Search NASA⌕ Search

SEARCH · Search NASA

Results for “Resource Allocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

Improving User Notification on Frequently Changing HPC Environments

Today s HPC centers user environments can be very complex. Centers often contain multiple large complicated computational systems each with their own user environment. Changes to a system s environment can be very impactful; however, a center s user environment is, in one-way or another, frequently changing. Because of this, it is vital for centers to notify users of change. For users, untracked changes can be costly, resulting in unnecessary debug time as well as wasting valuable compute allocations and research time. Communicating frequent change to diverse user communities is a common and ongoing task for HPC centers. This paper will cover the OLCF s current processes and methods used to communicate change to users of the center s large Cray systems and supporting resources. The paper will share lessons learned and goals as well as practices, tools, and methods used to continually improve and reach members of the OLCF user community.

communication↗

A Two-Step Load Disaggregation Algorithm for Quasi-static Time-series Analysis on Actual Distribution Feeders

This paper focuses on developing a two-step load disaggregation method for conducting quasi-static time-series analysis using actual distribution feeder data. This can help utilities conduct power flow studies using smart meter measurements to assess the impact of high penetration of distributed energy resources. In the first step, load profiles of residential and commercial buildings obtained from smart meter data are used to match the load profile at the feeder head. This step will determine the number of residential and commercial loads on the feeder. The second step is to allocate the selected load profiles to each load node based on its transformer rating. This allows each load node to have its own load profile and the aggregation of those nodal load profiles matches closely to the metered feeder load shape at the substation. This algorithm is validated using smart meter data and the SCADA data of a real feeder. We compared the performance of the proposed method with the traditional load allocation method (i.e. use the feeder load shape for all subsequent load nodes scaling by the transformer capacities) when conducting quasi-static power flow studies. Results show that the proposed algorithm matches the utility data well and the obtained voltage profiles reveal more voltage dynamics than using the conventional load allocation method. (PDF) A Two-Step Load Disaggregation Algorithm for Quasi-static Time-series Analysis on Actual Distribution Feeders.

load disaggregation, load shape, quasi-static, tim↗

Funding Mechanisms for Federal Geothermal Permitting

The Department of Energy's (DOE) Geothermal Technologies Office (GTO) initiated a Geothermal Regulatory Roadmap (GRR) in March 2012 to facilitate the development of utility-scale geothermal power. The GRR team conducted a series of workshops during the summer of 2012, which included key representatives from federal and state agencies, as well as industry and other stakeholders involved in the permitting and development of utility-scale geothermal projects. In many of the GRR meetings held with agencies, industry, and other stakeholders, a recurring issue was competing priorities for agency staff's time, which result in permit processing delays. Some agency personnel explained how only a percentage of their weekly or monthly time is allocated to geothermal due to geothermal budget allocations. Others described how their time allocation was determined by agency priorities, and not by specific geothermal budget allocations. In these cases, geothermal may not be a priority at all. One suggestion that was to increase geothermal permit fees or to develop some other mechanisms of cost recovery to fund additional geothermal positions or contractors to process permits more quickly. Because much of the geothermal resource available in the western U.S. is on federal lands, analysis of cost recovery programs could identify opportunities for additional funding mechanisms to support federal agency personnel and processing permits for geothermal projects. This paper discusses: federal agency revenues received for geothermal projects, including: (1) lease revenues, (2) fixed fees, and (3) cost recovery fees; and potential federal agency budget sources for processing geothermal applications, including: (1) cost-recovery fees for services rendered, (2) set-aside funds (such as those employed by EPAct2005), and (3) the appropriations process. This paper then analyzes the three budget sources as mechanisms for increasing funds available to federal agencies for processing geothermal permits and approvals. This paper concludes that both set-asides and cost-recovery fees for services rendered were effective ways of ensuring sufficient funding for processing geothermal authorizations on federally-managed public lands in a timely manner.

15 GEOTHERMAL ENERGY↗

INFORMATION: Special Report on "Selected Department of Energy Program Efforts to Implement the American Recovery and Reinvestment Act"

The American Recovery and Reinvestment Act of 2009 (Recovery Act) was enacted on February 17, 2009, to jumpstart the economy by creating or saving millions of jobs, spurring technological advances in health and science, and investing in the Nation's energy future. The Department of Energy received over $32.7 billion in Recovery Act funding for various science, energy, and environmental programs and initiatives. As of November 2009, the Department had obligated $18.3 billion of the Recovery Act funding, but only $1.4 billion had been spent. The Department's Offices of Energy Efficiency and Renewable Energy, Fossil Energy, Environmental Management, Science, and Electricity Delivery and Energy Reliability received the majority of funding allocated to the Department, about $32.3 billion. Obligating these funds by the end of Fiscal Year 2010, as required by the Recovery Act, and overseeing their effective use in succeeding years, represents a massive workload increase for the Department's programs. The effort to date has strained existing resources. As has been widely acknowledged, any effort to disburse massive additional funding and to expeditiously initiate and complete projects increases the risk of fraud, waste and abuse. It is, therefore, important for the Department's program offices to assess and mitigate these risks to the maximum extent practicable. In this light, we initiated this review as an initial step in the Office of Inspector General's charge to determine whether the Department's major program offices had developed an effective approach for identifying and mitigating risks related to achieving the goals and objectives of the Recovery Act. The Department's program offices included in our review identified risks and planned mitigation strategies that, if successfully implemented and executed, should help achieve the goals and objectives of the Recovery Act. While each office identified risks unique to its respective areas of responsibility, there were a number of risks shared in common. These included the mechanical and substantive requirements related to the award and distribution of funds; program and project performance monitoring; and, program and project execution activities. In particular, the offices self-identified common risks such as: (1) The inability to award and distribute funds in a timely manner to achieve the goals of the Recovery Act; (2) The sufficiency of monitoring procedures and resources to, among other things, prevent and detect fraud, waste and abuse throughout the performance period of financial assistance awards and contracts; and (3) The inherent cost, schedule and performance risks associated with first-of-a-kind, innovative research and demonstration projects. Our review confirmed that the Department had begun to implement a number of strategies designed to mitigate these and other program-specific risks. Our testing, however, identified challenges to the effective implementation of these mitigation strategies that need to be addressed if the Department is to meet the goals and objectives established by the Recovery Act. At the time of our review: (1) Program staffing resources, critical to the success of all other mitigation strategies, remained inadequate both in numbers and qualifications (certifications and training) for positions in procurement and acquisition, project management, and monitoring and oversight functions; (2) Performance measures for achieving Recovery Act goals such as distributing funds in an expeditious manner had not always been established and included in performance plans, and, in financial assistance and contract documents; and (3) Programs had not consistently demonstrated that previously reported deficiencies, identified through audits, inspections, investigations and other oversight activities, had been considered in designing mitigation strategies for the Recovery Act related risks. As we noted in our Special Report on the American Recovery and Reinvestment Act at the Department of Energy (OAS-RA-09-01, March 2009) these sorts of deficiencies, which were described in the March 2009 report, had adversely impacted the success of earlier Departmental projects. We concluded that consideration of these previously encountered internal control weaknesses was essential if the Department was to avoid the same or similar problems in executing the Recovery Act programs/projects. During the course of our audit we identified other internal control weakness indicators. When brought to their attention by the Office of Inspector General audit staff, program officials acted promptly to address these problems by modifying or improving their risk mitigation strategies. For instance, we found that the Office of Energy Efficiency and Renewable Energy, responsible for $16.8 billion in Recovery Act program activities, took steps to strengthen its merit review process to avoid potential conflict of interest concerns.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Market-Based Coordination of Thermostatically Controlled Loads—Part I: A Mechanism Design Formulation

This paper focuses on the coordination of a population of Thermostatically Controlled Loads (TCLs) with unknown parameters to achieve group objectives. The problem involves designing the bidding and market clearing strategy to motivate self-interested users to realize efficient energy allocation subject to a peak power constraint. Using the mechanism design approach, we propose a market-based coordination framework, which can effectively incorporate heterogeneous load dynamics, systematically deal with user preferences, account for the unknown load model parameters, and enable the real-world implementation with limited communication resources. This paper is divided into two parts. Part I presents a mathematical formulation of the problem and develops a coordination framework using the mechanism design approach. Part II presents a learning scheme to account for the unknown load model parameters, and evaluates the proposed framework through realistic simulations.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

The rapid development of wind power that the United States has experienced over the last several years has been coupled with a growing concern that wind development will require substantial additions to the nation's transmission infrastructure. Transmission is particularly important for wind power due to the locational dependence of wind resources, the relatively low capacity factor of wind plants, and the mismatch between the short lead time to build a new wind project and the longer lead time often needed to plan, permit, and construct transmission. It is clear that institutional issues related to transmission planning, siting, and cost allocation will pose major obstacles to accelerated wind power deployment, but also of concern is the potential cost of this infrastructure build out. Simply put, how much extra cost will society bear to deliver wind power to load centers? Without an answer to this question, there can be no consensus on whether or not the cost of developing transmission for wind will be a major barrier to further wind deployment, or whether the institutional barriers to transmission expansion are likely to be of more immediate concern. In this report, we review a sample of 40 detailed transmission studies that have included wind power. These studies cover a broad geographic area, and were completed from 2001-2008. Our primary goal in reviewing these studies is to develop a better understanding of the transmission costs needed to access growing quantities of wind generation. A secondary goal is to gain a better appreciation of the differences in transmission planning approaches in order to identify those methodologies that seem most able to estimate the incremental transmission costs associated with wind development. Finally, we hope that the resulting dataset and discussion might be used to inform the assumptions, methods, and results of higher-level assessment models that are sometimes used to estimate the cost of wind deployment (e.g. NEMS and WinDS). The authors and general location of the 40 detailed transmission studies included in our review are illustrated in Figure ES-1. As discussed in the body of the report, these studies vary considerably in scope, authorship, objectives, methodology, and tools. Though we recognize this diversity and are cognizant that comparisons among these studies are therefore somewhat inappropriate, we nonetheless emphasize such simple comparisons in this report. We do so in order to improve our understanding of the range of transmission costs needed to access greater quantities of wind, and to highlight some of the drivers of those costs. In so doing, we gloss over many important details and differences among the studies in our sample. In emphasizing simple comparisons, our analysis focuses primarily on the unit cost of transmission implied by each of the studies. The unit cost of transmission for wind in $/kW terms on a capacity-weighted basis is estimated by simply dividing the total transmission cost in a study by the total amount of incremental generation capacity (wind and non-wind) modeled in that study. In so doing, this metric assumes that within any individual study all incremental generation capacity imposes transmission costs in proportion to its nameplate capacity rating. The limitations to this approach are described in some detail in the body of the report.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Enabling DER Participation in Frequency Regulation Markets

Distributed energy resources (DERs) are playing an increasing role in ancillary services for the bulk grid, particularly in frequency regulation. In this article, we propose a framework for collections of DERs, combined to form microgrids and controlled by aggregators, to participate in frequency regulation markets. Our approach covers both the identification of bids for the market clearing stage and the mechanisms for the real-time allocation of the regulation signal. The proposed framework is hierarchical, consisting of a top layer and a bottom layer. The top layer consists of the aggregators communicating in a distributed fashion to optimally disaggregate the regulation signal requested by the system operator. The bottom layer consists of the DERs inside each microgrid whose power levels are adjusted so that the tie line power matches the output of the corresponding aggregator in the top layer. The coordination at the top layer requires the knowledge of cost functions, ramp rates, and capacity bounds of the aggregators. We develop meaningful abstractions for these quantities respecting the power flow constraints and taking into account the load uncertainties and propose a provably correct distributed algorithm for optimal disaggregation of regulation signals among the microgrids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A method for evaluating the funding of components of natural resource and conservation projects

Many public and private entities such as government agencies and private foundations have missions related to the improvement, protection, and sustainability of the environment. In pursuit of their missions, they fund projects with related outcomes. Typically, the funding scene consists of scarce funding dollars for the many project requests. In light of funding limitations and funder's search for innovative funding schemes, a method to support the allocation of scarce dollars among project components is presented. The proposed scheme has similarities to methods in the project selection literature but differs in its focus on project components and its connection to and enumeration of the universe of funding possibilities. The value of having access to the universe is demonstrated with illustrations. The presentation includes Excel implementations that should appeal to a broad spectrum of project evaluators and reviewers. Access to the space of funding possibilities facilitates a rich analysis of funding alternatives. - Highlights: • Method is given for allocating scarce funding dollars among competing projects. • Allocations are made to fund parts of projects • Proposed method provides access to the universe of funding possibilities. • Proposed method facilitates a rich analysis of funding possibilities. • Excel spreadsheet implementations are provided.

54 ENVIRONMENTAL SCIENCES↗

Kokkos' Task DAG Capabilities.

This report documents the ASC/ATDM Kokkos deliverable "Production Portable Dy- namic Task DAG Capability." This capability enables applications to create and execute a dynamic task DAG ; a collection of heterogeneous computational tasks with a directed acyclic graph (DAG) of "execute after" dependencies where tasks and their dependencies are dynamically created and destroyed as tasks execute. The Kokkos task scheduler executes the dynamic task DAG on the target execution resource; e.g. a multicore CPU, a manycore CPU such as Intel's Knights Landing (KNL), or an NVIDIA GPU. Several major technical challenges had to be addressed during development of Kokkos' Task DAG capability: (1) portability to a GPU with it's simplified hardware and micro- runtime, (2) thread-scalable memory allocation and deallocation from a bounded pool of memory, (3) thread-scalable scheduler for dynamic task DAG, (4) usability by applications.

97 MATHEMATICS AND COMPUTING↗

Broadband polarization-entangled source for C+L-band flex-grid quantum networks

The rising demand for transmission capacity in optical networks has motivated steady interest in expansion beyond the standard C-band (1530–1565 nm) into the adjacent L-band (1565–1625 nm) for an approximate doubling of capacity in a single stroke. However, in the context of quantum networking, the L-band has yet to be fully leveraged with the suite of advanced tools for characterization and management available from classical lightwave communications. In this work, we demonstrate an ultrabroadband two-photon source integrating both C- and L-band wavelength-selective switches for complete control of spectral routing and allocation across 7.5 THz in a single setup. Polarization state tomography of all 150 pairs of 25-GHz-wide channels reveals an average fidelity of 0.98 and total distillable entanglement greater than 181 kebits/s. This source is explicitly designed for flex-grid optical networks and can facilitate optimal utilization of entanglement resources across the full C+L-band.

42 ENGINEERING↗

An Overview of Distributed Energy Resource (DER) Interconnection: Current Practices and Emerging Solutions

This guidebook provides an overview of key issues for utilities and utility regulators to consider as deployments of distributed energy resources (DER) increase, including what has been tried in the field and emerging good practices. Topics covered include: Interconnection Applications and Application Processing; Interconnection Standards; Advanced Inverters; Impact Screening and Evaluation; Estimating Future DER deployments; Distribution System Upgrades and Planning in a DER context; Cybersecurity; Storage and Solar plus Storage Interconnection; and Cost Allocation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluating adaptive and predictive power management strategies for optimizing visualization performance on supercomputers

Power is becoming an increasingly scarce resource on the next generation of supercomputers, and should be used wisely to improve overall performance. One strategy for improving power usage is hardware overprovisioning, i.e., systems with more nodes than can be run at full power simultaneously without exceeding the system-wide power limit. With this study, we compare two strategies for allocating power throughout an overprovisioned system – adaptation and prediction – in the context of visualization workloads. While adaptation has been suitable for workloads with more regular execution behaviors, it may not be as suitable on visualization workloads, since they can have variable execution behaviors. This study considers a total of 104 experiments, which vary the rendering workload, power budget, allocation strategy, and node concurrency, including tests processing data sets up to 1 billion cells and using up to 18,432 cores across 512 nodes. Overall, we find that prediction is a superior strategy for this use case, improving performance up to 27% compared to an adaptive strategy.

97 MATHEMATICS AND COMPUTING↗

Screening for hepatitis D and PEG-Interferon over Tenofovir enhance general hepatitis control efforts in Brazil

Hepatitis D virus (HDV), which requires the presence of hepatitis B virus (HBV), is a deadly yet neglected disease that rapidly leads to liver cancer and disease-induced mortality. This co-dependence creates complex transmission dynamics that make it difficult to predict the efficacy of interventions aimed at HBV and/or HDV control in endemic regions, such as certain municipalities of Brazil, where up to 65% of HBV-infected persons are co-infected. We created a mathematical model that captures the joint transmission dynamics of HBV and HDV, incorporating mother-to-child, sexual and household transmission. With an aim to minimize the number of total infections and disease-induced mortality in 2027, we then determined optimal strategies for Brazil and its sub-regions under a constrained budget, which was dynamically allocated among HBV and HDV screening, HBV and HDV treatment, HBV newborn and adult vaccination, and awareness programs. Three treatment options were considered, namely: Tenofovir, PEGylated-Interferon, and nucleic acid polymers (NAP). The additional cost of HDV screening and the use of a more expensive PEGylated-Interferon are offset by not wasting resources on treating co-infected persons with Tenofovir. The introductory price of NAP treatment must be less than $16,000 per course to become competitive with Tenofovir and PEGylated-Interferon in Brazil. Additional screening for HDV is beneficial, even in a low HBV and HDV endemic regions of Brazil. We recommend PEGylated-Interferon, wherever possible, for both HBV and HDV. If PEGylated-Interferon is not available in abundance, PEGylated-Interferon for co-infections and 4-year Tenofovir treatment for mono-infections is recommended.

60 APPLIED LIFE SCIENCES↗

Optimal placement of data concentrators for expansion of the smart grid communications network

Evolving power systems with increasing renewables penetration, along with the development of the smart grid, calls for improved communication networks to support these distributed generation sources. Automatic and optimal placement of communication resources within the advanced metering infrastructure is critical to provide a high‐performing, reliable, and resilient power system. Three network design formulations based on mixed‐integer linear and non‐linear programming approaches are proposed to minimise network congestion by optimising residual buffer capacity through the placement of data concentrators and network routeing. Results on a case study show that the proposed models improve network connectivity and robustness, and increase average residual buffer capacity. Maximising average residual capacity alone, however, results in both oversaturated and underutilised nodes, while maximising either minimum residual capacity or total reciprocal residual capacity can yield much‐improved network load allocation. Consideration of connection redundancy improves network reliability further by ensuring quality‐of‐service in the event of an outage. Analysis of multi‐period network expansion shows that the models do not deviate significantly from optimal when used progressively (within 5% deviation), and are effective for utility planners to use for smart grid expansion.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Phosphorus limitation of early growth differs between nitrogen‐fixing and nonfixing dry tropical forest tree species

Summary Tropical forests are often characterized by low soil phosphorus (P) availability, suggesting that P limits plant performance. However, how seedlings from different functional types respond to soil P availability is poorly known but important for understanding and modeling forest dynamics under changing environmental conditions. We grew four nitrogen (N)‐fixing Fabaceae and seven diverse non‐N‐fixing tropical dry forest tree species in a shade house under three P fertilization treatments and evaluated carbon (C) allocation responses, P demand, P‐use, investment in P acquisition traits, and correlations among P acquisition traits. Nitrogen fixers grew larger with increasing P addition in contrast to non‐N fixers, which showed fewer responses in C allocation and P use. Foliar P increased with P addition for both functional types, while P acquisition strategies did not vary among treatments but differed between functional types, with N fixers showing higher root phosphatase activity (RPA) than nonfixers. Growth responses suggest that N fixers are limited by P, but nonfixers may be limited by other resources. However, regardless of limitation, P acquisition traits such as mycorrhizal colonization and RPA were nonplastic across a steep P gradient. Differential limitation among plant functional types has implications for forest succession and earth system models.

59 BASIC BIOLOGICAL SCIENCES↗

Using Financial Contracts to Facilitate Informal Leases Within a Western United States Water Market Based on Prior Appropriation

The ability to reallocate water to higher-value uses during drought is an increasingly important “soft-path” tool for managing water resources in an uncertain future. In most of the Western United States, state-level water market institutions that enable reallocation also impose substantial transaction costs on market participants related to regulatory approval and litigation. These transaction costs can be prohibitive for many participants in terms of both costs and lengthy approval periods, limiting transfers and reducing allocation efficiency, particularly during drought crises periods. This manuscript describes a mechanism to reduce transaction costs by adapting an existing form of informal leases to facilitate quicker and less expensive transfers among market participants. Instead of navigating the formal approval process to lease a water right, informal leases are financial contracts for conservation that enable more junior holders of existing rights to divert water during drought, thereby allowing the formal transfer approval process to be bypassed. The informal leasing approach is tested in the Upper Colorado River Basin, where drought and institutional barriers to transfers lead to frequent shortages for urban rights holders along Colorado's Front Range. Informal leases are facilitated via option contracts that include adaptive triggers and that define volumes of additional, compensatory, releases designed to mitigate impacts to instream flows and third parties. Results suggest that more rapid reallocation of water via informal leases could have resulted in up to $222 million in additional benefits for urban rights holders during the historical period 1950–2013.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗