety implications of the upper vessel flow, it is important to ensure the models used to simulate this region of the vessel are accurate. In this study, the model was altered to better reflect the internal flow path of the upper head and this was compared to the reference model. The simulation of interest is a hot leg double-ended guillotine (HL DEG) break followed later by a full blockage of the core and core bypass. In this scenario, the coolant can only reach the core through the upper spray bypass, so its impact on core coolability can be clearly seen. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Mechanical design of 56 MHz superconducting RF cavity for RHIC collider

A 56 MHz Superconducting RF Cavity operating at 4.4K is being constructed for the RHIC collider. This cavity is a quarter wave resonator with beam transmission along the centerline. This cavity will increase collision luminosity by providing a large longitudinal bucket for stored bunches of RHIC ion beam. The major components of this assembly are the niobium cavity with the mechanical tuner, its titanium helium vessel and vacuum cryostat, the support system, and the ports for HOM and fundamental dampers. The cavity and its helium vessel must meet equivalent safety with the ASME pressure vessel code and it must not be sensitive to frequency shift due to pressure fluctuations from the helium supply system. Frequency tuning achieved by a two stage mechanical tuner is required to meet performance parameters. This tuner mechanism pushes and pulls the tuning plate in the gap of niobium cavity. The tuner mechanism has two separate drive systems to provide both coarse and fine tuning capabilities. This paper discusses the design detail and how the design requirements are met.

43 PARTICLE ACCELERATORS↗

Neutron radigoraphy of fluid flow for geothermal energy research

Enhanced geothermal systems seek to expand the potential for geothermal energy by engineering heat exchange systems within the earth. A neutron radiography imaging method has been developed for the study of fluid flow through rock under environmental conditions found in enhanced geothermal energy systems. For this method, a pressure vessel suitable for neutron radiography was designed and fabricated, modifications to imaging instrument setups were tested, multiple contrast agents were tested, and algorithms developed for tracking of flow. The method has shown success for tracking of single phase flow through a manufactured crack in a 3.81 cm (1.5 inch) diameter core within a pressure vessel capable of confinement up to 69 MPa (10,000 psi) using a particle tracking approach with bubbles of fluorocarbon-based fluid as the “particles” and imaging with 10 ms exposures.

15 GEOTHERMAL ENERGY↗

Spin Forming of an Aluminum 2219-T6 Aft Bulkhead for the Orion Multi-Purpose Crew Vehicle: Phase II Supplemental Report

The principal focus of this project was to assist the Orion Multi-Purpose Crew Vehicle (MPCV) Program in developing a spin forming fabrication process for manufacture of the aft bulkhead of the pressure vessel. The spin forming process will enable a single piece aluminum (Al) 2219 aft bulkhead which will eliminate the current multiple piece welded construction, simplify fabrication, and lead to an enhanced design that will reduce vehicle weight by eliminating welds. Phase I of this assessment explored spin forming the single-piece forward pressure vessel bulkhead from aluminum-lithium 2195.

Piascik, Robert S.↗

Comparison of Alternatives to the 2004 Vacuum Vessel Heat Transfer System

A study comparing different alternatives for the Vacuum Vessel Primary Heat Transfer System has been completed. Three alternatives were proposed in a Project Change Request (PCR-190) by relocating the heat exchangers (HXs) from the roof of the Tokamak building to inside the Vacuum Vessel Pressure Suppression System (VVPSS) tank. The study evaluated the three alternatives and recommended modifications to one of them to arrive at a preferred configuration that included relocating the HXs inside the Tokamak building but outside the VVPSS tank as well as including a small safety-rated pump and HX in parallel to the main circulation pump and HX. The Vacuum Vessel (VV) Primary Heat Transfer System (PHTS) removes heat generated in the VV during normal operation (10 MW, pulsed power) as well as the decay heat from the VV itself and from the structures/components attached to the VV (first wall, blanket, and divertor {approx}0.48 MW peak). Therefore, the VV PHTS has two safety functions: (1) contain contaminated cooling water (similar to the other PHTSs) and (2) provide passive cooling during an accident event. The 2004 design of the VV PHTS consists of two independent loops, each loop cooling half of the 18 VV segments with a nominal flow of 475 kg/s of water at about 1.1 MPa and 100 C. The total flow for both loops is 950 kg/s. Both loops are required to remove the heat load during normal plasma operation. During accident conditions, only one loop is needed to remove by natural convection (no pump needed) the decay heat of the complete VV and attached components. The heat is transferred to heat exchanger (HXs) located on top of the roof, outside the Tokamak building. These HXs are air-to-water (A/W) HXs. Three alternatives have been proposed for this cooling system. For a detailed discussion of these alternatives, please refer to Project Change Request, PCR-190 (Ref. 1). A brief introduction is given here. Alternative 1 includes only one main forced circulation loop with a small safety-rated pump in parallel with the main circulation pump. In addition, this alternative has two natural circulation safety loops. Both the safety and main loops supply water to the bottom of the VV with six branch lines and collect the heated water at the top of the vessel through six branches. The distribution headers are located in the lower pipe chase and the collection headers in the upper pipe chase. Each of these loops (one main and two emergency) has a HX mounted in the Vacuum Vessel Pressure Suppression System (VVPSS) tank. The main HX is cooled using either Component Cooling Water System (CCWS) or Chilled Water System (CHWS) water, and the emergency HXs are cooled by natural circulation of the VVPSS water. See Fig. 1 taken from PCR-190. Alternative 2 is exactly the same as Alternative 1 except that there is only one emergency loop and one emergency HX. See Fig. 2 taken from PCR-190. Alternative 3 also has one main forced circulation loop with a small safety-rated pump in parallel with the main circulation pump and one natural circulation safety loop. In this case, both the safety and main loops supply water to the top of the VV with three branch lines and collect the heated water at the top of the vessel through three branches. Here, the distribution header is located in the upper pipe chase as is the collection header. As before, each of these loops has a HX mounted in the VVPSS tank. The main HX is cooled using either CCWS or CHWS water, and the emergency HXs are cooled by natural circulation of the VVPSS water. See Fig. 3 taken from PCR-190. The preferred configuration is developed by selecting specific attributes of the other configurations analyzed and the logic for selecting this configuration is discussed at the end of the document. It is a modification of Alternative 2 that eliminates the separate safety loop, but incorporates a small safety rated HX and pump in parallel with the main HX and pump. It uses 18 inlet and 18 outlet branches (as did the 2004 design) and locates the HXs outside of the VVPSS tank. Tables 1 and 2 examine alternatives to the 2004 VV heat transfer system design that were proposed in PCR-190, as well as the preferred option.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

The Windscale Advanced Gas Cooled Reactor (WAGR) Decommissioning Project A Close Out Report for WAGR Decommissioning Campaigns 1 to 10 - 12474

The reactor core of the Windscale Advanced Gas-Cooled Reactor (WAGR) has been dismantled as part of an ongoing decommissioning project. The WAGR operated until 1981 as a development reactor for the British Commercial Advanced Gas cooled Reactor (CAGR) power programme. Decommissioning began in 1982 with the removal of fuel from the reactor core which was completed in 1983. Subsequently, a significant amount of engineering work was carried out, including removal of equipment external to the reactor and initial manual dismantling operations at the top of the reactor, in preparation for the removal of the reactor core itself. Modification of the facility structure and construction of the waste packaging plant served to provide a waste route for the reactor components. The reactor core was dismantled on a 'top-down' basis in a series of 'campaigns' related to discrete reactor components. This report describes the facility, the modifications undertaken to facilitate its decommissioning and the strategies employed to recognise the successful decommissioning of the reactor. Early decommissioning tasks at the top of the reactor were undertaken manually but the main of the decommissioning tasks were carried remotely, with deployment systems comprising of little more than crane like devices, intelligently interfaced into the existing structure. The tooling deployed from the 3 tonne capacity (3te) hoist consisted either purely mechanical devices or those being electrically controlled from a 'push-button' panel positioned at the operator control stations, there was no degree of autonomy in the 3te hoist or any of the tools deployed from it. Whilst the ATC was able to provide some tele-robotic capabilities these were very limited and required a good degree of driver input which due to the operating philosophy at WAGR was not utilised. The WAGR box proved a successful waste package, adaptable through the use of waste box furniture specific to the waste-forms generated throughout the various decommissioning campaigns. The use of low force compaction for insulation and soft wastes provided a simple, robust and cost effective solution as did the direct encapsulation of LLW steel components in the later stages of reactor decommissioning. Progress through early campaigns was good, often bettering the baseline schedule, especially when undertaking the repetitive tasks seen during Neutron Shield and Graphite Core decommissioning, once the operators had become experienced with the equipment, though delays became more pronounced, mainly as a result of increased failures due to the age and maintainability of the RDM and associated equipment. Extensive delays came about as a result of the unsupported insulation falling away from the pressure vessel during removal and the inability of the ventilation system to manage the sub micron particulate generated during IPOPI cutting operations, though the in house development of revised and new methodologies ultimately led to the successful completion of PV and I removal. In a programme spanning over 12 years, the decommissioning of the reactor pressure vessel and core led to the production 110 ILW and 75 LLW WAGR boxes, with 20 LLW ISO freight containers of primary reactor wastes, resulting in an overall packaged volume of approximately 2500 cubic metres containing the estimated 460 cubic metres of the reactor structure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Experimental Creep Life Assessment for the Advanced Stirling Convertor Heater Head

The United States Department of Energy is planning to develop the Advanced Stirling Radioisotope Generator (ASRG) for the National Aeronautics and Space Administration (NASA) for potential use on future space missions. The ASRG provides substantial efficiency and specific power improvements over radioisotope power systems of heritage designs. The ASRG would use General Purpose Heat Source modules as energy sources and the free-piston Advanced Stirling Convertor (ASC) to convert heat into electrical energy. Lockheed Martin Corporation of Valley Forge, Pennsylvania, is integrating the ASRG systems, and Sunpower, Inc., of Athens, Ohio, is designing and building the ASC. NASA Glenn Research Center of Cleveland, Ohio, manages the Sunpower contract and provides technology development in several areas for the ASC. One area is reliability assessment for the ASC heater head, a critical pressure vessel within which heat is converted into mechanical oscillation of a displacer piston. For high system efficiency, the ASC heater head operates at very high temperature (850 C) and therefore is fabricated from an advanced heat-resistant nickel-based superalloy Microcast MarM-247. Since use of MarM-247 in a thin-walled pressure vessel is atypical, much effort is required to assure that the system will operate reliably for its design life of 17 years. One life-limiting structural response for this application is creep; creep deformation is the accumulation of time-dependent inelastic strain under sustained loading over time. If allowed to progress, the deformation eventually results in creep rupture. Since creep material properties are not available in the open literature, a detailed creep life assessment of the ASC heater head effort is underway. This paper presents an overview of that creep life assessment approach, including the reliability-based creep criteria developed from coupon testing, and the associated heater head deterministic and probabilistic analyses. The approach also includes direct benchmark experimental creep assessment. This element provides high-fidelity creep testing of prototypical heater head test articles to investigate the relevant material issues and multiaxial stress state. Benchmark testing provides required data to evaluate the complex life assessment methodology and to validate that analysis. Results from current benchmark heater head tests and newly developed experimental methods are presented. In the concluding remarks, the test results are shown to compare favorably with the creep strain predictions and are the first experimental evidence for a robust ASC heater head creep life.

Krause, David L.↗

An apparatus for studying scintillator properties at high isostatic pressures

We describe the design and operation of a unique hydraulic press for the study of scintillator materials under isostatic pressure. This press, capable of developing a pressure of a gigapascal, consists of a large sample chamber pressurized by a two-stage hydraulic amplifier. The optical detection of the scintillation light emitted by the sample is performed, through a large aperture optical port, by a photodetector located outside the pressure vessel. In addition to providing essential pressure-dependent studies on the emission characteristics of radioluminescent materials, this apparatus is being developed to elucidate the mechanisms behind the recently observed dependency of light-yield nonproportionality on electronic band structure. The variation of the light output of a Tl:CsI crystal under 511-keV gamma excitation and hydrostatic pressure is given as an example.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Advancements and Opportunities for On-board 700 bar Compressed Hydrogen Tanks in the Progression towards the Commercialization of Fuel Cell Vehicles

Fuel cell vehicles are entering the automotive market with significant potential to reduce harmful greenhouse emissions, facilitate energy security, and increase efficiency while providing expected driving range and fill times. One of the challenges for successful commercialization is transitioning the on-board fuel system from liquid gasoline to compressed hydrogen gas. Storing high pressurized hydrogen requires a specialized structural pressure vessel, significantly different in function from a gasoline container. In addition, the lower hydrogen energy combined with highly efficient fuel cell still requires a storage vessel that is four times the volume of a gasoline tank. In the late 1990s, the industry first developed hydrogen tanks based on traditional type 3 and 4 compressed natural gas (CNG) tanks designed for 250 bar service. As fuel cell vehicles developed along with the need for greater driving range, the OEMs increased the hydrogen storage pressure to 350 bar and then to 700 bar, which is currently the industry norm. However, the 700 bar pressure vessels continued to be manufactured using the materials and the design approach from the CNG tank technologies. In 2012 the U.S. Department of Energy, Office of Fuel Cell Technologies initiated a project to develop Enhanced Materials and Design Parameters for Reducing the Cost of Hydrogen Storage Tanks. The project took a holistic approach to improving performance by investigating: 1) the cost tradeoff of reduced composite mass at 500 bar versus the added insulation cost for cold gas operation at 200K, 2) using hybrid fiber layups to refine the tank composite design, 3) increasing the composite translation efficiency by adding nano-reinforcing particles to the resin, and 4) substituting a lower cost alternate resin in the filament winding process. This paper summarizes the effectiveness of these design modifications and considers the outlook for on-board 700 bar compressed hydrogen tank systems to achieve the commercialization goals for fuel cell vehicles.

Hydrogen storage, carbon fiber composite, compo, a↗

Oxygen Storage Tanks Are Feasible for Mars Transit

The Mars transit tanks will probably be titanium lined, composite over wrapped pressure vessels (COPVs) similar to those used in the space shuttle and International Space Station(ISS). Since the mass of a storage tank is proportional to the mass of the gas it contains, the required oxygen will use about the same mass of tanks regardless of the number and size ofthe tanks. Using existing relatively small COPVs is possible. Pressure vessels can fail due torupture and leakage but no failures have occurred in space and the expected failure rates are very low. Since one or two spare tanks are required for reliability, using smaller tanks can reduce the total mass. For a Mars round trip, the mass of oxygen and tanks including spares is roughly equal to the mass of the ISS Oxygen Generation Assembly (OGA) and its spares. Since the OGA must orbit Mars and be returned to Earth, while half the storage tanks are emptied on the way to Mars and can be abandoned, storage tanks have a significant launch mass advantage over the OGA. Storage tanks are simpler, more reliable,and have fewer failure modes than an OGA. They would have smaller design and development costs and need less crew time and maintenance. Oxygen storage tanks are feasible for Mars transit and are attractive compared to the ISS OGA.

Jones, Harry W.↗

Spacecraft Crew Cabin Condensation Control

A report discusses a new technique to prevent condensation on the cabin walls of manned spacecraft exposed to the cold environment of space, as such condensation could lead to free water in the cabin. This could facilitate the growth of mold and bacteria, and could lead to oxidation and weakening of the cabin wall. This condensation control technique employs a passive method that uses spacecraft waste heat as the primary wallheating mechanism. A network of heat pipes is bonded to the crew cabin pressure vessel, as well as the pipes to each other, in order to provide for efficient heat transfer to the cabin walls and from one heat pipe to another. When properly sized, the heat-pipe network can maintain the crew cabin walls at a nearly uniform temperature. It can also accept and distribute spacecraft waste heat to maintain the pressure vessel above dew point.

Carrillo, Laurie Y.↗

Modernization and Activation of the NASA Ames 11- by 11-Foot Transonic Wind Tunnel

The Unitary Plan Wind Tunnel (UPWT) was modernized to improve performance, capability, productivity, and reliability. Automation systems were installed in all three UPWT tunnel legs and the Auxiliaries facility. Major improvements were made to the four control rooms, model support systems, main drive motors, and main drive speed control. Pressure vessel repairs and refurbishment to the electrical distribution system were also completed. Significant changes were made to improve test section flow quality in the 11-by 11-Foot Transonic leg. After the completion of the construction phase of the project, acceptance and checkout testing was performed to demonstrate the capabilities of the modernized facility. A pneumatic test of the tunnel circuit was performed to verify the structural integrity of the pressure vessel before wind-on operations. Test section turbulence, flow angularity, and acoustic parameters were measured throughout the tunnel envelope to determine the effects of the tunnel flow quality improvements. The new control system processes were thoroughly checked during wind-off and wind-on operations. Manual subsystem modes and automated supervisory modes of tunnel operation were validated. The aerodynamic and structural performance of both the new composite compressor rotor blades and the old aluminum rotor blades was measured. The entire subsonic and supersonic envelope of the 11-by 11-Foot Transonic leg was defined up to the maximum total pressure.

Kmak, Frank J.↗