Search NASA⌕ Search

SEARCH · Search NASA

Results for “Resource scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

Cockpit resource management training at People Express

In January 1986 in a continuing effort to maintain and improve flight safety and solve some Cockpit Resource Management (CRM) problems, People Express implemented a new CRM training program. It is a continuously running program, scheduled over the next three years and includes state-of-the-art full-mission simulation (LOFT), semi-annual seminar workshops and a comprehensive academic program authored by Robert W. Mudge of Cockpit Management Resources Inc. That program is outlined and to maximize its contribution to the workshop's goals, is organized into four topic areas: (1) Program content: the essential elements of resource management training; (2) Training methods: the strengths and weaknesses of current approaches; (3) Implementation: the implementation of CRM training; and (4) Effectiveness: the effectiveness of training. It is confined as much as possible to concise descriptions of the program's basic components. Brief discussions of rationale are included, however no attempt is made to discuss or review popular CRM tenets or the supporting research.

Bruce, Keith D.↗

Expert mission planning and replanning scheduling system for NASA KSC payload operations

EMPRESS (Expert Mission Planning and REplanning Scheduling System) is an expert system created to assist payload mission planners at Kennedy in the long range planning and scheduling of horizontal payloads for space shuttle flights. Using the current flight manifest, these planners develop mission and payload schedules detailing all processing to be performed in the Operations and Checkout building at Kennedy. With the EMPRESS system, schedules are generated quickly using standard flows that represent the tasks and resources required to process a specific horizontal carrier. Resources can be tracked and resource conflicts can be determined and resolved interactively. Constraint relationships between tasks are maintained and can be enforced when a task is moved or rescheduled. The domain, structure, and functionality of the EMPRESS system is briefly designed. The limitations of the EMPRESS system are described as well as improvements expected with the EMPRESS-2 development.

Pierce, Roger↗

MOD: An Instrument for the 2005 Mars Explorer Program HEDS Payload

The Mars Organic Detector (MOD) was recently selected for the definition phase of the HEDS '05 (originally scheduled for '03) lander instrument package for fundamental biology and in situ resource utilization. MOD is designed to detect organic compounds in rock and soil samples directly on the surface of Mars in order to assess the biological potential of the planet. In addition, a MOD Tunable Diode Laser Spectrometer (TDLS) will provide information on desorption and decomposition temperatures, as well as the release rates and quantities of water and carbon dioxide that can be liberated from regolith samples, thereby providing the parameters needed for the design of systems for the future large-scale in situ extraction of valuable consumable resources. A MOD TDLS will also measure the atmospheric water and carbon dioxide content, as well as the atmospheric carbon dioxide isotopic composition, in order to determine whether there is an isotopic offset between atmospheric and surface carbon.

Bada, J. L.↗

Choosing Objectives in Over-Subscription Planning

Many NASA planning problems are over-subscription problems - that is, there are a large number of possible goals of differing value, and the planning system must choose a subset &it car! be accomplished within the limited time and resources available. Examples include planning for telescopes like Hubble, SIRTF, and SOFIA; scheduling for the Deep Space Network; and planning science experiments for a Mars rover. Unfortunately, existing planning systems are not designed to deal with problems like this - they expect a well-defined conjunctive goal and terminate in failure unless the entire goal is achieved. In this paper we develop techniques for over-subscription problems that assist a classical planner in choosing which goals to achieve, and the order in which to achieve them. These techniques use plan graph cost-estimation techniques to construct an orienteering problem, which is then used to provide heuristic advice on the goals and goal order that should considered by a planner.

Smith, David E.↗

Requirements Development Issues for Advanced Life Support Systems: Solid Waste Management

Long duration missions pose substantial new challenges for solid waste management in Advanced Life Support (ALS) systems. These possibly include storing large volumes of waste material in a safe manner, rendering wastes stable or sterilized for extended periods of time, and/or processing wastes for recovery of vital resources. This is further complicated because future missions remain ill-defined with respect to waste stream quantity, composition and generation schedule. Without definitive knowledge of this information, development of requirements is hampered. Additionally, even if waste streams were well characterized, other operational and processing needs require clarification (e.g. resource recovery requirements, planetary protection constraints). Therefore, the development of solid waste management (SWM) subsystem requirements for long duration space missions is an inherently uncertain, complex and iterative process. The intent of this paper is to address some of the difficulties in writing requirements for missions that are not completely defined. This paper discusses an approach and motivation for ALS SWM requirements development, the characteristics of effective requirements, and the presence of those characteristics in requirements that are developed for uncertain missions. Associated drivers for life support system technological capability are also presented. A general means of requirements forecasting is discussed, including successive modification of requirements and the need to consider requirements integration among subsystems.

Levri, Julie A.↗

Autonomously generating operations sequences for a Mars Rover using AI-based planning

This paper discusses a proof-of-concept prototype for ground-based automatic generation of validated rover command sequences from highlevel science and engineering activities. This prototype is based on ASPEN, the Automated Scheduling and Planning Environment. This Artificial Intelligence (AI) based planning and scheduling system will automatically generate a command sequence that will execute within resource constraints and satisfy flight rules.

Mars Rover↗

Enhanced atomics for workgroup synchronization

A technique for synchronizing workgroups is provided. The techniques comprise detecting that one or more non-executing workgroups are ready to execute, placing the one or more non-executing workgroups into one or more ready queues based on the synchronization status of the one or more workgroups, detecting that computing resources are available for execution of one or more ready workgroups, and scheduling for execution one or more ready workgroups from the one or more ready queues in an order that is based on the relative priority of the ready queues.

Dutu, Alexandru↗

Snowmass Energy Frontier Simulations using the Open Science Grid (A Snowmass 2013 whitepaper)

Snowmass is a US long-term planning study for the high-energy community by the American Physical Society's Division of Particles and Fields. For its simulation studies, opportunistic resources are harnessed using the Open Science Grid infrastructure. Late binding grid technology, GlideinWMS, was used for distributed scheduling of the simulation jobs across many sites mainly in the US. The pilot infrastructure also uses the Parrot mechanism to dynamically access CvmFS in order to ascertain a homogeneous environment across the nodes. This report presents the resource usage and the storage model used for simulating large statistics Standard Model backgrounds needed for Snowmass Energy Frontier studies.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Dawn Usage, Scheduling, and Governance Model

This document describes Dawn use, scheduling, and governance concerns. Users started running full-machine science runs in early April 2009 during the initial open shakedown period. Scheduling Dawn while in the Open Computing Facility (OCF) was controlled and coordinated via phone calls, emails, and a small number of controlled banks. With Dawn moving to the Secure Computing Facility (SCF) in fall of 2009, a more detailed scheduling and governance model is required. The three major objectives are: (1) Ensure Dawn resources are allocated on a program priority-driven basis; (2) Utilize Dawn resources on the job mixes for which they were intended; and (3) Minimize idle cycles through use of partitions, banks and proper job mix. The SCF workload for Dawn will be inherently different than Purple or BG/L, and therefore needs a different approach. Dawn's primary function is to permit adequate access for tri-lab code development in preparation for Sequoia, and in particular for weapons multi-physics codes in support of UQ. A second purpose is to provide time allocations for large-scale science runs and for UQ suite calculations to advance SSP program priorities. This proposed governance model will be the basis for initial time allocation of Dawn computing resources for the science and UQ workloads that merit priority on this class of resource, either because they cannot be reasonably attempted on any other resources due to size of problem, or because of the unavailability of sizable allocations on other ASC capability or capacity platforms. This proposed model intends to make the most effective use of Dawn as possible, but without being overly constrained by more formal proposal processes such as those now used for Purple CCCs.

99 GENERAL AND MISCELLANEOUS↗

Analysis of Salinity Intrusion in the San Francisco Bay-Delta using a GA- Optimized Neural Net, and Application of the Model to Prediction in the Elkhorn Slough Habitat

The San Francisco Bay Delta is a large hydrodynamic complex that incorporates the Sacramento and San Joaquin Estuaries, the Burman Marsh, and the San Francisco Bay proper. Competition exists for the use of this extensive water system both from the fisheries industry, the agricultural industry, and from the marine and estuarine animal species within the Delta. As tidal fluctuations occur, more saline water pushes upstream allowing fish to migrate beyond the Burman Marsh for breeding and habitat occupation. However, the agriculture industry does not want extensive salinity intrusion to impact water quality for human and plant consumption. The balance is regulated by pumping stations located alone the estuaries and reservoirs whereby flushing of fresh water keeps the saline intrusion at bay. The pumping schedule is driven by data collected at various locations within the Bay Delta and by numerical models that predict the salinity intrusion as part of a larger model of the system. The Interagency Ecological Program (IEP) for the San Francisco Bay/Sacramento-San Joaquin Estuary collects, monitors, and archives the data, and the Department of Water Resources provides a numerical model simulation (DSM2) from which predictions are made that drive the pumping schedule. A problem with this procedure is that the numerical simulation takes roughly 16 hours to complete a C:~ prediction. We have created a neural net, optimized with a genetic algorithm, that takes as input the archived data from multiple stations and predicts stage, salinity, and flow at the Carquinez Straits (at the downstream end of the Burman Marsh). This model seems to be robust in its predictions and operates much faster than the current numerical DSM2 model. Because the system is strongly tidal driven, we used both Principal Component Analysis and Fast Fourier Transforms to discover dominant features within the IEP data. We then filtered out the dominant tidal forcing to discover non-primary tidal effects, and used this to enhance the neural network by mapping input-output relationships in a more efficient manner. Furthermore, the neural network implicitly incorporates both the hydrodynamic and water quality models into a single predictive system. Although our model has not yet been enhanced to demonstrate improve pumping schedules, it has the possibility to support better decision-making procedures that may then be implemented by State agencies if desired. Our intention is now to use this model in the smaller Elkhorn Slough complex near Monterey Bay where no such hydrodynamic model currently exists. At the Elkhorn Slough, we are fusing the neural net model of tidally-driven flow with in situ flow data and airborne and satellite remote sensation data. These further constrain the behavior of the model in predicting the longer-term health and future of this vital estuary.

Thompson, David E.↗

Human Factors and Modeling Methods in the Development of Control Room Modernization Concepts

nuclear power plants. Although the nuclear industry has made steady improvement in outage optimization, each day of a refueling outage still represents an opportunity to save millions of dollars and each day an outage extends past its planned end date represents millions of dollars that may have been spent unnecessarily. Reducing planned outage duration or preventing outage extensions requires careful management of the outage schedule as well as constant oversight and monitoring of work completion during the outage execution. During a typical outage, there are typically more than 10,000 activities on the schedule that, if not managed efficiently, may cause expensive outage delays. Management of outages currently relies largely on paper-based resources and general-purpose office software. A typical tool currently used to monitor work performance is a burn-down curve, where total remaining activities are plotted against the baseline schedule to track bulk work completion progress. While these tools are useful, there is still considerable uncertainty during a typical outage that bulk work progress is adequate and therefore a lot of management time is spent analyzing the situation on a daily basis. This paper describes recent advances made in developing a framework for the design of visual outage information presentation, as well as an overview of the scientific principles that informed the development of the visualizations. To test the utility of advanced visual outage information presentation, an outage management dashboard software application was created as part of the Department of Energy’s Advanced Outage Control Center project. This dashboard is intended to present all the critical information an outage manager would need to understand the current status of a refueling outage. The dashboard presents the critical path, bulk work performance, key performance indicators, outage milestones and metrics relating current performance to historical performance. Additionally, the dashboard includes data analysis tools to allow outage managers to drill down into the underlying data to understand the drivers of the indicators.

99 GENERAL AND MISCELLANEOUS↗

Human Factors Principles in Information Dashboard Design - 278

Refueling outages remain one of the largest opportunities for improving capacity factor and reducing costs available to commercial nuclear power plants. Although the nuclear industry has made steady improvement in outage optimization, each day of a refueling outage still represents an opportunity to save millions of dollars and each day an outage extends past its planned end date represents millions of dollars that may have been spent unnecessarily. Reducing planned outage duration or preventing outage extensions requires careful management of the outage schedule as well as constant oversight and monitoring of work completion during the outage execution. During a typical outage, there are typically more than 10,000 activities on the schedule that, if not managed efficiently, may cause expensive outage delays. Management of outages currently relies largely on paper-based resources and general-purpose office software. A typical method currently used to monitor work performance is a burn-down curve, where total remaining activities are plotted against the baseline schedule to track bulk work completion progress. While methods like this are useful, there is still considerable uncertainty during a typical outage whether bulk work progress is adequate and therefore a lot of management time is spent analyzing the situation on a daily basis. This paper is a case study of how new technology, in combination with established human-factors and user-centered design knowledge, can be used to support Outage Control Center (OCC) personnel decision making. In particular, we describe recent advances made in developing a framework for the design of visual outage information presentation, as well as an overview of the human factors principles that informed the development of the visualizations. To test the utility of advanced visual outage information presentation, an outage management dashboard software application was created as part of the Department of Energy's Advanced Outage Control Center project (AOCC). This dashboard is intended to present all the critical information an outage manager would need to understand the current status of a refueling outage. The dashboard presents the critical path, bulk work performance, key performance indicators, outage milestones and metrics relating current performance to historical performance. Additionally, the dashboard includes data analysis tools to allow outage managers to drill down into the underlying data to understand the drivers of the indicators. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The WISE Satellite Development: Managing the Risks and the Opportunities

NASA's Wide-field Infrared Survey Explorer (WISE) MIDEX mission is surveying the entire sky in four infrared bands from 3.4 to 22 micrometers. The WISE instrument consists of a 40 cm telescope, a solid hydrogen cryostat, a scan mirror mechanism, and four 1K x1K infrared detectors. The WISE spacecraft bus provides communication, data handling, and avionics including instrument pointing. A Delta 7920 successfully launched WISE into a Sun-synchronous polar orbit on December 14, 2009. WISE was competitively selected by NASA as a Medium cost Explorer mission (MIDEX) in 2002. MIDEX missions are led by the Principal Investigator who delegates day-to-day management to the Project Manager. Given the tight cost cap and relatively short development schedule, NASA chose to extend the development period one year with an option to cancel the mission if certain criteria were not met. To meet this and other challenges, the WISE management team had to learn to work seamlessly across institutional lines and to recognize risks and opportunities in order to develop the flight hardware within the project resources. In spite of significant technical issues, the WISE satellite was delivered on budget and on schedule. This paper describes our management approach and risk posture, technical issues, and critical decisions made.

Risk Management↗

Evolution of the CMS Global Submission Infrastructure for the HL-LHC Era

Efforts in distributed computing of the CMS experiment at the LHC at CERN are now focusing on the functionality required to fulfill the projected needs for the HL-LHC era. Cloud and HPC resources are expected to be dominant relative to resources provided by traditional Grid sites, being also much more diverse and heterogeneous. Handling their special capabilities or limitations and maintaining global flexibility and efficiency, while also operating at scales much higher than the current capacity, are the major challenges being addressed by the CMS Submission Infrastructure team. These proceedings discuss the risks to the stability and scalability of the CMS HTCondor infrastructure extrapolated to such a scenario, thought to be derived mostly from its growing complexity, with multiple Negotiators and schedulers flocking work to multiple federated pools. New mechanisms for enhanced customization and control over resource allocation and usage, mandatory in this future scenario, are also described.

Yzquierdo, Antonio Pérez-Calero↗

Transportation of Radioactive Waste in Support of Ontario Power Generation's Darlington Nuclear Generating Station Refurbishment Project - 19384

Ontario Power Generation's (OPG) Darlington Nuclear Generating Station (DNGS) is currently executing a major refurbishment of the first of their four Candu reactors. As expected, the volumes of Low and Intermediate Level Waste (LILW) generated from this large-scale project have been significant. As a result, unique solutions were needed for the safe and efficient transportation of radioactive waste from the Darlington Nuclear Generating Station to OPG's Western Waste Management Facility for volume reduction and interim storage. OPG's Nuclear Waste Management Division and the Darlington Refurbishment Project worked together to identify unique radioactive waste transportation solutions. These solutions included staging and temporary storage facilities, new waste containers and specialized transportation packages, additional human resources and enhanced planning and logistics required to transport large volumes of routine and non-routine radioactive waste in a manner that minimized the impact on employee and public safety, project schedule and project costs. From a facilities perspective a shielded 'Marshalling Area' that allowed for loaded transportation packages to be staged was built on the Darlington site and a temporary licensed off-site radioactive waste storage facility close to the DNGS was contracted through a third party vendor. These two facilities allowed for more consistent and efficient schedules that limited radioactive waste shipments during off-hours and avoided peak traffic periods thereby limiting the risk to Refurbishment critical path activities. Special purpose-built transportation packages and waste containers were designed and fabricated to handle unique waste streams such as feeder pipes and other miscellaneous intermediate level waste items associated with reactor dismantling. Twenty-four Type A qualified transportation packages mounted to six flat deck trailers were designed and fabricated to support the shipment of contaminated feeder pipes. An Intermediate Level Waste Utility Container (ILWUC) to be used in conjunction with the Type B qualified Trillium Transportation Package was designed and fabricated to handle unique intermediate level waste streams arising from the reactor dismantling process. Logistics software was used to plan the shipments to ensure waste transportation packages could be loaded, transported, unloaded and returned safely to the project site in a timely manner without impacting project schedules. Several shipping scenarios were simulated and adjusted using the software to ensure that the most efficient use of equipment and resources for the radioactive waste transportation aspects of the project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SMC 2021 : Analyzing Resource Utilization and User Behavior on Titan Supercomputer

Resource utilization statistics of submitted jobs on a supercomputer can help us understand how users from various scientific domains use HPC platforms and better design a job scheduler. We explore to generate insight regarding workload distribution and usage pattern domains from job scheduler trace, GPU failure information, and project-specific information collected from Titan supercomputer. Furthermore, we want to know how the scheduler performance varies over time and how the users' scheduling behavior changes following a system failure. These observations have the potential to provide valuable insight, which is helpful to prepare for system failures. These practices will help us develop and apply novel machine learning algorithms in understanding system behavior, requirement, and better scheduling of HPC systems. There are two datasets, RUR and GPU. RUR: This dataset is the job scheduler traces collected from the Titan supercomputerfrom 01/01/2015 to 07/31/2019 (2015.csv - 2019.csv). These were collected usingResource Utilization Report (RUR), a Cray-developed resource-usage data collectionand reporting system. It contains the usage information of its critical resources (CPU,Memory, GPU, and I/O) of each running job on Titan during that period [2]. ProjectAreas: Every job is associated with a project ID. TheProjectAreas.csvdatasetprovides a mapping of the project ID to its domain science. GPU: There have been some hardware-related issues in the GPUs in Titan that caused some GPUs to fail, sometimes irrecoverably during some job runs. This dataset provides information regarding these failures during the execution of the submitted jobs. GPUs on Titan are uniquely identified by a serial number (SN), and they are installed in a location. A GPU can be installed in a location, then removed from that location following a failure, and then re-installed in a different location after fixing the problem. If the failure can't be recovered, the GPU might be removed entirely from Titan. There are two prominent types of failures that resulted in the removal of GPUs from Titan: Double Bit Error (DBE) and Out of the Bus (OTB). The dataset (gc_full.csv) has the following fields: 1. SN : Serial number of a GPU 2. location : The location where it is installed 3. insert : The time when it was inserted into that location 4. remove : The time when it was removed from that location 5. duration : Amount of time the GPU spent in this location 6. out : If the device was taken out entirely w/o a re-installment into a new location. 7. event : If the GPU was taken out entirely, the reason for its removal. To learn more about this dataset, please refer to the git repositoryhttps://github.com/olcf/TitanGPULifeand the related publication [1]. References [1] George Ostrouchov, Don Maxwell, Rizwan A Ashraf, Christian Engelmann, MallikarjunShankar, and James H Rogers. Gpu lifetimes on titan supercomputer: Survival analysisand reliability. InSC20: International Conference for High Performance Computing,Networking, Storage and Analysis, pages 1-14. IEEE, 2020. [2] Feiyi Wang, Sarp Oral, Satyabrata Sen, and Neena Imam. Learning from five-yearresource-utilization data of titan system. In2019 IEEE International Conference onCluster Computing (CLUSTER), pages 1-6. IEEE, 2019.

42 ENGINEERING↗

Job Scheduler-Driven Power Gateway for High Performance Computing

Power gateways in the form of a microgrid can incorporate multiple distributed energy resources (DER) in either grid forming or grid following mode and support high performance computing (HPC) power profiles including the large load-follow requirements observed in multi-user HPC systems. The microgrid’s flexibility to operate in either grid forming or grid following mode and to actively switch between these modes enables baseline power from multiple non-baseline DER while maintaining high power quality metrics for the HPC system. But this enormous flexibility in demand response and time of use shifting is generally programmed independently of any integration with an HPC job scheduler which can better inform the load shaping by the microgrid. While there are many existing approaches where the HPC job scheduler takes in information from the grid to make queue scheduling decisions, this work takes the opposite view and explores a scheduler where the jobs in the queue can directly impact the settings of the grid. Several HPC scheduler strategies are tested where the jobs in the queue directly impact the settings of a microgrid designed for HPC operation which is driving a datacenter with three classes of HPC architectures. The scheduler operation is shown using a microgrid with 64 kW of solar capacity and 320 kWh of battery over a period of 21 days operating with significant low-follow swings, a throttled grid, cloudy conditions, switching between grid following and grid forming modes, and a wide range of battery states-of-charge all while maintaining high quality power metrics. The scheduler provides a mechanism for the job queue to directly impact a power gateway like a microgrid and to improve HPC power outcomes such as maximizing renewable energy usage

microgrid↗