Search NASA⌕ Search

SEARCH · Search NASA

Results for “Sequential design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

Planning for Resilient Power Distribution Systems using Risk-Based Quantification and Q-Learning

Grid hardening is one of the most effective approaches that reduce the component failures and restoration efforts thus increasing the resilience of the power systems against extreme events. However, hardening and upgrading the entire system is prohibitively expensive and hence the optimal design of a distribution network is challenging. This paper adopted a reinforcement learning algorithm to identify the optimal hardening strategy to enhance the resilience of power distribution systems. Adopting the Q-learning algorithm as the reinforcement learning technique, we found the sequential optimal action for hardening measures to enhance the grid's resilience for the given budget. To identify the optimal strategy through Q-learning, Conditional Value at Risk (CVaR) is used as a rewarding metric. A study on the IEEE 123-bus test feeder validate the effectiveness of the proposed model and show how to effectively allocate budget limited resources to plan a resilient power distribution network.

Paul, Shuva↗

TU-EF-204-04: Feasibility Study of a Novel Stationary Spectral CT Scanner

Purpose: To evaluate a cadmium zinc telluride (CZT) detector module and to develop a proof-of-concept bench-top system to examine the concept and feasibility of a stationary spectral scanner that would consist of a CZT detector ring and a distributed source for rotationless imaging. Methods: The bench-top system employs a double-rotation set-up with two concentric but independent rotating stages, one for turning the object at sparse angles to mimic the imaging from a sequentially activated source distributed on a ring, while the other for translating the detector module to simulate a projection arc along a virtual detector ring. A source of 30-degree fan is used in the set-up, and the ring is designed to be 85cm in diameter in order to provide a 22cm field-of-view that is large enough for an average human head. The CZT detector module has 16×16 0.5mm pixels and eight global energy thresholds, and is attached to an experimental data acquisition board from the same vendor (Nova R&D). Its pixel gain is first calibrated using radioisotope Tc-99m to align the photo-peaks. Count rate performance is assessed using the X-ray source. Air and offset corrections are done prior to each CT scan. A 10cm acrylic phantom with 5 different inserts is imaged at 100kVp, 2mA, with an effective exposure window of 150ms per projection. Reconstruction is done using a total variation-type iterative method. Results: The detector module exhibited large gain variations among pixels. Average count rate was over 1Mcps per pixel. Parallax effect was observed along the arcs but was corrected. Reconstructed images from two energy bins demonstrated good contrast, spatial resolution and image uniformity, with little artifacts. Conclusion: The CZT detector tested is suitable for imaging relatively small objects. A stationary spectral CT appears feasible should we have enough buttable modules and a distributed source. This work was supported by Ministry of Science and Technology of China through grants 11YQ040082 and 2012BAI13B04.

60 APPLIED LIFE SCIENCES↗

Third-Party Aggregation Rulemaking in MISO and SPP Footprints

The report highlights key considerations for retail regulators in the footprints of the Southwest Power Pool (SPP) or Midcontinent Independent System Operator (MISO) in states that previously opted out of allowing third-party aggregation participation under FERC Order 719 and that may want to explore reversing the decision due to a changing policy environment under new FERC orders (i.e., 2222) and/or tightening resource adequacy constraints. Through a document review and a series of 27 interviews with regulators, aggregators, and other industry professionals, this document provides a high-level policy overview of the retail regulator’s role in a selection of processes, rules, and regulations to better understand how states have treated and/or integrated aggregators into wholesale markets. The report summarizes findings in two sections: General Findings and Specific Policy Findings. The General Findings offer high level takeaways such as the fact that 17 of the 20 states in MISO and SPP footprints opted out of third party aggregations following Order 719. Additionally, there is only one state that is fully restructured in the MISO and SPP footprints whereas the rest are vertically integrated, and the majority of third-party aggregations in the U.S. take place in restructured states outside of these footprints. Even so, third-party aggregations do take place in MISO and SPP albeit in small numbers and in an ad hoc regulatory environment. The specific policy findings delve deeper into specific examples of state actions on the topics of jurisdiction, registration and licensing, data governance, dual participation, and dispute resolution. Tables in each category organize state actions into Tiers I-III, which roughly correspond to the possible level of involvement or possible change necessary by state regulators and/or legislators to implement these actions. The tier level does not indicate any value judgement, as each state has respective regulatory limitations and each decision comes with various tradeoffs. One main tradeoff is between simplicity and quick implementation versus comprehensive and prolonged implementation. In many cases, actions in Tier I could be implemented without significant changes by relying on the use of existing processes for an aggregator context. On the other hand, many actions in Tier III are more narrowly designed to address aggregators specifically, but often require more significant changes including the involvement of additional parties through stakeholder engagement or legislative action. In some cases, these tiers are discrete. However, state regulators may also choose to progress through these various tiers sequentially as they phase in aggregators while learning from their experience. With the ability to stack bulk system level services, distributed energy resource aggregations in MISO and SPP could provide various private benefits (e.g., increased value streams to the owner) as well as societally beneficial grid services (e.g., peaking capacity, ancillary services, and other services that increase the grid’s overall operational efficiency). In deciding how to best to enable these benefits, states and retail regulators must weigh various tradeoffs if considering reversing a previous opt out.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Hydrodynamic Analysis and Optimization of Aquantis Marine Turbine: Cooperative Research and Development (Final Report)

The primary aim of this proposal is to improve the accurate prediction of hydrodynamic performance and dynamic load responses of the AQ10 floating axial-flow tidal turbine with a tri-cat mooring configuration. The validation of reduced-order modeling approaches with high-fidelity model will be implemented. Additionally, the frequency response domain, Response Amplitude Floating Wind (RAFT) toolbox plus an optimizer expanded for marine hydrokinetic turbines under the Submarine Hydrokinetic And Riverine Kilo-megawatt. Systems (SHARKS) program will be used for designing and exploring different key design parameters (platform dimension, mooring layout and its parameters) of next marine hydrokinetic (MHK) turbine generation.

16 TIDAL AND WAVE POWER↗

Design of a digital compression technique for shuttle television

The determination of the performance and hardware complexity of data compression algorithms applicable to color television signals, were studied to assess the feasibility of digital compression techniques for shuttle communications applications. For return link communications, it is shown that a nonadaptive two dimensional DPCM technique compresses the bandwidth of field-sequential color TV to about 13 MBPS and requires less than 60 watts of secondary power. For forward link communications, a facsimile coding technique is recommended which provides high resolution slow scan television on a 144 KBPS channel. The onboard decoder requires about 19 watts of secondary power.

Habibi, A.↗

Theoretical and material studies on thin-film electroluminescent devices

A highly efficient DC electroluminescent display is presented. A variably spaced superlattice structure is used to produce high energy injection of electrons into a ZnSe:Mn active layer in which impact excitation of the Mn centers can occur. The device is predicted to operate at an applied external bias on order of magnitude less than the best DC electroluminescent device to date. The device is predicted to have comparable brightness, since it operates in the saturation regime. The improved efficiency stems from avoiding significant energy loss to phonons. The electrons sequentially tunnel through a multilayer ZnSe/CaSrF2 stack under bias and emerge into the active layer at an energy equal to the conduction band bending. The injection energy is chosen to coincide with the impact excitation energy of the Mn centers. Different device designs are presented and their performance is predicted.

Summers, C. J.↗

The variably spaced superlattice electroluminescent display - A new high efficiency electroluminescence scheme

A new, highly efficient dc electroluminescent display is presented. A variably spaced superlattice scheme is suggested herein which can produce high-energy injection of electrons into a ZnSe:Mn active layer in which impact excitation of the Mn centers can occur. The device is predicted to operate at an applied external bias an order of magnitude less than the best dc electroluminescent device to date. The device is predicted to have comparable brightness, since it operates in the saturation regime. The improved efficiency stems from avoiding significant energy loss to phonons. The electrons sequentially tunnel through a multilayer stack under bias and emerge into the active layer at an energy equal to the conduction-band bending. The injection energy is chosen to coincide with the impact excitation energy of the Mn centers. Different device designs are presented and their performance is predicted.

Brennan, K. F.↗

Performance measurements of the first RAID prototype

The performance is examined of Redundant Arrays of Inexpensive Disks (RAID) the First, a prototype disk array. A hierarchy of bottlenecks was discovered in the system that limit overall performance. The most serious is the memory system contention on the Sun 4/280 host CPU, which limits array bandwidth to 2.3 MBytes/sec. The array performs more successfully on small random operations, achieving nearly 300 I/Os per second before the Sun 4/280 becomes CPU limited. Other bottlenecks in the system are the VME backplane, bandwidth on the disk controller, and overheads associated with the SCSI protocol. All are examined in detail. The main conclusion is that to achieve the potential bandwidth of arrays, more powerful CPU's alone will not suffice. Just as important are adequate host memory bandwidth and support for high bandwidth on disk controllers. Current disk controllers are more often designed to achieve large numbers of small random operations, rather than high bandwidth. Operating systems also need to change to support high bandwidth from disk arrays. In particular, they should transfer data in larger blocks, and should support asynchronous I/O to improve sequential write performance.

Chervenak, Ann L.↗

Multipurpose Prepregging Machine

Machine designed and built for variety of uses involving coating or impregnating ("prepregging") fibers, tows, yarns, or webs or tapes made of such fibrous materials with thermoplastic or thermosetting resins. Prepreg materials produced used to make matrix/fiber composite materials. Comprises modules operated individually, sequentially, or simultaneously, depending on nature of specific prepreg material and prepregging technique used. Machine incorporates number of safety features.

Johnston, N. J.↗

Power line communication system and method of auto-commissioning system nodes

A power line communication system and method permit auto-commissioning of multiple device control modules on a DC power line during the power up of the system. Device control modules associated with the peripheral devices are powered up sequentially and a unique address is assigned to each device controller when it is powered up. The device control modules have a unique circuit configuration that allows the use of inexpensive and mostly passive components. The cost effectiveness of the device controller design becomes particularly significant in applications, such as multi-panel OLED lighting fixtures, with high node counts.

97 MATHEMATICS AND COMPUTING↗

Polycaprolactone: A Promising Addition to the Sequential Infiltration Synthesis Polymer Family Identified through In Situ Infrared Spectroscopy

Infiltration of inorganic oxides inside polymers using sequential infiltration synthesis (SIS) is an effective method for creating materials for a broad range of applications. The reactions between various polymer functional groups and organometallic/inorganic precursors are unique, which makes it essential to understand the specific interactions for a range of precursors and polymers to enable predictive process design and to extend the utility of SIS to applications. In this paper, in situ Fourier transform infrared spectroscopy (FTIR) measurements have been performed during Al 2 O 3 and TiO 2 SIS in three different homopolymers: poly(methyl methacrylate) (PMMA), poly(epsilon-caprolactone) (PCL), and poly(2-vinylpyridine) (P2VP). From the FTIR intensity changes after precursor exposure and during the subsequent purge times, it is demonstrated quantitatively that the interaction dynamics and the stability of the intermediate complexes of these polymers with the metal precursors are substantially different. A key finding from this comparative study is that PCL interacts far more strongly with metal precursors, even though its carbonyl (C=O) and ester (C-O-R) functional groups are similar to those of the more weakly interacting PMMA. This behavior suggests that additional factors beyond the identity of the functional groups dictate how polymers interact with metal compounds in SIS. PCL, which has not previously been reported in SIS processes, may be an attractive polymeric template for implementing SIS with improved uniformity and cost-effectiveness.

36 MATERIALS SCIENCE↗

Electro-Thermal Characterization of Dynamical VO 2 Memristors via Local Activity Modeling

We report translating the surging interest in neuromorphic electronic components, such as those based on nonlinearities near Mott transitions, into large-scale commercial deployment faces steep challenges in the current lack of means to identify and design key material parameters. These issues are exemplified by the difficulties in connecting measurable material properties to device behavior via circuit element models. Here, the principle of local activity is used to build a model of VO 2 /SiN Mott threshold switches by sequentially accounting for constraints from a minimal set of quasistatic and dynamic electrical and high-spatial-resolution thermal data obtained via in situ thermoreflectance mapping. By combining independent data sets for devices with varying dimensions, the model is distilled to measurable material properties, and device scaling laws are established. The model can accurately predict electrical and thermal conductivities and capacitances and locally active dynamics (especially persistent spiking self-oscillations). The systematic procedure by which this model is developed has been a missing link in predictively connecting neuromorphic device behavior with their underlying material properties, and should enable rapid screening of material candidates before employing expensive manufacturing processes and testing procedures.

36 MATERIALS SCIENCE↗

Terahertz Chiral Metamaterials Enabling Broadband Polarization Conversion Using Polarization Guiding Effect

Polarization control plays a vital role in terahertz (THz) photonics, enabling a wide range of applications from imaging and spectroscopy to sensing and wireless communication. However, conventional polarization control methods at THz frequencies are limited by narrow operational bandwidths and excessive absorption losses. In this work, we present a broadband THz polarization control based on the polarization guiding effect. We design and fabricate a THz polarization rotator capable of rotating incident linear polarization by 90°. The device consists of 24 twistingly stacked silicon–air metagrating layers that introduce a large degree of form birefringence, with each metagrating layer being 280 µm thick and sequentially twisted by 3.75°. Numerical simulations using the Berreman 4 × 4 method predict broadband operation of the device. Experimental validation using THz time-domain spectroscopy confirms efficient and broadband 90° polarization rotation from 0.2 to 1.25 THz. Based on this concept, we further propose THz Q-plates for the generation of broadband structured vector beams with radial and azimuthal polarization states. This work offers a scalable, material-agnostic platform for advanced THz polarization manipulation and vector beam engineering, opening new pathways for next-generation THz photonic devices.

36 MATERIALS SCIENCE↗

SU-CD-PinS Room/Hall E-00: HAZMAT Training for the Medical Physicist - Part I

Medical Physicists are frequently involved in shipping radioactive materials or supervising those who do. Current U.S. Department of Transportation Hazardous Material Regulations, 49 CFR Parts 171 - 185, require hazmat employees to have documented training specified in 49 CFR 172 Subpart H. A hazmat employee is defined as an individual who: (1) loads, unloads or handles hazardous material; (2) manufactures, tests, reconditions, repairs, modifies, marks or otherwise represents containers, drums or packagings as qualified for use in the transportation of hazardous materials; (3) prepares hazardous materials for transportation; (4) is responsible for safety of transporting hazardous materials; or (5) operates a vehicle used to transport hazardous materials. Recurrent training is required at least once every three years. (The IATA two-year training interval is not applicable and is generally misunderstood.) FAA has escalated inspection and enforcement. Facilities who ship radiopharmaceuticals to other laboratories, return radiopharmaceuticals or radioactive sources to suppliers, or otherwise ship radioactive materials have been cited for failure to provide and document the required training. The interrelationship of transportation regulations, 49 CFR, IATA, ICAO and other transportation regulations, which are frequently misunderstood, will be explained. The course will cover typical shipments by air and highway which are encountered in a medical institution. Items such as fissile materials, highway route controlled quantities, rail shipments, vessel shipments and such will be omitted; although specific questions may be addressed. A major objective of the course is to present the process of shipping radioactive material in a sequential and logical fashion. How radioactive materials for transportation purposes are defined by activity concentrations for exempt materials and activity limits for exempt consignments will be explained. Radioactive material shipments of excepted packages and Type A packages will be emphasized. The program is designed to meet the function specific DOT training requirements for shippers of medical radioactive materials. General awareness training and security awareness training can be obtained from two free DOT training CDs. Safety training and security awareness training is generally satisfied by the training required under the institution’s radioactive material license. For shippers of radioactive Yellow III labeled packages an in-depth written security plan and training are no longer required as of April 8, 2010. In general almost all shippers of medical radioactive material are now not required to have an in-depth security plan. Contents of general awareness training, security awareness training and in-depth security plans will be briefly outlined. It is the hazmat employer’s responsibility to ensure that each hazmat employee is properly trained. No third party can fulfill that requirement. It is the hazmat employer’s responsibility to determine the degree to which this course meets the employer’s requirements, including contents of the course and the examination. Participants will gain sufficient knowledge to prepare hazmat training programs for others in their institutions. A handout will be posted which should be printed out and brought to the course for reference during the presentation. The handout will also satisfy part of the training documentation required by DOT. A feature handout section is a composite table which provides A1, A2, RQ, Exempt Concentration, and Exempt Consignment values in a single table in both Becquerel and Curie units. Course attendance will be certified through the AAPM CEU documentation system. Learning Objectives: Understand the regulatory requirements for shipping radioactive materials. Understand the regulatory requirements for training of hazmat employees. Comprehend how to classify, package, mark, label, document, placard, and transport radioactive materials.

60 APPLIED LIFE SCIENCES↗

SU-CD-PinS Room/Hall E-01

Medical Physicists are frequently involved in shipping radioactive materials or supervising those who do. Current U.S. Department of Transportation Hazardous Material Regulations, 49 CFR Parts 171 - 185, require hazmat employees to have documented training specified in 49 CFR 172 Subpart H. A hazmat employee is defined as an individual who: (1) loads, unloads or handles hazardous material; (2) manufactures, tests, reconditions, repairs, modifies, marks or otherwise represents containers, drums or packagings as qualified for use in the transportation of hazardous materials; (3) prepares hazardous materials for transportation; (4) is responsible for safety of transporting hazardous materials; or (5) operates a vehicle used to transport hazardous materials. Recurrent training is required at least once every three years. (The IATA two-year training interval is not applicable and is generally misunderstood.) FAA has escalated inspection and enforcement. Facilities who ship radiopharmaceuticals to other laboratories, return radiopharmaceuticals or radioactive sources to suppliers, or otherwise ship radioactive materials have been cited for failure to provide and document the required training. The interrelationship of transportation regulations, 49 CFR, IATA, ICAO and other transportation regulations, which are frequently misunderstood, will be explained. The course will cover typical shipments by air and highway which are encountered in a medical institution. Items such as fissile materials, highway route controlled quantities, rail shipments, vessel shipments and such will be omitted; although specific questions may be addressed. A major objective of the course is to present the process of shipping radioactive material in a sequential and logical fashion. How radioactive materials for transportation purposes are defined by activity concentrations for exempt materials and activity limits for exempt consignments will be explained. Radioactive material shipments of excepted packages and Type A packages will be emphasized. The program is designed to meet the function specific DOT training requirements for shippers of medical radioactive materials. General awareness training and security awareness training can be obtained from two free DOT training CDs. Safety training and security awareness training is generally satisfied by the training required under the institution’s radioactive material license. For shippers of radioactive Yellow III labeled packages an in-depth written security plan and training are no longer required as of April 8, 2010. In general almost all shippers of medical radioactive material are now not required to have an in-depth security plan. Contents of general awareness training, security awareness training and in-depth security plans will be briefly outlined. It is the hazmat employer’s responsibility to ensure that each hazmat employee is properly trained. No third party can fulfill that requirement. It is the hazmat employer’s responsibility to determine the degree to which this course meets the employer’s requirements, including contents of the course and the examination. Participants will gain sufficient knowledge to prepare hazmat training programs for others in their institutions. A handout will be posted which should be printed out and brought to the course for reference during the presentation. The handout will also satisfy part of the training documentation required by DOT. A feature handout section is a composite table which provides A1, A2, RQ, Exempt Concentration, and Exempt Consignment values in a single table in both Becquerel and Curie units. Course attendance will be certified through the AAPM CEU documentation system. Learning Objectives: Understand the regulatory requirements for shipping radioactive materials. Understand the regulatory requirements for training of hazmat employees. Comprehend how to classify, package, mark, label, document, placard, and transport radioactive materials.

61 RADIATION PROTECTION AND DOSIMETRY↗

SU-G-PinS Room/Hall E-00: HAZMAT Training for the Medical Physicist - Part II

Medical Physicists are frequently involved in shipping radioactive materials or supervising those who do. Current U.S. Department of Transportation Hazardous Material Regulations, 49 CFR Parts 171 - 185, require hazmat employees to have documented training specified in 49 CFR 172 Subpart H. A hazmat employee is defined as an individual who: (1) loads, unloads or handles hazardous material; (2) manufactures, tests, reconditions, repairs, modifies, marks or otherwise represents containers, drums or packagings as qualified for use in the transportation of hazardous materials; (3) prepares hazardous materials for transportation; (4) is responsible for safety of transporting hazardous materials; or (5) operates a vehicle used to transport hazardous materials. Recurrent training is required at least once every three years. (The IATA two year training interval is not applicable and is generally misunderstood.) FAA has escalated inspection and enforcement. Facilities who ship radiopharmaceuticals to other laboratories, return radiopharmaceuticals or radioactive sources to suppliers, or otherwise ship radioactive materials have been cited for failure to provide and document the required training. The interrelationship of transportation regulations, 49 CFR, IATA, ICAO and other transportation regulations, which are frequently misunderstood, will be explained. The course will cover typical shipments by air and highway which are encountered in a medical institution. Items such as fissile materials, highway route controlled quantities, rail shipments, vessel shipments and such will be omitted; although specific questions may be addressed. A major objective of the course is to present the process of shipping radioactive material in a sequential and logical fashion. How radioactive materials for transportation purposes are defined by activity concentrations for exempt materials and activity limits for exempt consignments will be explained. Radioactive material shipments of excepted packages and Type A packages will be emphasized. The program is designed to meet the function specific DOT training requirements for shippers of medical radioactive materials. General awareness training and security awareness training can be obtained from two free DOT training CDs. Safety training and security awareness training is generally satisfied by the training required under the institution’s radioactive material license. For shippers of radioactive Yellow III labeled packages an in-depth written security plan and training are no longer required as of April 8, 2010. In general almost all shippers of medical radioactive material are now not required to have an in-depth security plan. Contents of general awareness training, security awareness training and in-depth security plans will be briefly outlined. It is the hazmat employer’s responsibility to ensure that each hazmat employee is properly trained. No third party can fulfill that requirement. It is the hazmat employer’s responsibility to determine the degree to which this course meets the employer’s requirements, including contents of the course and the examination. Participants will gain sufficient knowledge to prepare hazmat training programs for others in their institutions. A handout will be posted which should be printed out and brought to the course for reference during the presentation. The handout will also satisfy part of the training documentation required by DOT. A feature handout section is a composite table which provides A1, A2, RQ, Exempt Concentration, and Exempt Consignment values in a single table in both Becquerel and Curie units. Course attendance will be certified through the AAPM CEU documentation system. Learning Objectives: Understand the regulatory requirements for shipping radioactive materials. Understand the regulatory requirements for training of hazmat employees. Comprehend how to classify, package, mark, label, document, placard, and transport radioactive materials.

60 APPLIED LIFE SCIENCES↗

SU-G-PinS Room/Hall E-01

Medical Physicists are frequently involved in shipping radioactive materials or supervising those who do. Current U.S. Department of Transportation Hazardous Material Regulations, 49 CFR Parts 171 - 185, require hazmat employees to have documented training specified in 49 CFR 172 Subpart H. A hazmat employee is defined as an individual who: (1) loads, unloads or handles hazardous material; (2) manufactures, tests, reconditions, repairs, modifies, marks or otherwise represents containers, drums or packagings as qualified for use in the transportation of hazardous materials; (3) prepares hazardous materials for transportation; (4) is responsible for safety of transporting hazardous materials; or (5) operates a vehicle used to transport hazardous materials. Recurrent training is required at least once every three years. (The IATA two year training interval is not applicable and is generally misunderstood.) FAA has escalated inspection and enforcement. Facilities who ship radiopharmaceuticals to other laboratories, return radiopharmaceuticals or radioactive sources to suppliers, or otherwise ship radioactive materials have been cited for failure to provide and document the required training. The interrelationship of transportation regulations, 49 CFR, IATA, ICAO and other transportation regulations, which are frequently misunderstood, will be explained. The course will cover typical shipments by air and highway which are encountered in a medical institution. Items such as fissile materials, highway route controlled quantities, rail shipments, vessel shipments and such will be omitted; although specific questions may be addressed. A major objective of the course is to present the process of shipping radioactive material in a sequential and logical fashion. How radioactive materials for transportation purposes are defined by activity concentrations for exempt materials and activity limits for exempt consignments will be explained. Radioactive material shipments of excepted packages and Type A packages will be emphasized. The program is designed to meet the function specific DOT training requirements for shippers of medical radioactive materials. General awareness training and security awareness training can be obtained from two free DOT training CDs. Safety training and security awareness training is generally satisfied by the training required under the institution’s radioactive material license. For shippers of radioactive Yellow III labeled packages an in-depth written security plan and training are no longer required as of April 8, 2010. In general almost all shippers of medical radioactive material are now not required to have an in-depth security plan. Contents of general awareness training, security awareness training and in-depth security plans will be briefly outlined. It is the hazmat employer’s responsibility to ensure that each hazmat employee is properly trained. No third party can fulfill that requirement. It is the hazmat employer’s responsibility to determine the degree to which this course meets the employer’s requirements, including contents of the course and the examination. Participants will gain sufficient knowledge to prepare hazmat training programs for others in their institutions. A handout will be posted which should be printed out and brought to the course for reference during the presentation. The handout will also satisfy part of the training documentation required by DOT. A feature handout section is a composite table which provides A1, A2, RQ, Exempt Concentration, and Exempt Consignment values in a single table in both Becquerel and Curie units. Course attendance will be certified through the AAPM CEU documentation system. Learning Objectives: Understand the regulatory requirements for shipping radioactive materials. Understand the regulatory requirements for training of hazmat employees. Comprehend how to classify, package, mark, label, document, placard, and transport radioactive materials.

60 APPLIED LIFE SCIENCES↗

Control means for a solid state crossbar switch

A control system for a solid state crossbar switch which allows a plurality of switch control and interrogation functions to be implemented by time sharing related circuitry is described. The crossbar switch includes a plurality of X ports and Y ports, each X-Y port intersection designating a specific X-Y intersection latch which controls a plurality of associated switches for interconnecting one set of data lines associated with the X port to another set of data lines associated with the Y port. The control system continuously and sequentially addresses each of the X-Y intersection latches at a 10 megahertz rate. During this addressing, the control circuitry includes a capability for interrogating each intersection latch for determining which are in a set condition, ensuring that only one X-Y intersection latch is set on an X row and Y column defining that latch, resetting all of the X-Y intersection latches, and determining which of the X-Y intersection latches are in a set condition.

Anderson, T. O.↗